Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 11I_6/13/1996 MEMORANDUM TO: Thomas G. Bradford, Village Manager FROM: Gary Preston, Director of Public Works DATE: June 7, 1996 SUBJECT: Village Council Agenda Item for June 13, 1996; Consideration of Professional Services Agreement with Gee & Jenson for Design and Construction Phase Services for the Tequesta Drive Drainage Diversion Project Please find attached, a proposal for the above referenced project in the amount of $13,000 from Gee & Jenson. This project was reviewed by the Public Works Committee on May 20, 1996, and the Stormwater Utility Board on May 29, 1996 for further consideration and action at the June 13, 1996 Village Council Meeting. The $70,000 proposed budget allocation provides project funding in the amount of $13,000 for Engineering Services and $57,000 for construction. Please place this item on the June 13, 1996 Village Council Meeting Agenda for Councilmembers'consideration. GP/mk Attach. 1 t nc GEE & JENSON Vi T Engineers-Architects-Planners,I �r lequesta One Harvard Circle West Palm Beach,FL 33409 J U N 0 7 1996 Telephone(407)683-3301 Fax(407)686-7446 June 5, 1996 Village Manager's Office Mr. Tom Bradford, Village Manager Village of Tequesta P.O. Box 3273 Tequesta, Fl 33469 Re: Tequesta Drive Drainage Improvements West of Seabrook Drive Dear Mr. Bradford: We are pleased to submit the following proposal for professional services in connection with drainage improvements to Tequesta Drive West of Seabrook Drive. The following is an itemized list of the services required to develop the plans and perform the contract administration/construction observation for the above referenced project. 1. Develop paving and drainage plan • 2. Develop utility relocation plans 3. Perform drainage calculations 4. Develop cost estimate 5. Perform administration construction observation 6. Field survey The cost for these services will be a lump sum fee of$13,000 including reimbursables. This proposal is intended to serve as a supplemental agreement to the original contract dated September 16, 1993 and all terms and conditions of the contract unless specifically modified herein, shall remain the same. Should you agree with the conditions and scope of this proposal, please execute in the location provided. Very truly yours, Allan F. Oslund, PLS Project Manager • Roy F. Overman Vice President Accepted by: Date: