Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 7A_5/16/1991 ewe• f • VILLAGE OF TEQUESTA Post Office Box 3273 •. 357 Tequesta Drive � ;,1 ,,'41 Tequesta,Florida 33469-0273 • (407)575-6200 `'1, ° FAX: (407)575-6203 Ch COUKt{ MEMORANDUM TO: Village Council FROM: Thomas G. Bradford, Village Manager DATE: May 2, 1991 SUBJECT: Agreement for Funding of Water Main Construction In Conjunction with the Old Dixie Highway Project; Agenda Item As you ( know, Palm Beach County is about to award the contract for the widening of Old Dixie Highway from approximately Jupiter Crab to County Line Road. As a result of this construction activity, the Village must relocate its water mains to avoid conflicts. In anticipation thereof, the Village has allocated funds in the amount of $160,000. to accomplish this work. The apparent low bidder for this project is Hardrives, Inc. , the same firm which constructed Tequesta Drive. Hardrives low bid is $1, 296, 203.42 of Which $145, 277 is the responsibility of the Village. Resolution No. 15-90/91 approves the attached Agreement and :;pelts out the procedures whereby the Village will pay Palm Beach County for our obligations. It is recommended that the Village Council approve Resolution No. 15-90/91. TGB/mk Attachment • • Recycled Paper RESOLUTION NO. 15-90/91 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, APPROVING THE AGREEMENT BETWEEN THE VILLAGE OF TEQUESTA AND PALM BEACH COUNTY, FLORIDA FOR JOINT PROJECT FUNDING FOR THE CONSTRUCTION OF OLD DIXIE HIGHWAY FROM S.R. 811 TO NORTH COUNTY LINE ROAD PALM BEACH COUNTY, FLORIDA, PALM BEACH COUNTY PROJECT NO. 87541 A & B. WHEREAS, Palm Beach County intends to engage in construction activity on Old Dixie Highway from S.R. 811 to North County Line Road; and WHEREAS, as a result thereof, the Village of Tequesta Water Department is responsible for relocating its water mains and eliminating any water appurtenances in conflict with said construction activity of Palm Beach County; and WHEREAS, Palm Beach County has proposed an Agreement between the Village of Tequesta and Palm Beach County for Joint Funding of the construction activities related to Palm Beach County Project No. 87541 A & B. NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, AS FOLLOWS: Section 1 . The Agreement between the Village of Tequesta and Palm Beach County, Florida for Joint Project Funding for the construction of Old Dixie Highway from S.R. 811 to North County Line Road, Palm Beach County, Florida, Palm Beach County Project No. 87541 A & B attached hereto as Exhibit "A" and made a part of this Resolution is hereby approved and the Village Manager is authorized to execute the same on behalf of the Village of Tequesta. THE FOREGOING RESOLUTION was offered by Councilmember who moved its adoption. The Resolution was seconded by Councilmember , and upon being put to a vote, the vote was as follows: FOR ADOPTION AGAINST ADOPTION The Mayor thereupon declared the Resolution duly passed and adopted this day of , A.D. . 1991. MAYOR OF TEQUESTA Joseph N. Capretta ATTEST: Bill C. Kascavelis Village Clerk • JONES, FOSTER, JOHNSTON & STUBBS, P. A. ATTORNEYS AND COUNSELORS FLAGLER CENTER TOWER 505 SOUTH FLAGLER DRIVE ELEVENTH FLOOR LARRY B.ALEXANDER MICHAEL T.KRANZ • P.O.DRAWER E R.BRUCE JONES VINCENT J.ALTINO JOHN M.LeROUX WEST PALM BEACH,FLORIDA 33402-3475 1904-1988 GEORGE H.BAILEY JOHN BLAIR McCRACKEN KEVIN C.BEUTTENMULLER / PAMELA A.McNIERNEY (407)659-3000 HENRY F.LILIENTHAL MICHAEL D.BROWN TIMOTHY E.MONAGHAN RUTH P.CLEMENTS GUY RABIDEAU FAX:(407)832-1454 1902-19e2 SCOTT M.COLTON JOHN C.RANDOLPH JOYCE A.CONWAY _ PAULA REVENE HARRY ALLISON JOHNSTON MARGARET L.COOPER ANDREW ROSS 1995-1983 BYRON R.CORNWELL STEVEN J.ROTHMAN REBECCA G.DOANE PETER A.SACHS RANDY D.ELLISON ANDREA J.SAFKO RETIRED L.MARTIN FLANAGAN JOEL T.STRAWN WILLIAM A.FOSTER WRITER'S DIRECT LINE: LORI E.HANDELSMAN SIDNEY A.STUBBS,JR. SCOTT G.HAWKINS ALLEN R.TOMLINSON THORNTON M.HENRY JOHN S.TRIMPER OTHER LOCATION PETER S.HOLTON SANDY M.VANSTRUM r,. REBECCA F.HUHTA MICHAEL P.WALSH (� J.A.JURGENS H.ADAMS WEAVER ` ( 1 54 N.E.FOURTH AVE. MARK B.KLEINFELD PAUL C.WOLFE '^-1 DELRAY BEACH,FLORIDA 33483 CHARLES B.KOVAL V1LL4CE OF TEMSA1 April 29, 1991 APR 30199r► • VILLAGE win Mr. Thomas G. Bradford MA FILE Village Manager 4117 QFF7CE Village of Tequesta 0 cn Post Office Box 3273 - Tequesta, Florida 33469 ' I RE: Village of Tequesta Agreement with Palm Beach County for Joint Project Participation; Construction Funding Our File No. 13153 . 