Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 6D_11/8/2001 I .),J-. -- o, r . iirlh�o- VILLAGE O TEQUE TA \\v�10\ 4 Post Office Box 3273 a 250 Tequesta Drive,Suite 300 P t ,,r o Tequesta,Florida 33469-0273 (561)575-6200 s V IA o Fax:(561)575-6203 I ®1 a ,. VILLAGE MANAGER MONTHLY REPORT e,eu_ OCTOBER 11 —NOVEMBER 8, 2001 I The following report emphasizes the priorities as established by the Village Council for the Village Manager. 1) Funding for new Village buildings: In a continuing effort to monitor economic conditions as it relates to securing funding for new Village buildings, I am providing the attached financial analysis for your review. As of 2:15 p.m., November 6, 2001, the Federal Reserve again lowered the short term lending rate by 50 basis points to its lowest level in decades. i I have reviewed the current trends and rates with our Finance personnel and will prepare a recommendation for your review and consideration. 2) Monitoring of ongoing sewer, water and swale construction. i As of October 31, 2001, Asphalt Consultants have completed sewer installation and water on River Drive. Swales and restoration work are proceeding as scheduled. The first lift of asphalt has been installed. Work on installing water and sewer lines along Country Club Drive has been completed (and;the road re-opened as of November 1, 2001). Discussions are being held with the contractor to review plans for Golfview Drive and contemplated change orders. A schedule of work during November and December is being evaluated (the contractor has indicated that he intends on shutting down all work for two weeks over Christmas). Alternatives are being reviewed to minimize inconvenience to Village residents during this time. A final update of activities is planned for Council presentation on December 12, 2001. 3) Management of new facilities and design. As you are aware, October 29, 2001, marked the groundbreaking for the ,new public safety facility. A pre-construction meeting was held prior to the event with the contractor and architect with weekly meetings scheduled throughout the project. A construction schedule has been forwarded to you for your use. As of this date the contractor has set his construction trailer, surveyed the site, leveled the construction pad, and Recycled Paper I began preliminary work on utilities. The required bonds have been reviewed and filed. 4) Village Staff With the exception of a part time position in the Community Development Department, all staff positions have been filled. In an effort to enhance communications with department heads and Village personnel I have initiated an ITM (in-touch management program) allowing for regular scheduled meetings with department heads on a weekly basis and all Village personnel at least twice a year on a one to one basis. Sessions with shift personnel will be coordinated during the shift the employee is normally assigned. Additionally, a human resource consultant is being utilized to assist in program development for the Village staff. The staff has been working diligently to provide the highest level of service to our residents. 5) Nothing significant to report. 6) Grant Development. I am continuing to research our ability to acquire grant/legislation appropriations for the Village. I am scheduling a meeting with our grants coordinator to review current and future initiatives. I anticipate increased difficulties in this area as a result of recent events and current economic conditions and uncertainties both within Florida and nationally. 7) Master Planning of the 2003 Water Franchise Agreement. Efforts to resolve pending issues with the existing franchise are ongoing. Recently, a meeting to review these issues was held with the Village attorney, utility engineers, utility rate consultant and staff. Discussions with Jupiter's administration continue. After staff has completed its review, I will be recommending a workshop with the Village Council for review. 