Memorandum
To: Village Council
From: Thomas G. Bradford, Village Manager
Date: July 31, 1996
Subject: Resolution in Support of Shore and Mangrove Protection
Project; Agenda Item
The Channel Dredging Committee of Beach Road is an association of
four condominiums located on Beach Road, these being, Cliveden,
Lamar, Island House, and Seamist . There are a series of small
islands between the docks serving these condominiums and the
Intracoastal Waterway. This channel silts over every three to
five years and must be dredged. The four buildings fund the
dredging based on the number of boat slips each has at the rear
or west side face of the Intracoastal Waterway. Robert Snyder of
the American Wetlands Research Foundation, Inc. has been retained
by the Committee for the purpose of finding a long-term solution
to maintaining a clear channel for these property owners and boat
owners .
Mr. Snyder has requested that the Village Council give its
support to the project which will give the Committee credence in
seeking grant funding from other environmental organizations
interested in such projects using the Ecosystem Management
approach. Mr. Snyder will attend the August 8th Village Council
Meeting and will present a 12 minute video on the details of the
proposal for your edification.
It is recommended that the Village Council approve the resolution
in support of the Shore and Mangrove Protection Project
referenced herein.
TGB/cm
villcoun\073196-2
}.. '6•.. 1.4' . .viz
.�'� AI ER X CPN luE Q ANIDS?i R 15, AR€LI timD�tir X ON „ ,x
95 Lighthouse Drive Jupiter, Florida (4071 746- 7290
.4,-:. . J .
t�' �� Positive Action Throug -.Reaspnx} Philosophy and Perspective !r,
j P. ,, 'If ,
y ,�', r}}. , ' .0 •i-� 4, Village of Tequesta
' ram 1"t/i(V' 4,;+{ \ • July 1996 , T ,
' f' + r 'l ,e,, *
a 40x,.:. Mr . Tom Bradfor• � JUL 1996
.4 401 .• , '<,- .i% City Manageil� , .,- . ' Villa• Mana ,
se-
- . si. Village 11age -f TegUeita 'h .e ers Office
i ' ''' �.x-• , 357 Tequesta Drive 'i.. }
:s. .. e . . . Tequesta FL 33469 _ . .* • 0 J, ,
ubj ect .:� • :`B AND MANGROVE PROTECTION PROJE �'t'�"'' •r �'
Dear Tom: z. k 1. ' �; t •
' 1/A'' .
The American Wetlands Research Foundation, Inc . `,(a F501 (c) (3)
' foundation since 1981 ) has instituted a SHORE ' AND;" MANGROVE 4.,. PROTECTION PROJECT employing the Ecosystem Management approach as .
instituted by the Florida Environmental Reorganization Act of 1 •:• "4:'
A coy of our proposal is attached wt
1 fir: T .
•
— • , 1 ve submitted this to DEP}' s southeast district ' Ec. :"ys ` m
k . Management office, discuss it with Larry. ' 'Donnell and with Don K -. , ,
• • Kiern who works for el sa - e- er. , w heads the Ecosystem ;,
,: Management office. if
At the end of the proposal ig a draft REiOLUTION,,,which I wouX like ,
the Village to consider. Section 1 is just a statement of support
of the ecosystem enhancement activiactivity
and section 2 would; authorize
drafting a memorandum Of agreement if the Village, deeird more
t. . direct involvement Semm itfint rom the 1
Village and sectio 2 may idctionvoArai
ipkindnvolves servnoiccoes ened/orf fund' ge
support which would `` e subject to additional Cogmnission ap rov
`' eir.,
This is basically set Up as a demonstration project environmentalhat could
serve as a ; model in the epha4ement of already 4
permitted projects that need continuing maiTitedkncet There are- a
a- number of other areas within the "estuar%,es of the Village of `,
Tequesta thkt would benefit' frail this integrated approach. State 111 h.
and Federal funds may be available to assist the Village :-n #
furthering the Ecosystem Management approach.
A resoluti of su por't by the Village :F .. -
dj ?Anil assist A F in
Air obtaining an Urban Forestry grant to continue citizen involvement -
.. 4in enhancing our forestry rources ,
,,$.- ' Ar - .5., -4,-. - '
41,
{ tease calls if you have any questions - t ' , `
Sincerely yours, x. 3 .�- r
{4..
