March 1, 2002
:. .iginal Contract Price $3,601,366
Change Order Additions
P.C. #2 Soil testing requirements per specifications $1,500
P.C. #4 Modifications to west apparatus wall footer. $1,500
P.C. #11 Added electronic security gate to west driveway. $4,734
P.C.#30 Add concrete base for radio tower $758
$8,492
Change Order Deletions
P.C. #19 Delete Knox box ($289)
P.C. #21 Delete ballistic drywall ($7,271)
P.C. #27 Alternate soffit brackets ($4,044)
P.C. #22 Delete Fire Alarm System ($7,675)
($19,279)
Revised Contract Price $3,590,579
C1•,t±•
OOkS
3\1( ENTERPRISESS
9000 Burma Road, Suite 101 Palm Beach Gardens, FL 33403 561.863.1200 Fax: 561.863.1264
February 12, 2002
Mr. Mike Flattery
Gee& Jenson Architects
One Harvard Circle •
West Palm Beach, FL 33409
Re: Tequesta Public Safety Building
Testing Costs
Pending Change No. 2- Revised (P.C. #2R)
Dear Mike:
On November 20, 2001,we submitted a request for a change order establishing a testing
allowance for the referenced project. You responded by saying that the owner was only
obligated to pay for the testing associated with specification section 02200 Earthwork.
While there is another specification section 02201 for"Earthwork Buildings",the two sections
are almost identical in every way. In fact, section 02200 makes several references to
building related work(Refer to paragraphs 1.1A, 3.2.A.5, 3.3.A.1 and 3.5.C.1 as
examples).
We estimate that all testing for the project will run in the neighborhood of$4,000 to$5,000.
Given the specification language and the fact that neither the owner nor contractor allowed
for the cost of testing,we respectfully request that a change order be approved in the
amount of One Thousand Five Hundred Dollars($1,500.00) (or approximately one third of
the estimated cost).
Please let me know if we need to discuss or if you require additional information.
Sincerely, Accepted:
David Brooks Enterprises, Inc. Village of Tequesta
David Brooks
President cs..._)
Cc Chief Jim Weinand, VOT 1 f ®Date: 0 ��t' ›"
9
Rick Wilhelm, DBE in,� 1t Name/Title ,�„�
File 6,' 4 61164,
C:IMSWORD1TequestaW.C.#2R.doc
General Contractors • Construction Management
Nov 20 01 07: 39a Day+.id Brooks Ent. Inc. (561 ) 863-1264 P. 1
i }
•
`J oo1�
"��`ill l `ENTERPRISES
9000 Burma Road, Suite 101 Palm Beach Gardens, FL 33403 561.863.1200 Fax: 561.863.1264
November 19,2001 FAXED
Mr. Mike Flattery
NOV2o 2O I
Gee&Jenson Architects
One Harvard Circle
West Palm Beach, FL 33409
Re: Tequesta Public Safety Building
Footing/Retaining Wall Change
Pending Change No.4(P.C.#4)
Dear Mike:
We are in receipt of the memorandum from J.Casey Long to Brian Tavares,outlining a
modification to the west wall of the apparatus bay foundation. We have priced this work
assuming a wider footing and the addition of three courses of 12"block with filled cells.
The Det price increase for this change is Two Thousand Seven hundred Thirteen Dollars
<5913.00). We further request that the contract time be increased by one(1)day.
Attached please find a cost break down for this work. Please review and let me know if ybu
have questions or require further information.
Sincerely, Accepted:
14; Ao David Brooks Enterprises, Inc. Village of Tequesta
9David Brooks By:
President
Cc Chief Jim Weinand, VOT Air ig
Rick Wilhelm, DBE Print Nam Title
! h�t�' File
CIMSWORD\TequestalP.C.#4.doc
General Contractors • Construction Management
Nov 20 01 04: 39p p. 1
-'I 1 ).id
ooks
ENTERPRISES
Gu- 9SYo
9000 Burma Road, Suite 101 Palm Beach Gardens, FL 33403 561.863.1200 Fax: 561.86r3 2fM
PAxe
November 20, 2001
NOV 202001
Mr. Mike Flattery
Gee&Jenson Architects
One Harvard Circle
West Palm Beach, FL 33409
Re: Tequesta Public Safety Building
Temporary Automatic Gate
Pending Change No.4(P.C.#11) 1O0 ?�
Dear Mike: ,yqQ
We offer to install a temporary automatic gate at the west driveway for the sum of Four N-
Thousand Seven hundred Thirty Four Dollars ($4,734.00). We further request that the
contract time be increased by zero(0)days.
Please note the following qualifications:
1. The gate is a cantilever style gate and includes four transmitters. (The vendor
says a rolling style gate would not be any cheaper.)
2. The gate and operator are new. (No market for used equipment.)
3. We assume the owner will remove and take possession of the gate at the
completion of Phase I of the project. The cost of removal is excluded from our
price.
Attached please find a cost break down for this work. Please review and let me know if you
have questions or require further information.
Sincerely, Accepted:
David Brooks Enterprises, Inc. Village of Tequesta
1411111110
David Brooks
By: � �
President •`
Cc Chief Jim Weinand, VOT /1f..%, \�_
Rick Wilhelm, DBE Print Na' e/Ti - ) yak
File -
// //, /� ' /Z0/
C:IMSWORD17equesta\P.C.#11.dac 400tOr ..4Act
General Contractors • Construction Management
/; RR11 c
Day I(!BIE 00k S
N T E R P R I S E
9000 Burma Road, Suite 101 Palm Beach Gardens, FL 33403 561.863.1200. Fax: 561.863.1264
February 12, 2002
Mr. Mike Flattery
Gee& Jenson Architects
One Harvard Circle
West Palm Beach, FL 33409
Re: Tequesta Public Safety Building
Delete Knox Box& Power/Security per Proposal Request No. 8
Pending Change No. 19
Dear Mike:
We offer to delete the knox box and associated power/security service for a net credit of
Two Hundred Eighty Nine Dollars ($289.00). This figure represents the total savings
minus twenty-five percent contractor incentive for value engineering. I believe this is in line
with our discussions with the owner.
