HomeMy WebLinkAboutDocumentation_Regular_Tab 10-A_2/12/1998 1
Memorandum
' lla e Co Manager��
To:r V Council
g Bradford, Village
From: Thomas G. 1998
February 4, Tequesta Participation in Funding
Date: Request for Teq
Subject: Jupiter an
roundd
FPL Transmission Line at Loxahatchee Rive
r
Underground
enda Item
Crossing; 9 Jupiter to
request from the Town of o bury the
the remainder of the costs
the attached
We have receivedat the
participate in funding the Loxahatchee River
Inlet
line crossing know, the Jupiter 1 268, 376
Alternate transmission e• As you may of the '
District votedAl Bridge. approximately $705,103
to fund aPp the existing distribution lines on the
ythe same and
cost to bury
west side of the Alternate AlA Bridge• be asked to participate
shouldof the proposed
for that segment .
I do not believe that
Villageto Point 4. This is because I
to the underground solely
transmission ndne fromhis1stegment was placed solely
know off ti hand thatease the residents of Jupiterove
for political purposes to appease Since that is a Jupiter
adjacent thereto.
d be paid for totally
who issue, that immediately ge , in my opinion,
by
segment,
the Town of Jupiter. be
segment from Point 1 to Point 2 • It wouldo also
beneficialTh
leaves thesthur oses to cause this accurat accurately telling how
pld for aesthetic Th re is no way bent
placed hnderground. 36% .
remaining $563,273 is related
to be approximately line
mucho o the obut it appearsplacing t
from Point 1
to Point 2, the cost associated with
If so, $202,778 would be to point 2 .
line underground from Point 1 share as a
so inclined, Tequesta' s municipalities
Ife the Village Council is $26,767 .
the two
p
total population between of
j wouldcentage of for a total contribution
be 13 • as of taxable value between 00he two
The
Alternatively, as a percentage14 .4% or $
municipalities, Tequesta' s share would be 27 �984•
averaip computations would be $27 ,984.
- - average of the two comp if anything,
juncture, Tequesta still does not know
what, transmission
At this J to cause FPL to either bury
— it must rg Tequesta from Tequesta Drive to the Water
line underground in the transmission line
or relocate the route ofne• If you recall,
a
Treatment Plant, edge of U.S. Highway
Junel the1997 ,eastern provided professional cost estimates
the
18, Gee & Jenson
lacing
592 000, and cost of placing
e which indicated that the cost of reloca in e
to the Village Highway One would be $ Village Boulevard
route line U.S .underground from Tequesta Drive to
' = the
would be $625, 000 . It is anticipated that part of these funds
would be raised through assessments from the abutting property
owners who would benefit by the relocation or placement of same
underground. Therefore, Tequesta would not bear 100% of this
cost. However, it is estimated that Tequesta will bear at least
two-thirds of this cost.
It is still possible that the FEC Railway will come to terms with
FPL and, ultimately, allow for the transmission line to be placed
on FEC property westward of the western Old Dixie Highway
right-of-way. If this comes to fruition, then, perhaps, if the
Village Council is so inclined to participate in the same, the
Village Council may wish to participate in one of the three
amounts so indicated above ($26,767; $27,984; $29,200) .
It is recommended that the Village Council advise Jupiter that
Tequesta must withhold agreement to cost participate in the
remainder of this project until such time as it knows the full
cost that it is faced with in dealing with the same transmission
line in Tequesta. Jupiter should also be advised that in the
event that Tequesta does not choose to expend funds for
alteration of the transmission line in Tequesta, that Tequesta
may contribute $27,984 for its estimated share for placement of
the transmission line underground between Point 1 and Point 2 in
Jupiter.
TGB/krb
council\020498-2.sam
•
`ti,
•
--�-� JUPITER FLORIDA,SUNDAY,FEBRUARY 1 1998 50 Cents
...r '.: '1'a1 .• i... z =.,...3:•'lr e._..r:N-.i 1•- ," 6..r - ,� .. .� 4...♦,_.i<! '_" .e`.'. -.�ti:3:-.^r : ,f is�l`:..t. ter n-1+:
JID willpay toput line under river iP ' I
�„, _L.
"„ �.B Offers'to bury another FPL line if Jupiter buries future line near shore ' t'tt �, ..
