HomeMy WebLinkAboutDocumentation_Local Planning Agency_Tab 4A2_11/20/1997 CAPITAL IMPROVEMENT •
Goal: 1.0.0 Undertake actions necessary to:(1)keep present public facilities in good
condition;(2)accommodate new development,using sound fiscal policies;and
(3)maximize the use of existing facilities and promote orderly,compact
municipal growth. Further,decisions to finance public facilities improvements
shall be based upon the use of sound fiscal policy oriented to minimizing
Village debt service liabilities.
Objective: 1.1.0 Capital Improvements will be provided to: (1)correct existing deficiencies;(2)
accommodate desired future growth;and/or(3)replace worn-out or obsolete
facilities.
Policies: 1.1.1 The Village shall include all projects identified in the policies of the various
elements of this Comprehensive Plan and determined to be of relatively large
scale and high cost($10,000 or greater),as capital improvements projects for
inclusion within the 5-Year Schedule of Improvements. Provision of Capital •
improvements so defined shall be implemented through procedures outlined in
policies 1.1.2- 1.1.4 and 1.4.1 -1.4.4 of this Element. A capital improvements
project is defined to include land and/or improvements,plus any studies
oriented to defining the initial need for land and/or.facilities.
1.1.2 The Village shall,as a matter of priority,schedule for funding any capital
improvement projects in the 5-Year Schedule of Improvements which are
designed to correct existing public facility deficiencies.
1.1.3 A Capital Improvements Coordinating Committee is hereby created,composed
of the Village Council Finance and administration Committee,the Village
Manager and the Finance Director for the purpose of annually evaluating and
ranking in order of priority projects proposed for inclusion in the 5-Year
Schedule of Improvements.
1.1.4 Proposed capital improvement projects shall be evaluated and ranked in order
of priority according to the following guidelines:
a) Whether the proposed project is financially feasible,in terms of its impact
upon local budget potential;
b) Whether the project is needed to protect public health and safety,to fulfill
the Village's legal commitment to provide facilities and services,or to
preserve,achieve full use of or increase the efficiency of existing facilities;
c) Whether the project prevents or reduces future improvement costs,
provides service to developed areas lacking full service,or promotes in-fill
development;
d) Whether the proposed project is consistent with plans of State agencies and
the South Florida Water Management District.
Objective: 1.2.0 Village expenditures in high hazard coastal areas shall be limited to 100%of
those post disaster improvements costs for facilities over which Tequesta has
operational responsibility(e.g.:potable water systems and public streets and
recreational facilities).
CI-1
s.
•
Policies: 1.2.1 The Village shall expend funds in high hazard coastal areas for the
replacement and renewal of public facilities over which Tequesta has
operational responsibility.
1.2.2 The Village shall continue to expend funds to maintain existing facilities and
services under the jurisdiction of Tequesta at their existing Levels-of-Service.
Objective: 1.3.0 Future development shall bear a proportionate cost of facility improvements in
order to maintain adopted Tequesta Level-of-Service standards. Proportionate
costs are defined to mean 100%of that amount necessary to assure that
Tequesta Level-of-Service standards are maintained as a result of development
approval for those facilities over which Tequesta has operational control.
Policies: 1.3.1 The Village shall require local street,drainage,sewage collection and potable
water distribution systems improvements,as required by the application of the
Tequesta Level-of-Service Standards,of any new development necessitated by
such development.
1.3.2 Defined Recreation Facility needs may be met by any of the following means:
(1)on-site provision of public or private facilities;(2)dedications;or(3)fees in
lieu thereof. Plan expansion for potable water and sewer systems shall be
accommodated by charges administered by the Village and the Loxahatchee
River Environmental Control District. Major road improvements shall be
accommodated by participating in the County's Fair Share Road Impact Fee
program. Solid Waste collection and disposal improvements shall be
accommodated by the fee schedule annually levied by the private hauler(Note:
Tipping Fees are levies by the Palm Beach County Solid Waste Authority).
1.3.3 Determination of needed public facility improvements shall be made prior to
the time that a Building Permit is issued.
Objective: 1.4.0 The Village shall manage its fiscal resources to ensure the provision of needed
capital improvements at a level equal to,or exceeding,the adopted Tequesta
Level-of-Service standards.
