HomeMy WebLinkAboutDocumentation_Regular_Tab 5B_10/17/1991 eji
FTEQUESTA .
• BUILDING DEPARTMENT• . J Post Office Box 3273 • 357 Tequesta Drive
•
`i'0Nt /,, Tequesta. Florida 33469-0273 • (407) 575-6220
Qz�ti� .�► FAX: (407)'575-6203
ZONING BOARD OF ADJUSTMENT
PUBLIC HEARING MINUTES
AUGUST 1 9 , 1 9 9 1
I. CALL TO ORDER AND ROLL CALL
The Village of Tequesta Zoning Board of Adjustment held a
regularly scheduled Public Hearing at the Village Hall, 357
Tequesta Drive, Tequesta, Florida, on Monday, August 19, 1991.
The meeting was called to order at 7': 30 P.M. by Vice Chairman
Van Wagner. A roll call was taken by Fran Bitters, the
Recording Secretary. Boardmembers present were: Robert
Freimark, Kenneth Northamer, Vice Chairman James Van Wagner,
Alfred DeMott and Edwin Nelson. Chairman William Kirkland
was not in attendance. John Turner arrived at 7: 33 p.m. , at
which point Alternate Robert Freimark stepped down to allow
Mr. Turner to sit on the Board. Scott D. Ladd, Clerk of the
Board and John C. Randolph, Village Attorney were also in
attendance.
l II.. APPROVAL OF AGENDA
Boardmember Turner moved to approve the Agenda as submitted.
Boardmember DeMott seconded that motion. The vote ,on the
motion was:
Alfred DeMott - for
Kenneth Northamer - for
James Van Wagner for
Edwin Nelson - for
John Turner - for
the motion was therefore passed and adopted.
J ,
Zoning Board of Adjustment
Meeting Minutes
August 19, 1991
Page 2
III. APPROVAL OF PREVIOUS MEETING MINUTES (Zoning Board of
Adjustment Meeting Minutes, July 15, 1991) .
Boardmember Turner moved to approve the above-referenced
Minutes as submitted. Boardmember DeMott seconded that
motion. The vote on the motion was:
Alfred DeMott - for
Kenneth Northamer - for
James Van Wagner - for
Edwin Nelson - for
John Turner - for
the motion was therefore passed and adopted.
IV. NEW BUSINESS
1. The application of The Reverend Thomas Vengayil,
Administrator, St. Jude's Parish, on behalf of J. Keith
Symons, Bishop of the Diocese of Palm Beach, owner of St.
Jude' s Catholic Church, located at 204 U.S. Highway One,
North, requesting a variance to the terms of the Official
Comprehensive Zoning Ordinance of the Village of
Tequesta, Ordinance No. 355, as amended, Section VIII,
Subsections (B) , (C) , (D) , (E) , (F) , and (H) (7) , to allow
the construction of a new church sanctuary with a
separate bulding for church offices and with the phasing
of the required parking in two` (2) phases, Phase I to
include 200 parking spaces, and Phase II to add an
additional 240 parking spaces to be completed within five
(5) years after the date of issuance of a "Certificate
of Occupancy" for the new sanctuary and offices, in lieu
of all of the required parking being provided prior to
the issuance of a "Certificate of Occupancy", as required
by the Zoning Ordinance.
Zoning Board of Adjustment
Meeting Minutes
August 19, 1991
Page 3
Bill Shannon, representative for St. Jude's Church, and Jim
Howell, architect, were in attendance for the above-referenced
case. Mr. Shannon explained that the application is for a
temporary variance, since the Church is requesting that
certain provisions of the Zoning Code, with respect to
parking, lighting for exterior parking, and landscape for
parking lots be temporarily postponed. A drawing and an
overhead projection were displayed of the overall plan. The
present request for variance is only for the west parking lot.
There are presently a little more than 300 parking spaces. The
proposed plan will have a total of 440 parking spaces.
