Date: Underground
Request Tfransmission Tequesta Subject: Jupiteround FPL Transmission Line at Loxahatchee River
Undergr A ends Item
Crossing: 9 Jupiter to
requestWe
from the Town
of
to bury the
pa have received andthe attached mainder of
participate in funding the Loxahatchee Riverat
the
P line crossing know, the Jupiter
Alternate138KVlet
transmission e• As you may 268, 376
Distic voted Bridge. approximately $705,103 of the $ '
same and the existing distribution lines on the
District to
fund
cost to bury the west side of the Alternate AlA Bridge• participate
should be askeed tof pe tpicipate
for that segment
I do not believe thatVillageto Point 4 . This is because I
inoposed
the cost round solely
this segment was placed underground
solely
n that this Point ease the residents of Jupiter know first-hand to apP Since that isu a JupitCoee
who polilitical purposes
adjacent thereto.hould be paid for totally by
who e, that immediately ge , in my opinion,
issue, segment,
the Town of Jupiter. be
segment from Point i to Point 2 • It wouldo also
Th
bone leaves the Se9m ur oses to cause this accurat segment
to how
beneficial for aesthetic There is no way bent
u placed hnderground. 36% .
remaining $563,273 is related to theline the
mch
from o the obut it appears to be approximately
from Point 1 778 Pwould2 be the cost associated with p
If so, $202,
line underground from Point 1 to Pointshare as a
Tequesta' s municipalities
If the Village Council is so inclined, two $26,767 .
total population betweencontributionhe m n ci
1 wouldc be of a totalvalue between the The
wo
be 1, as, for a of taxable 4% or $29 �200 ,
muniAltecipalities,
a percentage
average oftths,
Tequesta ations would be $27 ,share would be •9.84.
- -- average of the two computations if anything,
this juncture, Tequesta still does not know
what,ham, transmission
At 7to either bury
it must pay to cause FPL from Tequesta Drive to the Water
line underground in Tequestathe transmission line
or relocate the route of One. If you recall,
Treatmentong Plant, edge ofHighway
along the eastern g U.S.U• professional cost estimates
the
June 18, 1997 , Gee & Jenson provided that the cost of relocating the
e which indicated 592 �000, and cost
of placing
to the Village y One would be $ Village Highway Tequesta Drive to
route to U.S. round from
the line underground
would be $625, 000 . It is anticipated that part of these funds
would be raised through assessments from the abutting property
owners who would benefit by the relocation or placement of same
underground. Therefore, Tequesta would not bear 100% of this
cost. However, it is estimated that Tequesta will bear at least
two-thirds of this cost.
It is still possible that the FEC Railway will come to terms with
FPL and, ultimately, allow for the transmission line to be placed
on FEC property westward of the western Old Dixie Highway
right-of-way. If this comes to fruition, then, perhaps, if the
Village Council is so inclined to participate in the same, the
Village Council may wish to participate in one of the three
amounts so indicated above ($26,767; $27,984; $29,200) .
It is recommended that the Village Council advise Jupiter that
Tequesta must withhold agreement to cost participate in the
remainder of this project until such time as it knows the full
cost that it is faced with in dealing with the same transmission
line in Tequesta. Jupiter should also be advised that in the
event that Tequesta does not choose to expend funds for
alteration of the transmission line in Tequesta, that Tequesta
may contribute $27, 984 for its estimated share for placement of •
the transmission line underground between Point 1 and Point 2 in
Jupiter.
TGB/krb
council\020498-2.sam
JUPITER FLORIDA,SUNDAY,FEBRUARY 1 1998 SO Cents
•JID will pay to put line under river•
� yt,
Edaor o.> Editor tkr Offers'to bury another FPL line if Jupiter buries future line near shore
ti+•fir.
