VILLAGE MANAGER'S REPORT
JANUARY 6, 1997 - FEBRUARY 7, 1997
During this reporting period, there were 290 recorded telephone
calls to the Village Manager ' s Office.
■ Memorandum to Planner Regarding Annexation; Revisit of
Annexation Areas A & D.
■ Letter to Village Attorney Regarding Agreement Between the
School District of Palm Beach County and the Village of
Tequesta.
■ Memorandum to Coordinator of Stormwater Utility Regarding
Construction of New Road Between Village Boulevard & Tequesta
• Drive via Assessments .
■ Memorandum to Village Council Regarding Village Council
Priorities; Status Report.
■ Letter to George Webb, Palm Beach County Engineer, Regarding
Procedures for Landscaping County Road Right-of-Way.
■ Memorandum to Director of Public Works & Recreation Regarding
Old Dixie Highway Landscaping Project; Beautiful Palm Beaches
Grant.
■ Letter to Ivah London, Water Department Customer Service
Representative II, Regarding Village Council Invitation.
■ Memorandum to Director of Public Works & Recreation Regarding
Model Street Paving Program.
■ Letter to Scott Hawkins, Esq. , Regarding Tequesta Peninsula
Sewering.
■ Letter to Will Ray, Executive Director, Palm Beach County
Cultural Council, Regarding Countywide Study.
■ Memorandum to Fire Chief Regarding Proposed Agreement with
School District of Palm Beach County.
■ Memorandum to Water System Manager Regarding Safety Council of
Palm Beach County; Course Work.
■ Letter to Peter Stoehr Regarding Request for Temporary Signage.
■ Memorandum to Fire Chief Regarding Village Newsletter;
Ambulance Articles.
■ Memorandum to Councilmember Schauer Regarding North County
Education Foundation Meeting.
0 •
• Letter to North County City Managers Regarding Salary Survey.
• Memorandum to Councilmember Hansen Regarding Loxahatchee
Council of Governments Meeting.
• Letter to Bill Reese, Reese, Macon & Associates, Regarding Hobe
Sound Water Company and Town of Jupiter Island.
• Letter to James Spurgeon, Town of Jupiter Island, Regarding
Tequesta Reverse Osmosis Treatment Facility.
• Memorandum to Building Official Regarding Request for Copy of
All Permits .
• Memorandum to Finance Director Regarding Notice of Personal
Injury Claim; Request for Transmittal to Insurance Agent for
Subrogation and Compliance with the Requested Information.
• Memorandum to Water System Manager and Director of Finance
Regarding Amendment of Water Department Street Address .
• Letter to Michael J. Rigas, Vice-President, Adelphia Cable
Communications, Regarding Adelphia Cable Communications Request
for Franchise Renewal with the Village of Tequesta.
• Memorandum to Director of Public Works Regarding Nichols
Sanitation; Rate Reduction in Exchange for Franchise Term
Extension.
• Letter to Scott G. Hawkins, Esq. Regarding Proposed Tequesta
Peninsula Sewering; ENCON Compliance with Tequesta Sewer
Franchise Agreement.
• Memorandum to All Department Heads Regarding Reporting of
Compensatory Time.
• Memorandum to Department Heads Regarding Florida Institute of
Government Course Registration.
• Memorandum to Water System Manager Regarding Financial Center
Lease; Taxable Property for 1997 .
• Letter to Resident Regarding Request of Code Review for Fence
Near Camelia Circle.
• Memorandum to Code Enforcement Officer Regarding Request for
Code Violation Review.
• Letter to Scott Hawkins, Esq. , Regarding Tequesta Peninsula
Sewering Issue.
• Letter to Richard Dent, Executive Director, Loxahatchee River
District, Regarding Request for Public Filed ENCON Record;
Resolution No. 96-4 .
2
• Memorandum to Water System Manager Regarding Safety Policy &
General Safety Rules .
• Memorandum to Water System Manager Regarding Safety Policy &
General Safety Rules; CWA Request to Bargain.
• Letter to Robert Assfalg, General Manager, Tequesta Country
Club, Regarding Certificate of Exemption.
• Memorandum to Fire Chief Regarding Floor Plan of Annex
Building.
• Letter to Scott Hawkins, Esq. , Regarding Proposed Sewering of
Tequesta Peninsula; ENCON Public Facilities Report per F. S .
189 . 415 .
• Memorandum to Building Official Regarding Comprehensive Plan
and Evaluation and Appraisal Report; ENCON Public Facilities
Report .
• Memorandum to Village Council Regarding Tequesta Community
Preservation Association; Safe Neighborhood District.