Policies: 1.4.1 Prior to the issuance of certificates of Occupancy,the Village shall require that
all public facilities are available to serve development for which development
orders were previously issued. Development orders for future development
shall not be issued unless the Village has demonstrated either of the following:
(1)Compliance with Tequesta Level-of-Service Standards;or(2)Provision of
needed public facilities in compliance with the Tequesta Level-of-Service
Standards within the adopted 5-Year Schedule of Improvements.
1.4.2 In providing capital improvements,the Village shall limit general obligation ,
debt to an amount equal to or'less than 5%of the property tax base.
1.4.3 The Village shall annually update the 5-Year Schedule of Improvements. The
results of this update shall be incorporated within a capital budget as part of the
annual Village budgeting process:
1.4.4 Efforts shall be made to secure grants or private funds,whenever available,to
finance the provision of capital improvements.
CI-2
•
•
Objective: 1.5.0 Decisions regarding the issuance of development orders and permits shall be
based upon coordination of the development requirements included in this Plan,
the Village land development regulations,and availability of necessary public
facilities needed to support such development at the time needed.
Policies: 1.5.1 Prior to issuing a development order or building permit,the Village shall use
Level-of-Service(LOS)Standards adopted in the various elements of this
Comprehensive Plan to review the impacts of new development and
redevelopment upon public facility provision. The Village shall not issue a
development order or building permit which results in a reduction in service for
affected public facilities below these Level-of-Service Standards. A listing of
LOS standards is exhibited on Table CI-1.
1.5.2 The Village shall adept maintain an adequate fames Conc urrency
Management Ordinance dung-1990 requiring that,at the time a development
permit is issued,adequate facility capacity is available,or will be available
upon occupancy of the development,based upon the application of the Tequesta
Level-of-Service Standards to the proposed development.
1.5.3 Proposed Comprehensive Plan amendments and requests for new development
or redevelopment shall be evaluated according to the following guidelines as to
whether the proposed action would
a) Contribute to any condition of public hazard as described in the
SANITARY SEWER,SOLID WASTE,DRAINAGE STORMWATER
MANAGEMENT,POTABLE WATER,and NATURAL
GROUNDWATER RECHARGE ELEMENT,and COASTAL
MANAGEMENT ELEMENT;
b) Exacerbate any existing condition of public facility capacity deficits,as
described in the TRANSPORTATION
ELEMENT; SANITARY SEWER,SOLID WASTE,DRAINAGE
STORMWATER MANAGEMENT,POTABLE WATER and NATURAL
GROUNDWATER RECHARGE ELEMENT;and RECREATION AND
OPEN SPACE ELEMENT;
c) Generate public facility demands that may be accommodated by capacity
increases planned in the 5-Year Schedule of Improvements;and
d) Conform with future land uses as shown on the Future Land Use Map of
the FUTURE LAND USE ELEMENT,and public facility availability as
described in the SANITARY SEWER,SOLID WASTE,DRAINAGE
STORMWATER MANAGEMENT,and NATURAL GROUNDWATER
RECHARGE ELEMENT.
If public facilities are developer-provided,they shall accommodate public
facility demands based upon adopted LOS standards.
If public facilities are provided,in part or wholly,by the Village,financial
feasibility shall be demonstrated subject to this element.
CI-3
•
Effects upon appropriate state agency and/or Water Management District
facilities plans shall be evaluated.
Objective: 1.6.0 • The Village shall designate an Urban Service Area as a means of: (1)
Implementing future land use designations,as per the Future Land Use Map;
and(2)limiting potential Village post disaster redevelopment expenditures.
Policies: 1.6.1 That portion of the Village not located within the Coastal High Hazard Area,as
defined in the Coastal Management Element,shall be designated as the
Tequesta Urban Service Area.
1.6.2 The Coastal High Hazard Area,as designated in the Coastal Management
Element shall be designated as a Limited Urban Service Area where the level
of facilities and services provided by Tequesta shall be limited to those
currently provided.
1.6.3 Consideration of the expansion of the Village Urban Service Area shall be
made coincident with any annexation actions.
CI-4
•
CAPITAL IMPROVEMENTS IMPLEMENTATION
S-Year Schedule of Improvements
The 5-Year Schedules of Capital Improvements for Fiscal Years 1998-2002 is
are presented on Tables CI-2 and.CI-3. A review of other Comprehensive Plan Elements leads to the
conclusion that the Goal,Objectives and Policies and 5-Year Schedule of Improvements of the Capital
Improvements Element are internally consistent with the remaining Elements.
