Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 8A_11/16/2000 Memorandum To: Village Council From: Joann Manganiello, Assistant Village Manager/Village ClerI6 Date: November 8, 2000 Subject: Bid Award for Construction of Main Street,Tequesta Village Center; Resolution No. 7-00/01,Agenda item Bids for the Construction of Main Street (Tequesta Drive to Bridge Road), Tequesta Village Center, were opened on Monday, November 6, 2000.. Two contractors submitted alternate bids: Rosso Paving and Drainage Company of West Palm Beach, Florida, and American Engineering and Development Corp. of West Palm Beach, Florida. Upon review of the bids and the contractors' credentials, Tim Messier, P.E., Messler & Associates, Consulting Engineer, has recommended bid award to Rosso Paving and Drainage Company, the low bid. (See attached letter from Mr. Messier dated November 8, 2000.) Rosso Paving and Drainage Comapny has completed many paving projects throughout Palm Beach County including work in the Village of Tequesta. The amount of the Bid Award is $163,524.65. Please note that the actual cost of construction of the new road is $103,065.10, with total construction at $147,070.85 including engineering, mobilization, earth/site work, and paving(concrete, asphalt, pavers, curbs, car stops, etc.). Funds Appropriated From FY 2000/2001 Allocation Capital Projects Fund $112,000.00 $112,000 Stormwater Utilities Capital Fund $ 16,453.80 $ 90,000 Reserves $ 35,070.85 $216,401 TOTAL $163,524.65 This project was bid with a Bid Alternate for Landscaping/Irrigation/Lights/Site Furniture which is part of the future overall streetscape for Main Street/Tequesta Village Center. It will not be let at this time. However, the Bid award does include the electrical and irrigation sleeve installation for the lights and landscaping which will be installed at the same time the road is being constructed. This work accounted for an additional $9,306 to the total construction cost. In regard to the future Main Street Streetscape Project (Landscape/Irrigation/Lights/Site Furniture), Councilrnember Sharon Walker has advised me that she recently met with Palm Beach County Commissioner Karen Marcus, District 1, who has offered to provide the Village of Tequesta with the funds for this Streetscape Project. Memorandum: Village Council November 8, 2000 Page 2- It is recommended that the Village Council approve the Bid Award for the Construction ofMain Street (Tequesta Drive to Bridge Road), Tequesta Village Center, to Rosso Paving and Drainage Company of West Palm Beach,Florida in the amount of$163,524.65. Attachments c: Michael R. Couzzo, Jr., Village Manager amipro/files/asstmg/priority/mainst .....rm li ilik Messier .E Associates CONSULTING ENGINEERS wil" 1"/71 ‘ 11211 Prosperity Farms Rd., Suite C-301, Palm Beach Gardens, Florida 33410 Phone (561) 627-2226 Fax (561) 624-1569 November 8, 2000 Ms. Joann Manganeillo Assistant Village Manager Village of Tequesta 250 Tequesta Drive, Suite 300 Tequesta, FL 33469 Re: Main Street Bids Dear Joann: Attached please find the tabulations of the bids received for the construction of Main Street. After a review of the bids, it was determined that Rosso Paving & Drainage Company submitted the lowest bid. Additionally, Rosso has complied with all of the requirements as stated in the invitation