Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 7-C_9/10/1998 3ilr Cio V�`0 L VILLAGE OF TEQ UESTA , Post Office Box 3273 • 250 Tequesta Drive • Suite 300 , Tequesta, Florida 33469-0273 • (561) 575-6200 s i1� Fax:(561) 575-6203 ° VILLAGE MANAGER'S REPORT August 24, 1998 - September 4, 1998 • Letter to Jerry Brownlee Regarding 1998 Notice of Proposed Property Taxes and Proposed or Adopted Non-Ad Valorem Assessments . • Letter to Herman Brice Regarding 1998 Notice of Proposed Property Taxes and Proposed or Adopted Non-Ad Valorem Assessments . • Letter to Mark Galloway Regarding 1998 Notice of Proposed Property Taxes and Proposed or Adopted Non—Ad Valorem Assessments . • Letter to Representative Thomas Warner Regarding Village of Tequesta Proposed Special Bill for the Unilateral Annexation of Anchorage Point and Jupiter Manors . • Letter to Senator William G. "Doc" Myers Regarding Village of Tequesta Proposed Special Bill for the Unilateral Annexation of Anchorage Point and Jupiter Manors . • Memorandum to Gary Preston Regarding 1998 Notice of Proposed Property Taxes and Proposed or Adopted Non-Ad Valorem Assessments. • Memorandum to Tom Hall Regarding 1998 Notice of Proposed Property Taxes and Proposed or Adopted Non-Ad Valorem Assessments . • Memorandum to Village Council Regarding Tequesta Drive Drainage Diversion Project; FEMA Additional Funding. • Letter to John C. Randolph Regarding Siegel v. Village of Tequesa Release of Lien. • Memorandum to Scott Ladd Regarding Interlo.cal Agreement with Palm Beach County for Regulation of Contractors and Construction Activity. • Letter to Kevin Kinnebrew Regarding Appointment as an Alternate Member to the Tequesta Board of Adjustment. • Letter to Vincent J. Sama Regarding Appointment as an Alternate Member to the Tequesta Board of Adjustment. 1 • Letter to Darlene Kostrub, Palm Beach County Literacy Coalition, Regarding September as Literacy Month in the Village of Tequesta. • Memorandum to Carl C. Hansen, Al Oslund and William E. Sharpless Regarding Reappointment to the Board of Trustees of the Employees' Pension Trust Fund of the Village of Tequesta. • Participated in an informational meeting relative to the proposed plans for Tequesta Plaza and Bridge Road at 6 : 00 p.m. on August 25tn • Attended the Manager/Finance Director's monthly meeting in the Town of Jupiter on August 26tn. • Attended the Village Council Meeting at. 7 : 00 p.m. on August 27th • Participated in a telephone conference call with Scott Hawkins, Tom Jenson and other consultants relative to Jupiter legal matters at 3 :30 p.m. on August 28th • A Staff Meeting was Conducted at 10 : 00 A.M. on September 1st, wherein the following items were discussed: 1 . The Fire Chief indicated receipt of HAZMAT response payment by Rinker Materials . 2 . The Fire Chief inquired as to the acceptability for fees being collected in association with Special Events Permit. 