1 Dear Tom: I have reviewed the above referenced Agreement and approve same as to legal form and sufficiency. Enclosed are the three original agreements which I have executed. Sincerely; 'John C"Randolph JCR/ssm Enclosures AGREEMENT BETWEEN THE VILLAGE OF TEQUESTA AND PALM BEACH COUNTY, FLORIDA FOR THE JOINT PROJECT PARTICIPATION FOR THE CONSTRUCTION ,FUNDING OF OLD DIXIE HIGHWAY FROM SR 811 TO N. COUNTY LINE ROAD PALM BEACH COUNTY, FLORIDA PALM BEACH COUNTY PROJECT NO. 87541 A&B THIS AGREEMENT, made and entered into this. day of 1991, by and between PALM BEACH COUNTY, a' political subdivision in the State of Florida, herein referred t "COUNT Pa, o as ',COUNT , and the Village of Tequesta, a municipality in the State of Florida, herein referred to as the ',VILLAGE", W I T N E 8 S E T H : WHEREAS, COUNTY and VILLAGE desire to jointly participate in the construction of certain utilities within the right-of-wa Dixie Highway from SR 811 to N. County Line Road; and y of Old . WHEREAS, Florida Statutes, Section 163.01, allows governmental units to make the most efficient use of their powers by enabling them to cooperate with other localities on a basis of mutual advantage; and WHEREAS, the execution of agreement is in the best interest of both governmental units by promoting efficient utility construction along the Old Dixie Highway right-of-way referred to , previously; NOW, THEREFORE, for and in consideration ,,of the mutual covenants contained herein, the Parties . to this Agreement a follows: agree as 1 VILLAGE OF TEQUESTA 1. The agreement between the COUNTY and the VILLAGE for the Joint Funding Improvements to Old Dixie Highway from SR 811 to N. County Line Road, dated January 8, 1991 and attached hereto (Attachment A) is incorporated by reference and made part of this agreement. 2 . The VILLAGE agrees to pay directly to the COUNTY costs attributable to said utility construction as outlined in the Specifications for this project. 3 . Said summation of costs is stated in the amount of $ 145,277 . 00 in accordance with the attached bid tabulation for the specified work. 4 . Said costs shall be adjusted upon completion of the project using "as constructed quantities", said quantities being measured by the Palm Beach County Engineering and Public Works Department. 5. The VILLAGE agrees to fund those contributions set forth in Paragraphs 1 through 3 above as shall be paid by the VILLAGE as such costs accrue and within thirty (30) days after a bill for same has been sent by the COUNTY to the VILLAGE. 6. The COUNTY is to be responsible for administering the funds in accordance with the Agreement. 7 . The VILLAGE is to be responsible for, and agrees to provide or cause to be performed all inspection services during construction of and final certification for the aforementioned utility systems. 2 VILLAGE OF TEQUESTA 8'. In the event that additional work and funding is required, the additional cost attributable to said utility construction as outlined in the specifications for this project is the responsibility of the VILLAGE.' In the event of an under run ' attributable • to said utility construction as outlined in the • specification, the VILLAGE will, be credited the excess amount. 9 : All provisions of this Agreement calling for the expenditure of ad valorem tax money, by either COUNTY or VILLAGE are • subject to annual budgetary funding and should either Party involuntarily fail to fund any of their respective obligations pursuant to this Agreement, this Agreement may be terminated. 10. Any and all notices required or permitted to be given hereunder shall be deemed received three (3) days after same are deposited in U.S. Mail sent via certified mail, return receipt requested. All notices, to Authority shall be sent to: Village of Tequesta P.O. Box 3474 Tequesta, FL 33469 ATTN: Thomas C. Hall, Water System Manager All notices to the County shall be sent: to: George T. Webb,P.E. , Acting County Engineer Engineering and Public Works Department P.O. Box 2429 West Palm Beach, FL 33402 ATTN: Roadway Production 3 VILLAGE OF TEQUESTA IN WITNESS WHEREOF, the Parties unto this Agreement have set ; ' their hands and seals on the day and date first written above. VILLAGE OF TEQUESTA ' PALM BEACH COUNTY, FLORIDA, BY ITS BOARD OF COUNTY COMMISSIONERS BY: BY: (DATE) (DATE) ATTEST: ATTEST: • JOHN B. DUNKLE, CLERK BY: BY: . (DATE) (DATE) APPROVED AS TO FORM AND LEGAL APPROVED AS TO FORM AND LEGAL SUFFICIENCY: SUFFICIENCY: _ BY:. �ii /r/ BY: VILLAGE ATTORNEY COUNTY ATTORNEY 4 1 AGREEMENT BETWEEN THE VILLAGE OF TEQUESTA AND . PALM BEACH COUNTY, FLORIDA FOR JOINT PROJECT PARTICIPATION IN CONSTRUCTION , OF OLD DIXIE HIGHWAY FROM SR 811TO N. COUNTY LINE. ROAD . PALM BEACH COUNTY PROJECT NO. 87541 THIS AGREEMENT, made and entered into this day " of 1991, by and between the COUNTY OF. PALM BEACH, a political subdivision of the State of Florida, hereinafter called and referred to as the ""COUNTY" and the Village of Tequesta, a municipality in the State of Florida, hereinafter ;called and .. referred to as the tS.VILLAGEH, ' W' I T N E S S E T H : • . WHEREAS, the VILLAGE and the' COUNTY 'are authorized to enter into this agreement pursuant to Section 163 . 