Operational Impacts of Proposed Capital Improvements
A review of proposed capital improvements,as presented on Tables X CI-2 and CI=3 in relation to
projected increases in Village operating expenses leads
to the conclusion that little or no increases in Village staffing levels should result from programmed
projects.
•
•
•
Program Time Frame(Fiscal Year)
•
ementfi Coordinating'Committee 1990
•
•
•
Objectives
-1, 0 and e 0
•
Ti'ew,-radopt amend, eces a Palm Be.,c C..0 ty 1 070
•
per ObJ five 1,6.0
•
•
CI-5
•
TABLE CI-1
TEQUESTA LEVEL OF SERVICE(LOS)STANDARDS
FACILITY LOS STANDARD
Sanitary Sewer Max.Month Daily Sewage Generation Rate
Residential-734 93 gallons/capita/day
Non-Residential-434 478 gallons/acre/day
Maximum Daily Flow
Residential-7878 100 gallons/capita/day
Non-Residential-46479 516 gallons/acre/day
Solid Waste Average Generation Rate
Residential: Single Family-6.01 lbs/capital/day
Multi-Family-3.41 lbs/capita/day
Non-Residential: Total -125 lbs/acre/day
Restaurants-75 lbs/acre/day
All Other-50 lbs/acre/day
Potable Water Average Day Water Consumption Rate
Residential-236 20 gallons/capita/day
Non Residential 2,020 gallons/km/day
Maximum Day Water Consumption Rate
Residential-354 180 gallons/capita/day
Non-Residential 3,030.gallons/acreS/day
Storage Capacity
System-4,840 3.75 million gallons
Dfainage Stormwater Management Design Storm
Public Facilities-425:Year,24-Hour Duration Storm
Transportation Collector Roadways-LOS Standard C,Peak D
Urban Minor Arterials-LOS Standard C,Peak D
Urban Principal Arterials-LOS Standard C,Peak D
Recreation and Open Space Unit/Population
Neighborhood Parks 2 acres/1,000
Community Parks 2 acres/1,000
Beaches 1 mile/31,250
Golf Courses 9 holcc/30,004
Tennis 1 court/2,500
Basketball 1 court/2,500
Baseball/Softball 1 field/7,200
Football/Soccer 1 field/4,800
Playground areas 1 acre 3,600
*Non Residential includes the following land use types:Commercial;Public Buildings and Grounds;Educational;
and Other Public Facilities.
Source: Village of Tequesta; 11/97
CI-6
r a
TABLE CI-2
VILLAGE OF TEQUESTA PROPOSED 5-YEAR CAPITAL IMPROVEMENT PROGRAM
CAPITAL PROJECTS FUND
FY 1998-FY 2002
Project Description Status FY98 FY99 FY00 FY01 FY02
PUBLIC WORKS/
TRANSPORTATION FACILITIES
County Line Road Sign PN $25,000
Seabrook Paving C
Seabrook Road Landscape Improvement(N) B $35,000
Eastwinds Landing Roadway R $5,000 $5,000 $145,000
FEC Improvements B $28,000 -
Tequesta Drive Bridge Repair ED $40,000 $20,000
Seabrook Road Curbs&Landscaping Engr. PN/B $5,000
Seabrook Road Curbs&Landscaping Improv. (S) PN/B $50,000 $50,000
Landscape Architect Fee-Country Club Dr. B $25,000
Country Club Landscape Improvement B $50,000 $50,000 $50,000
Village Blvd.Landscape Improvement B $12,500
Village Roadway Overlay(2.13 miles) R $40,700
Village Roadway Overlay(2.42 miles) R $43,800
Village Roadway Overlay(4.11 miles) R $86,500
Village Roadway Overlay(4.17 miles) R $92,150
Village Roadway Overlay(4.29 miles) R $86,000
TOTALS $128,800 $141,700 $226,000 $186,500 S257,150
SANITARY SEWER FACILITIES
Not Village Responsibility N/A N/A N/A N/A N/A N/A
CI- 7
TABLE CI-2 (Continued)
