TO: Village Council
FROM: Thomas G. Bradford, Village Manager
DATE: August 9, 1991
SUBJECT: Bid Award Recommendation for Drilling of Well 24;
Agenda Item
Bids were opened on July 18, 1991 for the drilling of Well 24
located adjacent to the Children's Psychiatric Hospital in southern
Martin County. Seven (7) firms responded with All Webb's
Enterprises, Inc. of Jupiter, Florida, being the low bidder in the
amount of $21,800. The Village engineer has reviewed the
qualifications of All Webb's and recommended award of the project to
the same. The Village has worked with All Webb's in the past and
found them to be a reputable operation.
Please note that this cost represents only the drilling of Well 24
and not any of the equipment and pumps associated therewith.
Based upon the foregoing, it is recommended that the Village Council
award the drilling of Well 24 bid to All Webb's Enterprises, Inc. of
Jupiter, Florida in the amount of $21, 800.
•
TGB/mk
Attachment
Recycled Paper
V
i VILLAGE OF TEQUESTA
,;1"lift WATER DEPARTMENT
` `�t,,�� , Post Office Box 3474 • 357 Tequesta Drive
cw
Tequesta, Florida 33469-0474 • (407) 575-6230
MEMORANDUM :
TO: Thomas G. Bradford, Village Manager
FROM: Thomas C. Hall , Water System Manager
'l
DATE: August 8 , 1991 .
SUBJECT: Recommendation of Bid Award for Drilling of Well 24
Please find attached a letter of recommendation from Bill Reese
of R.M.A. regarding the drilling of Well 24 which is located
northeast of Sandy Pines facility in Martin County.
Also attached is the actual bid tab sheet from bid opening on
July 18th.
We would like Council to recommend award to All Webb' s
Enterprises , Inc. , of Jupiter at their August 15th meeting. Should
Council have any questions for the engineer, Mr. Reese will be in
attendance at that meeting. •
TCH:gk
attachment •
RMA . .
Reese, Macon;and Associates, Inc,
August 8, 1991
Village of Tequesta
P.O. Box 3273
Tequesta, FL 33469
ATTN: Thomas C. Hall, Water Department Manager
RE: Production Well 24
Dear Mr. Hail:
On July 18, 1991 seven bids on the referenced project were
received. A summary of the results is as follows:
All Webb's Enterprises, Inc. $21,800
Meredith Corporation $31,236
McGregor Pump Company, Inc. $32,008
Southwest Water Wells, Inc. $37,000
American Drilling, Inc. $39,700
Diversified Drilling, Inc. $40,995
Layne Atlantic, Inc. $45,488
We have requested, and received, qualifications from the low
bidder. Copies are attached. We have reviewed the information
and found it to be in order. The low bid price is extremely
attractive and well below the estimated amount. Based on the
above, we recommend award of the project to All Webb's
Enterprises, Inc. in the amount of $21,800.
Please advise if Council elects to accept the recommendation
and we will proceed to prepare contract sets for execution.
•
If you have questions or wish to discuss this further,
please call.
Very truly yours, .
William D. Reese, P.E. '
•
90-162. 1
3003 S. Congress Avenue - Palm Springs, Florida 33461 - (407) 433-9311
BID TABULATION
CITY OF TEQUESTA PRODUCTION WELL 24
BID OPENING JULY 18, 1991
BID ADD. BID
CONTRACTOR AMOUNT No. 1 BOND - COMMENTS
American Drilling, 3q ?DO.OD �� 4SDO.00
Inc.
Diversified 4/ �9��
Drilling 7 yes
°
All Webb' s Enter-
prises, Inc. ye-5 /090 ,o,
Southwest Water-
wells, Inc. 37,000•00 y- 510
Layne Atlantic �/ -�/ pD ye-s sip
McGregor Pump Co. , 32 008,e0 yes Sfo
Inc. i
Meredith Corp. 3/ Z 36,p0 YES
i
Youn ros. ,
nc.
1
•
•
PROPOSAL
VILLAGE OF TEQUESTA
PRODUCTION WELL
Proposal of All Webb's Enterprises, Inc.
(Name)
309 Commerce Way, Jupiter, FL 33458
(Address)
to furnish all materials, equipment and labor and to perform
all Work in accordance with the Contract Documents for the
Village of Tequesta Production Well 24 located in Tequesta ,
Florida. .
