HomeMy WebLinkAboutDocumentation_Regular_Tab 15_9/14/2023Agenda Item #15.
Regular Council
STAFF MEMO
Meeting: Regular Council - Sep 14 2023
Staff Contact: Marjorie Craig, Utilities Director Department: Utilities
Utilities Department Monthly Report
qw
Attached please find the monthly Utilities Department update.
This document and any attachments may be reproduced upon request in an alternative format by
completing our Accessibility Feedback Form, sending an e-mail to the Village Clerk or calling 561-768-
0443.
BUDGET AMOUNT N/A
FUNDING SOURCES: N/A
DID YOU OBTAIN 3 QUOTES?
❑ Yes 0 N/A
AMOUNT AVAILABLE N/A EXPENDITURE AMOUNT: N/A
IS THIS A PIGGYBACK:
❑ Yes 0 N/A
COMMENTS/EXPLANATION ON SELECTION Not related to a procurement item
N/A
23.0831.AUG for SEP VC Mtg Utilities Update v2
Page 186 of 675
Agenda Item #15.
Village
345 Tequesta Drive
Tequesta, FL 33469
of Tequesta
`vy'6� OF TfpG`�a
a s
To: The Honorable Mayor and Village Council
Through: Jeremy Allen, Village Manager
From: Marjorie G. Craig, PE, Director, Utilities Department
Date: August 31, 2023
Re: Utilities Department Monthly Report
The Utilities Department monthly report for July is found below:
Stormwater
• El Portal —joint project with Public Works — includes road/
sidewalk improvements
o Construction mobilization commenced on Monday August 21'Y
o Catch basin and pipe construction expected to take 6-8
weeks, have had a few delays so far
o Then swales and sidewalks will be installed
• FDEP Vulnerability Assessment Grant/ Project
561-768-0700
www.tequesta.org
Picture 1 - Dewatering on El Portal Project
o Applied for an additional $50,000 of funding from FDEP from the Resilient Florida grant program
o Held the public outreach workshop on August 161" to get feedback on the study and status
• Dover Ditch — Shared Project with Town of Jupiter
o Grant administrator from FDEP has reached out and we'll be bringing the agreement to Council
o CMA performing design and permitting
o CORPS permit estimated to take 6-9 months, possibly up to a year
This document may be reproduced upon request in an alternative format by contacting the Village
Clerk's Office at 561-768-0440 or by completing our accessibility form: https://bit.ly/3mnfeU4
Page 187 of 675
Agenda Item #15.
• 42in SW Pipe — 68
River Dr — Part is
Failing
o Pipe to be
televised to
determine
condition of
entire pipe
o After TV'ing,
will
determine
length of pipe
to line
Water
i
� 'ar,. �.✓ _ � � mom..
Picture 3 - 68 River Dr - 42 in Stormwater Pipe to be Televised
• Water Treatment Plant Projects - projects are in ongoing stages for the water treatment plant
o SCADA modifications — second contract for critical communication issues scheduled
o WTP Improvements — project is being modified per the approved revised scope
o Membrane replacement design for train #2 — Dover Engineering — design specs complete for
train #2; suppliers contacted with design specs, only Veolia remains willing to meet design
criteria accountability; train 41 specs will be modified for pressure and flow changes and same
membrane will be used; train #3 design planned for FY24
o Unregulated contaminant monitoring rule (UCMR) pre-screening sampling -received quote for
sampling all wells
• WM#1 & #4 —Tequesta Dr and Country Club Dr
o Loxahatchee River District has completed the sewer pipe lining
o B&B Construction has advised that materials will be delivered by about December 20th so the
full notice to proceed (NTP) is scheduled for January 8, 2024
o Pre -construction submittals and Village permits have been completed
o Will be sending out letters to residents before the construction starts
• WM#2 Beach Rd Phase 2
o Project will be funded by State Revolving Loan funds so a "Request for Inclusion" submittal has
to be approved before the project can be bid — next FDEP meeting is November
o Design complete with meter and bypass modifications-Kimley-Horn to send plans to Village
o KH updating engineer's opinion of probable cost prior to bidding
o This will be the next project bid with a target bid date soon after the FDEP meeting
Page 2 of 2 Village of Tequesta
Page-V of 675
Agenaa item wi o.
Fr
a9�a
Fry
a9(%a
Fr ryas
Er {aa
S
s
F oyob
27'
s
o�°b
F27
/ry
F
>
Fri
0M l
E
C
3
G7
� ga
0 N7 v
H f2 gy a
0 u
� i
Er
PJ
�
N r� aPiI
N
f y
ryP
LL a4�aaa
LL
rr a 4P�
ra o
g�a
rr 4O2
g�J
rr a0
0 0 0 0 0 0 0 o a911a
agw
r 0-.
2g
0 0 0 0 0 0 o o
0 0 0 6 6 C 0
a
0,
ron�invmN,orO
yag
■
� Er ryas
Cp
��
b
fQ
Frd
yea
O
�
Fr
7
P
�
Fr
ga
oc P
Frye
3
VO
P7
Fr7 gar
Q
P°G
N
LL
age
rr a°a0
a4
�� °2
o
a
0 0 - 4
o,
11,
E2 z
ag O
�a' a
ab ■
Er
CL
3
1 E� u
0 �
O
�
W
ob LL
Er
o
3E
V
y1 �
2
t
yP �
rr O
N
LL
ag
Ca
r� d0 a
a
% r
^ � z
r� a�o2 0
0 0
00 0
ag
0 0 0 0 0 0 0 o O •
0� o 0 0 0 0 0 0
m
N
O
Page 189 of 675