8) Relationship Development. As directed, the Village has expanded its chamber role and is now a member of the Jupiter Tequesta Juno Beach (Mike Couzzo — Trustee/Board of Directors), Northern Palm Beach (Steve Allison is representative) and Martin County Chamber (Chief Weinand is 2 representative). On a monthly basis this report will provide chamber updates to advise you on issues of importance. Preliminary discussions with our consulting-engineers have been held to review ENCON's plans for future system expansion. 9) Expansion of Water Plant and Customer Base. Discussions have been held and we are continuing to analyze efforts to expand our customer base. Preliminary discussions have been held with the following utilities: Town of Jupiter, Jupiter/Martin Water Association, and representatives of Jupiter Island and Martin County. Direction has been given to our plans/specifications for the water plant's expansion as adopted in the annual budget. Future reports will contain information on Priorities 10 and 11, which are Annexation issues with Palm Beach County and Amendments to the Comprehensive Plan. FYI Matters: • On November 5, 2001, Mr. Gary VanBrock telephoned to inform me as a courtesy that he has sold a 3 %z acre parcel north of Tequesta Drive, east of Old Dixie Highway, to Centex Homes. He indicated that Centex Homes was interested in expanding its townhouse/condo project. F:/CouzzoNillage Manager Monthly Report 3 • VILLAGE OF TEQUESTA TFRDEPARTMENT OF FIRE RESCUE VILLAGE MANAGER'S REPORT OCTOBER 2001 Number of days included in this report 31 Total number of calls 88 Number of Medical Calls 59 Number of Fire Calls 21 Number of Calls classified as Others 8 Resources Utilized for Incident Mitigation Number of Engine Company Responses 59 Number of Ladder Company Responses 8 Number of times Mutual Aid was Received 5 Number of times Mutual Aid was Given 2 Total Number of Hrs Needed for Incident Mitigation 471.00 Average Daily Staffing Daily on-duty Career Firefighting Force 5.10 Daily on-duty Volunteer Firefighting Force 0. 5 Average number of Volunteer Firefighters on-duty During Daytime Hours 0.75 Average number of Volunteer Firefighters on-duty During Night time Hours 0.58 Total Firefighting Force on duty 5.74 Fire Code Enforcement Total hours Utilized on Code Enforcement 107L 50 Hours Spent on pre-fire Planning 11.00 Number of Violations Found this Month 66 Number of Violations Corrected this Month 55 Required]Duties Hours Needed for Vehicle Maintenance 77.00 Hours Utilized for Equipment Testing 22.00 Hours Needed for Equipment Maintenance 53.00 Hours Needed for Equipment Checks 130.00 Hours Needed for Building Maintenance 105.00 Hours Needed for Hose Testing 0.00 Hours Needed for Hydrant Testing 58.00 Total Gallons of Water Used 2,780.00 Miscellaneous Hours Dedicated to Community Service 84.50 Hours Required for Administrative Support 188.00 Firefighter Physical fitness Program 47.00 VILLAGE OF TEQUESTA TFR DEPARTMENT OF FIRE RESCUE VILLAGE MANAGER'S REPORT OCTOBER 2000 Number of days included in this report 31 Total number of calls 69 Number of Medical Calls 42 Number of Fire Calls 14 Number of Calls classified as Others 13 Resources Utilized for Incident Mitigation Number of Engine Company Responses 41 Number of Ladder Company Responses 13 Number of times Mutual Aid was Received 0 Number of times Mutual Aid was Given 7 Total Number of Hrs Needed for Incident Mitigation 239.00 Average Dail Staffing Daily on-duty Career Firefighting Force 5.10 Daily on-duty Volunteer Firefighting Force 0.54 Average number of Volunteer Firefighters on-duty During Daytime Hours 0.46 Average number of Volunteer Firefighters on-duty During Night time Hours 0.60 Total Firefighting Force on duty 5.64 Fire Code Enforcement Total hours Utilized on Code Enforcement 56.5,0 Hours Spent on pre-fire Planning 23.00 Number of Violations Found this Month 19 Number of Violations Corrected this Month 22 Required Duties Hours Needed for Vehicle Maintenance 73.00 Hours Utilized for Equipment Testing 32.00 Hours Needed for Equipment Maintenance 51.00 Hours Needed for Equipment Checks 135.00 Hours Needed for Building Maintenance 117.00 Hours Needed for Hose Testing 44.00 Hours Needed for Hydrant Testing 3.00 Total Gallons of Water Used 3,200.00 Miscellaneous Hours Dedicated to Community Service 96.00 Hours Required for Administrative Support 224.00 Firefighter Physical fitness Program 80.00 \`. Memorandum Utilities Department