01, Florida Statutes, as amended, which permits local governmental units to make the. most efficient use of their powers by enabling them to cooperate with other• localities on a basis of mutual advantage; and WHEREAS, the COUNTY has caused to be prepared roadway construction plans and specifications for improving Old Dixie Highway from SR 811 to N. County Line Road; and WHEREAS, the VILLAGE has caused to be prepared utility construction • plans and specifications for water distribution, and transmission systems for the aforementioned portion of Old Dixie Highway which will .serve portions of its service area; and WHEREAS, both VILLAGE and the COUNTY declare that 'it is in the public interest that the water distribution, and transmission systems be constructed with the aforementioned Old Dixie Highway improvements; and 1 VILLAGE OF TEQUESTA AGREEMENT WHEREAS, the VILLAGE has budgeted funds for cooperation in construction of the water distribution, and transmission systems along the authorized service section of Old Dixie Highway; and WHEREAS, the VILLAGE is desirous of funding the costs for construction of the water distribution, 'and transmission systems which benefit the VILLAGE;. and WHEREAS, the VILLAGE will perform all inspections, testing and certifications required for the water distribution, and transmission systems to insure compliance with their specifications and permits;' NOW, THEREFORE, for and in consideration of the mutual covenants contained herein, the Parties to this Agreement agree as follows: ' 1• , The recitals set forth above are hereby adopted and incorporated in this agreement. 2 • The COUNTY agrees to: A. Advertise for bids, submit bids to the VILLAGE for review, and award a contract for the construction of Old Dixie Highway ' improvements, water distributions, and transmission systems which are to be owned by the VILLAGE. B. Administer the above contract and administer the funds in accordance with this Agreement.• 2 . 4 VILLAGE OF TEQUESTA AGREEMENT , C. • Supply the VILLAGE with a contract audit in accordance with standard accounting propedures which, reflect total , final costs of the water distribution, and transmission systems, upon completion of this project. 3 . The VILLAGE agrees to: A. Use a professional engineer selected by • the VILLAGE to prepare deSign plans for the construction of the water distribution, and transmission systems and obtain, all necessary permits for the project. B. Pay the costs of engineering services to accomplish design plans for the construction of the water distribution, and transmission Systems for the project. C. Provide or cause to be performed all inspection services for the construction of the water distribution, and transmission systems during construction of and final certification for the aforementioned 'water systems. D. To the extent that the VILLAGE is charged with design for the construction of the water distribution, and transmission , systems of the project, the VILLAGE agrees to be responsible for any and all liability with regard to its performance of the requirements of this agreement. 3 VILLAGE OF TEQUESTA AGREEMENT , E. ' ,To contribute and to forward to the• COUNTY the funding for the actual costs of construction of the water distribution, and transmission systems. Contributions and funding for the cost of such construction shall be paid by the VILLAGE as such costs accrue and within 30 days after a bill for same has been sent by the COUNTY to the VILLAGE. 4 . Both the COUNTY and the VILLAGE agree to pay to the other such funds as are indicated in the final audit ' set forth in Paragraph 2 (C) above, which will balance accounts between the parties. 5 . This Agreement shall be executed in triplicate and the COUNTY shall retain two (2) copies and the VILLAGE shall retain one (1) copy. All shall be considered an original. 