Attached you will find supporting documentation for this proposal. Please don't hesitate to
give me a call if you have questions or require additional information:
Sincerely, Accepted:
David Brooks Enterprises, Inc. Village of Tequesta
David Brooks By: '
President
Cc Chief Jim Weinand, VOT / . ®per •o Date: a!'
Rick Wilhelm, DBE P nt Name/ . e
File ► c 03~
C:\MSWORD\Tequesta\P.C.#19.doc
General Contractors • Construction Management
}
•
•
ESTIMATE RECORD Date: 02/12/02 ,.
David Brooks Enterprises,Inc. Project: Teauesta Public Safety Bldg. Page: 1 of 1
P.C.#19-Delete Knox Box(P.R.#8) Prepared by. DB
lam ' Labor Total Material Material Subcontract Subcontract Total
_..eat Description Unit Quantity Unit Labor Unit Total Unit Total Cost
•
Delete Knox Box&Labor .LS 1.00 (10.00) (10) (180.00) (180) 0 (190)
Power&Security LS 1.00 0 0 (195.00) (195) (195)
(10) (180) (195) (385)
State Sales Tax- % 0 0
(10) (180) (195) (385)
CHECK—) (385)
Contractors Portion of V/E Savings % 25 96
Bonds/Insurance % 0
•
(289)
•
C- W. !q
PROPOSAL �' OWNER
REQUEST ARCHITECT
AL1 DCX'LL1lE T G/uy-ELECTRONIC FORMAT CONSULTANT
CONTRACTOR
FIELD
OTHER
TH15 UO(.UMtki r HA5 IMP(IK'1_iN 1 LE.,AL CONSEQUENCES; (-ON5ULTATION W1 TIC AN-A11URav1•Y 15 taN W WIAGEU W11'H R 1"JPECT T(3 ITS
COMPLETION OR MODIFICATION. AUTHENTICATION OF 'HIS ELECTRONICALLY DRAFTED AlA DOCUMENT MAY BE MADE BY USING AlA
Dent I\fEVT Ds,„"
PROJECT:Tequesta_Public Safety Facility PROPOSAL REQUEST NO.: 8
(Name and address)
250 Teaue3ta_Drive-Suite 300
Tequesta. FL 33469-0273
DATE OF ISSUANCE: 12-21-01
OWNER:Village of Tequesta CONTRACT FOR:Construction of Public Safety Facility
250 Teque. Drive-Suitg_300.
Tequesta.FL 33469-0273 •
(Name andaddtess)'
CONTRACT DATED: October 18.2001
ARCHITECT'S PROJECT NO.:20004,08
TO CONTRACTOR:David Brooks Enterprises. Inc. ARCHITECT:Gee&Jenson E A-P.Inc.
9000 Burma Road-Suite 101
Palm BeacttGardens.FL 33403
(Name and address)'
(Name mdaddaat Bite iatvarti irk
Worst Palm Beagh,FL 33409
Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract
Documents described herein. Submit-proposal within 7 days, or notify the Architect in writing of the date on which you
anticipate submitting your proposal.
THIS IS NOT A CHANGE ORDER,A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE
WORK DESCRIBED IN THE PROPOSED MODIFICATIONS.
Description:
(Loan a written description of the Work)
DELETE Knox Box inoludjngPowet&Security
Attachments:
(Lin attached documents that support daso4Niwn.)
iILQLLSI'1:L'b7
(Signaler) (Printed name sad title) -
0 1993 THE AMERICAN IN ITUTE OF ARC ITECTS, 1735 NEW PORK AVENUE. N.W., WASHINGTON, D.C. 20006-5292. AIA DOCUMENT G709 -
PROPOSAL REQUEST-1993 EDITION-AIA®-WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution.This
dorument was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the
date of expiration as noted below. User Document: tequesla g709 _!f8_12 21-OLaia -- 12/21/2001. AIA License Number 1007569, which expires on
10+31/2002.
Electronic Former 6709-1993
-'eir 1
' _ --- -- - -.._ .. .,. .or. sr. .,-,, -,., ,n tier
Gerelco Electrical Contractors, Inc.
521 NW Enterprise Drive
Port St. Lucie, Fl. 34986
Phone: 1-561-340-7474
Fax: 1-561-340-7475
Change Order Proposal
01/29/02
Customer:
David Brooks Enterprises, Inc.
9000 Burma Rd Ste 101
Palm Beach Gardens, Fl 33403
Job:
Project: Tequesta PSF-Deduct For Knox Box Number: 3399
Tequesta, Fl
Change Order Number:3399-09
Work Description:
This is a deductive change order to delete power to the Knox Box and raceway for the
security shown at the Knox box as directed by Proposal Request#8.
The total amount of this Deductive Change Order: <$195.00>
Sincerely,
Steve Blackford
Project Manager
01/29/02 14:59 Page 1
JOB NAME: Tequesta PSF-Deduct For Knox Box
All Breakdowns (All)
Number 3399-06
J Date 01/30/02
Bid Time 12:59
Estimator Steve Blackford
Job Location Tequesta, Fl
Type of Building(s) New Government
Job Info Delete Knox Box power and raceway for security to Knox Box.
Square footage 20,292.