• Memorandum to Building Official Regarding Plat Dedications to
Palm Beach County.
• Memorandum to Building Official Regarding Comprehensive Plan
Preparation; Education Facilities Report.
• 'Memorandum to Building Official Regarding FEMA.
• Letter to Richard Dent, Executive Director, Loxahatchee River
District, Regarding Proposed Tequesta Peninsula Sewering.
• Letter to Cheryl Cohen, President, Nutrition Wise, Regarding
•
Request for Temporary Sign/Taste Fair Event.
• Letter to Richard E. Walesky, Director, Palm Beach County
Department of Environmental Resources Management, Regarding
Agreement with Florida Department of Environmental Protection;
Mangrove Trimming Delegation Authority.
• Memorandum to Building Official Regarding New Comprehensive
Plan Requirements for School Siting.
• Memorandum to Planner Regarding Grants Writing Series .
• Memorandum to Village Council Regarding Palm Beach County
Cultural Council; County-wide Study.
• Memorandum to Water System Manager Regarding Safety Policy;
Inclusion of Worker' s Comp Procedures .
• Memorandum to North County City Managers Regarding February 19
City Manager/Finance Director Monthly Luncheon Meeting.
3
• Letter to Richard Dent, Executive Director, Loxahatchee River
District, Regarding Public Hearing Notice of the Loxahatchee
River District Intent to Use the Uniform Method of Collecting
Non-Ad Valorem Assessments .
• Memorandum to Building Official Regarding Palm Beach County
Comprehensive Plan Amendments .
• Letter to Scott Hawkins, Esq. , Regarding Public Hearing Notice
of ENCON Intent to Use the Uniform Method of Collecting Non-Ad
Valorem Assessments .
• Memorandum to Village Council Regarding Comprehensive Plan
Preparation; Visioning.
• Memorandum to Damian Peduto, Planner, Regarding Comments on
Draft Right-of-Way Abandonment Application Form.
• Letter to Jack Horniman, Planning Consultant, Regarding
Proposed Amendments to Section 9 .4 of the Unified Land
Development Code; Wetlands Protection; Delegation of Mangrove
Trimming Authority.
• Letter to Al Oslund, Coordinator of Stormwater Utility,
Regarding Cypress Drive Drainage Improvement Project; Requested
Evaluation of Adjustment in Assessment Process .
• Letter to Scott Hawkins, Esq. , Regarding Tequesta Comprehensive
Development Plan; Sanitary Sewer Element; Tequesta v. ENCON.
■ Memorandum to Director of Public Works & Recreation Regarding
Assessment by ENCON of Wastewater Facility Serving Tequesta.
• Memorandum to Fire Chief Regarding Jupiter Inlet Colony Town
Commission Candidate; Tequesta Fire-Rescue Department..
■ Letter to Louise Murtaugh, Executive Director,
Jupiter/Tequesta/Juno Beach Chamber of Commerce, Regarding
Request for Information.
• Letter to Marilyn Hall Regarding Request for Temporary Signage;
Fashion Show.
■ Letter to Marilyn Hall Regarding Request for Temporary Signage;
Rummage Sale.
■ Letter to Village Attorney Regarding Federal Truth in
Advertising Law.
■ Letter to Scott Hawkins, Esq. , Regarding Proposed Sewering of
Tequesta Peninsula; Proposed Dames & Moore Well Locations .
■ Letter to Sir John Van Kesteren Regarding Temporary Signage;
Blowing Rocks Festival .
4
• Memorandum to Building Official, Planning Consultant, and
Frederick Schwartz , Kimley-Horn, Regarding Tequesta Proposed
Amendments to Palm Beach County Thoroughfare Identification
Map.
• Letter to Village Attorney Regarding Town of Palm Beach
Proposed Telecommunications Ordinance .
• Memorandum to Village Council Regarding March 19, 1997, Meeting
Schedule .
• Met with Councilmember Hansen at 2 : 00 p.m. on January 6, 1997 .
• A. Staff Meeting was conducted on January 7, 1997, wherein the
following items were discussed:
1 . Water System Manager was requested to develop a written .
drought plan for water and applicable restrictions .
2 . Finance Director questioned as to compliance with request
to advise applicable employees of bonus and sick leave
conversion payments in pay envelope.
3 . Building Official was requested to provide the Village
Manager with a xerox copy of the revised building permit
indicating applicable Village holidays .
4 . Director of Public Works questioned on status of easement
for Shay Place drainage outfall.
5 . Water System Manager questioned on establishment of leak
detection program for Intracoastal crossings .