4.... .., ,
.., ikt
, , ,,,.. „ „AA-. ) , • -#. 4: . ,
4. ireel Al
Ai Robert /4: Snyder, 1�#8. , P. .Preys. Rr , ,�} A•
- nc rt:
RESOLUTION NO. 34-95/96
A RESOLUTION OF THE VILLAGE COUNCIL OF THE
VILLAGE OF TEQUESTA, PALM BEACH COUNTY,
FLORIDA, IN SUPPORT OF THE AMERICAN WETLANDS
RESEARCH FOUNDATION AND THE CHANNEL DREDGING
COMMITTEE OF BEACH ROAD, IN TEQUESTA,
FLORIDA, TO CONDUCT A SHORE AND MANGROVE
PROTECTION PROJECT.
WHEREAS, navigational maintenance is required to provide
boating access to existing, permitted boat berthing
facilities; and
WHEREAS, increasing boat traffic acts to increase the
frequency of required maintenance; and
WHEREAS, increasing boat traffic also accelerates the loss of
mangrove islands and shoreline; and
WHEREAS, the oceanographic factors dealing with sediment
transport, wave generation and dissipation, and wind and
tidal driven currents , as they influence scour, deposition,
shore erosion, water quality and biological support functions
can be integrated into the design of navigational access
projects .
NOW, THEREFORE, be it resolved by the Village Council of the
Village of Tequesta, Palm Beach County, Florida as follows :
Section 1. The Shore and Mangrove Protection Project, a
navigational maintenance project incorporating shore and
mangrove re-establishment and protection, habitat
improvement, and improved stability sponsored jointly by the
Channel Dredging Committee and the American Wetlands Research
Foundation, Inc. , attached hereto as Exhibit "A" and
incorporated by references a part of this resolution, is
hereby supported by the Village of Tequesta.
Section 2 . The Village Council of the Village of Tequesta
supports the demonstration of how the understanding and
implementation of oceanographic factors can reduce
maintenance requirements while enhancing and protecting
important mangrove forests and providing increased support
for fish and wildlife.
Section 3 . The Village Clerk is hereby directed to provide a
copy of the resolution to the American Wetlands Research
Foundation, Inc. and the Channel Dredging Committee of Beach
Road.
THE FOREGOING RESOLUTION was offered by Councilmember
, who moved its adoption. The motion
was seconded by Councilmember , and
upon being put to a vote, the vote was as follows :
FOR ADOPTION AGAINST ADOPTION
The Mayor thereupon declared the Resolution duly passed and
adopted this day of , 1996 .
MAYOR OF TEQUESTA
ATTEST:
Joann Manganiello
Village Clerk
AIt1ERXCAN WEQ LAND$ RE$EARCI-t F-QDUNDAQX N , ZNC_
95 Lighthouse Drive Jupiter, Florida 1407) 746- 7290
.:�\;.
...F. -,, Positive Action Through Reason, Philosophy and Perspective
,
lf0;1
j SHORE AND MANGROVE
PROTECTION PROJECT
THE ECOSYSTEM MANAGEMENT APPROACH
i'`� -- --- _ -
r.
Ti- 1- I'- T p:- 0 I I
LOCATION:
Sec 31, Twp ROS, Rng 43E, Village of Tequesta, County of Palm Reach.
Atlantic Intracoastal Waterway, Jensen Beach to Jupiter Inlet Aquatic Preserve.
111. 111 It.. .r.�u.[t.NOcuvroirm L MA& 1 •.•.wt0 SU ouST ,..___..;-.1 •wA.." 4h rut , 9•xo , .1"`-. .�
It
•11•'%=.1%"3:•:IN:4:•9 Di am . i K
_ ..
�-.�� '�..wl
_ ..,.,.. N.M.Ill ..�.. i
4.
s �,.moo '
T ...w.. Br Ica . ----
A Navigational Maintenance Project Incorporating Shore and
Mangrove Re-establishment and Protection, Habitat Improvement,
and Improved Stability.
Sponsored Jointly by the CHANNEL DREDGING COMMITTEE
ASSOCIATIONS (COCA) and the AMERICAN WETLANDS RESEARCH
FOUNDATION. INC. (AWRF) and Coordinated with the MARINE
RESOURCES COUNCIL of EAST FLORIDA, INC. (MRC).
A Proposal for Cooperation with the FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION, OFFICE of ECOSYSTEM MANAGEMENT,
ECOSYSTEM PLANNING AND COORDINATION Group,
SHORE AND MANGROVE PROTECTION DEMONSTRATION PROJECT
INDEX
INTRODUCTION PAGE 1
GOALS AND OBJECTIVES PAGE 2
PROJECT DESCRIPTION PAGE 3
PROJECT NEEDS PAGE 5
ORGANIZATIONAL BACKGROUND PAGE 6
BUDGET PAGE 7
DRAWINGS PAGE 8
- ii -
SHORE AND MANGROVE PROTECTION DEMONSTRATION PROJECT
A Navigational Maintenance Project Incorporating Shore and
Mangrove Re-establishment and Protection, Habitat Improvement ,
and Improved Stability.