Non-Ouoted Material
Division Total factor Extension
01 Raceway, Ftgs, & Boxes -39.99 0.0 % $ -39.99
02 Wire & Cable -7.06 0.0 % $ -7.06
Total -47.05 $ -47.05
Quoted Material
Total $ 0.00
Sales Tax (6%) $ -2.82
tal Material $ -49.87
Labor Hours
Division Total factor Extension
01 Raceway, Ftgs, & Boxes -6.01 0.00 % -6.01
02 Wire & Cable -1.52 0.00 % -1.52
Total -7.53 -7.53
Labor Rates
Category % of Total ou s Base Rate Burden Extension
$ z
Electrician/mech. 100.0 -7.53 16.00 3.20 20.00 -144.58
Total 100.0 -7.53 X 19.20 (AVG LAB RATE W/BURDEN) = $ -144.58
Job Subtotal (Prime Cost) $ -194.45
Pverhead (0%) $ 0.00
..ofit (0%) $ 0.00
' 01/29/02 14:59 Page
JOB NAME: Tequesta PSF-Deduct For Knox Box
All Breakdowns (All)
b Total $ -194.45
Actual Bid Price $ -195.00
Material to labor ratio: 0.26
Cost per square foot $ -0.01
Selling price per square foot $ -0.01
' 01/29/02 14;58 1 Page 1
Tequesta PSF-Deduct For Knox Box
EXTENSION BY PHASE
Item # Description Oty Price U Disc Ext Price Labor U Ext Labor
--- 01 Raceway, Ftgs, & Boxes ---
1001 3/4" EMT -108.00 45.27 C 35.00 -31.78 3.75 C -4,.05
1427 3/4" Set Screw Die Cast Conn -4.00 54.00 C 60.00 -0.86 0.11 E -0.44
1547 3/4" Set Screw Die Cast Cplg -12.00 72.40 C 60.00 -3.48 0.07 E -0.84
2573 4" Square Deep Box (1/2 & 3/4 KO's) -2.00 304.30 C 60.00 -2.43 0.23 E -0.46
2734 4" Square-1G Plaster Ring-1-1/4"D -2.00 205.40 C 65.00 -1.44 0.11 E -0.22
--- 01 Raceway, Ftgs, & Boxes Total --- -39.99 -6.01
--- 02 Wire & Cable ---
2787 #12 THHN CU Solid Wire -210.00 67.22 M 50.00 -7.06 7.22 M -1.52
--- 02 Wire & Cable Total.--- -7.06 -1.52
Job Total -47.05 -7.53
•
* -25.00% Labor Factor
V 0I C.a! UC. VT• VL� uV Y tU YI VUn.7 L..V.• a..V• l VV a -. VV. Vv . r•
•
PROPOSAL p. C• Ict
REQUEST . OWNER
CONSLI
2 L•1 DcKUME TG,rv-ELECTRONICna /4J• ANSUTECT
L'fANT
0
CONTRACTOR
FIELD
OTHER ❑
COMPLETION OR MODIF1CAT1UN. AIMIENITCATION OF TiUS ELECTRONICALLY DRAFTED MA DOCUMENT MAY BF. MADE BY USING AM
PROJECT: F ,
(nfaaoeaadaddter) PROPOSAL REQUEST NO.: A
r,.,�.�unyi�!i1tE 300
DATE OF ISSUANCE: 12-21 of
OWNER:Viilaae of Tecamata
ors T4. .r n• CONTRACT FOR:Cci ti Conan of pr,
■RS,�.�rroe rites ev� _bl• cafe 7aaszat
(Name Iaddrttr/'
CONTRACT DATED: Draggaguilaga
ARCHITECT'S PROJECT NO.:20004.08
TO CONTRACTOR: jQ
ARCHITECT:Gee 8 Jenson F A I I -
(—=ud and adrGettJ'
(AGmeacd
WeetPahT Beach FL 33409
•
ease subtmt an uemtZe propose r c s
tote n ra rn an ontrtsci tone r pro ono cations tot ntract
!)octtments described herein. Sub ngc
posal within � days, or notify the Architect in writing of the date on which you
anticipate submitting your pcopinal
THIS IS NOT A CHANGE ORDER,A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION
1Ae0 t I P I D O. .• TO PROCEED WITH THE
Description:
(ram a whew dermp t oo oldie Hunt:)
D FT nOX I30x;i i ciito s s
taimai
•
Attachments:
(Let attached documeaurbuAwait d ,a)
•
(signature) v
(Printed came and We) -• --
O 993 THEA 1CAN t I UrE
PROPOSAL REOUEsi-1993 EDITION-qiq®, A E, . . WAsni • -5 . AIA DOCUMENT Gi09 -
danurrenr was electronically 19permission WARNING.Unlicensed photocopying vitiates U.S.copyright laws and is subject to legal prosecution.This
dare of expiration as note produced
User po t of the
g,A nd CAII 9B_11.21-01.ai yIV2001.repuelused in AIA=License Number Mont violation the
I' ber 1007569.which expires on
Electronic Format G709.1993
1
S b(.6Ei-9R7_ ro - -. -
•
OOkS
yid ENTERPRISESS
9000 Burma Road, Suite 101 Palm Beach Gardens, FL 33403 561.863.1200 Fax: 561-.863.1264
February 19, 2002
Mr. Mike Flattery
Gee&Jenson Architects
One Harvard Circle
West Palm Beach, FL 33409
Re: Tequesta Public Safety Building
Filled Cells in Lieu of Ballistic Sheet Rock (Proposal Request No. 10)
Pending Change No. 21
Dear Mike:
We offer to delete the ballistic sheet rock and add filled concrete cells for a net credit of
Seven Thousand Two Hundred Seventy One Dollars ($7,271.00). This figure represents
the total savings minus twenty-five percent contractor incentive for value engineering. I
believe this is in line with our discussions with the owner.
Attached you will find supporting documentation for this proposal. Please don't hesitate to
give me a call if you have questions or require additional information.
Sincerely, Accepted:
David Brooks Enterprises, Inc. Village of Tequesta
( k 5)
David Brooks By:
President
Cc Chief Jim Weinand, VOT P Date:CC reil'
Rick Wilhelm, DBE Print Name/Tit
File g.
C:MSWORD\Tequesta\P.C.#21.doc
General Contractors • Construction Management
C. 14 Z °
•
-PROPOSAL RECEIVED OWNER
REQUEST JAN 0 2 ZUUZ )RAC
AlA DOCL MaVT G/uy-ELECTRONIC FORMAT CONSULTANT
CONTRACTOR
FIELD•
❑
OTHER ❑
THIS DLIV.UNnnNT IIAS IMPOI\IANNT LLCUAL C:U\5EUULNcrs; CUNSULIAIION WIIH AN ArIUKNLY IS ENWURAL,u) Wr1I1 Rk.t' l 10 1I3
COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA
DOCUMENT T1IUL
PROJECT:TequestaPublic Safety Facility PROPOSAL REQUEST NO.: LQ
(Name and addrr:r)
250 Tequesta Drive-Suite 300
Tequesta.FL 33469-0273
DATE OF ISSUANCE: 12-21-01
OWNER:Village of Tequesta CONTRACT FOR:Construction of Public Safety Facility
250 Teauesta_Drive-Suite 300
Tequesta. FL 33469-0273
(Nme and address)'
CONTRACT DATED: October 18.2001
ARCHITECT'S PROJECT NO.:20004.08
• TO CONTRACTOR: David Brooks Enterprises.Inc, ARCHITECT: Gee&Jenson E-A-P. Inc.