6. Any and all notices required or permitted to be given here under shall be deemed received five (5) days after same are deposited in U.S. Mail sent via certified mail, return receipt requested. All notices to the VILLAGE shall be sent to: Thomas C . Hall Water System Manager Village of Tequcsta 1' ..). Box 3474 Teq•'es La, Florida 33469 • All notices to the COUNTY shall be sent to: H.F. Kahlert, P.E. , County Engineer Engineering and Public Works Department P.O. Box 2429 West Palm Beach, FL 33402 ' ATTN: Roadway Production . 4 ' i VILLAGE OF TEQUESTA AGREEMENT IN WITNESS WHEREOF, the County of Palm Beach, Florida has caused this Agreement to signed by the Chairman of the Board of County Commissioners and the seal of ' said Board to be affixed hereto and attested by the Clerk of said Board, pursuant to authority granted by said Board, and the Village of Tequesta has caused this Agreement to be signed in its name by its Chairman and its seal to be affixed hereto,, .attested by its Secretary, the date and year first above written. VILLAGE OF TEQUESTA PALM BEACH COUNTY, FLORIDA, '. BY ITS BOARD OF COUNTY COl.u.1ISSIdNERS e--i- io-,7-90 By l L (�- ) ) \2tt .=� -' ,DATE %~ � DATE " ,;ATTEST: : , `�''.,• ATTEST: lie, 1AN 8.; 1991 r �; •t- JOHN B. �� � .. l ;,t . DUN1LE CLERK ' ,/e L ,!/ r• ,..,G / B Y ,J )CL / / DATE iv/'74 'd j' i DATE APPROVED AS TO FORM AND C" d� � � %rl; " • ' LEGAL SUFF CIENCY: APPROVED 'AS:"TO 'FORM AND LEGAL SUFFICIEN('Y;;-/ . B Y: ; Y.. �7�- LAGS ATTORNEY BY �G /��� • / COUNTY ATTORNEY (final 10/11/90) • • • 5. • . . _ . . . . . . . . • . . . . . . • . • . . . _• .. . . , .. . , , • • • . . . . . -'.- ,_ • - . • - . .... '. . '... ' . . .., . • • . . . . . . . . . PROJECT NAME: OLD DIXIE HIGHWAY FROM SR 811 TO OOUNTY LINE ROAD . _. • . . .PROJECT NUMBER: 87541 A8B BERGERON LAND • . - , RANGER CONSTRUCTION " _ . . • , . BID OPENING: MARCH 26, 1991 - ' . -'-- DEVELOPMENT, INC. - '• INDUSTRIES INC BELVEDERE CONSTRUCTION Co ' . • - - . _ _ . . • _ _ . . • - .• ITEM ' QUANTITY/UNITS ' UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT _== . = = =-====== ========= =============_======= == ===========-_=== -ROADWAY ITEMS . .- ' 1. MOBILIZATION 1 LS 5151,221.19 $151,221.19 • 560,000.00 160,000.00 $50,000.00 $50,000.00 . . 2 MAINTENANCE OF TRAFFIC - • ' . • . 1 LS 137,838.00 137,838.00 158,600.00 158,600.00 S23,000.00, .,.. S23,000:00 . .• ' . 3 CLEARING AND GRUBBING - 1 LS S16-081.74 116,181.74 $40,000.00 $40,000.00 -S45,000.00 S45,000.00 . - . . . . 4 .REGULAR EXCAVATION . . 11,350 CY $1.17 S11,279.50 $2.80 $31,780.00 . _ . $2.00 $22,700.00. 5 EMBANKMENT (COMPACTED IN PLACE) _ • 2,121,CY . 16.31 113,383.51 - $6.40 $13,574.40 -'' • $6.00 S12,726.00 . . . 6 TYPE .C. STABILIZATION (12") , 44,185 SY. • $0.90 139,766.50 . $1.45 .S64,068.25 $1.55 $68,486.75 " . • . 7 LIMEROCK BASE (8")(DBL CRSE)(INCLUDES PRIME COAT) 42,224 SY . 13.77 1159,184.48 $5.60 1236,454.40 15.50 ' 1232i232.00 - - ••8 TYPE S-1 ASPH. CONC.,(1 1/4") (OVERLAY) • , 1,000 SY $3.42 13,420.00 : 13.00 $3,000.00 . $3.10 : $3,1.00.00 . .... . ._ . 9 TYPE. S-1 ASPH. CONC. (2 1/2")f0BL CRSEXINCL.TACK COAT)" . 42,092 SY • - S4.57 .1192.,360.44 - S3.65 'S153,635.80 • $3.76 - 1158,265.92 . , - - - . 10 CLASS I CONCRETE (GRAVITY WALLS) - 21 CY . $525.30 $11,031.30 $225.00 14,725.00 . $385.00 $8,085.00 . . 11 INLET (TYPE C)(MODIFIED) . 6 EA 1630.36 .$3,782.16 1800.00 • $4,800.00 . 1870.00 $5,220.00 : - 12 INLETS (CuRB)(TYPER-5)(<10.) ' ' . . . 11 EA . $1,575.90 117,334.90 S1,500.00 ' 116,500.00 11,585.00 $17,435.00 13 INLETS (CURB)(TYPE P-6)(.<10,) 11 EA - $1,838.55 $20,224.05 $1,500.00 .$16,500.00 S1,80000 S19,800.00 : 14 . INLETS (CURB)(P-2)(CONFLICT)(<10') 2 EA $2,311.32 • $4,622.64 $1,800.00 ' $3,600.00 - $3,000.00 S6,000.00 . • 15 INLETS (DITCH BOTTOM)(P-x)(<101)(INCL,. BOLT & CHAIN) , 4 EA S1,260,72 s5,042.88 S1,45000 15,800.00 $1,690.00 16,760.00 . • _-. • • 16 INLETS (DITCH'BOTTOM)(P-X)(>10')(INCL. BOLT 8 CHAIN) 2 EA - . uS1,365.78 $2,731.56 S1,508.00' $3,000.00 $2,000.00 s4,000.0 . . • 17 _ MANHOLES (P-7T)(OO') 13 EA 1893.01 111,609.13. $975.00 $12,675.00 $1,280.00 ' 116,640.00 18 MANHOLES (P-7T)(>10') 2 EA 11,239.71 12,479.42 $1,050.00 . $2,100.00 s1,450.00 S2,900:00 19 MANHOLES (J-7T)(<10.)(M00IFIED)(ALT. "B") - 3 EA 16,093.48 118,280.44 15,600.00 - 116,800.00 - $5,100.00 $15,300.00 20 MANHOLES (J-71)(>10')(mODIFIED)(ALT. "B") 1 EA 15,253.00 - 1.5,253.00 $5,500.00 $5,500.00 . S4,860.00 $4,860.00 21 ADJUST MANHOLES (STORM) . . 2 EA 1157.59 1315.18 1300.00 1600.00 165000 $1,300.00 . . • . - . 22 CAP EXISTING INLETS 8 CONVERT TO JUNCTION BOX 3 EA s472.77 - .11,418.31 $600.00 s1,800.00 1675.00 12,025.00 23 CONN. EXIST. 36" RCP TO JUNCTION BOX 8 PLUG EXIST. 24" 1 EA $472.77 $472.77 $1,000.00 $1000.00 $680.00 1680.00 . . • 24 CONCRETE PIPE CULVERT (18") • 1,851 LF $18.91 S35,00210 114.50 126,839.50 . 