Sponsored Jointly by the CHANNEL DREDGING COMMITTEE
ASSOCIATIONS (CDCA) and the AMERICAN WETLANDS RESEARCH
FOUNDATION, INC. (AWRF) and Coordinated with the MARINE
RESOURCES COUNCIL of EAST FLORIDA, INC. (MRC) .
A Proposal for Cooperation with the FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION, OFFICE of ECOSYSTEM MANAGEMENT,
ECOSYSTEM PLANNING AND COORDINATION Group, and
A request for matching funds from Foundations, Government
Organizations and private Associations and Corporations that
recognize the benefits of Total Resource Management .
INTRODUCTION
The Project is being undertaken as a demonstration of how long-
range ecosystem management can be implemented while providing
solutions to practical problems that are more commonly dealt with
by addressing symptoms rather than causes . Typical of this
misdirection of effort is the placement of navigation channels in
locations that require frequent maintenance . The maintenance
itself can be environmentally disturbing and the spoil , even though
it comes from the immediate area, is typically trucked to an upland
site and used for construction fill . By incorporating knowledge of
ocean processes including waves , currents , tides and winds and
their interactions with soils and vegetation, we can harness the
forces , and the natural reactions to them, to reduce maintenance
requirements , protect shoreline vegetation , and provide habitat for
important estuarine creatures .
Planning for this first demonstration project began in 1995 with
careful bathymetric monitoring to track the needs for navigational
channel maintenance, and oceanographic observations related to boat
traffic in the Atlantic Intracoastal Waterway.
In March 1996 the Channel Dredging Committee Associations executed
a grant to the American Wetlands Research Foundation , Inc . to
provide scientific and technical guidance leading to a long range
plan directed toward overall ecosystem management instead of
opposing the forces of nature just to provide safe navigational
access for boats . Four condominium associations representing sixty
six berth owners have approved of this approach.
Page 1 of 12
SHORE AND MANGROVE PROTECTION DEMONSTRATION PROJECT
The program is being managed by John E. Downey representing CDCA
and Robert M. Snyder, P.E. , C. E.P. representing AWRF.
The Channel Dredging Committee Associations will pay for
construction costs of the program. AWRF is seeking student and
instructor assistance for experimental habitat activities and
monitoring from FAU, FIT, and local school science projects . AWRF
is also seeking matching grants to cover experimental and
monitoring expenses and other costs to insure timely reporting of
progress both to agencies and to the general public .
GOALS AND OBJECTIVES
AWRF believes that individuals , like ecosystems, should be treated
holistically as opposed to being categorized as boaters, fishermen
(sport OR commercial) , builders, developers, taxpayers, regulators
or environmentalists. Any individual can, and may, fit into many
categories , and all share in the benefits of intelligent ecosystem
management . Increasing their knowledge, their interest , and their
participation helps clear the road blocks for collaborative efforts
that lead to efficient , long range progress towards realizing
productive harmony between man and nature.
Our GOAL is to demonstrate the effectiveness of this approach in
such a way that different elements of our work (and combinations
thereof) can be adopted throughout the Indian River Lagoon,
estuarine Florida, and elsewhere, where similar problems exist .
Our results will be related to environmental science and technology
and reported at technical society meetings, to regulatory agencies ,
and to the public, in a format that will allow direct application
of the scientific and technological principles to other locations .
Our OBJECTIVES are to apply the scientific and technological
principles to a specific site that typifies many locations where
the maintenance of boat traffic and protective boat berthing not
only seem contradictive to each other, but where each independently
can have continuing environmental impact when addressed in the
narrow confines of single element problem solving. We don' t
profess that there are permanent solutions since we share. a dynamic
environment where maintenance, even in wilderness systems, is a
functional requirement . We do profess , however, that a holistic
approach can not only reduce maintenance, but can lead to overall
long term environmental enhancement .
Page 2 of 12
SHORE AND MANGROVE PROTECTION DEMONSTRATION PROJECT
PROJECT DESCRIPTION
The project area is just north of the S .R. 707 Bridge which crosses
the Atlantic Intracoastal Waterway (AIW) in the Village of
Tequesta, Palm Beach County, Florida. Four adjacent condominiums
have frontage on the eastern shore with thirty three berthing piers
perpendicular to their protective bulkhead . Between the berthing
area and the AIW the waters are shallow with a mangrove island
located in the northern half. An access channel was dredged and
has been maintained from the approximate center of the berthing
area westward, and nearly perpendicular to, the AIW.