3 . The Fire Chief distributed the hurricane plan for receipt of departmental updates . 4 . The Fire Chief indicated the need for funds to upgrade air vents for central air conditioning in the Fire-Rescue living quarters . 5 . The Finance Director sought direction relative to requirement of interfund transfers prior to account overdrafts . 6 . The Finance Director reviewed $7 . 00 surcharge information. 2 4 • 7 . The Finance Director reviewed fixed asset threshold and all agreed that new threshold would be $750 effective 9/1/98 . 8 . The Director of Public Works sought direction relative to stepping stones at Good Shepherd. 9 . The Director of Public Works reviewed Jupiter request for amendment of Weir at Dover Ditch. 10 . The Director of Public Works advised that Stormwater Assessment for Tequesta Pines lots A, B & C was in error and would be removed.. 11 . The Director of Public Works sought direction for schedule of concert series . 12 . The Director of Public Works sought direction relative to funds to pay Northern assessment. The Director of Public Works provided a copy of Draft West Tequesta Landscape Plan for Village Manager review and comment. 13 . The Director of Public Works was requested to provide the status of a Workers' Compensation Case. 14. The Director of Community Development was requested to report on the status of satellite dishes at Mobil Oil in Countyline. Plaza. 15 . The Fire Chief was requested to complete review of feasibility of volunteers in contract work with labor attorney. 16 . All Department Heads were reminded to complete PERT charts for FY 1999 . • 17 . The Finance Director was advised that first debt service payment on RO Bond Issue was due in September 1999 . • 18 . The Water System Manager was reminded to contact each franchise community for paving schedule to coordinate paving with water main replacement in future. 3 19 . The Water System Manager was requested to provide the status of the demolition of the storage tank at Village Hall. 20 . The Water System Manager was requested to provide the status of the sale of land at the Bridge Road property. 21 . The Water System Manager was requested to provide a draft of Water and Conservation Administrative Policy Revisions . 22 . The Water System Manager was requested to provide the status of RO Project on rates. 23 . The Water System Manager was reminded of the request for written plan on RO Plant operations . 24 . The Director of Public Works and Chief of Police were reminded to order "No Parking" signs for Tequesta Oaks Drive as soon as possible. 25 . The Director of Public 'Works was requested to address irrigation problem at US 1 medians as soon as possible. 26 . The Director of Community Development was requested to provide status report relative to planner activities for property owner concurrent with South Cypress Drive Landscape Plan. 27 . The Director of Community Development was reminded to have the Village Attorney prepare a right-of-way ordinance as soon as possible. 