114.00 .S25,914.00 - :. . . 25 TRENCH SAFETY (18") " - . 1,851 IF • $1.05 $1,943.55 . 10.10 S185.10 ' $0.50 $925.50 - • 26 CONCRETE PIPE CULVERT (24") 1,819 LF $21.01 . $38,217.19 . S20.00 $36,380.00 $20.00 $36,380.00 .• •27 TRENCH SAFETY-(24") " 1,819 UF 11.05 s1,909.95 $0.10 $181.90 -S0.50 $909.50 28 CONCRETE PIPE CULVERT (30") . . 2,030 LF - $25.21 $51,176.30 $28.50 $57,855.00 $26.00 . $52,780.00 . . •.... -.29 .TRENCH SAFETY (30") " .. • 2,030 IF ' 12.10. $4,263.00. $0.18 - 1203.00 10.75 . 11,522.50 30 CONCRETE-PIPE CULVERT (36") 388 LF $37.82 $14,674.16 133.00 112,804.00 .. S42.00. . S16,296.00 31 TRENCH SAFETY (36") " 388 LF _ $2.10 • $814.80 $0.10 $38.80. $2.00 $776.00 32 FRENCH DRAINS (18" CMP NON PERFORATED) 108 LF S3362 $3,630.96 $25.00 12,700.00 - 123.00 * $2,484.00 .. • 33 TRENCH SAFETY (18") " . 108 LF 12.10 1226.80 10.10 110.80 $0.50 $54.00- . .- .34 FRENCH DRAINS (18" CMP PERFORATED) . ' •. 1,824 LF $34.67. 'Z S63,238.08 S42.00 76,608.00 $42.00 $76608.00 35 TRENCH SAFETY (FRENCH DRAINS) (18" CmP) " ". 1,824 LF $2.10 $3,830.40 $0.10 $182.40 • $0.50 $912.00 •.. . 36 FRENCH DRAINS (30" RCP PERFORATED) • 1,084 LF $47.28 $51,251.52 $58.50 163,414.00 $51.00. 555 284.00 37 TRENCH SAFETY (FRENCH DRAINS) (30" RCP) " 1,084 LF $3.15 $3,414.60 . $0.10 $108.40 $0.75 $813.00 • ' • . 38 TRENCH INSPECTION BOXES(D.O.T. INDEX 245 W/18" OPENING) . 8 EA $945.54 $7,564.32 $900.00 $7,200.00 . S1,030.00 S8,240.00 39 ALUMINUM HANDRAIL . ' 212 LF $26.27 - $5,569.24 $28.00 $5,936.00 ' $36.00 $7,632.00 40 CONCRETE CURB 8, GUTTER (TYPE F) . . 11,353 LF $5.62 $63,803.86 $5.15 S58,467.95 $5.10 - S57,900.30 ' 41 CONCRETE SIDEWALK (4" THICK) 4,040 SY " $12.61 150,944.40 $11.25 $45,450.00 $11.55 $46,662.00 42 CONCRETE SIDEWALK (6" THICK) . _ 550 SY $14.71 $8,090.50 . 114.00 S7,700.00 114.35 S7,892.50 • 43 GUARDRAIL (ROADWAY)(INCLUDING MISCELLANEOUS ASPHALT) 1,682 LF $13.66 122,976.12 111.00 S18,502.00 512.85 . 521,613.70 44 END ANCHORAGE ASSEMBLY (TYPE IV) 4 EA $735.42 $2,941.68 1510.00 52,040.00 1515.00 $2,060.00- - - •45 SEED 4 MULCH . 14,984 SY ' ' 10.15 .12,247.60 50.40 $5,993.60 •• * $0.35 : • $5,244.40 . . .. • . . . •• . . . . . • . . • •. . • : - - , . • . .. ,- - • . . • - . .• - . . , . . • . • • . _. . . -. . . . . • - ' , . •• . . • PROJECT NAME: OLD DIXIE HIGHWAY FROM SR 811 TO COUNTY LINE ROAD PROJECT NUMBER: 87541 Ad6 BERGERON LAND RANGER CONSTRUCTION BID OPENING: MARCH 26, 1991 DEVELOPMENT, INC. INDUSTRIES, INC. BELVEDERE CONSTRUCTION CO. ITEM OUANTITY/UNITS UNIT PRICE AMOUNT UNIT PRICE _ AMOUNT UNIT PRICE AMOUNT _ = _ = CONTINGENCY ITEMS ' 46 ADJUST SANITARY SEWER MANHOLE TOPS 6 EA S189.11 S1,134.66 S400.00 S2,400.00 s505.00 $3,030.00 47 ADJUST SOUTHERN BELL MANHOLE TOPS 7 EA 1315.18 $2,206.26 S600.00 $4,200.00 $505.00 $3,535.00 48 ADJUST WATER VALVE BOXES. 3 EA $94.55 s283.65 s40.00 5120.00 S190.00 S570.00 49 MANHOLES (P-71)(<101) 5 EA S893.01 14,465.05 5950.00 $4,750.00 51,350.00 s6,750.00 50 MANHOLES (P-7T)(>10') 1 EA S1,239.71 s1,239.71 $1,125.00 S1,125.00 S1,600.00 s1,600.00 51 TYPE P CONFLICT BOX (<10') 5 EA S1,155.66 15,778.30 1750.00 .13,750.00 S1,765.00 S8,825.00 52 TYPE J CONFLICT BOX (<10') 1 EA s2,101.20 $2,101.20 s900.00 S900.00 $3,000.00 $3,000.00 53 SOD 2,000 SY S1.21 S2,420.00 S1.70 S3,400.00 S1.45 S2,900.00 54 SUPPORT SST CABLE 120 LF 16.30 1756.00 15.00 $600.00 $5.20 S624.00 55 INSTALLATION OF SBT MANHOLE CURB TOPS 1 EA 1315.18 S315.18 S500.00. S500.00 S1,500.00 S1,500.00 56 AC PIPE REMOVAL 100 LF 131.52 13,152.00 s15..00 $1,500.00 125.00 $2,500.00 57 TYPE S ASPH.CONC.(OVERBUILD)(LEVELING CRSE)(MISC) 125 TN s57.78 17,222.50 S46.00 s5,750.00 $55.00 $6,875.00 58 REMOVE I. RESET FENCE 100 LF S4.20 1420.00 S10.00 S1,000.00 S15.50 S1,550.00 59 CONC. CULVERT PIPE (12")(YARD DRAINS d MISCELLANEOUS) 200 LF 130.47 16,094.00 514.00 $2,800.00 117.00 $3,400.00 60 TRENCH SAFETY (12") •• 200 LF s0.10 s20.00 s0.10 S20.00 $0.30 s60.00 61 MANHOLES (J-7T)(<10')(M001FIED)(ALT. "A") 3 EA $3,992.28 111,976.84 '4,000.00 S12,000.00 S7,000.00 S21,000.00 62 MANHOLES (J-7T)(>10')(MOOIFIEO)(ALT. "A") 1 EA 13,466.98 S3,466.98 $3,800.00 S3,800.00 S7,910.00 S7,910.00 63 YARD DRAINS 3 EA S630.36 $1,891.08 S400.00 51,200.00 S260.00 S780.00 64 8" DIP DEFLECTION OF EXISTING WATERMAIN 3 EA 51,470.84 54,412.52 12,200,00 S6,600.00 12,570.00 S7,710.00 VILLAGE. OF TEOUESTA ITEMS . 65 EXTENSION: OF 1" WATER SERVICE (STA. 10+27) 1 EA s236.39 S236.39 1300.00 S300.00 $500.00 $500.00 66 RELOCATE EXISTING FIRE HYDRANT, METER, ETC.(STA. 17+88) 1 EA S893.01 $893.01 11,300.00 $1,300.00 11,265.00 s1,265.00 67 TAPPING VALVE & SLEEVE, VALVE BOX, RELOCATE FIRE 1 EA S3,151.80 S3,151.80 $3,200.00 $3,200.00 15,025.00 S5,025.00 HYDRANT, ETC. (STA. 65+85) . 