9000 Burma Road-Suite 101
Palm each Gardens.FL 33403
(Name and address)' (Nameaodaddtrsr) One Harvard Circle
West Palm Beach. FL 33409
Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed modifications to the Contract
Documents described herein. Submit proposal within _�_days. or notify the Architect in writing of the date on which you
anticipate submitting your proposal.
THIS IS NOT A CHANGE ORDER,A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE
WORK DESCRIBED IN THE PROPOSED MODIFICATIONS.
Description:
(Incur a nzzuea description oldie Work)
Remove Bullet Proof Panels in Lobby SO1 and Provide all Labor and Material to Fill All CMU Cells with concrete per
Drawing PR10-SKT-1.
Attachments:
(lint utathecl documents thin support description.)
REQUESTED BY:Mike lattery
Gee&Jenson.Engineers.Architects.Planners.Inc,
Project Manager
(Signature) (Printed name and tide/
•
0 1993 THE AMERICAN INSTITUTE OF ARCHITECTS. i735 NEW YORK AVENUE, N.W., WASHIri ON. D.C. 20006-5292. AIA DOCUMENT-W09 -
PROPOSAL REOUEST-1993 EDITION-AIA®-WARNING:Unlicensed photocopying violates U.S.copyright laws and is subject to legal prosecution.This
document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation until the
dare of expiration as noted below. User Document: requesta 9709_tl10 12-21.01.aia -- 12/21/2001. AIA License Number 1007569, which expires on
10/3U2002.
Electronic Format G709-1993
1
I ,')
_J
CMU W/ SOLID FILLED.- I
CONCRETE CELLS I L
i
z �I I
MULTI—USE \ i i,
i 502 7 i I j
1
r-- CMU W/ S01 ID FILLED !
CONCRETE CELLS ` 1
Ii
-- -i-1- -- - - - - - -LL_
-- 101 --- tDI - - , ,; 1
LOBBY/i ! r / , i i L
L _ I ! WAITING
I . i so, I I t J _i- I
I I CMU W/ SOLID FILLED , 11 i
r—. i i CONCRETE CELLS , =—1 -
.I ! _ •_ _
-d- ! I,- - T�- - TEF I1
II i i II
�i i
--
�' 1i !
li ( II
! =—( —  — — �- , i t
CMU FILLED CELLS
LOBBY SO1 & MULT1—USE SO2 WEST WALL — FLOOR PLAN
=:: TEOUESTA PUBLIC SAFETY FACILITY
,.` ..., "II Joe No.�.«e VILLAGE OF TEOIJESTA cAnw-e 2000106
ca.,. TEQUESTA.FLORIDA GEE & Eimer►+
um
"'°'. JENSON PR10—SKT1
DM - LOBBY sot+MULTI-USE SO2 WEST WALL-CMU FILLED CV I S E,
rmers,inn awEr OP
o .f
ESTIMATE RECORD Date: 02/12/02
David Brooks Enterprises,Inc. Project: Tequesta Public Safety Bldq. Page: 1 of 1
P.C.#21-Filled Cells in Lieu of Ballistic S.Rock Prepared by DB
•
dad/ Labor Total Material Material Subcontract Subcontract . Total
odeet Description Unit Quantity Unit Labor Unit , Total Unit Total Cost
Added Filled Cells CY 23.00 45.00 1,035 75.00 1,725 20 460 3,220
Credit for Original Filled Cells CY 3.00 (45.00) (135) (75.00) (225) (20) (60) (420)
Credit for Drywall-Net LS 1.00 0 0 (12,495) (12,495) (12,495)
900 1,500 (12,095) (9,695)
State Sales Tax- 0 0
900 1,500 (12,095) (9,695)
CHECK—, (9,695)
Contractor's Portion of V/E Savings % 25 2,424
Bonds/Insurance % 0
(7,271)
RALPH DELLA-PIETRA, INC. RECEIVED CHANGE ORDER
880 Jupiter Park Drive, Unit 13
Jupiter, FL 33458 ''-�` No, C.O. # 2
Ph: 561-745-8555 Fax 561-745-7468 Date 2/14/2002
Job Name/Location Tequesta Public Safety
Building
To: David Brooks Enterprises, Inc
9000 Burma Road , Ste 101
Palm Beach Gardens, Fl. 33403 Ref#: PC#21,PR#10 Job Phone
We hereby agree to make the change(s)specified below:
Delete Bullet Proof Panels as designated in SO1 and replace with 5/8"drywall.
Credit
Total <$12,495.00>
NOTE: This Change Order becomes part of and on conformance with the existing contract.
WE AGREE hereby to make the change(s) specified above at this price < $ 12,495.00>
Date PREVIOUS CONTRACT AMOUNT
Authorized Signature(Contractor) REVISED CONTRACT TOTAL
ACCEPTED ---- The above prices and specifications Date of acceptance
of this Change Order are satisfactory and are hereby
accepted. All work to be performed under same Signature
terms and conditions as specified in original (OWNER)
7.ontract unless otherwise stipulated.
OOkS
lavi���ENTER RISES
9000 Burma Road, Suite 101 Palm Beach Gardens, FL 33403 561.863.1200 Fax: 561.863.1264
February 12, 2002
Mr. Mike Flattery
Gee&Jenson Architects
One Harvard Circle
West Palm Beach, FL 33409
Re: Tequesta Public Safety Building
Delete Fire Alarm System per Proposal Request No. 11
Pending Change No. 22
Dear Mike:
We offer to delete the fire alarm system per the referenced proposal request for a net credit
of Seven Thousand Six Hundred Seventy Five Dollars($7,675.00). This figure
represents the total savings minus twenty-five percent contractor incentive for value
engineering. I believe this is in line with our discussions with the owner.