To: Mayor and City Commission
Village of Tequesta
357 Tequesta Drive •
Tequesta, Florida 33469-0273
Gentlemen:
The undersigned bidder has carefully examined the Contract
Documents and the site of the proposed Work and is familiar
with the nature and extent of the Work and any local '
conditions that may in any manner affect the Work to be done.
The undersigned agrees to do all the Work and furnish all
materials called for by the Contract Documents, in the manner
prescribed therein and to the standards of quality and
performance established by the Engineer for the prices stated _
in the spaces herein provided, for each of the items or
combination of items stipulated .
•
•
•
P-1 •
r- \1 . ... .. .. .1
i
1 ' d
• I.
. , I
BASE PROPOSAL FORM •
• LUMP-SUM, UNIT
ESTIMATED 'PER-FOOT OR
ITEM QUANTITY DESCRIPTION PER-HOUR PRICE
MOBILIZATION AND DEMOBILIZATION
•
1 .0 1 For mobilization and demobiliz- •
I
ation of all equipment,
materials, and labor necessary '
to complete all work as described
in these Specifications and
Schedule of charges for drilling
• services .
LUMP SUM PRICE OF $ 4900.00 /lump
sum
PILOT HOLE .
2.0 . 1 For providing all equipment,
' materials, and labor necessary J I
to collect formation samples from.
•
•
a minimum 5-inch diameter pilot
hole drilled to approximately 100
feet below land surface; nine ,
split-spoon samples and sieve
analyses;, geophysical logging, .
plus all other necessary
incidentals.
UNIT PRICE PER PILOT HOLE OF $ 3700.00 /pilot
hole
•
Adjustments
2. 1 For drilling a minimum 5-inch
diameter pilot hole to more or
• less than 100 feet below land
•
surface. : .
PER FOOT PRICE OF $ 8.00 /foot
. I
2.2 For more or less than nine .
•
split-spoon samples including -
sieve analyses and grain size distribution
• curves (percent retained) .
PER UNIT PRICE OF $ 75.00 /sample
•
•
i
r
P •
I
• ' P-2
• : a.e
BASE PROPOSAL FORM
LUMP-SUM, UNIT
ESTIMATED PER-FOOT OR
ITEM QUANTITY DESCRIPTION PER-HOUR PRICE
2.3 For standby time as required `
by the-Consultant.
• PER HOUR PRICE OF . . $ 75.00 /hour •
3.0 1 PRODUCTION WELL
For providing all equipment,
materials, and. labor necessary
' to drill , construct, develop,
test andsample a production
well according to the •
specifications. Included in the
unit price is drilled 20-inch
diameter hole to a depth of 50
feet below land surface; 16-inch
. diameter steel outer casing to
. • , . a depth' of 50 feet below land
• surface; 35 feet of nominal 15-
inch diameter borehole; 10-inch
• • • diameter Schedule 80 PVC inner casing to a
• depth of 50 feet below land surface;
• • 30 feet of 10-inch diameter
•
Schedule 80 PVC continuous-wound well screen;
five-foot long sump 'below the well
screen; 40 hours of development;
4 hours of step-rate testing; 8
hours of constant-rate testing;
well-head completion and capping;
gravel; cement; all other
necessary incidentals. '
UNIT PRICE PER WELL OF $ .9500.00 /well
• Adjustments
3.1 For drilling more or less than
50 feet of 20-inch diameter
borehole.
PER FOOT PRICE OF $ 15.00 /foot
•
P-3 . . • •
O _ • . 4, .
1
• d
•
' . . BASE PROPOSAL FORM 1
. • 1
LUMP-SUM, UNIT
ESTIMATED PER-FOOT OR 1
ITEM QUANTITY DESCRIPTION ' PER-HOUR PRICE i
' ' 3.2 For furnishing and installing
more or less than 50 feet of 1
• 16-inch diameter steel outer .
casing. i
1
• PER FOOT PRICE OF $ 50.00 /foot.
• '
3. 3 For drilling more or less than . I
35 feet of nominal 15-inch
diameter borehole below the
casing. I
PER FOOT PRICE OF $ 12.50 /foot
•
3.4 For furnishing and installing l
_ more or less than 50 feet of
10-inch diameter Schedule 80
PVC inner casing.
• \ ,
PER FOOT PRICE OF $ 20.00 /foot '
, :3. 5 For furnishing and installing
1
' • . more or less than 30 'feet of
10-inch diameter continuous-
• wound,- Schedule 80 PVC well ,
screen.