28 . The Director of Public Works was requested to determine ownership of inapplicable detour sign at Cypress Drive and Tequesta Drive. 29 . The Director of Public Works was directed to have the Stormwater Utility Coordinator do all remaining storm structures with contract labor as soon as possible. 30 . The Director of Community Development reported that Lighthouse Cove was undergoing in-house review at this time. 4 31. The Chief of Police announced that the new detective in October would be Charles Weinblatt. 32 . The Chief of Police requested the ok to designate Good Shepherd School area as a "Drug-Free Zone" - same granted by Village Manager. • Met with representatives of JMZ Properties at 2 :30 p.m. on September 1st. • Met with Director of Public Works regarding improvements to Tequesta Park at 2 :30 p.m. on September 2na • Attended Unemployment Hearing at 9 : 00 a.m. in West Palm Beach on September 3r1 . • The Department of Fire-Rescue Village Manager's Report for the Month of August, 1998, is attached hereto and made a part of this Report. • The Department of Community Development Monthly Report for the Month of August, 1998, is attached hereto and made a part of this Report. • The Water Department Monthly Water Usages Report and Monthly Water Quality Analysis Report for the Month of August, 1998, is attached hereto and made a prat of this Report. WP80\VMReportSept. 5 ay. 4.t,t V xs ~ VILLAGE OF TEQUESTA DEPARTMENT OF FIRE RESCUE • VILLAGE MANAGERS REPORT AUGUST 1998 Number of days included in this report 31 Total number of calls 70 Number of medical calls 43 Number of fire calls 10 Number of calls classified as others 17 Resources utilized for incident mitigation Number of Engine company responses 40 Number of ladder company responses 9 Number of times Mutual Aid was received 2 Number of times Mutual Aid was given 6 Total number of hours needed for incident mitigation 217.5 Average daily staffing Daily on duty firefighting force 5.51 Daily on duty career firefighting force 5.04 Daily on duty volunteer firefighting force 0.4 Average number of volunteer firefighters on duty during daytime hours 0.6 Average number of volunteer firefighters on duty during night time hours 0.3 Fire Code Enforcement Total hours utilized on Code Enforcement 88 Hours spent on pre-fire planning 0 Number of violations found this month 68 Number of violations corrected this month 1 Required Duties Hours needed for vehicle maintenance 78 Hours utilized for equipment testing 29 Hours needed for equipment maintenance 58 Hours needed for equipment checks 153 Hours needed for building maintenance 122 Hours needed for hose testing 0 Hours needed for hydrant testing 2 Total gallons of water used 20000 Miscellaneous Hours dedicated to community service 40 Hours required for administrative support 221 Firefighter physical fitness program 79 PERMITS ISSUED DURING THE PERIOD 10/01/97 THROUGH 08/31/98 .1 PAGE 1 0 ...