South of the S . R. 707 Bridge there is a posted "No Wake" area which
runs south to the Indiantown Road Bridge. North of the 707 Bridge
there is a channel speed limit which allows high speed traffic .
Because of this, boats in the waters directly waterward of the boat
berthing area at the condominiums are either reducing speed if
headed south or increasing speed if heading north. Both of these
speed changes cause the boats to generate increased gravity waves
which then impinge on the shallow waters and through the navigation
channel . With Florida boat traffic increasing annually, this
activity will continue to increase . The resulting gravity waves
have, over the years , led to the complete loss of a mangrove island
in the south half of the berthing area and have caused significant
erosion and loss of mangroves on the north island . The waves also
disturb and redistribute the bottom sands of the bar system causing
deposition in the navigation channel leading to the boat berthing
area. This, in turn, leads to an increased requirement for
maintenance dredging.
In addition, the AIW channel is maintained by the U.S . Army Corps
of Engineers , conducting periodic dredging under contract , with the
spoil placed on the ocean beaches . In this particular area the
primary source of material is the ocean beaches to the north of the
Jupiter inlet . As beaches are eroded the suspended sediment load
is carried into the inlet where the heavier particles drop to the
bottom of the channel and the fines are deposited as "sling mud" on
the shallow banks . The fine materials , including ilmenite and blue
clay, result from beach replenishment in the Town of Jupiter Island
where the material is "mined" offshore for placement on the beach.
During replenishment operations, much of this material moves
quickly southward, into the Jupiter Inlet , and northward through
the AIW. Some of the channel shallowing material comes from the
banks as a result of wave and rain erosion.
The navigation access channel to the boat berthing area is located
such that it tends to intercept the natural migration of shallow
bottom sand and silt in its attempts to reach a dynamic
Page 3 of 12
SHORE AND MANGROVE PROTECTION DEMONSTRATION PROJECT
equilibrium. With the loss of the mangrove islands from wave
erosion, there is more unstabilized shallow material available for
migration into the channel leading to the requirement for more
frequent maintenance work.
The individuals impacted by the above noted works and processes are
condominium unit owners, boaters, fishermen (sport) , and taxpayers.
As such they are naturally concerned by the escalating cost of
navigational channel maintenance . These individuals are also
largely professionals and environmentalists. When presented with
the larger picture involving long range environmental management ,
they were quick to agree that the benefits were worth the
additional time and expense involved in moving forward with the
SHORE AND MANGROVE PROTECTION DEMONSTRATION PROJECT as proposed by
AWRF . The CHANNEL DREDGING COMMITTEE ASSOCIATIONS was formed and
the research grant was executed with the AMERICAN WETLANDS RESEARCH
FOUNDATION.
AWRF has reviewed the background information and the oceanographic
parameters within this project area in relation to the immediate
and long range needs of the project . We have developed a multi-
phase program incorporating the immediate and continuing needs for
navigational access in such ways as to utilize each step in the
process to move toward long term stability and environmental
enhancement ( see Sheets 1 through 4) . In Phase I the material from
the next maintenance dredging operation will be used locally to re-
establish the eroded mangrove island . Wave breaks will be placed
to accumulate additional sand away from the channel to reduce
subsequent maintenance requirements . Phase II will restore and
protect the vegetated northern island while easing navigational
constraints within the basin . Phase III involves opening a slanted
channel to the south that would be less susceptible to wave caused
sedimentation . The natural material from the channel would further
expand the eroded mangrove island and protect it from further loss .
The wave barrier installed in Phase I would be moved northward to
add protection to the northern island and the center channel would
be abandoned . The interior basin would be widened to provide safer
maneuvering . Following each of these Phases , the changes would be
monitored to determine the system response from boat traffic , wind
waves , and tidal currents .
Depending on the system responses a Phase IV operation could be
undertaken to provide a northern channel cut on an angle to lessen
wave impact . This material would be used to extend the northern
island that would be protected by a containment dike .
Page 4 of 12
SHORE AND MANGROVE PROTECTION DEMONSTRATION PROJECT
Previous experience in other projects indicates that intertidal
vegetated islands can be successfully constructed using adjacent
bottom material and that wave breaks are effective in reducing or
eliminating wave erosion on mangrove islands . We expect that the
angled channel ( s ) will be more stable requiring less maintenance
and therefore less environmental impact . We also are confident
that the re-established islands will provide habitat for a wide
variety of avian and aquatic species .