5107,000 to have an existing duster volts,to be out of sight along the the northwest corner of All-Euro- JID's commitment to pay for
JUPITER—High-power toms- bution line west of the bridge also river,so they don't mar the view. peon Auto on Alt.AlA,north of burying the river crossing was the z a'
mission lines will not cross over buried,within 18 months. the river,down to a short distance first promise of money for the * r; r"r`
the Loxahatchee River,Jupiter In- FPL has said it could not pay north of Center Street,near a for- project by a local government. �y
let District commissioners decided The matter is expected to come for and charge its customefs for mer marina,on the south side of s,y - f rt=,..>
Wednesday night. before the Jupiter Town Council more than the cost of overhead the river. The bids also showed "Were doing the river and 9, sr, d• 3
al its meeting Tuesday night. lines: $61,640 for the viva itself they're doing the land,"JID Corn- p' s •'
that the differential to a rives Mike Martinez said of I* T
By a unanimous vote,commis- and.S135,253 for the river plus anmust err
sioners aged to pay Florida "I would very much like to see attended area north and soth. wacrs
only,from bank to bank, the plan by which Jupiter might r r •^^ 4 e'04-
Power and Light Co.S597,916 to the,Town.of Jupiter participate" was$597,916 pay,to bury the north and south PtA3`x< �
bury the planned Ones along the lID Commission Chairman Tom But the company said that if "The bid pries are good until extensions of the river crossing.
Alternate AIA bridge, between Howard,said-"This 1-o1ahatchec' others,such as local governments, mid February,".11D attorney Bill
the north and south riverbanks River is a regional asset" picked up the difference between Broome told district commission- "We're pretty mach
m a hold- Jupiter Inlet District has said It
Commissioners noted that if the.aerial price and the cost to cis,Wednesday. ing pattern right now until we see will pay to bury the section o1
And commissioners offered an- if we have anyone to go down the future power line shown in
• other commissioners
if some other only the rive crossing is buried, bury the lines,the lines would be He also said that FPL has path with us,", Utilities Di- orange.It also will pay to bury
possibility: there will be go-foot poles on the tut under ground agreed to
government,such as the Town of rivenks. 4 evenly,any extra rector Dave Brown told JID coin- the existing line shown in pur-
• Jupiter, pays an additional In December,FPL said it had expenses such as those caused by mitisioners. pie if another government pays
$560,000 to bury those lines a far- For approximately a year,local bids to bury the lines. They obstructions underwater. . He said that Jupiter hasn't yet to bury the two parts of the
trier distance north and south of officials have said they wanted the showed the differential to be "I regard that as a substantial planned line depicted in yel-
the river, then JID will pay new lines,which will carry 138,000 S1,161,8191or the distance from concession,'he said. Please see Lures on A10 low.
•
•
Ale THE JUPITER COURIER Sunday,February 1,1998
Lines
•
•CONTINUED FROM AI , crossing and up to 25 percent
the extensions if others pay the
decided what it will pay,but has mainder,or making the 25 pan
been told"we're not going to see a payment contingent on the to
penny from Tequesta"and might amount being paid over tls
get"minimal financing,•'S50,000 years through tax-free bonds frc
to $100,000, from Palm Beach Jupiter.
County.
11D has S1.1 million in reserve Broome finally suggested the:
accounts that is available for the rangement that was adopted J
project,Executive Director Mike paying to bury the new line am
Grego told commissioners.Com- the river and paying to bury t
mission Chairman Tom Howard existing line if others paid to 1
said he wanted to be sure that the high-transmission extensic
enough money would still be avail- under Biome
able for aerge�nncier,such as a
• storrro-damagedjetty He noted that the present dist