5107,000 to have an existing distri- volts,to be out of sight along the the northwest corner of All-Euro- JID's conunitment to pay for , 0.0.t.' ey
JUPITER—High-power trans- bution line west of the bridge also river,so they don't mar the view. peen Auto on Alt.A1A,north of burying the river crossing was the �r ��¢
mission lines will not cross over buried within 18 months. the river,down to a short distance fast promise of money for the ; `� 1 rr
the Loxahatchee River,Jupiter In- FPL has said it could not pay north of Center Street,near a for- project by a local government. w Ii` ''
let District conunissionets decided The matter is expected to come for and charge its customers for suer marina,on the south side of --� °."---.*.a al
Wednesday night. before the Jupiter Town Council more than the cost of overhead the river. The bids also showed •'We're doing the river and i rays• ,•Pit
at its mating Tuesday night. lines; $61,640 for the river itself that the differential to a river t y're doingthe land,"JID Com- y• xl,,• s erg ���.: q
By a unanimous vote,commis bank to missioner ike Martinez said of x .�•
sinners a to Florida "I would very much like to see extended
253 for the river plus an crossing only,from bank M s� a
��ad .5597.916 the Town,of Jupiter a a extended area north and south. was$59,,916. the plan by which Jupiter might 14y Z`� gq`
Power and Light Co, to Pi p iP te,' pay,to bury the north and south h--�--�:— �-.: .re.
bury the planned lines along the JID Conunission Chairman Tom But the company said that if "The bid prices are good until extensions of the river crossing.
Alternate AlA bridge, between Hema7d.said."This Immhatehee' others,such as local governments, mid February,'JID attorney Bill
the north and south riverbanks. River is a regional asset." picked u i the difference between Broome told district commission- "Water grotty much a hold_ Jupiter Inlet bDury ict
has said it
the.aerialing we have right now until we see will pay to the section Of
Commissioners noted that i, price and the cost to ens Wednesday. if have anyone to power line shown In
And commissioners offered ao- go down the future
• other possibility. if some other only the river crossing is buried, bury the Guts,the lines would be He also said that FPL has path with us,',.'lupiter Utilities Di- orange.B also will pay to bury
there will be 80-foot poles on the Put under green& agreed to
• government,such as the Town of riverbanks. expenses such evenly,caused byrector Dave Brown told JID corn- the existing line shown in pur-
Jupacr, pays an additional In December,FPL said it had missions. pie if another government pays
$560,000 to bury those lines a far- For approximately a year,local bids to bury the lines. They obstructions underwater. He said that Jupiter hasn't yet to bury the two parts of the
tiler distance north and south of officials have said they wanted the showed the differential to be "I regard that as a substantial planned line depicted In yel-
the river, then JID will pay new lines,which will carry 138,000 $1,161,819'for the distance from concession,"he said. Please see Linen on A10 low.
•
AIO THE JUPITER COURIER Sunday,February 1,199e '
Lines .
•
•CONTINUED FROM Al , crossing and up to 25 percent
the extensions if others pay the
decided what it will pay,but has mainder,or making the 25 pera
been told"we're not going to see a payment contingent on the to
penny from Tequesta"and might amount being paid over its
get :minimal finanelng,"$5000o years through tax-free bonds fix
• to $100,000, from Palm Beach Jupiter.
County.
JID has$1.1 million in reserve Broome finally suggested the:
accounts that is available for the rangement that was adopted:3
project,Executive Director Mike paying to bury the new line ace
Grdla told commissioners.Com- the river and paying to bury I
• mission Chairman Tom Howard existing line if others paid to 1
said he wanted to be sure that the high-transmission entente
enough money would still be avail- under ground
able for l �rich as a
�sio ' jetty. He noted that the present dist
After checking financial figures button line west of the brid
with lID's staff. Howard said, would not go in the same slid
"I'm sufficiently confident we ground"sleeve"as the high-trz
have the$600,000" to bury the mission fine,so it could be do
river aoasing. - later. Commissioners said th
In the pest,amunissioneee have ll
would pay to have it'done wi
said they do not expect to raise 18 months.
property taxes to fund the project. Commissioner George Genii
Friday, Grella said that JID who also chairs the Jupiter-7
currently has approximately$2.9 quota-Juno Beach Chamber
million on hand If the district Commerce,said,before comm
paid to bury both the proposed sinners voted, 'The Chamber
line and present line this fiscal Commcice is 100 percent in as
year—totaling 5704,916—JID port of what we're anticipati
• would still have$15 million m doing."JID,he said,is the gc
hand when the fiscal year ended, element that's"most equitable
Sept.30,he noted. bear the cost,"because it cove
Wednesday,commissioners con- the largest area.