- THIS REPORT WAS PRINTED ON SEPTEMBER 1, 1998 --- VILLAGE OF TEQTJESTA k PERMIT TYPE AND DESCRIPTION '# OF PERMITS VALUATION FEES DUE FEES PAID ..:. BC - BUILDING - COMMERCIAL NEW - 2 2,852-49,0.44 45,621.44 .:!. BR - BUILDING - NEW RESIDENTIAL 11 .2,455,959%.29'. , . . 39,139,34 39-,13.904 .- ,..........M.2:._COMMERGIAL_ALTERATIDNALLAMITION8 ' 18 1,045,496A19." ' - 17433:34 .17,033:34 k- 02 .,:';': DM - DEMOLITION 4 10,445.00 235.00 235.00 1,1 I_ DR - DRIVEWAY 51 157,276.00 3,818.70 3,818.70 1:,.,. .R.I.,....,-;._BLECTRIUAL -__MISCELLANEOUS 98 17 225.00 7 086.60 7,086.60 v, ER - ELECTRICAL:=,'NEW.CONSTRUCT/OS " hil LB - LAND:DEVELOPMENT . ,,: ' . ' . ':: ':-' 1 -:-%'-'-E-.: .--,•-12b:r00e(60:::':-.- - ,;*2'4'-:000,'-66•-?-,71: ::.,,,.', .,,,...:•,-470tys) Vo:: L.__1L5__=_Iall1nst212E LEtrivilt -30',.- ---.- :,21L61446:, :,!-7; ::,-.,-az8IY:611: ::-,.;,..-i-',. ,211-460;,-,60 - '....,7 F'!! ME - MECHANICAL 129 955,815.48 17,791.24 17,791.24 ..1. MF - MULTI-FAMILY NEW/ADDITIONS/ALT. 4 9,550.00 315.00 315.00 .i.'..___MSL.: 111.3s...—mmuS 433 3,530,019.14 85,401.26 85,401.26 F PC - PUBLIC CONSTRUCTION- ,. 4' -660-757,0.0 . , ,10-570-43 . - 10i570.03 ''.Y... PL - PLUMBING - RESIDENTIAL & COMMERCIAL 81 . ' 2400.00!,- 7. .' ' 74542:63:' ' '7,342..00 P . . - ..- - -. '. .. ., ., . 0 p.---11A-- REsIDENTIAL_aLTERATOB.$ 6 ADDJTI05 • 23 . '. 520,025.00 : : . '.43;745.a.:1T ': ' 41,45E80'. 5 SS - SIGN PERMITS 20 32,809.00 992.00 992.00 1 , SP - SWIMMING POOLS 16 288,271.00 4,548.34 4,548.34 TOTALS FOR ALL PERMIT TYPES ' 946. ., 12;769,353y14,-... -,:y ...265,..23s,69 , ,165,2,38;69, ,.. ' • . '. ...., -, .177'51 l''.. :. O. !•,''1 '.1• 71 .:a 1'• 2(7. , .„---- 73 .1• .. . , —' 5ii .5 ' '. "'• ' •, 251 251 , ' 'II . .. •. , . ...'- • - ..' ' -. ••'''.' , .. . — — . • .. 52 t,3I ..,-, —— — -- g Hi .1 1:'7'.1-,11 NI l PERMITS ISSUED DURING THE PERIOD 01/01/98 THROUGH 08/31/98 a' PAGE 1 H ON SEPTEMBER 1' 1998 V3`L`LAGE OF TE TESTA PERMIT TYPE AND DESCRIPTION # OF PERMITS VALUATION FEES DUE FEES PAID IIII- BR - BUILDING - NEW RESIDENTIAL - --_ _ -.- 8— —- - 1 536,23a 97__ 24,441 0 24 44170. ' CA - COMMERCIAL ALTERATIONS & ADDITIONS 13 -. 920 587 00 1,4,990 39 _' . 14,990.39 "'- DM_-_DEMOLITIOtd_.—....___. 200 Q;._ 200.00 :'. DR - DRIVEWAY 45 115,951.00 3,113.32 3,113.32 +- ' EL - ELECTRICAL - MISCELLANEOUS 68 13,745.00 5,509.00 5,509.00 '= --.$R - Fi Ff`T/1TrAT -`NFW rnNCTRTICTION _ _ 6 O 6 940 0 6 0 I' LD -':LAND-'DEVELOPMENT c 00 I,al 1 : 20,,(?000 4,040. 00 �k,900 + LS LANDSCAPE PERMIT 23 , 161,,797 00 :: 2,70 60 2,707, 60 'r ME. -._MECITAM3'rnT. _ 13 $26,.,600, $..;' _ IS 3T8 70. 1 ,3?87Q had MF - MULTI-FAMILY NEW/ADDITIONS/ALT. 1 2,150.00 55.00 -�`�5.O0 " -a� -i MO - MISC. PERMITS 336 3,028,606.63 75,640.97 75,640.97 ,zl EC.._- pUnT,Ir rnxSTRnry_ON_-�___ 4: _ 660,757 00 10,570 03 10,570.03 PL, -..PLUMBING RESIDENTIAL &''COMMERCIAL 65 0 OD 4,8 6 00 4,$2 qv,: I RA - RESIDENT/AL-ALTERATIONS' &:ADDITIONS' 18 465 22.5 00 7 564 80 ICI SA .. _Cifaij''P.