We have not totally eliminated the alarm system. We have maintained the ability to monitor
the fire alarm system's flow and tampers with annunciation in the dispatch office.
Attached you will find supporting documentation for this proposal. Please don't hesitate to
give me a call if you have questions or require additional information.
Sincerely, Accepted:
David Brooks Enterprises, Inc. Village of Tequesta
David Brooks By:
President
Cc Chief Jim Weinand, VOT . 61,: . Date: -e),- 473"'
Rick Wilhelm, DBE Print Name/ ' e
File _' is o
C:IMSWORDITequesta1P.C.#22.doc
General Contractors • Construction Management
, 1 )
ESTIMATE RECORD Date: ' . 02/12/02
David Brooks Enterprises,Inc. Project: Teauesta Public Safety Blda. Page: 1 of 1
P.C.i 22-Delete Fire Alarm System(P.R.>#11 t Pr Pared bY: DB
betalu Labor Total Material' Material Subcontract Subcontract Total
Sheet Description Unit Quantity Unit Labor Unit Total Unit Total Cost
Delete Fire Alarm System LS 1.00 0 0 (10,233) (10,233) (10,233)
•
0 0 (10,233) (10,233)
State Sales Tax- % 0 0
0 0 (10,233) (10,233)
cnrcx— (10,233)
Contractor's Portion of V/E Savings % 25 2,558
Bonds/Insurance % 0
(7,675)
•
PROPOSAL OWNER
•
REQUEST .ARCHITECTOil
AIA DOCUMENT 6,7n9-ELECTRONIC FORMAT CONSULTANT
•
CONTRACTOR
Cil
FIELD
•
THIS 1.10CUNIL.1 rtAS 1MPOR A\r LEUAl. LUN U;\CES; LONSULTAT1ON WMTH AN ArivitNa 1{, tyk(U URACi u WITH KML'Irt.T TO 1 COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA
DOCUMENTDaoL
-
PROJECT:TequestaPubiic Safety Facility PROPOSAL REQUEST NO.: 11
(Name aid address)
250 TeQuesta_Drive-Suite 300
Tequesta—FL-33469-0273
DATE OF ISSUANCE: 12-21-01
OWNER:Village of Iequesta CONTRACT FOR:Construction of Public Safety Facility
250 Tegaleeta Drive-Suite 300
Teauesta.FL 33469-0273
(Name and addressr
CONTRACT DATED: October 18.2001
ARCHITECT'S PROJECT NO.:20004.08
TO CONTRACTOR:David Brooks Enterprises,Inc. ARCHITECT:Gee&Jenson E-/cP.Inc,
9000 Burma Road-Suite 101 •
Palm Beach Gardens.FL 33403
(Name and address).
(Maw and adolrrss) One Harvard Circle
West Palm Beach.Fl 33409
•
Please submit an itemized proposal t changes in the Contract Sum and Contract Time for proposed modifications to the Contract
Documents described herein. Submit proposal within :�days, or notify the Architect in writing of the date on which you
anticipate submitting your proposal.
THIS IS NOT A CHANGE ORDER,A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE
WORK DESCRIBED IN THE PROPOSED MODIFICATIONS.
Description:
(losers a wn11m deseap[ion of the Wont/
_DELETE Fire Alarm System except for the Tamper and Flow Switches,_
Attachments: rFl��4r +?off Sr�Q .Qb CsreIiL 'at Pootsorl� T�
(liteatua6eddoeuwenisthatsnppurtdrsnnlion./ �1V?RTott . t, y - t j,a. L- it Aa7w..0 ev
•
REQUESTED BY:Mike Flattery .
Gee&Jenson.Engineers,Architects. Planners.Inc.
if- •�.���� Project Manager
(Signa:ure)
(Pdnted name sod bile)
•
0 1993 T AMERICAN INSTITUTE OF ARCHI CTS, 1735 NE ENUE, N.W., W NG , D.C. - 29 . Al UMENT
PROPOSAL REQUEST-i993 EDITION-AIM)-WARNING:Unlicensed photocopying violates U.S.copyright(elks and is subject to legal prosecution.This
document was electronically produced with permission of the AIA and can he reproduced in accordance with your license without violation until the
date of expiration as rated below. User Document: tequesta g709_@1I 2-21.01.aia -- 12/21/2001. AIA License Number 1007569, which expires on
11Y3U2002.
Electronic Format 6709-1993
1
• Gerelco Electrical Contractors, Inc.
521 NW Enterprise Drive
Port St. Lucie, Fl. 34986 RF C F-l jF
Phone: 1-561-340-7474
Fax: 1-561-340-7475 F F E1 0 7 ?ON ,
Change Order Proposey -_- -=
01/31/02
Customer:
David Brooks Enterprises, Inc.
9000 Burma Rd Ste 101
Palm Beach Gardens, Fl 33403
•
Job:
Project: Tequesta PSF-Fire Alarm nariur:t Number: 3399
Tequesta, Fl
Change Order Number:3399-04
Work Description:
This is a deductive change order to delete the majority of the fire alarm system, The
remaining fire alarm system will monitor the tamper/flow for the fire sprinkler system with
annunciation in the dispatch office.
The total amount of this Deductive Change Order:<10,233.00>
Sincerely,
Steve Blackford
Project Manager
01/31/02 14:15 Page 1
JOB NAME: Tequesta PSF-Fire Alarm Deduct
All Breakdowns (All)
Job Number 3399-03
Bid Date 01/30/02
Bid Time 12:59
Estimator Steve Blackford
Job Location Tequesta, Fl
Type of Building(s) New Government
Job Info Deduct fire alarm system with the exception of monitoring the tamper & flow for the fire
sprinkler system with annunciation in the dispatch office.
Square footage 20,292.
