Loading...
HomeMy WebLinkAboutDocumentation_Miscellaneous_Tab 3D_4/26/1994 • March 3, 1994 'c i Mr. Thomas G. Bradford Village Manager Village of Tequesta 357 Tequesta Drive P.O. Box 3273 • Tequesta, FL 33469 Re: Country Club Drive Paving Overlay, Drainage & Landscaping Improvements Preliminary Construction costs "Al La Carte" Versions Dear Torn, • Please find enclosed the two cost estimates revised to reflect your latest requested selection of proposed improvements to Country Club Drive within the Village of Tequesta. Estimate 1 reflects two new 5 foot concrete sidewalks, while Estimate No. 2 reflects only an overlay (1 ") of the existing asphalt pathway. Both estimates are for 2% overlays of Country Club Drive in lieu of rebuilding the road base and subgrade. Please call if you have any questions requiring additional data. The contingency has been lowered from 10% to 5% per your request. Very truly yo , 671,067. W. is ar Staudinger, .E. WRS/In 93-004.40/108 • cc: Gary Preston w/encl. _ m:lwrs\votcmn Y .• PROJECT MGR: Richard Staudinger DATE: January 24, 1994 Revised: March 3, 1994 PROJECT. COUNTRY CLUB DRIVE • JOB NO. 93-004.40/108 VILLAGE OF TEQUESTA ESTIMATED BY: Jay Roach, Brett Nein • PAVING OVERLAY, DRAINAGE, AND LANDSCAPING IMPROVEMENTS WITH NEW SIDEWALKS , PRELIMINARY ESTIMATE OF CONSTRUCTION COSTS (NO. 1A) ITEM NO. ITEM QUANTITY UNITS UNIT PRICE COST PART-C-1 (2) 10' LANES W/TYPE "F"C&G W/FLUMES TO SWALES(NOT INCLUDING ROUNDABOUTS) I 1 Mobilization LUMP SUM $25,000 2 Maintenance of Traffic LUMP SUM $28,000 3 Driveway Replacement 800 SY $16.50 $13,200 4 Clearing &Grubbing 2 AC $2,000.00 $4,000 5 Topsoil 8,000 SY $1.00 $8,000 6 Asphalt Leveling Course 420 TONS $30.00 $12,600 7 2'/:"ACSC Type-S 17,200 SY $4.75 $81,700 8 Sodding 22.000 SY $1.20 $26,400 Curb&GuarF") 14,500 LF $6.00 Ot}= i Conc. Curb&Gutter-Special Flume 250 . LF $10.00 1,Z'.5XC \11/ 5 ft. VWide.Concre(e Sidewalk 8,500 SY $14.00 $119,000 /12\ Removp-Existing Pathway 6,800 SY S2.75 . $18,700 • ' 13 Trees,(3'•Cal1per) 270 EA S250.00 $67,500 • 1'4 • Queeir Palms 100 EA 3250.00 $25 900 15 Huge 3400 EA $8.00 $27,200 \\ 16 IrrirgMtion 230,000 SF $0.25 $57)06 r 17) Signing &Markings 29,000 LF • $0.30 //�38,700 18, Reflective Markers&Misc. Striping LUMP SUM V\\ $4,000, II 411? • 19 Relocating Signs • . 30 EA 3100.00 33;000 20 Embankment 2,000 CY $525 $10,500 • PART C-1 SUBTOTAL $629,500 , . /d,/ 7 o-o 35, 7aa /a, e-o--D k / c 4 SID 0 r Jo COUNTRY CLUB DRIVE VILLAGE OF TEQUESTA PAGE-2 PAVING OVERLAY, DRAINAGE AND LANDSCAPING IMPROVEMENTS 12 NEW SIDEWALK, PRELIMINARY ESTIMATE OF CONSTRUCTION COSTS (No IA) PART C-2 LANDSCAPE ISLAND AND SIGN • 1 ITEM NO. ITEM QUANTITY UNITS UNIT PRICE COST 1 1 Regular Excavation 550 CY S2.00 S1,100. 2 Removal of Flexible Pavement 280 SY 52.75 $770 3 12"Subbase (Stabilized) 196 SY $2.50 $490 4 8"Limerock Base ' 160 • SY $5.75 5920 5 2 1/2"ACSC Type-S 160+ SY $4.75 $760 6 Conc. Curb 150 LF . $6.00 $900 7 Signing &Markings 1200 LF $0.30 $360 8 Signs New 20 EA $100.00 $2,000 9 Pavers 420 SY S20.00 $8,400 ao,oO0 10 ! > Entrance Sign w/Lights &Landscaping LUMP SUM $10:600- 11 . Pathway Modifications LUMP SUM $2,000 . PART C-2 SUBTOTAL j27 700- 02 ..--ei ,,.� o--- WO ,.7oo • zi (.e+/L r ) 4/a 2,,,,,.e r- 37 L,. a/0-r-r) Vf-ff.A.�-yod..—.s 3,,7OV PART C-I SUBTOTAL • $629,500 PART C-2 SUBTOTAL $27,700 CONTINGENCY +5% $32,800 , SUB-TOTAL $690,000 ENG.&SURVEY 7% $48,300 ESDC 4% $27,600 • TOTAL 9765,900 • . ntirrsMabM1 '6a-v--�L el-:6:eA.w( ,id. ,60-L-. _,--- 1 C1-4./12c. j,"` — 6� / vd`4_ cue gy i _ ....