6 . Director of Finance reminded to scheduled Pension Board
Meeting for January of 1997 .
7 . Sought recommendation from Chief of Police for traffic
counters .
8 . Building Official questioned as to whether he had
notified Gallery Square North merchants and owners of
future Tequesta insurance requirements wherein he advised
yes .
9 . Building Official advised to proceed with Subdivision
Regulation Ordinance amendment with Village Attorney
review of same.
10 . Director of Public Works questioned relative to
discrepancy on anticipated South Florida Water Management
District Permit.
11 . A discussion relative to health insurance was held with
all Department Heads.
5
12 . Director of Finance requested to submit Budget
•
Preparation Calendar by February 1 , 1997 .
13 . Director of Finance was questioned on budget format and
conversion to Lotus 1-2-3 .
14 . Chief of Police requested to . have Code Enforcement
Officer proceed to next Ordinance No. 377 step.
15 . Director of . Public Works directed to have ENCON finish
patch of Country Club Drive, including striping.
16 . Water System Manager questioned on acquisition of custom
filters for Corporate Center air conditioners .
17 . Water System Manager requested to buy retirement watch
for Ivah London.
18 . Director of Finance requested to produce evidence of
employee resignation from CWA.
19 . Chief of Police advised of Village Manager concerns
relative to ascertaining frequency of Shift Supervisor
assignments in payroll reports.
20 . Chief of Police questioned on finalization of Shift
Supervisor Policy.
21 . Building Official advised of \ inadequate streetlighting
and parking lot lighting at Tequesta Oaks Drive and lot
behind Fidelity Federal .
22 . Director of Public Works requested to have FEC Railway
Crossing on Tequesta Drive inspected for improvements and
budget for same pursuant to Agreement with FEC.
23 . Building Official questioned relative to building permit
surcharge collection and report due on January 31 , 1997,
mandated by State.
24 . Building Official directed to hold a Development Review
Committee Meeting to review procedures.
25 . Building Official directed to have Planner do review of
Tequesta procedures and report on need for staff report
and recommendation for site plan review, variance,
landscape waiver, special exception, rezoning.
26 . Building Official questioned as to status of alley
abandonment application action.
27 . Water System Manager reminded to hold Safety Committee
Meetings per Policy 4-95/96 and to actively pursue duties
and functions of same listed on Page 4 of the Policy.
6
28 . Director of Public Works requested to provide address
numerals at Tequesta Recreation Center.
29 . Director of Public Works informed of poor condition of
vibernum hedge at Tequesta Recreation Center.
30 . A discussion was held with all Department Heads relative
to comp time reports, absences pre-approved in advance.
31 . Finance Director questioned relative to one-quarter hour
increment reporting by Paychex, Inc. of comp time
accruals and utilization.
32 . Water System Manager directed to include in his monthly
Village Council priority status report activity relative
to final design contract for reverse osmosis .
33 . Building Official questioned as to performance of new
Planner.
34 . Fire Chief requested to have Jupiter Courier do article
on new Tequesta ambulances .
35 . Fire Chief advised of Open House scheduled for February
1, 1997 .
36 . Chief of Police provided clarification of evening overlap
shift.
37 . Building Official requested comp time use direction.
38 . Water System Manager advised of Reverse Osmosis Well
meeting on January 8 , 1997 , at 9 : 00 a.m.
39 . Chief of Police requested to know cleaning crew schedule.
40 . Chief of Police questioned Village Manager relative to
desire for detail sheet for payroll.
41 . Director of Public Works advised Eastwinds Landing road
patch to cost $3, 500 .
42 . Fire Chief advised that Tiger Shark jet ski needed to be
returned or purchased for $1, 800 .
■ Met with Mayor Mackail and Gary Collins at 4 : 00 p.m. on January
8, 1997 .
■ Attended the Village Council Meeting at 7 :00 p.m. on January 9,
1997 .
■ Met with Chief Allison and Gary Preston on January 14, 1997, at
10 : 30 a.m. to discuss traffic calming and control devices .
■ Attended the Chamber of Commerce Board of Directors Meeting at
7 :45 a.m. on January 15, 1997 .
•
■ Met with Councilmember Hansen at 10 : 30 a.m. on January 15 .
■ Attended the City Manager/Finance Director Meeting at 12 : 00
Noon in Palm Beach Gardens on January 15, 1997 .
■ Attended the Regional Roadway Mediation Meeting at 6 : 30 p.m. at
Village Hall on January 15, 1997 .
■ Attended the Employee Pension Board Meeting at 8 : 30 a.m. on
January 20, 1997 .