In applying ecosystem management , it is important to maintain
flexibility in conducting each subsequent phase . Natural
interactions are highly complex and non-linear and , without
feedback, a program can be forced in a direction contrary to what
is learned in the previous phase( s) . Materials , construction
times, costs , and methods and equipment will be monitored and
reported as part of the basic demonstration project . The results
of the construction work will be applicable to other areas with
similar problems .
PROJECT NEEDS
In addition to its 1200 miles of coastal shoreline bordering the
Atlantic Ocean and the Gulf of Mexico, Florida has more than 7000
miles of estuarine shoreline . Much of this shoreline is occupied
by municipal , commercial and residential development that has taken
place over the last 100 to 150 years . Most of this development was
undertaken without knowledge of physical and ecological processes
and how they are influenced by construction activities . The
conditioning of future development with design criteria based on
modern knowledge does little to correct past problems or current
ongoing maintenance of already permitted activities . By
incorporating the ecosystem management approach into the
maintenance of existing systems , past development projects can be
upgraded to meet today' s criteria.
The basic engineering designs for the Demonstration Project have
been completed and the regulatory agencies have been advised of the
approach . While the construction and engineering costs will be
borne by the condominium associations , and the ecosystem management
costs are being contributed by AWRF, there are additional
activities that need to be undertaken in order to expand related
ecosystem enhancement activities and to document the project ' s
successes . These activities include ;
Page 5 of 12
SHORE AND MANGROVE PROTECTION DEMONSTRATION PROJECT
• Collecting background water chemistry measurements to
compare with regional trends . B-1
• Collecting mio- and macro-benthic baseline data. B-2
• Obtaining and inventory of current wildlife utilization
including avian and aquatic species . B-3
• Designing, fabricating and installing post larval habitat
structures within the project . B-4
• Production of an educational video explaining the project
and its expected benefits . B-5
• Periodic monitoring of all of the above including video
documentation. B-6
• Scientific and technological evaluation of each aspect of
the activity by credentialed scientists . B-7
• Preparation of findings for presentation at scientific
conferences ; reports to municipal , county, regional , and
federal agencies ; television informational shorts ; local
schools and interest groups , and press releases . B-8
Each of these activities must be planned in coordination with
construction events and Phasing and the overall program must be
organized for efficient execution.
ORGANIZATIONAL BACKGROUND
The American Wetlands Research Foundation (AWRF) is a 501 (c) (3 )
Florida Corporation ( IRS #580065863) dedicated to providing and
encouraging innovative solutions to the problems associated with
population growth as they impact ecosystem functions . AWRF was
established in 1980 to incorporate, into land development projects ,
applications of science and technology that contribute to
environmental diversity, productivity and stability. Results have
been widely reported in national and international conferences and
published in peer reviewed journals . Techniques and methods used
in nearly 100 completed , successful projects have been adopted by
regulatory agencies in permitting policies , guidelines , and rules .
AWRF maintains a board of professional correspondents around the
world from universities , governmental agencies, corporations , and
private organizations . To maintain free information exchange these
Page 6 of 12
SNORE AND MANGROVE PROTECTION DEMONSTRATION PROJECT
correspondents act as individuals but their professional
associations provide them, and AWRF, with current knowledge of
important environmental issues and trends . They will accept select
consulting assignments from AWRF to assist in scientific analyses
and evaluations and collaborate on presentation of technical
papers .
The president and chief scientist of AWRF is Robert M. Snyder who
is a registered Professional Engineer and a Certified Environmental
Professional . Mr. Snyder has been responsible for the planning ,
design, permitting , and construction oversight of numerous large
and small scale projects resulting in major long term environmental
enhancement . In the conduct of these projects he has worked
closely with specialists in chemistry, biology, hydrology,
geophysics , geology, oceanography, and advanced technology. Mr .
Snyder has also developed a critical path management approach for
strategic planning of complex , long-range ecoregion enhancement
projects .
BUDGET
In the strategic planning for the type of demonstration project
described here , it is realized that essentially each element of the
program can , and must , stand on its own as a competent scientific
study . At the same time it is important to realize that each
element of the program, without appropriate management oversight ,
could blossom into a full fledged basic research program of its
own . This program, however, is an applied research/demonstration
project and the field and laboratory work will be limited to that
which will complement the whole . This is not to say that an
element , or combination of elements , should not serve as a seed for
follow-on work leading to a graduate thesis for example , but that
the follow-on work would be undertaken under separate auspices .
