Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 7B_8/15/1991 4g y,. .. VILLAGE OF TEQUESTA 1 Post Office Box 3273 • 357 Tequesta Drive ;�•�� F Tcqucsta, Florida 33469-0273 • (407) 575-6200 a� ' ! ►� FAX: (407) 575-6203 'S: 4 f FIE CO,N y MEMORANDUM TO: Village Council FROM: Thomas G. Bradford, Village Manager DATE: August 9, 1991 SUBJECT: Bid Award Recommendation for Drilling of Well 24; Agenda Item Bids were opened on July 18, 1991 for the drilling of Well 24 located adjacent to the Children's Psychiatric Hospital in southern Martin County. Seven (7) firms responded with All Webb's Enterprises, Inc. of Jupiter, Florida, being the low bidder in the amount of $21,800. The Village engineer has reviewed the qualifications of All Webb's and recommended award of the project to the same. The Village has worked with All Webb's in the past and found them to be a reputable operation. Please note that this cost represents only the drilling of Well 24 and not any of the equipment and pumps associated therewith. Based upon the foregoing, it is recommended that the Village Council award the drilling of Well 24 bid to All Webb's Enterprises, Inc. of Jupiter, Florida in the amount of $21, 800. • TGB/mk Attachment Recycled Paper V i VILLAGE OF TEQUESTA ,;1"lift WATER DEPARTMENT ` `�t,,�� , Post Office Box 3474 • 357 Tequesta Drive cw Tequesta, Florida 33469-0474 • (407) 575-6230 MEMORANDUM : TO: Thomas G. Bradford, Village Manager FROM: Thomas C. Hall , Water System Manager 'l DATE: August 8 , 1991 . SUBJECT: Recommendation of Bid Award for Drilling of Well 24 Please find attached a letter of recommendation from Bill Reese of R.M.A. regarding the drilling of Well 24 which is located northeast of Sandy Pines facility in Martin County. Also attached is the actual bid tab sheet from bid opening on July 18th. We would like Council to recommend award to All Webb' s Enterprises , Inc. , of Jupiter at their August 15th meeting. Should Council have any questions for the engineer, Mr. Reese will be in attendance at that meeting. • TCH:gk attachment • RMA . . Reese, Macon;and Associates, Inc, August 8, 1991 Village of Tequesta P.O. Box 3273 Tequesta, FL 33469 ATTN: Thomas C. Hall, Water Department Manager RE: Production Well 24 Dear Mr. Hail: On July 18, 1991 seven bids on the referenced project were received. A summary of the results is as follows: All Webb's Enterprises, Inc. $21,800 Meredith Corporation $31,236 McGregor Pump Company, Inc. $32,008 Southwest Water Wells, Inc. $37,000 American Drilling, Inc. $39,700 Diversified Drilling, Inc. $40,995 Layne Atlantic, Inc. $45,488 We have requested, and received, qualifications from the low bidder. Copies are attached. We have reviewed the information and found it to be in order. The low bid price is extremely attractive and well below the estimated amount. Based on the above, we recommend award of the project to All Webb's Enterprises, Inc. in the amount of $21,800. Please advise if Council elects to accept the recommendation and we will proceed to prepare contract sets for execution. • If you have questions or wish to discuss this further, please call. Very truly yours, . William D. Reese, P.E. ' • 90-162. 1 3003 S. Congress Avenue - Palm Springs, Florida 33461 - (407) 433-9311 BID TABULATION CITY OF TEQUESTA PRODUCTION WELL 24 BID OPENING JULY 18, 1991 BID ADD. BID CONTRACTOR AMOUNT No. 1 BOND - COMMENTS American Drilling, 3q ?DO.OD �� 4SDO.00 Inc. Diversified 4/ �9�� Drilling 7 yes ° All Webb' s Enter- prises, Inc. ye-5 /090 ,o, Southwest Water- wells, Inc. 37,000•00 y- 510 Layne Atlantic �/ -�/ pD ye-s sip McGregor Pump Co. , 32 008,e0 yes Sfo Inc. i Meredith Corp. 3/ Z 36,p0 YES i Youn ros. , nc. 1 • • PROPOSAL VILLAGE OF TEQUESTA PRODUCTION WELL Proposal of All Webb's Enterprises, Inc. (Name) 309 Commerce Way, Jupiter, FL 33458 (Address) to furnish all materials, equipment and labor and to perform all Work in accordance with the Contract Documents for the