HomeMy WebLinkAboutAgreement_General_9/14/2023_Holtz ConsultingVILLAGE OF TEQUESTA CONSULTING SERVICES WORK AUTHORIZATION DATE: 8-17-23 VILLAGE RFQ. NO.: UTIL 06-20 WORK AUTHORIZATION NO.I I FOR CONSULTING SERVICES PROJECT No. G/L CODE: HOLTZ CONSULTING PROJECT NO.: PROJECT TITLE: State Revolvin Fund and (SRF) Assistance for Beach Road Phase 2 This Work Authorization, when executed, shall be incorporated in and shall become an integral part of the Agreement for Professional Services dated September 10, 2020 between the Village of Tequesta ("VILLAGE"), and Holtz Consulting ("CONSULTANT") hereafter referred to as the Agreement. I. PROJECT DESCRIPTION The VILLAGE owns and operates a potable water utility system to serve customers within the VILLAGE's service areas. The VILLAGE intends to fund the upcoming Beach Road Phase 2 Water Main Improvements project using State Revolving Fund (SRF) loan funding. This scope of services provides for professional engineering assistance to prepare and submit documentation to the State of Florida Drinking Water SRF program to procure loan funding for the projects. SCOPE OF SERVICES The following is a description of the services to be provided under this Work Authorization. TASK 1— PROJECT KICK-OFF MEETING CONSULTANT shall meet with the VILLAGE to discuss the proposed SRF-funded project, the project schedule, and provide a written list of data needs necessary to prepare submittals to the State of Florida. WORK AUTHORIZATION NO. 11 1 of 5 TASK 2 — PREPARE AND SUBMIT REQUEST FOR INCLUSION PACKAGE CONSULTANT shall prepare and submit a Request for Inclusion (RFI) package and supporting documentation to the FDEP. A "Request for Inclusion on the Priority List for Drinking Water Facilities" (DEP Form 62-252.900(1)) and supporting documentation will be submitted to the Drinking Water SRF program. TASK 3 — LOAN APPLICATION AND AGREEMENT PACKAGE ASSISTANCE CONSULTANT shall assist the VILLAGE with the preparation, submission, and coordination of the loan application and loan agreement package for the SRF Drinking Water Facilities Loan Application (DEP Form 62-552.900(2). TASK 4 — ASSISTANCE WITH SRF-COMPLIANCE COMPONENTS OF CONSTRUCTION CONTRACT DOCUMENTS CONSULTANT shall assist with SRF bid and construction contract documents for the project noted above. This may include supplementary conditions and Davis -Bacon wage requirements to be included in the contract documents, and assistance to the VILLAGE in submitting bid documents to the DEP such as addenda, debarment certification, copy of advertisement, bid tabulation and recommendation of award, and certification from Appendix A, FDEP Supplementary Conditions, and Davis Bacon wage rates. TASK 5 - ENGINEERING SUPPORT FOR STATE REVOLVING FUND (SRF) COMPLIANCE DURING CONSTRUCTION CONSULTANT will provide the following services during the construction phase of the water main improvements project: • Work with Contractor to ensure all applicable materials on the project comply with the provisions of the "American Iron and Steel" requirement as part of the SRF loan. • Review and approve weekly payroll information submitted by the Contractor and subcontractor(s) to ensure requirements for Davis Bacon wage requirements are met. • Conduct labor interviews with the Contractor's personnel throughout the construction duration as required by SRF guidelines. • Prepare and submit monthly disbursement requests with required supporting documentation to the FDEP SRF department in Tallahassee. Assumed a total of three disbursement requests. WORK AUTHORIZATION NO. 11 2 of 5 II. DELIVERABLES Task 1 - Deliverables: 1. Minutes distributed to all attendees of the kick-off meeting. 2. Written list of data needs to complete the SRF documentation. Task 2 - Deliverables 1. PDF copy of the completed SRF Request for Inclusion (RFI) package and supporting documentation submitted to the FDEP. Task 3 - Deliverables: 1. PDF copy of all loan application and loan agreement items provided to the VILLAGE in assistance of submission to the FDEP. The VILLAGE will be required to submit the loan application and loan agreement to the FDEP. Task 4 - Deliverables: PDF copy of all required SRF bid and construction contract documents required. Task 5 - Deliverables: 1. Tracking documentation to ensure all applicable materials on the project comply with the provisions of the "American Iron and Steel" requirement as part of the SRF loan. 2. Copies of all labor interviews conducted. 