Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 7B_8/8/1996 • MEMORANDUM TO: Thomas G. Bradford, Village Manager FROM: Thomas C. Hall, Water System Manager 41- -DATE: July 30, 1996 SUBJECT: Roofing Contract Award, Council Agenda Item On June 27, 1996, RFQ's were sent to four local roofing contractor regarding repairs to the Annex Building and the Water Treatment Plant. These companies were Jupiter Roofing & Sheet Metal, Worley Roofing, Inc., Harold Turner Roofing, Inc. and Tucker Roofing Services. Only two responded and their quotes were as follows: Company Annex Building Water Plant Total Worley Roofing $20,165 $ 6,987 $27,152.00 Harold Turner Roofing $22,160 $ 8,300 $30,460.00 In light of the above, we are seeking Village Council approval for contract award to Worley Roofing in the amount of $27,152.00. Funding will be provided by the Water Enterprise Fund, Renewal and Replacement Account, Buildings and Renovations having a budget allocation of $27,200. Please place this important item on the August 8th Agenda for approval. TCH/mk Attachs. FILE COPY REQUEST FOR Village of Tequesta Water Dept. QUOTATION 357 Tequesta Drive Tequesta Fl. 33469-0474 561-575-6234 The following number must appear on all quotations and related correspondence. REQUEST FOR QUOTATION: 04-95/96 REQUEST DATE: June 27, 1996 ADDRESS CORRESPONDENCE TO: TO: Name Thomas Hall Jupiter Roofing & Sheet Metal Tequesta Water Department 149 Jupiter St. PO Box 3474 Jupiter, Florida Tequesta Fl. 33469 33458 PHONE 561-575-6234 FAX* 561-575-6239 REQUIREMENTS: !Reply Required By 5:00pm July 15, 1996 Terms Net 30 Days Earliest Shipment F.O.B. .JOB LOCATION 901 N. Old Dixie Ship Via ITEM QTY DESCRIPTION COMMENT Furnish labor and materials to do the followino: 1 'Cut out and remove approximately 400 square feet of existing roof and insulation near front door entry area. 2 Replace damaged insulation with new, hot mopped to concrete. Hot mop one#43 base sheet and then three fiberglass felts on new area. 3 Remove existing 3x3 eaves drip and install new, hot mop two fiberglass felts on eave flashing. 4 Prime entire roof surface with roof primer and install one layer of SBS granule surface modified membrane set in hot asphalt. 5 Provide a Five (5)year guarantee against leaks. 6 Upon issuance of Purchase Order, work will commence within 10 days. -- 27-Jun-96 - DATE FILE COPY REQUEST FOR Village of Tequesta Water Dept. QUOTATION 357 Tequesta Drive Tequesta Fl. 33469-0474 561-575-6234 The following number must appear on all quotations and related correspondence. REQUEST FOR QUOTATION: 05-95/96 REQUEST DATE: June 27, 1996 ADDRESS CORRESPONDENCE TO: TO: Name Thomas Hall Jupiter Roofing & Sheet Metal Tequesta Water Department 149 Jupiter Street PO Box 3474 Jupiter, Florida Tequesta Fl. 33469 33458 PHONE 561-575-6234 FAX# 561-575-6239 REQUIREMENTS: Reply Required By 5:00pm July 15, 1996 Terms Net 30 Days Earliest Shipment F.O.B. JOB LOCATION 357 Tequesta Dr. Ship Via Annex Building ITEM QTY DESCRIPTION COMMENT Furnish tabor and materials to do the following: 1 Remove existing tar and gravel roof and haul away debris for proper disposal. 2 Install a 1.5" I.S.O. insulation over lightweight deck with screws and plates. 3 Hot mop one #43 base sheet over insulation. 4 Install a 1/8"tapered insulation system over base sheet set in hot asphalt. 5 Hot mop one#43 base sheet over the tapered insulation system. 6 Fabricate and install .040 aluminum eaves drip to lock on the existing eave cleat. 7 Hot mop three (3) fiberglass felts over the base sheet and flash in for curbs and vents. 8 Coat entire surface with fibered aluminum roof coat. 9 Provide a five year guarantee against leaks. NOTE NC unit will be removed from roof by others. Existing roof has little or no positive drainage. The_new roof must provide positive drainage. Addition- information may be obtained from the Building Official at 575-6220 Cry(,, .'- 27-Jun-96 DATE