68 12" M.J. RESILIENT SEATED VALVE W/VALVE BOX 6 EA s735.42 s4,412.52 $950.00 $5,700.00 1775.00 s4,650.00 69 10" M.J. RESILIENT SEATED VALVE W/VALVE BOX 1 EA $630.36 1630.36 5790.00 1790.00 1655.00 $655.00 70 8" M.J. RESILIENT SEATED VALVE W/VALVE SOX 3 EA 5420.24 S1,260.72 $520.00 $1,560.00 S455.00 S1,365.00 71 12" DUCTILE IRON PIPE •'• 2,280 LF 118.91 $43,114.80 $17.00 $38,760.00 $18.85. S42,978.00 72 1.0" DUCTILE IRON PIPE '•• 1,350 LF s24.69 $33,331.50 515.00 $20,250.00' 517.95 . S24,232.50 73 8" DUCTILE IRON PIPE ••• 3,300 LF . 511.03 $36,399.00 s11.50 $37,950.00 511.85 $39,105.00 74 SAMPLING POINTS 8 EA S262.65 $2,101.20 $125.00 S1,000.00 S150.00 $1,200.00 75 10" TERMINAL END 2 EA $525.30 $1,050.60 S725.00 $1,450.00 5445.00 $890.00 76 8" TERMINAL END 1 EA $525.30 1525.30 . $600.00 S600.00 $370.00 $370.00 77 TAPPING SADDLE W/1" CORPORATION STOP 2 EA $367.71 S735.42 575.00 5150.00 S350.00 5700.00 78 DUCTILE IRON FITTINGS 5,500 LBS 50.80 $4,400.00 S1.30 s7,150.00 S1.65 $9,075.00 79 BLOWOFF CONNECTION 1 EA s341.45 $341.45 5400.00 s400.00 S345.00 $345.00 80 TRENCH SAFETY (D.I.P.) •• 7,930 LF $0.10 1793.00 $0.10 $793.00 $0.20 $1,586.00 TOTAL AMOUNT OF BID $1,361,697.54 + s1,363,081.30 s1,373,479.57 + Corrected Total '' CONTINGENCY ITEMS MAY.BE INCREASED, DECREASED OR DELETED AS DIRECTED BY THE ENGINEER SEE SUPPLEMENTAL SPECIAL PROVISIONS • ' PROJECT NAME: OLD DIXIE NIGNWAY FROM SR 811 TO COUNTY LINE ROAD • PROJECT NUMBER: 87541 A&B - • • BID OPENING: MARCH 26, 1991 _ HARDRIVES, INC. • DICKERSON FLORIDA, INC. - J.W. CHEATHAM, INC. , AVERAGE ITEM ouANTITY/UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE a......saaz=ac a sa.a_aaaca -aocaaoamsaaaocaasaaeacacacaaaaaaaasaasasasaa:aaaaaaeaaaasaeaacaetaeaaanaacar - - - ROADWAY ITEMS - 1 MOBILIZATION 1 LS S58,500.00 S58,500.00 S3,800.00 S3,800.00 S65,442.00 ' S65,442.00 S42,580.67 • 2 MAINTENANCE OF TRAFFIC • 1 LS S37,000.00 S37,000.00 •. S26,750.00 •S26,750.00 S56,492.00 $56,492.00 ' S40,080.67 - 3 CLEARING AND GRUBBING -- . .1 LS , S25,000.00 , $25,000.00 .-S7,600.00 S7,600.00 .S15,484.00 S15,484.00 S16,028.00 .- _ ' 4 REGULAR EXCAVATION 11,350-CY S1.40 . S15,890.00 S7.80 S88,530.00 S2.22 S25,197.00 S3.81 . 5 EMBANKMENT (COMPACTED IN PLACE) - 2,121 CY $3.80 S8,059.80 $1.45 13,075.45 S2.22 S4,708.62 S2.49 6 TYPE •C' STABILIZATION (12") 44,185 SY s1.40 s61,859.00 S1.65 S72,905.25 S1.06 S46,836.10 •' S1.37 7 LIMEROCK BASE (8")(DBL CRSE)(INCLUDES PRIME COAT) 42,224 SY s4.95 S209,008.80 s5.45 S230,120.80 S4.22 S178,185.28 S4.87 ` 8 TYPE S-1 ASPH. CONC. (1 1/4".) (OVERLAY) 1,000 SY. • 52.05 S2,050.00 - 52.65 S2,650.00 S2.40 S2,400.00 . S2.37 - . - - 9. TYPE-S-1- ASPHt:CONC. (2 1/2")(DBL CRSE)(INCL.TACK-COAT) 42,092 SY s4.10 • S172,577.20 $4.30 S180,995.60- 54.92 5207,092.64 ' S4:44 - 10 CLASS I CONCRETE (GRAVITY WALLS) 21 CY S275.00 55,775.00 • 5210.00 s4,410.00 S308.00 • s6;468.00 S264.33 11 INLET (TYPE C)(M00IFIE0) • ' 6 EA S800.00 S4,800.00 S766.00 s4,596.00 S678.00 54,068.00 S748.00 ' - ' 12 INLETS (CURB)(TYPE P-5)(<10') 11 EA $1,525.00 S16,775.00 S1,720.00 . S18,920.00 S1,695:00 S18,645.00 S1,646.67 - - 13 INLETS (CURB)(TYPE P-6)(<10') . • - 11 EA • S1,710.00 - 118,810.00 S2,050.00 S22,550.00 . S1,978.00 $21,758,00 S1,912.67 - • 14 INLETS (CUR6)(P72)(CONFLICT)(<10') 2 .EA . S2,500.00 S5,000.00 S2,575.00 s5,150.00 S2,486.00 . 54,972.00 . $2,520.33 - 15 INLETS (DITCH BOTTOM)(P-X)(<10')(INCL. BOLT S CHAIN) 4 EA -- s1,440.00 • - s5,760.00 ' 53,180.00 s12,720.00 s1,356.00 S5,424.00 • $1,992.00 - ' 16 INLETS (DITCH BOT10M)(P-x)(3,10')(INCL. .BOLT S CHAIN) 2 EA 51,660.00 s3,320.00 • $3,360.00 $6,720.00 S1,469.00 ."12,938.00 $2;163.00 17 MANHOLES (P-7T)(<10') . 13 EA S1,030.00 S13,390.00 . S1,096.00 S14,248.00 S961.00 S12,493.00 - S1,029.00 18 MANHOLES (P-7T)(>10') 2 EA • S1;370.00 S2,740.00 11,215.00 12,430..00 ' 51,333.00 S2,666.00 $1,306.00, ' 19 MANHOLES (J-71)(<10')(MODIFIED)(ALT. "8") 3 EA S6,600.00 S19,800.00 S7,045.00 -S21,135.00 56,554.00' S19,662.00 S6,733.00 - 20 MANHOLES (J-7T)010')(MO0IFIED)(ALT. "B") -1 EA • 56,500.00 $6,500.00 S7,020.00 S7,020.00 .- S5,650.00 S5,650.00 S6,390.00 21 ADJUST-MANHOLES (STORM) 2 EA S500.00 - - S1,000.00 5735.00 . S1,470.00 S170.00 S340.00 S468.33 22 CAP EXISTING INLETS t CONVERT TO JUNCTION BOX 3 EA S575.00 . S1,725.00 S625.00 S1,'875.00 S509.00 . S1,527.00 S569.67 - - • 23 'CONN. EXIST. 36"-'RCP TO JUNCTION'BOX8 PLUG EXIST'. 