Non-Ouoted Material
Division Total Factor Extension
01 Raceway, Ftgs, & Boxes -1,235.64 0.0 % $ -1,235.64
02 Wire & Cable -399..69 0.0 % $ -399.69
05 Wiring Devices & Covers -13.31 0.0 % $ -13.31
07 Misc -2.43 0.0 % $ -2.43
Total -1,651.07 $ -1,651.07
Quoted Material
06 Fire Alarm (Vendor #1) $ -5,586.00
Total $ -5,586.00
Sales Tax (6%) $ -434.22
Total Material $ -7,671.29
Labor Hours
Division Total Factor Extension
01 Raceway, Ftgs, & Boxes -94.79 0.00 % -94.79
02 Wire & Cable -37.37 0.00 % -37.37
05 Wiring Devices & Covers -0.75 0.00 % -0.75
07 Misc -0.50 0.00 % -0.50
Total -133.41 -133.41
Labor Rates
Category % of Total Hours Base Rate Burden Extension
Electrician/mech. 100.0 -133.41 16.00 3.20 20.00 -2,561.47
Total 100.0 -133.41 X 19.20 (AVG LAB RATE W/BURDEN) = $ -2,561.47
•
01/31/02 14:15 Page 2
JOB NAME: Tequesta PSF-Fire Alarm Deduct
All Breakdowns (All)
Job Subtotal (Prime Cost) $ -10,232.76
Overhead (0P) $ 0.00
Profit (0P) - $ 0.00
Job Total $ -10,232.76
Actual Bid Price $ -10,233.00
Material to labor ratio: 0.75
Cost per square foot $ -0.50
Selling price per square foot $ -0.50
' t i
01/31/02 13:42 Page 1
Tequesta PSF-Fire Alarm Deduct
EXTENSION BY PHASE
Item # Description Oty Price U Ext Price Labor U Ext Labor
--- 01 Raceway, Ftgs, & Boxes ---
1001 3/4" EMT -1,426.00 33.95 C -484.13 2.90 C -41.35
1133 3/4" Alum Flex -60.00 38.80 C -23.28 3.00 C -1.80
1427 3/4" Set Screw Die Cast Conn -168.00 40.50 C -68.04 0.06 E -10.08
1547 3/4" Set Screw Die Cast Cplg -211.00 54.30 C -114.57 0.04 E -8.44
1886 3/4" DC Straight Squeeze Flex Conn -20.00 93.45 C -18.69 0.12 E -2.40
2279 3/4" 1-Hole Strap -18.00 20.17 C -3.63 3.00 C -0.54
2573 4" Square Deep Box (1/2 & 3/4 KO's) -84.00 228.22 C -191.70 0.12 E -10.08
2731 4" Square-1G Plaster Ring-5/8"D -35.00 83.93 C -29.38 0.05 E -1.75
2752 4" Square Box Extention Ring i;Specia -24.00 187.20 C -44.93 0.06 E -1.44
8288 18-2-SHLD-TWPR -1,691.00 152.15 M -257.29 10.00 M -16.91
--- 01 Raceway, Ftgs, & Boxes Total --- -1,235.64 -94.79
--- 02 Wire & Cable ---
2790 #12 THHN CU Stranded Wire -6,794.00 58.83 M -399.69 5.50 M -37.37
--- 02 Wire & Cable Total --- -399.69 -37.37
--- 05 Wiring Devices & Covers ---
- 4790 4" Square Flat Blank Cover -25.00 53.25 C -13.31 0.03 E -0.75
--- 05 Wiring Devices & Covers Total --- -13.31 -0.75
--- 07 Misc ---
6838 Yellow Wirenuts -33.00 7.35 C -2.43 1.53 C -0.50
6928 Fire Alarm System 1.00 QUOTE 6 0.00 0.00 E 0.00
--- 07 Misc Total ---- -2.43 -0.50
Job Total -1,651.07 -133.41
* -25.00% Price Factor
{
OX
ii
3av:id OO S
ENTERPRISES
9000 Burma Road, Suite 101 Palm Beach Gardens, FL 33403 561.863.1200 Fax: 561.863.1264
February 13, 2002
Mr. Mike Flattery
Gee&Jenson Architects
One Harvard Circle
West Palm Beach, FL 33409
Re: Tequesta Public Safety Building
Alternative Soffit Brackets Per Proposal Request No. 16
Pending Change No. 27
Dear Mike:
We offer to furnish an alternative soffit bracket per the referenced proposal request for a net
credit of Four Thousand Forty Four Dollars ($4,044.00). This figure represents the total
savings minus twenty-five percent contractor incentive for value engineering. I believe this is
in line with our discussions with the owner.
Attached you will find supporting documentation for this proposal. Please don't hesitate to
give me a call if you have questions or require additional information.
Sincerely, Accepted:
David Brooks Enterprises, Inc. Village of Tequesta
5)
David Brooks By: •
President
Cc Chief Jim Weinand, VOT . ' d �' Date: °24:H*--j
Rick Wilhelm, DBE int Name/Ti
File , t6e' c �--
C:\MSWORO\Tequesta\P.C.#27.doc
General Contractors • Construction Management
• e
ESTIMATE RECORD Date: 02/12/02
David Brooks Enterprises,Inc. Project: Tequesta Public Safety Bldg. Page: 1 of 1
P.C.#27-Alternate Soffit Brackets(P.R.#18) Prepared by DB
tail/ Labor Total Material Material 'Subcontract Subcontract Total
Sheet Description Unit Quantity Unit Labor Unit Total Unit Total Cost
Alternative Brackets EA 120.00 0 35.06 4,208 0 4,208
Delete Specified Brackets EA 120.00 0 (80.00) (9,600) 0 (9,600)
III
0 (5,392) 0 (5,392)
State Sales Tax- % 0 0
0 (5,392) 0 (5,392)
CHECK--> (5,392)
Contractor's Portion of V/E Savings % 25 1,348
Bonds/Insurance % 0
(4,044)
IIII
1 I
.� CEavR67* c # z-1
D
. . N i 1 10uz OWNER
PROPOSAL •REQUEST ARCHTTECT ^I �!