• sidered several alternatives for
working with Jupiter.paying the And Commissioner Pat Magi
differential to bury the lines across gao,who heads the Friends of t
the river and up to half the cost of l.oxahatchee group, said, "T
•
1•
PALM BEACH COUNTY MUNICIPAL TAX COMPARISON I
MUNICIPALITY POPULATION(1) TAX BASE(2)
Atlantis 1,694 $271,792,313
Belle Glade 16,858 $183,417,725
Boca Raton 67,754 $8,049,497,089
Boynton Beach 50,940 $2,245,940,786
Briny Breezes 398 $15,180,165
Cloud Lake 121 $3,568,615
Delray Beach 52,039 $2,758,936,396
Glenridge 219 $9,348,198
Golfview 153 $11,548,640
Greenacres 23,733 $620,219,288
Gulfstream 707 $297,015,850
Haverhill 1,187 $36,215,640
Highland Beach 3,264 $721,608,034
Hypoluxo 1,371 $147,895,684
Juno Beach 2,659 $448,462,645
Jupiter 30,599 $2,663,681,301
Jupiter Inlet Colony 421 $85,531,087
Lake Clarke Shores 3,640 $139,053,838
Lake Park 6,887 $267,198,028
Lake Worth 29,844 $667,451,327
Lantana 8,477 $341,966,726 .
Manalapan 330 $366,247,963
Mangonia Park 1,392 $110,073,501
Ocean Ridge 1,635 $306,488,038
Pahokee 6,935 $56,156,754
Palm Beach 9,790 $4,716,128,647
Palm Beach Gardens 31,909 $3,009,273,251
Palm Beach Shores 1,028 $149,972,270
Riviera Beach . 27,782 $1,376,589,416
South Bay 3,329 $37,557,176
TequeSta 4,673. $384,054,333
South Palm Beach 1,498 $163,259,960
Golf 195 $63,578,815
North Palm Beach 11,855 $760,220,910
Palm Springs 9,798 $177,676,316
Royal Palm Beach 16,720 $618,251,609
Wellington 26,148 $1,668,296,300
West Palm Beach 78,370 , $3,867,625,828
Total 536,352 $37,896,980,462
AVERAGE 14,115 $997,288,960'
1)Source: Bureau of Economic and Business Research, Uni
2) Palm Beach County Property Appraiser's Office
3) U.S. Department of Commerce, Economic and Statistics A
4)Calculated using 95% of Tax Base per Florida TRIM Law
File: TGB/AmiProlTaxlook.wk4
,i
tia
OWN OF JUPITER
thaei ' anuary 29 1998
' VijiigeofTequea
, � nsta
ter.. �.. JAN 3 0 1-'28
Village Manager's Office
Mr.Tom Bradford,Village Manager
Village of Tequesta
PO Box 3273
Tequesta, FL 33469-0273
Re: FPL's Proposed 138 KV Transmission Line Crossing of the Loxahatchee River
"A.
Dear Mr. O ord:
On the evening of January 28, 1998,the Jupiter Inlet District's Board of Commissioners moved
to fund approximately $705,103 of the $1,268,376 needed to bury both the proposed 138 KV FPL
transmission line and the existing distribution lines at the Loxahatchee River. Based on your office's
continued support in our committee to prevent these aesthetic impacts on the river and adjacent
historical sites,we are hopeful that the Village will be willing to also participate in funding this effort.
To provide added detail on the basis of costs and the funding arrangements established to date, I have
included several attachments for your review.
At your earliest convenience, please reply regarding the Village's position on funding. The
expiration of contractors' bids necessitates that we formalize our commitments within the next two
weeks. Of course,should you have any questions in the interim,feel free to give me a call.