After checking financial figures bution line west of the brid
with JID's staff, Howard said, would not go in the same HMI
"I'm sufficiently coofident we ground"sleeve"as the high-tee
have the S600,000" to bury the emission line,so it could be do
river crossing. later. Commissioners said di
In the past,commissioners have would pay to have it done wilt
said they do not expectto raise 18 months
property taxes to fund the Prole et- Commissioner George Genti
, Friday, Grella said that RD who also chairs the Jupiter-1
currently has approximately S2.9 questa-Juno Beach Chamber
million on hand. If the district Commerce, said,before coma
paid to bury both the proposed sioners voted, "The Chamber
line and present line this fiscal Commerce is 100 percent in su
year—totaling S704,916—JID port of what we're anticipati
• would still have$1.5 million in doing."11D,he said,is the gc
•hand when the fiscal year ended, emment that's"most equitable
Sept.30,lie noted bear the cost,"because it cow
Wednesday,commissioners con- the largest area
• sideeed several alternatives for And Commissioner Pat working with Jupiter paying theMagi
differential to bury the lines across goo,who heads the Friends of t
the river and uo to half the cost of Loxahatchee group, said, '"f
PALM BEACH COUNTY MUNICIPAL TAX COMPARISON I
MUNICIPALITY POPULATION(1) TAX BASE(2)
Atlantis 1,694 $271,792,313
Belle Glade 16,858 $183,417,725
Boca Raton 67,754 $8,049,497,089
Boynton Beach 50,940 $2,245,940,786
Briny Breezes 398 $15,180,165
Cloud Lake 121 $3,568,615
Delray Beach 52,039 $2,758,936,396
Glenridge 219 $9,348,198
Golfview 153 $11,548,640
Greenacres 23,733 $620,219,288
Gulfstream 707 $297,015,850
Haverhill 1,187 $36,215,640
Highland Beach 3,264 $721,608,034
Hypoluxo 1,371 $147,895,684
Juno Beach 2,659 $448,462,645
Jupiter 30,599 $2,663,681,301
Jupiter Inlet Colony 421 $85,531,087
Lake Clarke Shores 3,640 $139,053,838
Lake Park 6,887 $267,198,028
Lake Worth 29,844 $667,451,327
Lantana 8,477 $341,966,726
Manalapan 330 $366,247,963
Mangonia Park 1,392 $110,073,5Q1
Ocean Ridge 1,635 $306,488,038
Pahokee 6,935 $56,156,754
Palm Beach 9,790 $4,716,128,647
Palm Beach Gardens 31,909 $3,089,273,251
Palm Beach Shores 1,028 $149,972,270
Riviera Beach 27,782 $1,376,589,416
South Bay 3,329 $37,557,176
Tequesta 4,673 $384,054,333
South Palm Beach 1,498 $163,259,960
Golf 195 $63,578,815
North Palm Beach 11,855 $760,220,910
Palm Springs 9,798 $177,676,316
Royal Palm Beach 16,720 $618,251,609
Wellington 26,148 $1,668,296,300
West Palm Beach 78,370 • $3,867,625,828
Total 536,352 $37,896,980,462
AVERAGE 14,115 $997,288,960
•
1)Source: Bureau of Economic and Business Research, Uni
2) Palm Beach County Property Appraiser's Office
3) U.S. Department of Commerce, Economic and Statistics A
4)Calculated using 95% of Tax Base per Florida TRIM Law
File: TGB/AmiPro/Taxlook.wk4
TOWN OF JUPITER
January 29, 1998
/ViieofTeqUesfa
JAN 3 Q ,-Q
Village Manager's Office
Mr.Tom Bradford,Village Manager
Village of Tequesta
PO Box 3273
Tequesta,FL 33469-0273
Re: FPL's Proposed 138 KV Transmission Line Crossing of the Loxahatchee River
Dear Mr. O ord:
On the evening of January 28,1998,the Jupiter Inlet District's Board of Commissioners moved
to fund approximately $705,103 of the $1,268,376 needed to bury both the proposed 138 KV FPL
transmission line and the existing distribution lines at the Loxahatchee River. Based on your office's
continued support in our committee to prevent these aesthetic impacts on the river and adjacent
historical sites,we are hopeful that the Village will be willing to also participate in funding this effort.
To provide added detail on the basis of costs and the funding arrangements established to date, I have
included several attachments for your review.
At your earliest convenience, please reply regarding the Village's position on funding. The
expiration of contractors' bids necessitates that we formalize our commitments within the next two
weeks. Of course,should you have any questions in the interim,feel free to give me a call.