AIA DOCUMENT G7o9-ELECTRONIC FORMAT CONSULTANT 0 t CONTRACTOR -I
FIEI.L)
OTHER 0
TUTS I7'ICUMt N•r tiAS IMPORTAN T L1:CAL c.vti5tui ENC.Es;-WNsui,rA'flbN WI AN ATTORNEY IS ENLUtuwc,F.0 L i:H REAP ELI 10 ITS
COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED ALA DOCUMENT MAY BE MADE BY USING ALA
DOCIUMENT D.,oi.
PROJECT:Tequestapublic Safety Facilitt PROPOSAL REQUEST NO.: .
(Nameand address)
250 T-ec uesta Drive•- Suite 300
Teouesta, FL 33469-0273
— DATE OF ISSUANCE: 12-21-01
OWNER:Village of Tequest,;t CONTRACT FOR:Construction of Public Safety Facility
250 Teouesta Drive- Suite 300
Teouesta,FL 33469-0273 •
(Name end address)'
CONTRACT DATED: October 18.2001
ARCHITECT'S PROJECT NO.:20004.0(1
TO CONTRACTOR:David Brooks Enterprises. Inc,. ARCHITECT: Gee&Jenson EA-P. Inc,
9000 Burma Road-Suite 101
Palm Beach Gardens.FL 33403 •
(Name and address)' •
(Name and address) One Harvard Circle
West Palm Beach. FL 33409
Please submit an itemized proposal tor changes ui the Contract Sum and-Contract Time for proposed modifications to the Contract
- Documents described herein. Submit proposal within _7 days, or notify the Architect in writing of the date on which you
anticipate submitting your proposal.
THIS IS NOT A CHANGE ORDER,A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE
WORK DESCRIBED IN THE PROPOSED MODIFICATIONS.
Description:
(Insert a written description ofthe Work)
CHANGE Soffit Brackets per Drawing PR16-SKT-1.
Attachments:
(Lit attluicd documents that support description.)
_.......Liihi
REQUESTED BY:Mike Flatte
(0/1.4".ti ��J I /1 fee&Jenson.Engineers_A[chite-cts.Planners. Inc,
���-./ ' 1/_.. Project Manager
(Signature] (trinitd name and tit).)
' 0 1393 THE AMERICAN INSTITUTE OF ARCHITECTS, 173E NEW YORK AVENUE, N.W., WASHIFIGTON, D.C. 20006-5292. AIA DOCUMENT G709 -
PROPOS.AL REOUEST-1993 EDITION-AIA®-WARNING.Unlicensed photocopying violates U.S.copyright laws and Is subject to legal prosecution.This
document was electronically produced with permission of the AIA and can be reproduced in accordance with your license without violation unti; the
dare of expiration as noted below. User Document: requesta g709_t16 12-21.01.aia -- i2/21)2001. AIA License Number 1007569, which expires on
IQ/31/2002.
Electronic Format C709- 1993
1
Jan C'i VC VT: VGr+ a..ul fly L DU1 LS711'1S L.Vf r+ lJV 7T10 r,.
} •i
7V7v
CUCHEL BUILDING CORPORATION
LATH • PIASTER • stucco • EXTERIOR ERANAING
January 29, 2002
David Brooks Enterprises,Inc.
9000 Burma Road, Suite 101
Palm Beach Gardens,FL 33403
Attn: David Brooks
Decorative Corbel 8"Projection X 9"High X 8"Wide- $33.08!ea.
Total 120 pieces - $3,969.60
Z3b,
-I- TAx CC Io
it A ZOg
SCOPE OF WORK
Provide decorative corbel with base coat. Installation by others
•,: .�•;:...;i r•.-r+,c•. :pr: ..t!+ pC. q;. - {�.It�_ =•'4'4 =.y1 1 34:
,
;
p . ;
Jul 17 01 0900a , & T Mirasol . 561 -309-7913
Jul 17 01 06: 49a Cuchel Building Corp. 561-750-3416 P• 1
JU L- o' ^DOI 04; 58 ru FOAI CONCEPTS I
?t4 c 9545226doi
t -c
•,........---------_
•
, _____. ___ _ _:ssitima
siD1
I'
I
1 "
I ,
I
110 RoFILE
_........____:._: ......_„...._.. ........._.:,.."..•,):::::,.......0._71... _. ._r_c
vrrv,I,...n...7...,,: ,,...,".„.i.,.......i.,,...i..i.:::::::, „t,.::,n.,.... .:... .. . ..;,;..,..... ,..x..:..: ,..:...i.:.......i2.,:...,.::.: ,.. ..i,...., ,.
. i•J'1•&3,..*.•::.g2;.,...;}Wili.,/t4V4 ;•,,..' '41.•••P.r•''.'t ft.'1.V.if.•'• - ' ••• • • '' ... -:e:: ..• .. r.: •;• .:..;•'• ',1:.•:\..*;jie••'
,f'..,1::.'...::-••- ‘•:: :::.T.I._._.•:;.',".:•-• ,•:4' 'TX"i;„ mi 1 :.;:.-.. .. . • eg. !• •: ...:.1,-::,,1 :••:leg..r-•''.*-1.'••;•rl'' :.;,':!;• ...
;Z•Silittil:;47.3.1A!'grf...' :f*-1.?,-::::i:i... -.1::.•'•.....•-• :. ..: . -*.' " — -: • . ... ••,.,. .r.--
'....I r.v.e.-J.....• - ,... •.... i.• ....•
• . • • . .
• , . . ).1• . .
- . • • .
. . •
1-f:1; i::.7..'..,;.7:: •,•:.:7....;(.•; •'4' . •• •'.trY:t4r.t..lt i' ‘: ..t, .•' 1
''; `ii:A>,N•••" '- . . -r•';147•;.: , . . i••••.1, . • •tt .
":'-.4•t•'('‘i.,,' ..-. i 0.•kat; . - . '!:.•-•:': iIiit .' : ••• ..•'. '..r.••••• ' 'ef0 . , ...
.,•- 44;4,.- • , ,..,1, J ,n• • 'l f•-•'•••.-'1'Jr**;i....,. .. • - 1.p .:. -.. t,'::::;!ez,'
..... ";••I,., ! !;,%!:;!f''.