24" 1 EA -S300.00- - . - S300.00 ' S395.00 S395.00 $509.00_ - - ' $509.00 $401.33 24 CONCRETE PIPE CULVERT (18") 1,851, LF S15.75 S29,153.25 S13..70 S25,358.70 •520.34 . S37,649.34 S16.60 • 25 TRENCM-SAFETY (18") •• 1,851 LF . S1.00 S1,851.00 S1.26 S2,332.26 S1.13 52,091.63 51.13 • . 26 .CONCRETE PIPE CULVERT (24") 1,819 LF $17.50 $31,832.50- S17.60 S32,014.40 S22.60 S41,109.40 S19.23 - . 27 TRENCH SAFETY (24") •• 1,819 LF 51.00 S1,819.00 S1.26 S2,291.94 S1.13 • $2,055.47 S1.13 28 CONCRETE PIPE CULVERT (30") 2,030 LF S22.00 $44,660.00 S23.65 S48,009.50 S27.12 S55,053.60 S24.26 •• ' • 29 TRENCH SAFETY (30") •• 2,030 LF '51.25 S2,537.50 • s1.26 S2,557.80 s2.26 • S4,587.80 S1.59 • . 30 CONCRETE PIPE'CULVERT (36") • - . . 388 LF $28.00_. .- . S10,864.00 S36.65 • S14;220.20 . - 540.68 S15,783.84 .. 135.11-, - ,• - ; -- • - 31 TRENCH SAFETY (36") •• 388 LF 12.00 S776.00 S1.26 S488.88 S2.26 $876.88 - . S1.84 - - - .32 FRENCH DRAINS (18" CMP NON PERFORATED) 108 LF S19.00 $2,052.00 S13.10 S1,414.80 $36.16 $3,905.28 S22.75 33 TRENCH SAFETY (18") "" 108 LF S1.50 S162.00 S1.26 S136.08 52.26 S244.08 51.67 34 FRENCH DRAINS (18" CMP PERFORATED) - _ .1,824 LF . S35.00 . S63,840.00 $31.45 S57,364.80 _ $37.29 • S68,016.96 -S34.58 35 TRENCH SAFETY (FRENCH DRAINS) (18" CMP) V" - 1,824 LF .S1.00 . S1,824.00 S1.26 . .$2,298.24 12.26 $4,122.24 • $1.51 36 FRENCH DRAINS (30" RCP PERFORATED) . - 1,084 LF S44.00 S47,696.00 - S41.20 $44,660.80 S50.85 S55,121.40. $45.35 . 37 TRENCH SAFETY .(FRENCH DRAINS) (30" RCP) •• - 1,084 LF 52.00 S2,168.00 S1.26 . *S1,365.84 . S3.39 S3,674.76 S2.22. 38 . TRENCH INSPECTION 6OD(ES(D.O.T. INDEX 245 W/18" OPENING). • 8 EA • 5980.00• 57;840.00 S1,055.00 S8;440.00 S1,017.00 S8,136.00 $1,017.33 - ' 39 ALUMINIJ HANDRAIL - 212 LF. S35.50 $7,526.00 S34.10 $7,229.20 S39.20 S8,310.40 S36.27 - 40. CONCRETE CURB & GUTTER (TYPE F) •11,353 LF _ S5.25- . S59,603.25 S5.15 S58,467.95 54.75. • S53,926.75 S5.05 . ' - 41 CONCRETE SIDEWALK (4" THICK) 4,040 SY S11.00 S44,440.00 S11.20 S45,248.00 S10.00 S40,400.00 S10.73 42 CONCRETE SIDEWALK (6" THICK) • 550 SY -514.50 - $7,975.00 $13.90 $7,645.00 S15.00 S8,250.00 S14.47 . . 43 ' GUARDRAIL (ROADWAY)(INCLUDING MISCELLANEOUS ASPHALT) 1,682 LF 512.50 521,025.00 510.70 S17,997.40 S14.03 • • S23,598.46 S12.41 . • 44 END ANCHORAGE ASSEMBLY (TYPE IV) 4 EA 5540.00 S2;160.00 S520.00 S2,080.00 S560.00 S2,240.00 S540.00 45 SEED & IULCH ,14,984 SY 50.181 . $2,697.12 S0.14 S2,097.76 S0.17 S2,547.28 S0.16 • PROJECT NAME:.OLD DIXIE HIGHWAY FROM SR 811 TO COUNTY LINE ROAD PROJECT NUMBER: 87541 ABB _ - BID OPENING: MARCH 26, 1991 HARDRIVES, INC. DICKERSON FLORIDA, INC. J.W. CHEATHAM, INC. AVERAGE . ITEM QUANTITY/UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE CONTINGENCY ITEMS • 46 ADJUST SANITARY SEWER MANHOLE TOPS 6 EA S500.00 $3,000.00 S360.00 S2,160.00 S204.00 $1,224.00 S354.67 47 ADJUST SOUTHERN BELL MANHOLE TOPS 7 EA S500.00 S3,500.00 S360.00 $2,520.00 S339.00 S2,373.00 S399.67 48 ADJUST WATER VALVE BOXES - 3 EA S175.00 S525.00 S57.60 S172.80 S102.00 $306.00 S111.53 • 49 MANHOLES (P-7T)(<10') - 5 EA $1.,030.00 S5,150.00 S1,097.00 S5,485.00 $961.00 S4,805.00 S1,029.33 • 50 MANHOLES (P 7T)(>1O') -1 EA S1370.00 •• S1,370.00 S1,213.00 S1,213.00 S1,333.00 S1,333.00 S1,305.33 • , 51 TYPE P CONFLICT BOX (<10') _ _ ' . 5 EA .... ... S3,000.00 --- S15,000.00 S735.00 S3,675.00 S1;243.00 $6,215.00 S1,659.33 52 TYPE J CONFLICT BOX (<10') • 1 EA S4,000.00 S4,000.00 S735.00 S735.00 S2,260.00 42;260.00 S2,331.67 53 SOD 2,000 SY $1.35 S2,700.00 $0.85 S1,700.00 S1.29 S2,580.00 $1.16 54 SUPPORT SBT CABLE • 120 LF S6.00 S720.00 S8.10 S972.00 S6.78 S813.60 S6.96 55 INSTALLATION OF SBT MANHOLE CURB TOPS - 1 EA S500.00 S500.00 S1,365.00 S1,365.00 S339.00 S339.00- S734.67 . 56 AC PIPE REMOVAL - 100 LF S32.00 - S3,200.00 S16.55 . $1,655.00 $34.00 $3,400.00 S27.52 57 TYPE S ASPH.CONC_(OVERBUILD)(LEVELING CRSE)(MISC) 125 TN S35.00 $4,375.00 $38.60 $4,825.00 S36.85 S4,606.25 S36.82 58 REMOVE & RESET FENCE 100 LF S10.00 S1,000.00 . S4.00 S400.00 $10.00 $1,000.00 S8.00 59 CONC. CULVERT PIPE (12")(YARD DRAINS 8 MISCELLANEOUS) 200 LF- • $17.00 $3,400.00 S16.00 $3,200.00 S33.00 • $6,600.00 S22.00 60 TRENCH SAFETY (12") ** 200 LF S1.00 S200.00 S1.00 S200.00 $0.12 S24.00 S0.71 61 MANHOLES (J-7T)(<10')(MOOIFIED)(ALT. "A") 3 EA S4,240.00 S12,720.00 $5,440.00 S16,320.00 $4,294.00 $12,882.00 S4,658.00 . 62 MANHOLES (J-71)(>10')(MODIF►ED)(ALT. "A") • 1 EA S4,350.00 S4,350.00 S4,990.00 . $4,990.00 $3,729.00 - $3,729.00 S4,356.33 63 YARD DRAINS 3 EA S600.00 $1,800.00 S360.00 S1,080.00 S678.00 S2,034.00 S546.00 64 8" DIP DEFLECTION OF EXISTING WATERMAIN ... . . 