-r C��, (� 7/ n PROJECT MGR: Richard Staudinger DATE: January 24, 1994 Revised: March 3, 1994 PROJECT: COUNTRY CLUB DRIVE JOB NO. 93-004.40/108 VILLAGE OF TEOUESTA ESTIMATED BY: Jay Roach, Brett Nein • PAVING OVERLAY, DRAINAGE, AND LANDSCAPING IMPROVEMENTS EXISTING PATHWAY OVERLAY • PRELIMINARY ESTIMATE OF CONSTRUCTION COSTS (NO. 2A) ITEM NO. ITEM QUANTITY UNITS UNIT PRICE COST PART-C-1 (2) 10' LANES W!TYPE"F'C&G W/FLUMES TO SWALES(NOT INCLUDING ROUNDABOUTS) 1 1 Mobilization LUMP SUM $25,000 • 2 Maintenance of Traffic LUMP SUM $28,000 3 Driveway Replacement 800 SY $16.50 $13,200 4 Clearing &Grubbing 2 AC $2,000.00 $4,000 5 Topsoil 8,000 SY $1.00 $8,000 6 Asphalt Leveling Course 420 TONS $30.00 $12,600 7 2'/:"ACSC Type-S 17,200 SY $4.75 $81,700 8 Sodding 22,000 SY $1.20 $26,400 9 Curb&Gutter(Type"F") 14,500 LF $6.00 $87,000 10 .Cons. Curb&Gutter-Special Flume 250 LF $10.00 $2,500 11 1"Overlay Existing Asphalt Pathway 4,300 SY $2.00 $864000— ✓'#ooc 2 Trees(3"Caliper) 270 EA $250.00 $67,500 13 Queen Palms 100 EA $250.00 $25,000 14 Hedge 3400 EA $8.00 $27,200 15 Irrigation 230,000 SF $0.25 $57,500 16 Signing &Markings 29,000 LF $0.30 $8,700 17 Reflective Markers&Misc. Striping LUMP SUM $4,000 18 Relocating Signs 30 EA $100.00 $3,000 19 Embankment 2,000 CY $5.25 $10,500 PART C-1 SUBTOTAL $500,400 w s • COUNTRY CLUB DRIVE VILLAGE OF TEQUESTA PAGE-2 PAVING OVERLAY. DRAINAGE AND LANDSCAPING IMPROVEMENTS (EXISTING PATHWAY OVERLAY) PRELIMINARY ESTIMATE OF CONSTRUCTION COSTS (No 2A) • PART C-2 LANDSCAPE ISLAND AND SIGN ITEM NO. ITEM QUANTITY UNITS UNIT PRICE COST 1 Regular Excavation 550 CY • $2.00 $1,100 2 Removal of Flexible Pavement 280 SY $2.75 $770 3 12"Subbase(Stabilized) 196 SY $2.50 $490 4 8"Limerock Base 160 SY $5.75 $920 5 • 2 1/2"ACSC Type-S 160 SY $4.75 $760 6 Conc. Curb 150 LF $6.00 $900 7 Signing &Markings 1200 LF $0.30 $360 8 Signs New 20 EA $100.00 $2,000 9 Pavers 420 SY $20.00 $8,400 10 Entrance Sign w/Lights &Landscaping LUMP SUM $10,000 11 Pathway Modifications LUMP SUM $2,000 • • PART C-2 SUBTOTAL $27,700 • PART C-1 • SUBTOTAL $500,400 • PART C-2 SUBTOTAL $27,700 • CONTINGENCY +5% $26,400 • SUB-TOTAL $554,500 • ENG.&SURVEY 7% $38,800 ESDC 4% $22,200 TOTAL $615,500 rairwYrDNN Resolutions made by the Committee of Country Club Drive Residents at the meeting held April 12, 1994 1) All through trucks must be banned from Country Club Drive. 2) Signs must be posted on Old Dixie Highway designating it a Truck Route. Signs reading "No Through Trucks Allowed on Country Club Drive" should be posted east of the bridge on Tequesta Drive, on Country Club Drive at the Martin County Line, and on old Dixie Highway. 3) The 25 mile per hour speed limit on'Country Club Drive must be strictly enforced. 4) Signs reading "No Through Trucks Allowed" must be placed at all Tequesta Village roads leading from County Line Road south. These Village of Tequesta roads should also have 25 mile per hour speed limits that are strictly enforced. 5) Change the flashing yellow light on Country Club Drive at the Tequesta Country Club to a flashing red light. 6) Country Club Drive at the Martin County Line should be divided and landscaped in a manner consistent with the Village entrance at Tequesta Drive and US 1. 7) The roadbed on Country Club Drive at the Martin County Line must be laid with rippled brick and a guard house installed. 8) Appropriate landscaping including Oak trees should be implemented to further slow traffic and enhance the residential aspects of Country Club Drive. 9) No curbs or gutters are needed on Country Club Drive. The road should be resurfaced and a pathway for pedestrians built. 10)If traffic on Country Club Drive reverts back to the levels of intolerable congestion and noise prior to the temporary closure of Country Club Drive we request that the Tequesta Village Council implement the Safe Neighborhood Act to close and gate Country Club Drive at the Martin County Line. We will not tolerate previous traffic conditions on our residential road.