to bid. Please note that in the American Engineering Bid there was no bid for Irrigation under the Landscaping Alternate Bid section. American called us in advance of their bid submittal and indicated that they would not be able to submit the bid due to the lack of the an irrigation quote. We asked that they submit the bid without the irrigation quote. Therefore, we cannot disqualify their bid as insufficient. The question is moot as Rosso was the overall lowest bidder. We therefore recommend to the Village that Rosso Paving & Drainage be selected as the •contractor to complete the construction of Main Street. The following is a summation of their bid: 1. Base bid $161,517.10 2. Alternate (Landscaping) $160,586.40 Pursuant to your request, we have made certain changes to the bid in order to comply with the financial needs of the Village. The following bid deletes the Water Distribution item and the Landscaping Alternate from the bid. The revised bid does include the installation of the required irrigation and electrical sleeves. Manganiello November 8, 2000 Page 2 1. Base Bid a. Engineering Items $ 22,606.00 b. Earth/Site Work $ 12,093.75 c. Paving $103,065.10* d. Storm Drainage $ 16,453.80 e. Water Distribution (deleted) f. Elec./Irrig. Sleeve Install. $ 9,306.00 2. Landscaping (Alternate) (deleted) Revised Bid Total $163,524.65 *Adjustment to unit price for 8" base material versus 6 'A"base material. If you have questions, please call me at your convenience. Sincerely, MESSLER& ASSOCIATES CONSULTING ENGINEERS Timothy J. Messier, P.E. President RESOLUTION NO. 7-00/01 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, APPROVING THE BID AWARD FOR THE CONSTRUCTION OF MAIN STREET (TEQUESTA DRIVE TO BRIDGE ROAD) , TEQUESTA VILLAGE CENTER, TO ROSSO PAVING, OF WEST PALM BEACH, FLORIDA, IN THE AMOUNT OF $161, 517 .10, WITH FUNDS BEING APPROPRIATED FROM THE CAPITAL PROJECTS FUND ACCOUNT, HAVING A FY 2000/2001 BUDGET ALLOCATION OF $112, 000, THE STORMWATER UTILITIES CAPITAL FUND HAVING A FY 2000/2001 BUDGET ALLOCATION OF $90, 000, AND THE GENERAL FUND RESERVES HAVING AN ALLOCATION OF $216,401, AND AUTHORIZING THE VILLAGE MANAGER TO EXECUTE THE APPLICABLE CONTRACT ON BEHALF OF THE VILLAGE. NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS: Section 1. The Contract Proposal For the Construction of Main Street (Tequesta Drive to Bridge Road) , Tequesta Village Center, by Rosso Paving of West Palm Beach, Florida, Attached Hereto as Exhibit "A" and incorporated by reference as a part of this Resolution is hereby approved and the Village Manager of the Village of Tequesta is authorized to execute the same on behalf of the Village of Tequesta. THE FOREGOING RESOLUTION WAS OFFERED by Councilmember who moved its adoption. The motion was seconded by Councilmember and upon being put to a vote, the vote was as follows : FOR ADOPTION AGAINST ADOPTION The Mayor thereupon declared the Resolution duly passed and adopted this 15th day of November, A.D. , 2000 . MAYOR OF TEQUESTA Joseph N. Capretta ATTEST: Joann Manganiello Village Clerk MyDocuments\Resolutions\Main Street Construction MainStbidCOMP.xls PROPOSED MAIN STREET VILLAGE OF TEQUESTA BID FORMS - OCTOBER 2000 PAGE 1 OF 3 ITEM ROSSO PAVING&DRAINAGE AMERICAN ENG 86 DEV. CORP NUMBER DESCRIPTION QNTY BID QNTY BID _ 1 ENGINEERING ITEMS 1.01 