%;RMTTS'. _ - - ...Y .'7,564.0, yI r: _fin_ . 742a00 SP - SWIMMING POOLS 14 237,021.00 3,740.34 3,7�0-.3� 21 -, TnTAT,R FI'1R AT,T PFRMTT TYP,E$_ 'I ' -. _,_ _...,-._ 3�__.- 8 023,290.08 180.,419.84 180,419.84 - 17 I3YI _ IA lb J, w 147 I iI• i"9 ___....____ -.____- ___._-_.._. _.Y_.�..-...___,...-- JJ rJ 4- PERMITS ISSUED DURING THE PERIOD 08/01/98 THROUGH 08/31/98 PAGE 1 1..-: R THIS REPORT WAS PRINTED ON SEPTE1.5BF 1, 1998 e ,,.. . .. ,.,,,,, ,..,.....„.....•,.„....-. . ,,.,.,,. -.,,,,:,,,...,,..s..,:,•,,,,,.1,;.•,Q,,...'„:„.. ....-,,,.....;,,..,,,, ,-;,•;.,.•,:,,, ,-,::::(:.::-,:4,-,:y;4,..,;,,i..,.-,..,-.-4,--,..1--f,,,,-:-,,,,,,,,,,:,-,, --,:.:.--,;:,,-,-,.-..,.--:':-,,i-•--,'. ..-,.:' ----, '- - , ,- -st :•:..1,. ''.'-:.:,...'•••''''-'‘1!-':.2•..''''...,'..''),;::::':;',';:,•;‘!N',.‘r:lh::'•.-'•::::••.'.,1;;; ;:'''!--.:;'-•-,;•:: :'. ,.•:t'...-.:•••-:•,:..,:if.:'',:i'.,,••:.-.(f.,,Aiii,;,:li,i1g,.!:.0t;;.•1,gotlr.op. --..•.,,,!,:z:-.-,.... -a',.:,jil.;::::::';.:i .0-.''.,i,'.'•'•:r...,•;•-:";';,..,.....:2•••• ::i':.',.'''..-•.:,,,,,,'••'.:rl.:.,..•.•••-..-•• -'•. . `.•••' ".,•.. •i•'..,,:•••: •.:', ..„ • i, • si 71 —....— VALUATION FEES DUE FEES PAID ...# OF PERMITS 5 PERMIT TYPE AND DESCRIPTION 6 .15 . ..._.7: BR - BUILDING —:NEIT.'RES/DENT LAL... • :, : ' - : ' ' •• ; , 1- 291°'"•":..'s. 's--''"' - '. 41.-'.!;'46 61911'.....,0295...,;, , ......14:1,46.09,17'...I:3.2 05...1 I' CA - COMMERCIAL ALTERATIONS A-ADD;TIONS, . . .. ..3• .:'•-• .., .,•:.--4toi0'°'.:".-4"'...,•r :.:,:.--,.7 '.';:.-.,,.::•.8-13,1:.,•00:-•••,..,;,,I.:,: .-., .,.,:::!',:so..-:00 '":.. ' .- :• ,F; ;.•,,: : :.:..., : .. - FY,•:••• ', - ' •::'..:44i153):ccib'''''.• - - '' i 3 5..o 0 135'°° illd -DN. - 11EMOLITION ''. . . 3 '3,300.00 IN DR - DRIVEWAY • .ii 17,". EL - ELECTRICAL - MISCELLANEOUS 14 0.00 3,059.40 3,059.40 •1 0.00 245.00 245.00 L. ''1---"46"''. ''.' 'v.'''.''''.1'.'-:'''.61'.0. '''''''''''''''''..`,i::',,•;:'--..i':..'46.11.500; ...........:-.,.,..'..:r,,..:.:ii, '9 ER -- ELErTE I CAL - PIEll. CPF1.7./:.;PC7,191!-,f.....,..-:•;..,.,!.,..-:..' :.::' .',..,.;.:;,•..'':••71...';zi".....•.-',.'..!....;5:.... .-:,:•:'::::'...,•,..."-:.'..4;:1;:.:::','"i, . . .:.. ..,.,:i::. , ----;.,...:-!:• iii,ly`., :i':'' *,:-?,::„, ,,,,,, tri-trff;!:i!L;11,:;.,.:,,,,:1:';,:-2.,:.: 10.4.;,;4: fLty'..: ..i.:::;.,•:.,`:-.J.,,,' --iv, .'teg'''':•':'liANOSCA#A4taittn2`4,U ...;.'.`,',"1:•:.,,''-'''.:::::,i....1''''.'-':-..,:,;";:,,t.;''':'-'-''''.:q4:'sV:i'S'. ..,-<;'':. .,!;".''',-,;.-,`..''';.,,,,',4(fif:,.,:,;?,2,;`,"„..,i'"s:".,',":;i:P41-4949:g,q :J:-:)11,...$.,...:i.„4..c.,,t;. r.,A,.)...,,g,,..,;:,-,.:".,:,:!.•;..4:;,403,,.., '.: ..:..:•- • .1,, 897?00 . 1.1E2:3':'..1:ititr.C1.1StIA•;-71P,P4Rttiligi''',::..7,.'!','5•A''''i,4. :42.,•...;:i':.',...'';'!t-,.=.''.•.:.... :':.."-4.-'.':'....,.= ,'+2,....'•;...:',..'