The west parking lot requirements, under Village Code, require
certain interior landscaping, hard surfaces, and lights. The
application for temporary variance requests the opportunity
to build this facility with the following exception: Surface
with Bahia grass with a stabilized sub-surface of geo-webb or
something comparable, install parking bumpers but avoiding
hard surface driveways, avoid interior landscaping and
lighting, on a temporary basis. The proposed connection to
Village Boulevard will be completed in Phase I. Denial of
this request would cause the further postponement of the
construction of the new church because of lack of funds.
Postponement of the new church would be detrimental to the
overall community - the construction of it would not only be
a boost for the community but would make a statement for
Tequesta.
The new construction is expected to commence directly after
Village approval, with a hopeful target date of completion by
Christmas, 1992. Phase II to add an additional 240 parking
spaces to be completed within five (5) years after the date
of issuance of a "Certificate of Occupancy" for the new
sanctuary and offices would be subject to approval by the
Village.
Boardmember Turner moved to approve the variance as requested.
Boardmember Northamer seconded the motion.
Attorney Randolph asked 'if the Church would be willing to
enter into a recordable ,Agreement with the Village regarding
the requirement for future improvements within five years.
Zoning Board of Adjustment
Meeting Minutes
August 19, 1991
Page 4
Boardmember Turner amended his motion accordingly to reflect
the agreement of applicant to enter into a recordable
Agreement with the Village. Boardmember Northermer seconded
the amended motion. The vote on the motion was:
Alfred DeMott - for
Kenneth Northamer - for
James Van Wagner - for
Edwin Nelson - for
John Turner - for
the motion was therefore passed and adopted.
Mr. Shannon agreed to be responsible for drawing up the
Agreement.
2. The application of- Sandra (Ray) Starowesky, owner of Lot
78, Ridgewood Homes Subdivision, located at 68 Camelia
Circle, requesting a variance to the terms of, the
official Comprehensive Zoning Ordinance of the Village
of Tequesta, Ordinance No. 355, as amended, Section VII,
Schedule of Regulations and Application of Regulations,
Subsection (C) , Schedule of Site Regulations, R-1
District, minimum side yard setback, to allow the
continued use of an existing wood framed structure with
a side yard setback of zero feet (0' ) , in lieu of 7.51
(feet) as required by the Zoning Ordinance, and Section
X, Supplemental Regulations, Subsection (A) , Paragraph
(1) , Miscellaneous Structures, Sub-Paragraph (c) , Walls
and fences, to allow the continued use of an existing
concrete block with stone veneer wall forward of the
front building line, in lieu of no wall or fence shall
extend forward of the front building line on any lot or
parcel, as required by the Zoning Ordinance.
Mrs. Starowesky explained that the planter (wall) was built
by her son, without she or her son realizing a Permit was
needed to do so. The woodframe structure on the other side r
of the house, which was cited, was constructed approximately
three years ago, also without awareness that a Permit was
needed. Mrs. Starowesky apologized for her lack of awareness
concerning the legalities of the structure, and asked the
Board's mercy under the circumstances.
Zoning Board of Adjustment
Meeting Minutes
August 19, 1991
Page 5
Boardmember Northamer explained he had driven by the property
and found neither the wall structure nor the woodframe
structure to be a detriment to the surrounding community nor
the property itself.
Boardmember DeMott moved the approve the application as
submitted. Boardmember Nelson seconded the motion. The vote
on the motion was:
Alfred DeMott - for
Kenneth Northamer - for
James Van Wagner - for
Edwin Nelson - for
John Turner - for
the motion was therefore passed and adopted.
V. UNFINISHED BUSINESS
There was no unfinished business.
VI. ANY OTHER MATTERS
There were no other matters before the Board.
Zoning Board of Adjustment
Meeting Minutes
August 19, 1991
Page 6
VII. ADJOURNMENT
Boardmember Northamer moved that the meeting be adjourned.
Boardmember DeMott seconded that motion. The vote on the
motion was:
Alfred DeMott - for
Kenneth Northamer - for
James Van Wagner - for
Edwin Nelson - for
John Turner - for
the motion was therefore passed and adopted.
The meeting was adjourned at 8: 00 P.M.
Respectfully submitted,
Fran Bitters
Recording Secretary
DATE APPROVED:
Attest:
'jai 0.
Scott D. Ladd
Clerk of the Board