PYM'T& PERF. BOND 1 $5,500.00 1 $2,460.00 1.02 MOBILIZATION 1 $9,518.00 1 $25,440.00 1.03 CONSTRUCTION STAKING 1 $6,688.00 1 $8,985.00 1.04 MAINT. OF TRAFFIC 1 $900.00 1 $10,755.00 SUBTOTAL $22,606.00 $47,640.06 2 EARTH/SITE WORK 2.01 CLEARING &ASPH. REMOVAL 2483 $8,814.65 2755 $7,163.00 2.02 SITE FILL 977 $2,247.10 53 $2,252.50 2.03 UTILITY SLEEVES 4" PVC 240 $1,032.00 360 $3,438.00 SUBTOTAL $12,093.75 $12,853.50 3 PAVING 3.01 STABIL. SUBGRADE TYPE C 2365 $5,321.25 2458 $7,005.30 3.02 8"LIMEROCK 1772 $17,985.80 2341 $26,102.15 3.03 1 1/2"TYPE S-3 ACSC 1772 $12,581.20 1820 $16,107.00 3.04 TYPED'CURB 605 $6,050.00 995 $16,218.50 3.05 TYPE'F' CURB 520 $7,904.00 815 $17,930.00 3.06 CONC. SDWK.4"THICK 45 $1,539.00 135 $6,912.00 3.07 CONC.WHEEL STOPS 22 $326.70 41 $615.00 3.08 PAVER BRICK 582 $23,018.10 467 $18,026.20 3.09 SIGNS&PAVT. MARKINGS LS $1,012.00 1 $700.00 3.1 SOLID SOD 223 $2,564.50 400 $1,880.00 3.11 CONCRETE PAVING 467 $18,516.55 480 $21,216.00 3.12 8"x12" CONC. HEADER CURB 347 $6,246.00 890 $15,708.5d SUBTOTAL $103,065.10 $148,420.65 4 STORM DRAINAGE 4.01 TYPE'C'INLET 3 $4,521.00 4 $7,900.00 4.02 15" RCP 334 $8,082.80 334 $13,026.00 4.03 EXFILTRATION TRENCH 6'x4' 50 $3,300.00 50 $3,600.00 4.04 CONNECT TO EXISTING 1 $550.00 1 $4,015.00 SUBTOTAL $16,453.80 $28,541.06 5 WATER DISTRIBUTION 5.01 6" DIP WATER MAIN 36 $1,980.00 45 $4,410.00 5.02 DIMJ FITTINGS 0.1375 $756.25 0.2000 $1,753.00 5.03 10"x6"TAP. SLEEVE&VALVE 0 $0.00 0 $0.00 5.04 FIRE HYDRANT ASSEMBLY 1 $4,400.00 1 $2,675.00 5.05 CONNECT TO EXISTING 1 $2,200.00 1 $2,095.00 SUBTOTAL $9,336.25 $10,933.00 iTOTAL CONTRACT $163,554.90 $248,388.15 Page 1 NOV-09 00 13:19 FROM:T. J. MESSLERINC. 15616241569 TO:5615756203 PAGE:02 MainStbidCOMP-xls PROPOSED MAIN STREET VILLAGE OF TEQUESTA LANDSCAPE BID FORMS - OCTOBER 2000 PAGE 2 OF 3 ITEM ROam mum 0l DRAINAGE AMERICAN ENG. &DEV CORP NUMBER DESCRIPTION QNTY BID QNTY .Blp L LANDSCAPE ITEMS PLANT MATERIAL _ _ , L.01 QUERCUS VIRGINIANA LIVE OAK 10 $11,176.00 10 $16.700.00 L.02 ROYSTONEA ELATA ROYAL PALM 12 $12,070.20 12 $21,060.00 L.03 ANNUAL SEASONAL COLOR 490 $833.00 490 $686.00 L.04 CRINUM ASIATICUM CRINUM LILY 25 $1.397.60 25 $1.415.00 L.05 LIRIOLPE M."EVERGREEN GIANT' I 270 $1,215.00 270 $918.00, L.08 PHILODENDRON"ZANADU" DWARF PHILODENDRON 389 $4,358.80 389 $5,290.40 L07 MULCH ' INCLUDED INCLUDED INCLUDED INCLUDED L.08 TOP SOIL INCLUDED INCLUDED INCLUDED INCLUDED L.09 SOIL AMENITIES ' INCLUDED INCLUDED INCLUDED INCLUDED L10 ° -TREE STAKING INCLUDED INCLUDED INCLUDED INCLUDED SUBTOTAL ‘31,048.50 $46,069.40 LANDSCAPE MISC $1,200.00 L.11 IRRIGATION PACKAGE PACKAGE $18.330.00 NO BID NO BID L.12 SOD 2000SF $2,800.00 2000SF $2,300.00 SUBTOTAL` $20,830.00_ $3,500.00 SP LIGHTS SP.01 12' LIGHT POST 23 $86,422.50 23 $87,745.00 SP.02 WELL LIGHT 12 $16,898.40' 12 $17,160.00 SUBTOTAL_ $103,320.90 $104,905.00: SITE FURNITURE SP.03 8'BENCH 2 $2,950.00 2 $3,780,00 SP.04 TRASH RECEPTICALE 2 $2,337.00 2 $3,340.00 SUBTOTAL $5,287.00 . _ $7,120.OD TOTAL CONTRACT _ $160,586.40 0 $161,594.40 __" *NO IRRIGATION PACKAGE INC. Page 1 MainStbidCOMP.xls PROPOSED MAIN STREET VILLAGE OF TEQUESTA BID FORMS. - OCTOBER 2000 PAGE 3 OF 3 SECTION COMPLIANCE NUMBER DESCRIPTION RUSSO AMERICAN 8 NON-COLLUSION AFFIDAVIT X X 9 BID BOND X X 10 QUALIFICATIONS STATEMENT X X 11 PERFORMANCE BOND N/A N/A 12 PAYMENT BOND N/A N/A Page 1