.,, ....:,,.',...,.i.:.;:.,-. :. ,...... :... ,...; .,.. , ,, 23 FL - PLUMBING - RESIDENTIAL & COMMERCIAL 8 0.00 735.00 735.00 ;!!.) RA - RESIDENTIAL ALTERATIONS & ADDITIONS 1,649.00 1,649.00 2 102,000.00 3 8,950.00 197.00 197.00 Jr+. i''t SF SWIMMING:PUOLS-- --,Y.I-1,- •,:l':' .' '. -. .:,-.- -,...': .-, • :,.,. .;._;•••_;__...:.,;._s_.r,,..1,.TY 91.7...5°,..;°-:'(C.7:; .,,.14::.47:.9::: .r : : : 48 ::; : 7 - I ' ' B: 0 T :E PES 8 : : 3 ::005: : 11 15, Pa im ,, . . ...-".. 1m r: 1:3 !...? . . .. . . ....... . . ._., .. . . ... . . . ,..:. .__ .15 73 ;7 37 . .4. F -.-. • it:: • . s5 42 '“ ' . ' • ' , ., •.. ,,-....,.., — ,,. ., ..,. .. .. ... , , ., .,. . ....., . , , ._ —45 12,1,. 12) ;471 i...7.r! . ifl - . . . , , . ', liil , •123_, :. n . • . • .. • •••••• ..„ . •••• •••• . . .• . . •• . :. . . *1-f. !..,. -,-; -• w 5' . . •LI__ — . • •• ....:••••....• ....,.., ....- ; , . , . ., .. . . 55. " ..,,.1 • • , . . ,. . .. . .—_-----,4''. , ... , ,.. ,.., ,. ..., ., . • ,.. . • . ' - .: ' : ' '.,..;:. . . . . ....., ---.*----- I -? TTil&ige o T uesta Memo To: Thomas G. Bradford, Village Manager ` From: Thomas C. Hall, Water System Manager i�%/ Date: September 3, 1998 Subject: Monthly Water Usages for the Month of August 1 through August 31, 1998 The following is a summary of water pumpage for the above referenced month. TEQUESTA WATER TREATMENT PLANT AUGUST 1998 1997 Target Pumpage 40 .500 m.g. 40 . 500 m.g. Actual Pumpage 49.583 m.g. 34 . 809 m.g. Maximum Day 2 . 159 m.g. 1 .511 m.g. Minimum Day 0 . 913 m.g. 0 .439 m.g. Average Day. 1. 599 m.g. 1 . 123 m.g. Backwash Water Used 3 . 991 m.g. 2 . 655 m.g. Hydrant Flushing 0 .202 m.g. 0 .216 m.g. WATER PURCHASED FROM JUPITER AUGUST 1998 1997 Target Pumpage 35. 000 m.g. 35 . 000 m.g. Actual Pumpage 39.385 m.g. 39 .236 m.g. Maximum Day 1.981 m.g. 1.746 m.g. Minimum Day 0 .510 m.g. 0 . 563 m.g. Average Day 1.270 m.g. 1.266 m.g. TOTAL DISTRIBUTION SYSTEM PUMPAGE NBHAUGUST 1998 1997 Total Pumpage 88 . 968 m.g. 73 . 922 m.g. Maximum Day 3 .499 m.g. 2 .815 m.g. Minimum Day 2 .242 m.g. 1. 939 m.g. Average Day 2 . 870 m.g. 2 .385 m.g. Page 2 - 1998 1997 Metered Service Connections 4 . 895 4, 767 Rainfall 3 .73" 10 .12" WATER SALES DATA Total Water Sales (FYTD) $2, 652, 951 $2,365, 255 Target Sales (FYTD) $2,436, 863 $2,479, 576 Jupiter Purchased Water - Annual Contract 547, 500 m.g. Water Received from Jupiter to-date 40 . 041 m.g. Contract Balance 507 .459 m.g. MONTHLY WATER QUALITY ANALYSIS PARAMETER 1998 1997 Ph 7.5 7 .5 Total Alkalinity 208 mg/1 202 mg/1 . Total Hardness 223 /1 216 mg/1 Calcium Hardness 213 mg/1 208 mg/1 Color 5 pcu 5 pcu Iron 0 .04 mg/1 0 . 04 mg/1 Chlorides 64 mg/1 65 mg/1 Turbidity 0 . 06 ntu 0 . 10 ntu Chlorine (total) 3 .2 mg/1 2 . 9 mg/1 DISTRIBUTION SYSTEM MAINTENANCE Meter Installation Replacements 24 New Installations 2 Hydrant Maintenance Flushed 4 Replaced 0 Serviced 0 Blow-offs Flushed 0 /mk c: Connie Holloman, Director of Finance Roy Fallon, Chief Operator Tom Jensen, P.E. , Reese, Macon & Associates Mo.Usage.9.3.98