Without the scientific studies the demonstration project will serve
its basic functional purpose in providing a broader perspective to
projects that can lead to sustainability and better harmony between
the needs of man and nature . The scientific studies , on the other
hand , will provide a more competent foundation for extension of
ecosystem management approach on a regional , or even worldwide
basis .
Funding for the basic design and demonstration project has already
been committed . Additional grants are being solicited to cover the
costs of the scientific study elements either singly or
collectively, and for the analysis and presentation of the results .
Page 7 of 12
SHORE AND MANGROVE PROTECTION DEMONSTRATION PROJECT
The following BUDGET ITEMS are keyed to the NEEDS section presented
earlier.
BUDGET ITEM PROJECT ELEMENT BASELINE COST MONITORING COST
B-1 Water Chemistry $1 , 500 $500 @ 6mos .
B-2 Benthic Study 5 , 000 1 ,000
B-3 Wildlife Inventory 1 , 500 1 , 000
B-4 Habitat Structures 5 , 000 2 ,000
B-S Initial Video 8, 000 1 , 000
B-6 Monitoring B1-B4 13 , 500
Documentary Video 12, 000
B-7 Scientific Reports 15 , 000
B-8 Local Presentations 12. 000
$73 , 500
Project Management 24.000
TOTAL $97, 500
The Demonstration Project will have value without these additional
items . Each item will , however, add significant meaning to the
project and the more that can be included the more comprehensive
will be the results . Each of the project items can be funded
separately or in combination . Some of the items may be provided as
contributions by the parties involved . The resources required to
conduct the work are available locally or through the AWRF
correspondents .
Additional supporting materials are available on request .
Page 8 of 12
1 , 1 L
ISLANDr .
HOUSE 7 SEA MIST— ll
•
cuvEDEN LA MAR i_— 9 DOCKS ) t5 DOCKS I
.04 DocKS 4k DoueS
- [ -
I � H
. L, rr
•
'1
.\ ����-4 '�� \ o cAsuARlN4
\ 7-...- ..----....
%4' �� I 1 / 1 ' 0
/ Pts
/
AN4�VE � IV: -iMwt \
MU..I
` — �MLy,! 1994 MAM4RoYC CI•I!'
�� MAIN7iNA AcE RLQUI¢fi Me MT
_ _____
4o xloo�: 4000
�___f�' AVE.cut•4�
f—� DRzD.E Vol... 400eWx.4 -2/c.M4. 4 coo w. d. * . .
.y!•
X. NYDER
• ScA LL - CE.INOGRAPHY 0
0 6 too 21O T BY ER VICES. INC. �1
FOR - CHANNEL CONDITIo N S - JAN 1994 ••u •••.c .u•rt c• ',PAID.&aa.y
CHANNEL DREDGING MOhlr zgANCE DREDGUVG VFRmIT S. --
cu MN IT E - DEP me NumBER, 502.342.i 66 - 154PR bS SFC 3i 'Rap 40S,Rnq 41*
tcLAµe, LA MAR, CoE FItE ma/Am-R. 199 300 991 C.P•BG)•13 JUL. Slxim tkOcA Co,�,�+y
SEAMICT�comObS PE D[RM DP-3c ,-13-5AUG•93 Sheet 1 of 4s-. `.�
•
-...4. Jo z 1aa45 _ sc.sites-£4•So£•yo wxaa 94 Ssjar. o i
stw V3 S
AJ fAv9NT�d 46"nrst•(,8 eti0166 cod 66t Z39wnN ary 30 3$A amnst
•
vvwvn ,N3a�no34 ' SCi•d^11£ 73$ iQ tdVSt 99114.5..2oS b39wnN 311.1 d9G
-
5 Liw2T3d 91�+i,a3 to 3arrefi•L1vivW 3iLl iwwo,
. =
.•os.a• e+• =t4.... Ian! p . a) .O.y7 Co 9N19O32tA 13N0.1VHD
9661- ipNbNS1NWW o3sodObd - 210A
•L�7N! 73,1A?!3 9 - - .. t oy L oat is i
0 .{Hd niDON►3J _ 9-ten s
laAn I 3Sbiid IL 3Sbt1d J!/
• C •r�•�r,00� D Z �x 000ii z•10/� 3`�O�a S'il�aNa7,G l�o
/� ' •• ` % ',4•1.*0'3PV SSVY7a1102 ItLomm3 r.�
46,coot. 00t 4•0 . 1~f —���__�
��
'1••1aS 3 thlik
1N3W itl1mll! 7AnI431N dW
ar•n)+.0139NYW +.6fi1 — fw7W —
9Nauiiwn anubN a/•45"I ooi•3Wb _,Zefo9l trecirmcoz;•. - Y 1 Jji'.F /:"...w '.J "It, /
jr(
1 Ix•'- o•1•t i� 3Acra,NV W
i • •na 099 ` 144r Si -ttodS �+ J
\ "tsn —t �1 ls�,"o 1 ;iZo}�t1 ;NalSawh
b
. - C A \` '� �_ , _ �'^� ,01/•'"c" ,w� 7 3;y7d V01vmA 3nthlN C
VNIZIVnc� r o — �- --• J�3�~ J,.u✓N s ooz
j % `-���� • oiF t 70A JlrelfJ�'n ' vO4o)1 y 1)3d 5 ',no-4 ti
11 , vocd 6 #o0 W
1 1 S 1 `jdo f
•-,_3SraN aNVI
t 1 lI V-Y73S
�—+ •3uvTd on . ••lISO DsoD • i .w o anorw. '4Ls7/...., t,`�A:v'�.