Sincerely,
Lee R. Evett
Town Manager
Attachments
210 Military Trail • Jupiter, Florida 33458 • Phone (561) 746-5134 • Fax (561) 575-7785
FPL Powerline Crossings of Loxahatchee River at Jupiter Inlet
Cost and Funding Arrangement Summary
•
As of January 29, 1998
Cost to Underground Proposed 138 KV Transmission Line $1,161,189
(From Point 1 to Point 4 Shown on Attached Map)
Cost to Underground Existing Distribution Line $ 107,187
Located West of Alt.AlA Bridge
*Subtotal: $1,268,376
Less:
Cost to Underground Proposed 138 KV Transmission Line from $ (597,916)
River Bank to River Bank
(To be funded by Jupiter Inlet District-From Point 2 to
Point 3 Shown on Attached Map)
Less:
Cost to Underground Existing Distribution Line Located West of $ (107.187)
Alt.A1A Bridge
Balance to be Funded by Others: $ 563,273
*Costs do not include contingency for any out of scope conditions.
e
UNDER GROUND LIMITS OF PROPOSED FPL
138 Kv TRANSMISSION LINE &EXISTING DISTRIBUTION LINE
- / / ; I I
1.--/p J___j
Y
// / I; / ,
,,, //.7 /
/ / / / . • . / g /.,-.- /
ICprO
r ,? 7 0/ii
4/A7
j " / / ,/ /
/
\, /
)/"---N • TO BE FUND: 0
BY OTHERS
•
JUPIIER
LIGHTHOUSE
EXISTING FPL AERIAL •;
DISTRIBUTION LINE •
• H
43)
LOXAHATC •
RIVER • \.
EE •
• •
. 4 .
Si •1 1 I 4\......_
,t •;4" PROPOSED 138Kv
----\ ; • TRANSMISSION LINE
/./ 1'
, / ) *.
_
i I
��•\.\�
----___EL, / . •
- > /-4 TO BE FUNDED
�` BATHERS ,
EEEEE3; !; 111111111
III'; , „------\
Er / LEGEND . .i.
;:t.
1 -..I ...- UNDERGROUND UTILMES TO BE FUNDED
FROM JUPITERBVI.BTDISTRICT
r TO BE FUNDED BYOTHERS
'+
T
\\ 1
JUPI ERWAIER[MMES.JAN,29.1998
JUPITER RIVER CROSSING
DIFFERENTIAL COSTS POINT 1 TO POINT 4
Underground Overhead Differential
Construction Costs
Underground Construction
Contractor Bid 1,044,866 1,044,866
Overhead Construction
Labor,Vehicle&Misc. 8,974 39,163 (30,189)
Material 25,232 72,590 (47,358)
Total Construction Costs* 1,079,072 111,753 967,319
Engineering&Construction Support Costs.
Engineering, Licensing and Design 89,000 9,500 79,500
Drafting and Records 4,500 500 4,000
Construction Management, Field Supervision •
and Inspection 102,500 11,000 91,500
Procurement and Contract Administration 22,000 2,500 19,500
Total Support Costs 218,000 23,500 194,500 .
Total Costs 1,297,072 135,253 1,161,819
*
Total Construction Costs Do Not Include Contingency For Any Out of Scope Conditions.
CONVERSION COST FOR EXISTING FEEDER
Cost of new subaqueous feeder, including direct bore $135,296
Net book value of existing overhead feeder 5,087
Cost to remove existing overhead feeder 45,129
Replacement cost of existing overhead feeder ( 69,707)
Salvage value of existing overhead facilities ( 8,618)
Customer contribution in aid of construction $107.187*
*This amount covers.FPL facilities only
JUPITER RIVER CROSSING •
DIFFERENTIAL COSTS POINT 2 TO POINT 3
Underground Overhead Differential
Construction Costs
Underground Construction
Contractor Bid 461,850 461,850
Overhead Construction
Labor, Vehicle&Misc. 8,974 15,438 (6,464)
Material 25,232 28,702 (3,470)
Total Construction Costs* 496,056 44,140 451,916
Engineering&Construction Support Costs
Engineering, Licensing and Design 89,000 9,500 79,500
Drafting and Records 4,500 500 4,000
Construction Management, Field Supervision •
and Inspection 47,000 5,000 • 43,000
Procurement and Contract Administration 22,000 • 2,500 19,500
Total Support Costs 162,500 17,500 146,000
Total Costs 658,556 61,640 597,916
•
* Total Construction Costs Do Not Include Contingency For Any Out of Scope Conditions.