3. Copies of all weekly payroll documentation. 4. Completed disbursement packages to be forwarded to the FDEP for processing. III. SCHEDULE Upon receipt of Notice -To -Proceed the CONSULTANT will complete the services identified in this Work Authorization within the schedule outlined in Table 1. WORK AUTHORIZATION NO. 11 3 of 5 Project Kick -of Meeting Request for Inclusion Submittal Loan Application Submittal Table 1 Schedule Cumulative Time to Complete Time to (Calendar Days) Complete (Calendar Days) 7 days from NTP 7 days 7 days after kick-off meeting 14 days 30 days after approval from FDEP Dependent upon FDEP The CONSULTANT will perform the tasks as outlined in the scope of services for Lump Sum Fee of $29,400 in accordance with our approved billing rates with an estimate of costs by task provided in Table 2 and further detailed in Attachment A. Monthly progress payments will be authorized based on percent complete as determined by CONSULTANT and approved by VILLAGE. Table 2 Budget Summary Description Total 1. Project Kick-off Meeting $1,480.00 2. Prepare and Submit Request for Inclusion Package $3,740.00 3. Loan Application and Agreement Packages Assistance $3,100.00 5. Assistance with SRF Compliance Components of Construction Contract Documents 2,480.00 6. Engineering Support for SRF Compliance During Construction $18,600.00 TOTAL 29,400.00 V. ASSUMPTIONS Services and/or materials to be provided by the VILLAGE and other related key assumptions include: 1. Assistance with providing required data as part of the Request for Inclusion and loan application including, but not limited to financial, historical, and census data, and any required rate studies, capital financing plan, and information required to be provided in the business plan. 2. Assistance with preparation of required exhibits and maps. 3. Prompt review of all deliverables. 4. Participation of key personnel at progress meetings WORK AUTHORIZATION NO. 11 4 of 5 VI. AGREEMENT REFERENCE The work authorized under this Work Authorization shall be performed under the terms and conditions described within the Professional Services Agreement dated September 10, 2020, by and between the Village of Tequesta ("VILLAGE") and Holtz Consulting ("CONSULTANT"). Compensation shall not exceed the hourly rates currently in effect under this Agreement. HOLTZ ONSULTING By: Print Name: Christine Miranda. PE Title: Vice President VILLAGE OF TEQUESTA IN JeremyAflen Jeremy Allen pate. ligitaI20signed23.0&23b1439:34 -04'00' Jeremy Allen, Village Manager Date: August 23, 2023 WORK AUTHORIZATION NO. 11 5 of 5 24: CD 0 0 M 0 o V� r% o o (dn)pn� jwnjnsuwqnS 00 10 0 vp a, -pnpul) iso� wqj cl Olc� C C4 'A w 60)eq aAqujls!u! jol3adsul uolpru fA C-4 C-1 (aa) J"Ulmug W aau!tug judial- . .......... . . .......... Ag o UO C7 65 a 0 yY u 0 E .4 > E 4 i us V E, rV zo N LU m Q rW^ V m C) U (1) Ln M c O aJ N aJ \ C M C 0 w cW G N Q U a Q w N p m w m � m F.. -1 Q C F LLI c w C H O LL OLU ru n QU J � J_ w >o m m N } w \ Ln p M LU Lu Z N CO 23 N Z v a Z w 0 O w M p ll Z w 00 w Ur LM a � M m N } LL 0 Ln C7 N Z 00 Z W w aLL a LU w O On Ln O m w a m Q1 Gf rr) Cm 0 'A ,--i N v m c Z D a Q Lu LU In O O O O O O p Ln o m m 0 0 C Z O O -::I' lD m Ln w 3 1-,i--I m fV co Z t/} rl V1 N � a U cc Z p LU 0 0 0 0 0 0 0 0 Ln 0 0 0 0 Ln w 0-::: O O O O lz (7 O O V 00 U') O I- p Ln -1 Il N r" a) 00 p r l/)- r-I -V� to Ln m t/} t/} V1 V} M } J a 06 H O T a) +J � i ccu C N U Y 0 7t a) C LL) a) U-> Q C E O LU ar O -0v CL p (7 •° v O v Otin C Q o LL 0 Q Q oz w E a Q — w N z �O m v cu C u Eco _ O a p N m v OLn — 06 o 00 a, C u � p cC6 \ Ln C bD Q J = I� Z. ++ Y —r_ C GD •i to LL c--I -C C Q 7 L W aJ 2' � a) a) C p c � +OJ Ln E -, U w L N CO 2-C s a c c a v v 0 +� -O N aJ J CQ C a) +C.i U U v u a) Ln ca ca vi Ow � tio J L aJ CU m U CL O a) w C1 aJ m LL _ CryVj y Ln N N i- CL m Ln O CL C k m LAaSk at tC F_ 7 Q L S Q L w a�u°aL���� ,-i N m In o I