Village of Tequesta Production Well 24 located in Tequesta , Florida. . To: Mayor and City Commission Village of Tequesta 357 Tequesta Drive • Tequesta, Florida 33469-0273 Gentlemen: The undersigned bidder has carefully examined the Contract Documents and the site of the proposed Work and is familiar with the nature and extent of the Work and any local ' conditions that may in any manner affect the Work to be done. The undersigned agrees to do all the Work and furnish all materials called for by the Contract Documents, in the manner prescribed therein and to the standards of quality and performance established by the Engineer for the prices stated _ in the spaces herein provided, for each of the items or combination of items stipulated . • • • P-1 • r- \1 . ... .. .. .1 i 1 ' d • I. . , I BASE PROPOSAL FORM • • LUMP-SUM, UNIT ESTIMATED 'PER-FOOT OR ITEM QUANTITY DESCRIPTION PER-HOUR PRICE MOBILIZATION AND DEMOBILIZATION • 1 .0 1 For mobilization and demobiliz- • I ation of all equipment, materials, and labor necessary ' to complete all work as described in these Specifications and Schedule of charges for drilling • services . LUMP SUM PRICE OF $ 4900.00 /lump sum PILOT HOLE . 2.0 . 1 For providing all equipment, ' materials, and labor necessary J I to collect formation samples from. • • a minimum 5-inch diameter pilot hole drilled to approximately 100 feet below land surface; nine , split-spoon samples and sieve analyses;, geophysical logging, . plus all other necessary incidentals. UNIT PRICE PER PILOT HOLE OF $ 3700.00 /pilot hole • Adjustments 2. 1 For drilling a minimum 5-inch diameter pilot hole to more or • less than 100 feet below land • surface. : . PER FOOT PRICE OF $ 8.00 /foot . I 2.2 For more or less than nine . • split-spoon samples including - sieve analyses and grain size distribution • curves (percent retained) . PER UNIT PRICE OF $ 75.00 /sample • • i r P • I • ' P-2 • : a.e BASE PROPOSAL FORM LUMP-SUM, UNIT ESTIMATED PER-FOOT OR ITEM QUANTITY DESCRIPTION PER-HOUR PRICE 2.3 For standby time as required ` by the-Consultant. • PER HOUR PRICE OF . . $ 75.00 /hour • 3.0 1 PRODUCTION WELL For providing all equipment, materials, and. labor necessary ' to drill , construct, develop, test andsample a production well according to the • specifications. Included in the unit price is drilled 20-inch diameter hole to a depth of 50 feet below land surface; 16-inch . diameter steel outer casing to . • , . a depth' of 50 feet below land • surface; 35 feet of nominal 15- inch diameter borehole; 10-inch • • • diameter Schedule 80 PVC inner casing to a • depth of 50 feet below land surface; • • 30 feet of 10-inch diameter • Schedule 80 PVC continuous-wound well screen; five-foot long sump 'below the well screen; 40 hours of development; 4 hours of step-rate testing; 8 hours of constant-rate testing; well-head completion and capping; gravel; cement; all other necessary incidentals. ' UNIT PRICE PER WELL OF $ .9500.00 /well • Adjustments 3.1 For drilling more or less than 50 feet of 20-inch diameter borehole. PER FOOT PRICE OF $ 15.00 /foot • P-3 . . • • O _ • . 4, . 1 • d • ' . . BASE PROPOSAL FORM 1 . • 1 LUMP-SUM, UNIT ESTIMATED PER-FOOT OR 1 ITEM QUANTITY DESCRIPTION ' PER-HOUR PRICE i ' ' 3.2 For furnishing and installing more or less than 50 feet of 1 • 16-inch diameter steel outer . casing. i 1 • PER FOOT PRICE OF $ 50.00 /foot. • ' 3. 3 For drilling more or less than . I 35 feet of nominal 15-inch diameter borehole below the casing. I PER FOOT PRICE OF $ 12.50 /foot • 3.4 For furnishing and installing l _ more or less than 50 feet of 10-inch diameter Schedule 80 PVC inner casing. • \ , PER FOOT PRICE OF $ 20.00 /foot ' , :3. 5 For furnishing and installing 1 ' • . more or less than 30 'feet of 10-inch diameter continuous- • wound,- Schedule 80 PVC well , screen. PER FOOT PRICE OF $ 30.00 /foot J 3.6 For more or less than 40 hours • of development time I PER' HOUR PRICE• OF --- $ 95.00 /hour ' 3.7 . . For. more or less than 4 hours of 1 • step-rate testing per well . . PER HOUR PRICE OF $ 95.00 /hour J • . I .. ... 