:!. .;-S`....7•:;"- r . .1.. •
:).'.:Z.L'r'.....:'1'.:... '- •
g•f4P...AAJ ' 4.1i.;• . '' ' •n.
..I-. '••••.•.: ,....,. ....:....:;.:76: ..?..1:,•! '.•..1,'..."...I.iri:•,!!4.7.1.1.fli. ..,..
V• ;,::..:. • . ..•••••:::1.-4...ett.••:.:1•;ihit.:.• .:.•v...LA•ge-•l'114;t• C.
-..:::.• ,-••• ": ••••:‘,., ... :,..,! ,•: ,,.,,,:,•,-1, -.. !,.rt.•:•.1..., •.•i. .....
•
.- . '.:1:1•••••'-4,1.. .........;.1 if.%•....4•{;%3i......4,%.1.,,";1::,.-7...4.•.-.d.:47;i'/•:.i•:,f,I.,..?-1.....,.:. 0......i.:i
'1.1tilf•V:4:%`I 1 :
:lett. .1'4-;;;:•::!..7%.•................t1....-.',.:1;I:1-•;.1.t ,:yr..... -'...- .-.....4.-.2;i..;•-•:0,.--:A!.;
f
1.....1.0:- il•.1 :"1- -
- •!..--i.it?'"2.,:s .: • :':.: ...!:•-,.•:.;:';•.:1;:1,... .1:1?:. ••?'* --' .,..'`1"•'1 •4'.."".....4..c4.,..:1,:!?.';:
,... :.f.rs......„,.!i ,..•._ ...:..,4•:::; ..,•i,.:,....'..;'i.: :•!.•-..•••• • •;....:+•.-,••:;•••:••••..i.:•g.-'":•:••
. .,. i ,..:.2:.•z:,....A •••4 .7 . ,.45•:••••••:!: • :4: r'...'::-..1.-`:::;:,:.:, ...;:. ' .• • •r.';•*::-;•ri..:i7.1:,:f‘.; I-: . •' — . 1.'11.:-•:;*-...' " 'i...lc;. ,k`" "....:•1••••••I •2•1.;••••;A••‘ '4'-•C;::.'::i4!•..1.4•:••.-:.•••:•••!".:.....•-::•t':.''‘i X••,':kcJV. I
--• 'I.'.??...7:12 ••• 1, '-•• •.•,T a.;t:!:..i:5:.• •-.,,r,0 l4...c..,1*,!:•••••"•• • " ::::.:•:-,..i.1.,4-;1•4,;.;...-:!:!• • .4,-• .1::.,:44,-• ...•,i:4' .4;i:•,:e4.1: -5•::. ' . ..-....-„•:t.:f,;.•!:1
; :3,'. .7....;r,!-1:...,:..:•:,•: :•r:"P: ....;!::::: )...._ .•,••.-k..-..i4••...i. :..-. :-• . .•:....- :..;-:1.:•-•;•*5.1:•.';'•-'''.•
.....:.11:'-i,..4.--.•'.. i .i1•••••'. -,-......::•.t. -...:-:.3,?:'.....A.:••..;!!..,- ::";.....--;-....•-:,..,;:;;i.'4.4.ii•t ?;Z
..'zi•E..... ,2r,•?. .t' : ..",:1.•: •'.1-1. ..-' ..,.....'.,. `.....,•':.::;:,:a.-. i . •: .... .. .. -.q 414.;
•
• L. -............1. 1:..-''- f••-•':.511";.'"TZ'•:*'-'1;.•!.—r..:t:-7.•
. .1.:•,.......'". .,'•..;:t .. :1. .. '.."•.*:.* ..-•;••.;igr?.. ;5:g.'....:1,..•‘:.^il'•,;: i":191fir• . •.. ....",.:..,.;;*...,....71::::14.1.9.r7•Yetr•;•.: •Te...P..7 \4:A.1/4.E., :' ; i:::-. . :i. .:F....g.::1411: ::r1.?'..:11•7.i711:71-.i...PV...:',:r:.........,;".:....:i..''..1,:..1..:.1,...,.•...:.;:i:,.4.:1....::.:.........1!...........';'.:.'•...r...;...::.......r.1_,..'.:.....;,.....11.....:.1...•.:7..,.1;.:..f'.1:.'...,:-..1:,.....4:.1:, :I';..4:.....c..'..:.....;.....11'!::1.:":‘..•:,:j...::::°1.:'..4..,.i..1
:;:;.1.4.1.i•:;!:4:1:11;!!•:•1:.;f:if......."....:.;.:0 7'-•7:.'4:•!•!.'•.:. ..*.•i.f.1
•
• . -4,1:•'.1.',,,••9•;...:7i•...t.•"'••••••••••••••:.••;•-....• 41:1q.1
.,... .
•'S.4,
:!4: ‘it•:.-1;••;.1.
•.'4 ..". ,•••,-. -
. ..".'11::11•;41-7••: %•
... " ••1.,..:.-fi ..
• .....,.;1.1,...rz...q...1.11•11;-.4.f. •4
i ...r.11-'...,,,:::..,.:'*•.•-'• .. •-:.•••.."-. ,,,-..12.,11.1=.:•,........-...:.v.::4;, ,:,.;...:i:,,,,,i:.:. ;,,,r,I.:..,„:
•••.::•:::f.•:; ;.r..,:;•..,..73 ' -,• ',it,,,:ivek 4.4:'•40k -.7.:.
r:....•* .1'..t.i.,.,..:,"
',:•,' • f'VI.;:.:' . .:* .:,' 3.•i!.^.......=
....i7:%::.: :-....3.:,17i....;..
2;'••.);••':?;:i'.4.•:!'5••••••:.•••-•t•-'st- • '•''.51•--- .
..ii.•.•••11;1".. ••
'..(•`.. •:.'.:.•••'ij tZ•C:',.4:ii4:,
- froi;':••••••.-..1-*•••••;...I.:•-j,:111:'P. r.••••,-
.
.1::14;•;'. '4.*:':-#3•1:f•:11.9:•-4:.'.41.-...4;5;•• *'11: _...--
• -
•
•
i
rrMI)1561—X R1P7t_IL 'f471i-LI