3 EA . . $1,485.00 $4,455.00 S2,625.00 S7,875.00 S1,582.00 $4,746.00 $1,897.33 . - VILLAGE OF TEOUESTA ITEMS ' 65 EXTENSION OF 1" WATER SERVICE (STA. 10+27) 1 EA S240.00 S240.00 S353.00 $353.00 S252.00 S252.00 S281.67 66 RELOCATE EXISTING FIRE HYDRANT, METER, ETC.(STAI 17+88) : -: 1 EA' •7'4.:'•! S900.00 • . S900.00 $796.00 S796.00 S961.00 S961.00 S885.67 . 67 TAPPING VALVE & SLEEVE, VALVE BOX, RELOCATE FIRE' • . 1 EA ' . $3,200.00'z ' S3,200.00 S8,379.00 S8,379.00 S3,390.00 $3,390.00 54,989.67 HYDRANT, ETC. (STA. 65+85) - 68 12" M.J. RESILIENT SEATED VALVE W/VALVE.BOX '6 EA $740.00 S4,440.00 ' $866.00 $5,196.00 S791.00 S4,746.00 S799.00 ' 69 10" M.J. RESILIENT SEATED VALVE W/VALVE BOX•'A}'. ' T.r'"''.';?`•;•'`'1 EA`•"'B`11:0 5640.00 .: '_.i S640.00 S715.00 S715.00 S678.00 S678.00 S677.67 ti•.. 70 8" M.J. RESILIENT SEATED VALVE W/VALVE BOX '• .:: 3 EA`"'+ 5420.00`"' `' S1,260.00 • S473.00 S1,419.00 S452.00 S1,356.00 S448.33 71 12" DUCTILE IRON PIPE •"• "t 2,280 LF r:' ,'.•;.;;:'fir' S19.00; ;''- $43,320.00 $19.60 S44,688.00 S19.78 S45,098.40 • S19.46 72 10" DUCTILE IRON PIPE •••• 1,350 LF.,.: 4.S24.75` S33 412.50 S16.05 S21,667.50 S26.00 $35,100.00 S22.27 73 8" DUCTILE IRON PIPE ••• ' ' "• `'''"�,>"° ''.' ' f'�-" `'`�.'' 3,300 LF' '', - S11.00 $36,300.00 S12.90 $42,570.00 $11.30 S37,290.00 S11.73 . 74 SAMPLING POINTS ' e 8 EA '-•'`;" S265.00. ' - S2,120.00 S183.00 $1,464.00 S283.00 S2,264.00 S243.67 75 ' 10" TERMINAL END ":••�;,-%;:,: ' •,,T'%'; 2 EA'T.;:.'1�'�.:4,S530.00 S1 060.00 $850.00 $1,700.00 $565.00 ' S1,130.00 S648.33 76 8" TERMINAL END • • - - - : - �� . 1 EA•ti• a- .- 5530.00 • S530.00 S830.00 S830.00 S565.00 S565:00 S641.67 77 TAPPING SADDLE W/1" CORPORATION STOP y " l` '`: 2 EA' •.' ,f4, 5370.00'S, S740.00 S95.00 S190.00 S396.00 S792.00 S287.00 78 DUCTILE IRON F I TT I NGS, .;y d _L'{,`:'•''� ;ri ;rq:,! :',I :4.;',:t.'. 5,500.LBS;Y� r S0.80 S4,400.00 $2.10 511,550.00' S0.86 S4,730.00 S1.25 79 BLOWOFF CONNECTION ,. ., • ,�•_.a; q-c �-w 1 EA: 345.00; L;} 5345.00, 5502.00 S502.00 S367.00 8367.00 S404.67 • 80- TRENCH SAFETY (D.I.P.).,!• ;.,•i., . 7,930 LF .. .; - $0.15' 6 '51,18!.50 $1.05 S8,326.50 $0.23 - $1,823.90 S0.48 TOTAL AMOUNT OF BID S1,296,203.42 S1,33.4,674.45 . S1,352,472.36 • _ • CONTINGENCY ITEMS MAY BE INCREASED, DECREASED OR DELETED AS DIRECTED BY THE ENGINEER •• SEE SUPPLEMENTAL SPECIAL PROVISIONS • • • • • PROJECT NAME: OLD DIXIE HIGHWAY FROM SR 811 TO COUNTY LINE ROAD - • PROJECT NUMBER: 87541 AL8 BID OPENING: MARCH 26, 1991 HARDRIVES, INC. i. DICKERSON FLORIDA, INC. J.L1..-CHEATHAM, INC. AVERAGE ITEM. • - -• QUANTITY/UNITS.' UNIT PRICE - AMOUNT UNIT PRICE AMOUNT • UNIT PRICE AMOUNT • UNIT PRICE ••• PRICE OF REMOVAL., DISPOSAL, GROUTING OF AC PIPE SHALL BE INCLUDED IN THE-COST PER FOOT OF PIPE • • NOTE: ITEM NO. 55 CURB MANHOLE TOPS TO BE PROVIDED BY SBT. ' NOTE: ITEM-NO. 56 IS GOVERNED.BY SECTION 800 OF THE SPECIFICATIONS. . NOTE: ITEM NO. 57 IS FOR RESURFACING OF THE TEOUESTA DRIVE INTERSECTION AND INCLUDES MAINTENANCE OF TRAFFIC. NOTE: ITEM NO. 59 IS FOR YARD DRAINS, AS REQUIRED. NOTE: ITEMS NO. 64 THRU 80 ARE IN ACCORDANCE WITH 1HE VILLAGE OF TEOUESTA, PALM BEACH COUNTY HEALTH,DEPARTMENT L FLORIDA DEPARTMENT OF .ENVIRONMENTAL REGULATION SPECIFICATIONS. DAYS TO COMPLETE: TWO HUNDRED SEVENTY (270) CALENDAR DAYS Prepared By: S. Sandman Checked By: R. Terrell - - V l l ATTACHMENT "B" p PROJECT NAME: OLD DIXIE HIGHWAY FROM SR 811 TO N. COUNTY LINE ROAD BID OPENING DATE: MARCH 26, 1991 PROJECT t! 87541 ASB VILLAGE OF TEOUESTA ITEM QUANTITY/UNITS UNIT PRICE • TOTAL ROADWAY ITEMS 48 ADJUST WATER VALVE BOXES 51 TYPE P CONFLICT BOX (<10') 3 EA $175.00 $525.00 56 AC PIPE REMOVAL 1 EA $3,000.00 $3,000.00 64 8" DIP DEFLECTION OF EXISTING WATERMAIN 100 LF $32.00 $3,200.00 65 EXTENSION OF 1" WATER SERVICE ) 3 EA $1,240.00 $4,240.00 66 RELOCATE EXISTING FIRE HYDRANT, ETC. 1 EA $20.00 $240.00 67 TAPPING VALVE & SLEVE, VALVETA. ELOCATE 1 EA 5900,00 $900.00 FIRE HYDRANT, ETC. (STA. 65+85) ' 68 12" M.J. RESILIENT SEATED VALVE W/VALVE BOX 1 EA S3,200.00 $3,200.00 6 69 10" M.J. RESILIENT SEATED VALVE W/VALVE BOX 1 EA EA $$640.00 S4,640.00 70 8" M.J. RESILIENT SEATED VALVE W/VALVE BOX 3 EA 5420.00 $1,260.00 40.00 $640.00 71 12" DUCTILE IRON PIPE 3 72 10" DUCTILE IRON PIPE 2280 LF $19.00 $43,320.00 1350 LF $24.75 $33,412.50 73 8" DUCTILE IRON PIPE 74 SAMPLING POINTS 3300 LF $11.00 $36,300.00 75 10" TERMINAL END 8 EA $265.00 $2,120.00 76 8" TERMINAL END 2 EA $530.00 $1,060.00 77 TAPPING SADDLE W/1" CORPORATION STOP 1 EA $530.00 $530.00 78 DUCTILE IRON FITTINGS 2 EA $370.00 $740.00 5500 LBS $0.80 $4,400.00 79 BLOWOFF CONNECTION 80 TRENCH SAFETY (D.I.P.) 1 EA $345.00 $345.00 7930 LF $0.15 $1,189.50 TOTAL AMOUNT . $145,277.00