STAFF MEMO
Meeting: Regular Council - Dec 14 2023
Staff Contact: Marjorie Craig, Utilities Director Department: Utilities
Utilities Department Monthly Report
Attached is the monthly Utilities Department update.
This document and any attachments may be reproduced upon request in an alternative format by
completing our Accessibility Feedback Form, sending an e-mail to the Village Clerk or calling 561-
768-0443.
BUDGET • - •
BUDGET AMOUNT N/A AMOUNT AVAILABLE N/A EXPENDITURE AMOUNT: N/A
FUNDING SOURCES: N/A IS THIS A PIGGYBACK:
❑ Yes 0 N/A
DID YOU OBTAIN 3 QUOTES?
❑ Yes 0 N/A
COMMENTS/EXPLANATION ON SELECTION Not related to a procurement item
N/A
23.Nov for Dec VC Mtq Utilities Update Dec
Page 235 of 593
Agenda Item #12.
Village of Tequesta
345 Tequesta Drive 561-768-0700
Tequesta, FL 33469 www.tequesta.org
To: The Honorable Mayor and Village Council
Through: Jeremy Allen,Village Manager
From: Marjorie G. Craig, PE, Director, Utilities Department do
Date: November 30, 2023
Re: Utilities Department Monthly Report
The Utilities Department monthly report for December is found below:
Stormwater
• El Portal—joint project with Public Works—includes road/sidewalk improvements
o Stormwater catch basins, swales, and sidewalks are almost all complete and sod is being placed
o Paving remains
o Mr. Wynn noted the patience and understanding of the residents that have been affected by the
construction and offers his many thanks
J", mom
_ r
a•
k
7
This document may be reproduced upon request in an alternative format by contacting the Village
Clerk's Office at 561-768-0440 or by completing our accessibility form: https://bit.ly/3mnfeU4
Page 236 of 593
Agenda Item #12.
• FDEP Vulnerability Assessment Grant/ Project
o Applied for an additional $50,000 of funding from FDEP from the Resilient Florida grant program
to fill data gaps
o Current status is: working on sensitivity analysis but data gaps may impede completion right
now; also working on identifying focus areas
• Dover Ditch—Shared Project with Town of Jupiter
o Agreement received from FDEP and is on agenda for approval
o CMA still working on final design and permitting with the CORPS permit the mission critical
milestone
Water
• Water Treatment Plant Projects -projects are in ongoing stages for the water treatment plant
o SCADA modifications—second contract for critical radio communication concerns raised an
emergent need to replace our radio communication system since existing radios keep failing and
cannot be repaired; existing 900 MHz system needs to be upgraded to a 200 MHz system as
soon as possible; replacement request is on this agenda
o Membrane replacement design for train#2—Dover Engineering—design specs complete for
train#2, will use design for train#1; Dover Engineering has provided draft scope for providing
installation specs and bid assistance since the original membranes/sizes are no longer available
and we cannot install new membranes
o Unregulated contaminant monitoring rule (UCMR) sampling at wells have been conducted and
results were found to be contaminated; sampling of surficial aquifer wells and point of entry
sample completed December V and upper Floridan aquifer well sampling scheduled for
December 81h
o Water Treatment Improvements—received plant internal hydraulic model for sizing the high
service pumps; received 90% design plans and specs for review by the Village;will schedule
review meeting in January; final plans and specs anticipated by March
• Water Main Projects
o WM#1 —Tequesta Dr. and Country Club Dr.
• Anticipate full notice to proceed (NTP)to B&B Construction on January 8, 2024 (material
delays until December 15-20th delayed the NTP)
• Pre-construction submittals and Village permits complete
• Letters to residents to be sent in December in anticipation of January NTP and in the water
bills
• Signage to be staged near the construction site
AL
Page 2 of 3 Village of Tequesta
Page of 593
Agenda Item #12.
o WM#2 Beach Rd Phase 2
• "Request for Inclusion" submittal to FDEP goes before the committee at the February
meeting—Palm Beach County permit was not complete by the November meeting, per
Kimley Horn/Holtz
• Design complete with meter and bypass modifications by Kimley-Horn
• KH's updated engineer's opinion of probable cost-$4.1M (May estimate was$3M)
• Bid can move forward once final permit from PBC is received, anticipate January bid date
Miscellaneous
• Department-wide "Happy New (Fiscal!)Year!" meeting held in November with interactive
activities, refreshments, and Mr. Craig made chili for the team; team shared what was
accomplished in FY23 and what was planned for FY24
• The new chair of the state section of the American Water Works Association was "pinned"
on November 291n
i
14
0441
r t'lyaaT.
X. +os�ai
Page 3 of 3 Village of Tequesta
Page , of 593
Agenaaimm wit
, ( }
CL
\
\� m ( _ \ .
? ; • • . m •
w \ \ \
�
/}
�\\ z z . . . . . . . e
}
2
| - �
r � _ «
u
[ )
� 9<1
■ �%$
\ \ \ \ \ \ \ ..... §&\\« \ \ \ \ \ \ \ \ %
Or
z $ z §
% f
°
2 §
7
, -. ƒj91
s
0 ¥ y .
90
S m y ® »
, | , % - % s
« . % - `
| |�I y \
| . gip %
` _ : , , ° %
( ^
Page 239 7 593