•Pd •n0 OtE uorlvw•otc3 , 0 4,41,• . hods
ss i,r•.w- t_.,44,
�0£s5'd •p.c 'no 0ZZ = •31/'3J •bs OE • M3011 sAT3aN I r ..
Id 01 S 0 L •pA •bs EES = '3J/'3J 'bs 1Z • 43oI0 SoIITd Ff
— — I •31 'T 00Z = •tlic zuaou!13uo3 11 •svgd '20++,�z'
�vwt+LIMY
49-9 )35 s3ueid 009 - ssasp pion L L SlNcnd 009
i.>t•W1>r9LT♦ •PA 'no 009 • UO T l llA•7Yg S oo ' S)t3OC jf f7
•
sl•...n-, , 'ow!. •p.t •n� L9 = '3J/'3J •Dt Of • troy awTl•N N343J�T� 'SZl-r111J37.�s
1 S>noa qI ZldW eft ro ss �oao�
...Zoo
\.�j�_ •p.c •bs E6 = •33/•3J •bs Pt • 43013 s•3TTd
iupowS 1Nvtd
;5+..". .•• — '31 'i 09 = Nss.18 GPM
1sEf - L 151w Y3 •p•c -no Ott = '33/'31 •bs OE • troy anT3vi( ' 1354Nd
•pc 'bs L90i = '3J/'31 'bs 1Z • 430TJ J•3TTd
'3J •t 001 = •>(Ta 3uowutv3uo3 I oss4d 37nG
1t43W N1Y1NOrJ
>P032)9 3/NtIA Z 3224S 'itRrIS
1 1 STVINH.Lvri dO 71IB
----� - 1
C144N14SL CUT
•
ISLAND
[IJ
HOUSE SEA MIST _40
GUVEDEN LA MAR -1_ 9 DocKS J 15 DOCKS / 4%
4$ DocIcS 4%2 Doc.KS , -=e''
ri i
BILL OF MATERIALS sec C-G
Sheet 3
Containment Dike 350 1. ft. 1lir
wit --/
Filter Cloth • 24 sq. ft./ft = 933 sq. yd. • � �~s T2.
Native Rock • 30 eq. ft./ft. = 390 cu. yd. 50
Wave Break - move 60 1. ft. to new location fAu t INS �96W Src•A A'
Excavation = 1100 cu. yd. 9`
Cord Grass = 600 plants �roNT
r 2N _,--
, i
{ A==•'�:�+oo�Xt -r17t.,,y1 o r cAstiARWA
•
o \\ r...... •-• _- ,
`\ ,i N,
gr� I / MAIK2out Spo1L
,4eoc. d \`N \
MANGRevE ' MANGROVE X
X
K �
• e''// 7 • f 40', 1 Oo'-4000
_• �Ly,( � 1y94 MANGRov6 U�ue' AVE. twT=.4•
• ` 1�-- MOPE WAVE 6REAtL DQEOGE Val.. z 4eeo��.� -2�ca-j4• �6�a,.,.�d.