To: Michael R. Couzzo,Jr.,Village Manager Through: Michael F. Estok,Utilities Director ' From: Roy Fallon, Chief Operator Date: November 1,2001 Subject: Monthly Water Usage for the Month of October 2001 The following is a summary of monthly water usage for the month of October 1-31, 2001. TEQUESTA WATER TREATMENT PLANT ' 2001 2000 Target Pumpage 52.000 m.g. 40.000 m.g. Actual Pumpage 59.062 m.g. 47.504 m.g. Maximum Day 21.469 m.g. 2.246 m.g. Minimum Day 1;.079 m.g. 0.861 m.g. Average Day 11.905 m.g. 1.532 m.g. Backwash Water 11.231 m.g. 0.794 m.g. Hydrant Flushing 1.312 m.g. .017 m.g. WATER PURCHASED FROM JUPITER 2001 2000 Target Pumpage 46.500 m.g. 46.500 m.g. Actual Pumpage 47.663 m.g. 45.336 m.g. Maximum Day 1.821 m.g. 1.795 m.g. Minimum Day 1.271 m.g. 1.025 m.g. Average Day 1.538 m.g. 1.462 m.g. TOTAL DISTRIBUTION SYSTEM PUMPAGE 2001 2000 Actual Pumpage 106.725 m.g. 92.840 m.g. Maximum Day 4.128 m.g. 3.786 m.g. Minimum Day 2.770 m.g. 2.229 m.g. Average Day 3.443 m.g. 2.995 m.g. Monthly Water Usage Report For the month of October 2001 Page 2— 2001 2000 Meter Service Connections 5,036 4,995 Rainfall 5.08" 16.64" Water Purchased from Jupiter—Annual Contract 547.500 m.g. Water Received from Jupiter to-date 141.060 m.g. Contract Balance 406.440 m.g. MONTHLY WATER QUALITY ANALYSIS 2001 2000 pH j 7.50 mg/1 7.72 mg/1 Total Alkalinity 159 mg/1 131 mg/1 Total Hardness 156 mg/1 136 mg/1 Calcium Hardness 148 mg/1 128 mg/1 Color 3 mg/1 4 pcu Iron 0.05 mg/1 0.03 mg/1 Chlorides j 63 mg/1 63 mg/1 Turbidity 0.10 mg/1 0.18 ntu Chlorine(total) 2.8 mg/1 3.5 mg/1 DISTRIBUTION SYSTEM MAINTENANCE New Connections 2 METERS Meters Replaced 14 Flushed 274 HYDRANTS Replaced 0 Serviced 15 Blow-offs Flushed 42 RF/mk c: Jody Forsythe, Finance Director Tom Jensen, P.E.,Reese, Macon&Associates, Inc. MonthlyReport\Month of Oct.01 PERMITS ISSUED DURING THE PERIOD 10/01/01 THROUGH 10/31/01 PAGE 1 THIS REPORT WAS PRINTED ON NOVEMBER 1, 2001 VILLAGE OF TEQUESTA PERMIT TYPE AND DESCRIPTION ft OF PERMITS VALUATION FEES DUE FEES PAID AL - ALARM 2 1,409.00 80.00 80.00 BR - BUILDING - NEW RESIDENTIAL 1 456,595.00 7,299.52 7,299.52 CA - COMMERCIAL ALTERATIONS & ADDITIONS 1 10,000.00 154.00 154.00 DR - DRIVEWAY 3 2,800.00 130.00 130.00 EL - ELECTRICAL - MISCELLANEOUS 13 0.00 663.40 663.40 ER - ELECTRICAL - NEW CONSTRUCTION 8 0.00 985.00 985.00 LS - LANDSCAPE PERMIT 1 2,500.00 60.00 60.00 ME - MECHANICAL 7 43,126.00 737.18 737.18 MF - MULTI-FAMILY NEW/ADDITIONS/ALT. 2 66,000.00 1,124.00 1,124.00 MO - MISC. PERMITS 41 478,521'.00 8,161.52 8,161.52 PC - PUBLIC CONSTRUCTION 1 1,237,791.01 19,798.66 19,798.66 PL - PLUMBING - RESIDENTIAL & COMMERCIAL 10 0.00 475.00 475.00 RA - RESIDENTIAL ALTERATIONS & ADDITIONS 4 155,821.84 2,507.15 2,507.15 i SB - SIGN PERMITS 3 15,485.00 296.20 296.20 SP - SWIMMING POOLS 5 77,236.00 1,205.78 1,205.78 TOTALS FOR ALL PERMIT TYPES 102 2,547,284.85 43,677.41 43,677.41 PERMITS ISSUED DURING THE PERIOD 01/01/01 THROUGH 10/31/01 • PAGE 1 THIS REPORT WAS PRINTED ON NOVEMBER 1, 2001 VILLAGE OF TEQUESTA PERMIT TYPE AND DESCRIPTION # OF PERMITS VALUATION FEES DUE FEES PAID AL - ALARM 19 111,155.25 2,168.75 2,168.75 BC - BUILDING - COMMERCIAL NEW 1 500,000.00 7,994.00 7,994.00 BR - BUILDING - NEW RESIDENTIAL 10 3,633,250.20 58,070.12 58,070.12 CA - COMMERCIAL ALTERATIONS & ADDITIONS 18 722,835.00 11,598.42 11,598.42 DM - DEMOLITION 7 104,186.00 1,683.98 1,683.98 DR - DRIVEWAY 21 75,257.00 1,579.00 1,579.00 EL - ELECTRICAL - MISCELLANEOUS 88 2,400.00 4,813.60 4,813.60 ER - ELECTRICAL - NEW CONSTRUCTION 17 0.00 6,455.00 6,455.00 LD - LAND DEVELOPMENT 1 0.00 160.00 160.00 LS - LANDSCAPE PERMIT 7 128,655.00 3,298.00 .3,298.00 ME - MECHANICAL 59 312,206.00 5,821.02 5,821.02 MF - MULTI-FAMILY NEW/ADDITIONS/ALT. 5 1,235,311.00 31,008.97 31,008.97 ' MO - MISC. PERMITS 336 3,419,841.39 65,681.92 65,681.92 PC - PUBLIC CONSTRUCTION 8 1,480,238.16 23,653.81 23,653.81 PL - PLUMBING - RESIDENTIAL & COMMERCIAL 265 0.00 11,236.00 11,236.00 RA - RESIDENTIAL ALTERATIONS & ADDITIONS 25 861,434.35 16,400.86 16,400.86 SB - SIGN PERMITS 19 50,645.00 1,211.20 12,211.20 SP - SWIMMING POOLS 15 292,783.00 4,594.53 4,594.53 • TOTALS FOR ALL PERMIT TYPES 921 12,930,197.35 257,429.18 257,429.18