PER FOOT PRICE OF $ 30.00 /foot J
3.6 For more or less than 40 hours
• of development time I
PER' HOUR PRICE• OF --- $ 95.00 /hour '
3.7 . . For. more or less than 4 hours of 1
•
step-rate testing per well .
. PER HOUR PRICE OF $ 95.00 /hour J
• . I
.. ... 1
•
` . ! �. . .� d.d
• •
. •
•
• • BASE PROPOSAL FORM
LUMP-SUM, UNIT .,
ESTIMATED PER-FOOT OR •
ITEM QUANTITY DESCRIPTION PER-HOUR PRICE
3.8 For. constant-rate testing,
including more or less than
2 hours of pre-test monitoring
and 2 hours of post-test
• monitoring and 8 hours of
pumping per well . •
•
PER HOUR PRICE OF $ 95.00/hour
3.9 For standby time at the
direction of the Owner,
Engineer or Consultant .
PER HOUR PRICE OF $ 75.00/hour
4.0 1 MONITOR WELL PAIR
For providing all equipment,
materials, and labor necessary
to collect formation samples from a minimum
. five inch diameter borehole, geophysical I
logging, and construct, develop and complete
1 monitor well pair according
to the specifications. •
Included in the unit price is a
minimum 5-inch diameter borehole;
2-inch diameter Schedule 40 PVC casing and,
machine-slotted, Schedule 40 PVC screen;
locking steel protective casing; gravel pack;
cement; development and all
necessary appurtenances to
complete 60 foot and 120 foot deep well
• pairs . (Wells will be constructed to the
dimensions listed in Exhibit D) .
UNIT PRICE PER WELL PAIR OF $ 3700.00/well pair
Adjustments
4.1 •For installing more or less than
a 120-foot-deep well .
PER FOOT PRICE OF $ 8.00 /foot
• : P-5
'.1
0
•
BASE PROPOSAL FORM •
LUMP-SUM, UNIT •
ESTIMATED PER-FOOT OR .
ITEM QUANTITY DESCRIPTION PER-HOUR PRICE
4.2 For standby time at the direction '
of the Consultant
PER HOUR PRICE OF $ 75.00 /hour
•
. I
-
_
- . P-6. �'''• ' .
•
4 1
•
RECAPITULATION OF PROPOSAL
Item 1 .0 Mobilization and Demobilization :
1 x $ 4900.00 = $ 4900.00
Item 2.0 Pilot Hole : 1 x $ 3700.00 = $ 3700.00
Item 3.0 Production Well • 1 x $ 9500.00 = $ 9500.00
Item 4 .0 Monitor Well Pair : 1 x $ 3700.00 = $ '3700.00
TOTAL = $ 21,800.00
Accompanying this proposal is a certified or cashier's check
or a bid bond in the amount' of $ 1,090.00 (not less than
5% of the bid) made payable to the Village of Tequesta which
is to be forfeited as liquidated damages, if, in the event
this proposal is accepted, the undersigned fails to execute
the agreement and furnish and pay for satisfactory
performance and payment bonds under the conditions and within
the time specified in the proposal; otherwise said certified
or cashier's check or bid bond is to be returned to the
undersigned.
The undersigned agrees that within ten days from the date of
acceptance of this proposal , to execute the agreement and
furnish and pay for satisfactory performance and payment
bonds, in the full amount of the Contract price, guaranteeing
the faithful performance of the work- and payment of bills .
The undersigned also agrees to substantially complete the
Work within 90 days after the date when the Contract Time •
commences to run and to be completed and ready for final
payment--within 90 days after the Contract Time commences to
run.. .
The undersigned further agrees to reimburse the Owner, as
liquidated damages for each calendar day elapsing between the
date herein specified as the date of final completion and the
actual date of such final completion of the Contract Work the
amount of $200 per calendar day.
Bidder acknowledges the receipt of Addenda No. 's 1
•
•
., P_7
4 1'1 ti 11 ,
The following is a complete list.. of all of the subcontractors
to be used if the undersigned is awarded the Contract for
this project . Subcontractors named below may not be changed
by the Contractor: The Owner may request a change under the
terms of applicable sections of the General Conditions.
Type of Work Name and Address of Subcontractor
Geophysical Logging Southern Resources, Gainsville, FL 32604 1
11
•
11
! 11
•
•
Dated this 17 day of July 1991
(month) (year) 1
Contractor: All Webb's Enterprises, Inc.
Address: 309 Commerce Way
Jupiter, FL 33458
•. By: C,9rZe .)
(c.b.A)1.1:0.0
• Title: David W. Webb, President
• C i
•
•
P-8