Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 8F_5/13/1993 7 ell VILLAGE OF TEQUESTA YIL F Q Post Office Box 3273 • 357 Tequesta Drive • Tequesta,Florida 33469-0273 • (407)575-6200 7. . : t Fax: (407)575-6203 ;�' :tom M COUµ MEMORANDUM: TO: Village Council FROM: Thomas G. Bradford, Village Manager 7 DATE: May 7, 1993 SUBJECT: Authorization to Execute a Change Order with Chaz Equipment Company in Conjunction with the Water Distribution Pipeline Associated with the Well 25, 26 & 27 Project; Agenda Item Chaz Equipment Company was the low bidder for the Well 24 Project. The Project is complete and the new Well 24 is functioning satisfactorily. Meanwhile, on the Western Peninsula, the Village is on the verge of proceeding with the Well 25, 26 & 27 Project. Martin County desires to pave Country Club Drive in August of 1993 . Therefore, in order to meet this time constraint, the Village has sought a change order request from Chaz Equipment Company to lay the necessary pipeline from the proposed wells within the right-of-way of Country Club Drive up to, approximately, the entrance to Little Club. Chaz proposes to do this work for $396,763 . 31 . Due to delays that we have experienced and having not, as of this writing, received the final approval from Martin County to lay the remaining link of the distribution line through Little Club, Chaz may not honor their change order quote. These unknowns will be answered prior to your Village Council Meeting in that: 1) _A meeting is to be scheduled with Martin County Engineering prior to the Village Council Meeting. 2) Chaz will be contacted to request that they hold their original change order quote. MEMO: Village Council Page 2- In the event that the "missing link" through Little Club is approved by Martin County and that Chaz holds to its change order quote, or an amount the engineers find to be reasonable, we will recommend to you that you allow staff to proceed with this portion of this important water project. The only matters to be resolved for this Project are: 1) Finalization of the well sites . Progress is being made with Turtle Creek for acquisition of their sites . Condemnation on the remaining well can proceed as soon as Martin County approves our route through Little Club. 2) Final approval from Martin County of the water line through the Little Club area. TGB/krb Attachment RMA To: TION Reese, Macon and Associates, Inc. FOR YOUR INF RMA FROM arch 8, 1993,. . • Village of Tequesta ,r P.O. Box 3273 Tequesta, FL 33469 rr r -• ATTN: Mr. Tom Hall, Water System Manager RE: Country Club Drive Raw Water Main Chaz Equipment Company Quotation Dear Tom: Enclosed is a copy of Chaz Equipment Company, Inc. quote for Country Club Drive. The Raw Water Main unit prices have increased slightly from the original bid date of May 1992. Some pipeline items did get lower. As you know Don Holloman did not allow the use of their standard road repair detail due to the existing type of road construction on Country Club Drive. Therefore, we need a full width road detail which resulted in an increased construction cost. The Chaz quote appears to be reasonable. If the job were bid the price may be slightly lower but due to the Martin County deadline it does not appear there will be time to take that route. If the Village must bid the project it is likely the price will increase significantly due to shortened construction time span. If the Village wishes to issue a change order let us know as soon as possible so the change order can be prepared. This will allow Chaz to obtain permits and proceed as quickly as possible to meet the August 1, deadline. This Contractor has demonstrated that he is qualified and capable of performing this project within the time frame required. If the job were to be bid we may not be able to say the same for the low bidder. We recommend the Village accept this quotation from Chaz Equipment Co., Inc.. • Very truly yours, ",;(1radzi William N. Blischke, Jr. wnb-030 93-106 9121 N. Military Trail • Suite 207 • Palm Beach Gardens, Florida 33410 Ph. (407) 625-6660 FAX (407) 625-6664 , VILLAGE OF TEQUESTA - RAW WATER PIPING - COUNTRY CLUB DRIVE Schedule of Items and Unit Prices EUnit Item No. Description Quantity MiltEstimated Mee Amount 1 12" PVC C-900 5,040 L.F. $(7,20.61 $/o3 ,4° 2 10" PVC C-900 840 L.F. $2821 $ /67/ - 4o 3 8" PVC C-900 2,385 L.F. $ /S'97 $ 3.8,0gt.I's• 4 12" D.I. Pipe 500 L.F. $ 696."" $,/3,os s-,o° 5 10" D.I. Pipe 175 L.F. $n73,03 $ 1,'o3gds 6 8" D.I. Pipe 160 L.F. $ 620.33 $ .3/ a S a?,6 7 D.I. Fittings 4,800 Lbs. $, 1.SS" $ ?14).°° 8 12" R.S.V. w/box 2 Each $ 4 D83.9. $ 4/0.If 9 10" R.S.V. w/box 1 Each $ 9i9,s3 $ WI.s 3 10 • 8" R.S.V. w/box 4 Each $ C S.-aft $ �463."1 i 11 Air Release Valve Assembly 5 Each $ f'1O.°° $' 80100.ov 12 • 12" Terminal End 1 Each $..S °° $ 3 25 °° 13 8" Terminal End 2 Each $ T 25:°° $ /,' °°. 14 Concrete Driveway • Replacement 275 S.Y. $ ��,s'o $ 4/ 7,so .15 Asphalt Driveway 900 S.Y. $ /O.Sp $ 9.54-0.°Q 16 Concrete Sidewalk Replacement 550 L.F. $ d 49 $ 4`0,7,64S° �' . , -. '- traz EQUIP . CO . INC . • MAR 09 '93 104 REEEE• P . 03 ' • h1ACdh! ASSOC. y. • 1 • :' i P. ea Sobec�ule of items and Unit Prices t % Estimated Unit ' 'i ! Am at + acted •I. I • LI;' 17 ' Asphalt Sidewalk I • Replace � .. Replacement 2 200 L.F. $ ../3 $ i I. • i. 18 6Saed and Mulch 4,000 • i of 19 ' Sod 55,000 pit $ ' • 120 • + Full Road Replacement ' 0 a) Stabilized I;. Subgrade c� i ,000 S.Y. $`, ' $ I b) Lime Rock I ' _ ' ' I Base • , 1 21 1• : Papal Road Replacement . . I I i e Overlay 2,000 S.Y. $ so ' o, . ' :!' 1 ' b) Replace Exist _ $c 9,a ,, i r ' r Asphalt Thick. 380 ;;, . e)ease 300 S.Y. $ ,j ..ro $' r ,ro.°° ' . i S.X. $, �. $.I lam; ,!, ' I Traffic, Control 1 L.S. $ .� oo 1 .1i i $ •9'' pa ' ' i i Total Estfmmated Amount $ 39Lf--76 13r,, i ' I is Ii i ''1. 1 I :I i I I. • .: I 1