1 • ` . ! �. . .� d.d • • . • • • • BASE PROPOSAL FORM LUMP-SUM, UNIT ., ESTIMATED PER-FOOT OR • ITEM QUANTITY DESCRIPTION PER-HOUR PRICE 3.8 For. constant-rate testing, including more or less than 2 hours of pre-test monitoring and 2 hours of post-test • monitoring and 8 hours of pumping per well . • • PER HOUR PRICE OF $ 95.00/hour 3.9 For standby time at the direction of the Owner, Engineer or Consultant . PER HOUR PRICE OF $ 75.00/hour 4.0 1 MONITOR WELL PAIR For providing all equipment, materials, and labor necessary to collect formation samples from a minimum . five inch diameter borehole, geophysical I logging, and construct, develop and complete 1 monitor well pair according to the specifications. • Included in the unit price is a minimum 5-inch diameter borehole; 2-inch diameter Schedule 40 PVC casing and, machine-slotted, Schedule 40 PVC screen; locking steel protective casing; gravel pack; cement; development and all necessary appurtenances to complete 60 foot and 120 foot deep well • pairs . (Wells will be constructed to the dimensions listed in Exhibit D) . UNIT PRICE PER WELL PAIR OF $ 3700.00/well pair Adjustments 4.1 •For installing more or less than a 120-foot-deep well . PER FOOT PRICE OF $ 8.00 /foot • : P-5 '.1 0 • BASE PROPOSAL FORM • LUMP-SUM, UNIT • ESTIMATED PER-FOOT OR . ITEM QUANTITY DESCRIPTION PER-HOUR PRICE 4.2 For standby time at the direction ' of the Consultant PER HOUR PRICE OF $ 75.00 /hour • . I - _ - . P-6. �'''• ' . • 4 1 • RECAPITULATION OF PROPOSAL Item 1 .0 Mobilization and Demobilization : 1 x $ 4900.00 = $ 4900.00 Item 2.0 Pilot Hole : 1 x $ 3700.00 = $ 3700.00 Item 3.0 Production Well • 1 x $ 9500.00 = $ 9500.00 Item 4 .0 Monitor Well Pair : 1 x $ 3700.00 = $ '3700.00 TOTAL = $ 21,800.00 Accompanying this proposal is a certified or cashier's check or a bid bond in the amount' of $ 1,090.00 (not less than 5% of the bid) made payable to the Village of Tequesta which is to be forfeited as liquidated damages, if, in the event this proposal is accepted, the undersigned fails to execute the agreement and furnish and pay for satisfactory performance and payment bonds under the conditions and within the time specified in the proposal; otherwise said certified or cashier's check or bid bond is to be returned to the undersigned. The undersigned agrees that within ten days from the date of acceptance of this proposal , to execute the agreement and furnish and pay for satisfactory performance and payment bonds, in the full amount of the Contract price, guaranteeing the faithful performance of the work- and payment of bills . The undersigned also agrees to substantially complete the Work within 90 days after the date when the Contract Time • commences to run and to be completed and ready for final payment--within 90 days after the Contract Time commences to run.. . The undersigned further agrees to reimburse the Owner, as liquidated damages for each calendar day elapsing between the date herein specified as the date of final completion and the actual date of such final completion of the Contract Work the amount of $200 per calendar day. Bidder acknowledges the receipt of Addenda No. 's 1 • • ., P_7 4 1'1 ti 11 , The following is a complete list.. of all of the subcontractors to be used if the undersigned is awarded the Contract for this project . Subcontractors named below may not be changed by the Contractor: The Owner may request a change under the terms of applicable sections of the General Conditions. Type of Work Name and Address of Subcontractor Geophysical Logging Southern Resources, Gainsville, FL 32604 1 11 • 11 ! 11 • • Dated this 17 day of July 1991 (month) (year) 1 Contractor: All Webb's Enterprises, Inc. Address: 309 Commerce Way Jupiter, FL 33458 •. By: C,9rZe .) (c.b.A)1.1:0.0 • Title: David W. Webb, President • C i • • P-8