VILLAGE OF TEQUESTA PROPOSED 5-YEAR CAPITAL IMPROVEMENT PROGRAM
CAPITAL PROJECTS FUND
FY 1998-FY 2002
Proiect Description Status FY98 FY99 FY00 FY01 FY02
SOLID WASTE FACILITIES
Serviced Franchise N/A N/A N/A N/A N/A N/A
STORMWATERI MANAGEMENT FACILITIES
Tequesta Drive Diversion PN $54,000
Fairview East Drainage Modification R $90,000
Golfview Drive Drainage Modification R $50,000
Country Club Drive Drainage Expansion PN $48,000
Bridge Road Drainage Improvement PN $90,000
Riverside Drive Drainage Improvement PN $85,000
Video Drainage System PN $10,000 $10,000 $10,000
Drainage Study PN $15,000
TOTALS $69,000 $100,000 $108,000 $100,000 $85,000
RECREATION FACILITIES
Tequesta Park Basketball Court Resurface R $6,200
Constitution Park Basketball Courts Resurface R $6,000
Constitution Park Pathway Resurface R $20,000
Tequesta Park Tennis Courts Resurface R • $10,000
Tequesta Drive Pathway(Willow to Seabrook) PN $52,000
TOTALS $0 $6,200 $52,000 $16,000 $20,000
•
CI- 8
TABLE CI-2 (Continued)
VILLAGE OF TEQUESTA PROPOSED 5-YEAR CAPITAL IMPROVEMENT PROGRAM
CAPITAL PROJECTS FUND
FY 1998-FY 2002
Proiect Description Status FY98 FY99 FY00 FY01 FY02
HOUSING FACILITIES
None Scheduled N/A N/A N/A N/A N/A N/A
CONSERVATION MEASURES
Not Applicable N/A N/A N/A N/A N/A N/A
COASTAL MEASURES
Not Applicable N/A N/A N/A N/A N/A N/A
TOTAL CAPITAL IMPROVEMENT
FUND IMPROVEMENTS $197,800 $247,900 $386,000 $302,500 $362,150
*Key:
PN-Projected Need
ED-Existing Deficiency
R-Repair/Replacement
B-Beautification
C-Complete
CI- 9
•
TABLE CI-3
VILLAGE OF TEQUESTA PROPOSED CAPITAL IMPROVEMENT PROGRAM
WATER DEPARTMENT
FY 1997-FY 2002
Project Description Status FY97 FY98 FY99 FY00 FY01 FY02
POTABLE WATER FACILITIES
Machinery&Equipment PN $16,250 $7,600 $5,000 $5,000 $5,000 $5,000
PC Programs PN $1,800 $1,800 $1,000
Vehicle Purchase PN
Paint Bridge Crossings PN $25,000 •
Distribution Improvements: ED
Seabrook Road $44,000
Beach Road $187,000 $187,500
Turtle Creek $12,500 $12,500
Mona Road $9,000 $9,000
Bridge Road $14,000 $14,000
Tropic Vista $80,000 $80,000
CADD Mapping ED $12,000-> $10,000
Garage Facility PN $522,645-> $10,000
Well 28 PN $200,000
Cypress Drive Drainage PN $52,600-> $52,600
Telemetry at Remote Sites: ED
Design/Bid,Engineering $25,000
Construction $29,500 $157,500
ESDC $7,500 $7,500
RO Reject Disposal: PN
DesignBid,Engineering $25,000
Permitting $5,000
Construction $145,750 $580,000
ESDC $40,000
CI- 10
TABLE CI-3 (Continued)
VILLAGE OF TEQUESTA PROPOSED CAPITAL IMPROVEMENT PROGRAM
WATER DEPARTMENT
FY 1997-FY 2002
Project Description Status FY97 FY98 FY99 FY00 FY01 FY02
POTABLE WATER FACILITIES
RO Plant: PN
Design/Bid,Engineering $355,000
Construction .$475,500 $3,550,000 $2,243,000.
ESDC $150,000 $225,000
Start-up Engineering $10,000 $25,000
RO Wells/Piping: PN
Design/Bid,Engineering $20,000
Construction $142,940 $470,000 Bond Total:FY98/99/00
ESDC $15,000 $7,535,000
•
TOTAL ENTERPRISE FUND
WATER IMPROVEMENTS $1,818,485 $4,887,000 $2,546,000 $420,000 $308,000 $308,000
*Key:
PN-Projected Need
ED-Existing Deficiency
•
R-Repair/Replacement
B-Beautification
C-Complete
—>-Carryover
•
CI- 11