Sincerely,
Lee R. Evett
Town Manager
Attachments
210 Military Trail • Jupiter, Florida 33458 • Phone (561) 746-5134 • Fax (561) 575-7785
FPL Powerline Crossings of Loxahatchee River at Jupiter Inlet
Cost and Funding Arrangement Summary
•
As of January 29, 1998
Cost to Underground Proposed 138 KV Transmission Line $1,161,189
(From Point 1 to Point 4 Shown on Attached Map)
Cost to Underground Existing Distribution Line $ 107,187
Located West of Alt A1A Bridge
*Subtotal $1,268,376
Less:
Cost to Underground Proposed 138 KV Transmission Line from $ (597,916)
River Bank to River Bank
(To be funded by Jupiter Inlet District-From Point 2 to
Point 3 Shown on Attached Map)
Less:
Cost to Underground Existing Distribution Line Located West of $ (107,187)
Alt.A1A Bridge
Balance to be Funded by Others: $ 563,273
*Costs do not include contingency for any out of scope conditions.
•
UNDER GROUND LIMITS OF PROPOSED FPL
138 Kv TRANSMISSION LINE & EXISTING DISTRIBUTION LINE
,
_.-_------j-----::--j' --- •
111 I 1 iip
, / /
\ . ./ , / . ,
,/,
,/, , ,_,,, 7-----7
, ,,„
, : , .
,, / . ../ .,, , , . .4.37
, /
i / / / /
Ili
,, ,,, „ / / / 4„,j,..
.,a.,
/ / ,' ��R /,/ ®
., / ,, /, /, / /i \,./i , , . / • \
.� . • TO BE FUND: �
/ BY OTHERS
MUER
LIGHTHOUSE
EXISTING FPL AERIAL •;
DISTRIBUTION LINE . : •
•�Y • • XIX
a
• •
4 •
LOXAHATCHEE • ''' 4
RIVER • •
A •
PROPOSED 138Kv
�; TRANSMISSION LINE
//\' ''H . s‘ / /4.
, .0// C) -
i \
-___EL, .
>�/ TO BE FUNDED
.7,
, (4044.iiimp,
7T*IERS ,
-ice. : \ ', ,II`;�,
EE/P '"/ 7 LEGEND .
--- ,11D.--- UNDERGROUND I MAIM
FROM JUPITER INLET DISTRICT
TO BE FUNDED BY OTHERS
1 +
tiAMi
•
y \\ JUPIIERWATEIt[mLillESS.JAN:29,1998
JUPITER RIVER CROSSING
DIFFERENTIAL COSTS POINT 1 TO POINT 4
Underground Overhead Differential
Construction Costs
Underground Construction
Contractor Bid 1,044,866 1,044,866
Overhead Construction
Labor,Vehicle&Misc. 8,974 39,163 (30,189)
Material 25,232 72,590 (47,358)
Total Construction Costs* 1,079,072 111,753 967,319
Engineering&Construction Support Costs.
Engineering, Licensing and Design 89,000 9,500 79,500
Drafting and Records 4,500 500 4,000
Construction Management, Field Supervision
and Inspection 102,500 11,000 91,500
Procurement and Contract Administration 22,000 2,500 19,500
Total Support Costs 218,000 23,500 194,500 .
Total Costs 1,297,072 135,253 1,161,819
ti
* Total Construction Costs Do Not Include Contingency For Any Out of Scope Conditions.
s
CONVERSION COST FOR EXISTING FEEDER
Cost of new subaqueous feeder, including direct bore $135,296
Net book value of existing overhead feeder 5,087
Cost to remove existing overhead feeder 45,129
Replacement cost of existing overhead feeder ( 69,707)
Salvage value of existing overhead facilities ( 8,618)
Customer contribution in aid of construction $107.187*
*This amount covers FPL facilities only
JUPITER RIVER CROSSING
DIFFERENTIAL COSTS POINT 2 TO POINT 3
Underground Overhead Differential
Construction Costs
Underground Construction
Contractor Bid 461,850 461,850
Overhead Construction
Labor,Vehicle&Misc. 8,974 15,438 (6,464)
Material 25,232 28,702 (3,470)
Total Construction Costs* 496,056 44,140 451,916
Engineering&Construction Support Costs
Engineering, Licensing and Design 89,000 9,500 79,500
Drafting and Records 4,500 500 4,000
Construction Management, Field Supervision •
and Inspection 47,000 5,000 • 43,000
•
Procurement and Contract Administration 22,000 • 2,500 19,500
Total Support Costs 162,500 17,500 146,000
Total Costs 658,556 61,640 597,916
•
* Total Construction Costs Do Not Include Contingency For Any Out of Scope Conditions.