_- —��,1-- To PeoT�TMM&GeovFSIII PF{ASE III �� --,----
4
11ANT coRD co-ASS
ou 3'cssrucs ((�`,VYDER 4
SCALL 60o pIA.+TS iCE4NOGRAPHY
1-6 Leo S BY tfERV1CFS INC.' '�
2e0 FT
FOR PROPoSE0 IMOR.ovEMENTS- - 1997-1998 CHANt'( L DREDGING +•a i.et.ou.i o•••c *c■ no•ta.aa•e)
COM/RIT'I'SE - _ Ste. 31,Twp 40S,E„y 43E
c4KDr44, LA MAR, Palm Seed,C5tufty
lA mit Novsi, Sheet 3 of 4'-. `�
i t ! _ Lli Li
y
I
•
ISLAND
MOUSE r SEA MISTI r .
—r u
CUVEDEN LA MAR 11
L_ 9 Dec KS T IS DOSS 11
Aso DocKS 4k DocKS _ I
BILL OF MATERIALS 1
Sheet 4 .-- /
•
Containment Dike = 540 ft.
Filter Cloth • 24 sq. ft./ft. = 1440 sq. yd. T
Native Rock • 30 sq. ft./ft. = 600 cu. yd. L r `
Wave Break = 200 ft.
Filter Cloth • 14 sq. ft./ft. = 311 sq. yd.
Native Rock • 30 sq. ft./ft. = 222 Cu. yd. /"'� �-
Excavation = 122 Cu. yd. 1 •
Cord Grass = 840 plants 14
cyoiR ` c. cASUARIN4
`R/tSS a"e^1 R
P B,o o�TS ,c v,orA,smoor2� � r
lIif7N[ /oO�ei!/e/t \ mango-444 Jfgd` Ad. r_ / -\ / N.
r q
u.crnM/a�C�rTO \ ' �_ �/ MArtGRo`�E J r• 0
'ti MANGROVE _I' y MANGROVE _M`k, _ __
.r 4
,I'
C 6• 6 yyf� �� P4LV,/ I994 MANGR�N! '�� } --
S x . ><r<>t ry _/ Here.' WinWouT ofAwr4w41ei.0WDia..•rC
G �-�_�--— (gyp wAve 68'iiK As Amp &wee"QREia<ileeretrro.., ryes
A r— C R eNA.�n, L 1.✓/AZ F/4c •Av AS/•d•QOST.
�' /VA✓/647fo.J17uRtu[A1741"1 cru T NC ES L� Y. 2uo '
-!e is Zoo • Saeo OaAYf.Cur *.cT
X J p Pc=o6t' Au..se•e r 41
y 2;rc.�f.P Q'72 c"Yd NYDER
, ---i SCAT 4 BY UER CFS MC.--r `1
2eo FT
FOR POT6K T1A 1. 111gPRovE'M ENTS - 1999-2000 •a uc.+.eusc s..c ,u�•*[• 'Loom...aa•4T
CHANNELc -t Sac 3 mwp cL,,2Aq 43L
coMmlT r GGeo Cnu,tl�
cuvfD�N, LA u malt,
tSL0 MD NOuSL
SEA MIST ce•4005 Sheet 4 of 4'-. I
SHORE AND MANGROVE
PROTECTION P RO J E C T
THE ECOSYSTEM MANAGEMENT APPROACH
A RESOLUTION BY IN SUPPORT OF THE
AMERICAN WETLANDS RESEARCH FOUNDATION AND THE CHANNEL DREDGING
COMMITTEE ASSOCIATIONS OF BEACH ROAD, TEQUESTA TO CONDUCT THE SHORE
AND MANGROVE PROTECTION PROJECT
WHEREAS, navigational maintenance is required to provide boating
access to existing, permitted boat berthing facilities : and
WHEREAS, increasing boat traffic acts to increase the frequency of
required maintenance: and
WHEREAS, increasing boat traffic also accelerates the loss of
mangrove islands and shorelines : and
WHEREAS, the oceanographic factors dealing with sediment transport ,
wave generation and dissipation, and wind and tidal driven
currents , as they influence scour , deposition, shore erosion, water
quality, and biological support functions can be integrated into
the design of navigational access projects ;
NOW, THEREFORE, BE IT RESOLVED by
•
Section 1 . The supports
the demonstration of how the understanding and implementation of
oceanographic factors can reduce maintenance requirements while
enhancing and protecting important mangrove forests and providing
increased support for fish and wildlife .
Section 2 . The hereby
authorizes the to enter into -a
Memorandum of Agreement between
and the American Wetlands Research Foundation including funding and
in-kind support for budgeted activities where appropriate.
INTRODUCED, PASSED AND ADOPTED THIS DAY OF , 1996
BY:
(title)
ATTEST: APPROVED AS TO FORM:
ESQ.
( title) ( title)