■ Met with Margaret Inserra, new Executive Director of Lighthouse
Gallery and School of Art, at 2 : 30 p.m. on January 20 .
■ A Staff Meeting was held on January 21 at 10 : 00 a.m. wherein
the following items were discussed:
1 . Director of Public Works requested to report on status of
easement for drainage outfall for Shay Place.
2 . Finance Director reminded to submit Budget Calendar by
February 2 , 1997 .
3 . Finance Director reminded to complete budget format and
convert all applicable items to Lotus 1-2-3 .
4 . Finance Director requested to provide health insurance
conversion status report.
5 . Director of Finance confirmed that comp time one-quarter
hour increments had been rectified.
6 . Director of Public Works questioned as . to his
understanding of his assignment to seek Nichol ' s Contract
extension for rate reduction.
7 .- Village Clerk requested to provide information relative
to responsibility for planting live oaks at Tequesta
Insurance Agency.
• 8 . Director of Finance requested to ensure Solid Waste
Authority assessment reimbursements from applicable local
governments.
9 . Finance Director reminded to hold Pension Board Meeting
for approval of Division of Retirement reports prior to
Mayor execution of same.
10 . Director of Public Works requested to provide information
relative to french drain on River Drive.
11 . Chief of Police questioned as to arrival of stop signs
report for Public Works Committee Meeting.
12 . Director of Finance reminded that all employees receive
x-ray at pre-employment physical.
8
13 . Fire Chief advised of Sexual Harassment Seminar in
February. Village Manager advised that all persons not
previously attending to attend as requested by Village
Manager.
14 . Chief of Police sought direction relative to
applicability of Thru-Truck Permit prohibitions relative
to wrecker service.
15 . Village Clerk announced Employee Handbook up-date.
• Attended the Roadway Mediation at 6 :30 p.m. on January 22 at
Village Hall .
.■ Attended the Local Planning Agency Workshop at 7 : 00 p.m. on
January 23 at Village Hall .
• Attended the Redevelopment Committee Meeting at 9 : 00 a.m. on
Friday, January 24, at Village Hall.
• Met with Building Official and Planner regarding outline for
staff report to Village Council relative to annexation.
• Met with officials from Town of Jupiter, Chamber of Commerce,
and Florida History Center relative to FPL Transmission Lines
at 9 : 00 a.m. on January 29 .
• Met with Fire Chief and Building Official relative to minor
modifications to Annex Building at 2 :00 p.m. on January 30 .
• Met with Carol Goldstein, Wolf Organization, and Norrie Boyd of
the Palm Beach County Cultural Council . regarding Tequesta
cultural facility issues at 2:00 p.m. on January 31 .
• Met with Councilmember Hansen at 10: 30 a.m. on Monday, February
3 .
• A Staff Meeting was conducted on February 4 wherein the
following items were discussed:
1 . Water System Manager instructed to complete drought plan
for Tequesta with appropriate restrictions in two weeks.
2 . Water System Manager directed to complete leak detection
program for Intracoastal crossings in two weeks .
3 . Building Official directed to hold DRC Meeting to review
procedures in two weeks .
4 . Building Official instructed to have Planner do review of
VOT procedures and report on need for staff report and
recommendation for site plan review, variance, landscape
waiver, special exception, rezoning and to also establish
deadline for this, annexation report and all other
assignments to be provided to Planner.
9
5 . Building Official questioned as to community rating
system inspection .
6 . Water System Manager was provided with specific
instructions relative to implementation of. Drug-Free
Workplace Policy in conjunction with Bargaining.
7 . Director of Finance advised that employee time accruals
appeared to be wrong in certain instances .
8 . Director of Finance provided with specific instructions
relative to IRS determination letter for retirement plan
and the calling of the next Retirement Board Meeting.
9 . The Village Clerk provided a report on the acquisition of
a telephone consultant for Village operations .
10 . Director of Public Works questioned as to status of
easement for Shay Place drainage outfall .
11 . Building Official instructed to provide revised EAR LPA
Meeting schedule, if needed, to Village Manager' s Office
in writing.
12 . Director of Finance indicated that the budget format was
finalized and that all conversions to Lotus 1-2-3 would
be accomplished prior to departmental submittal
deadlines .
13 . Director of Finance requested to provide up-date on
health insurance conversion efforts .
14 . Director of Finance provided assurances that comp time
accruals were being provided in appropriate increments .
15 . Water System Manager directed to commence with appraisal
of water property for fair- market value rent and possible
sale to lessees .
16 . Director of Public Works requested to provide status of
efforts with Nichols Sanitation for contract extension
for rate reduction.
17 . Building Official questioned as to status of pole
relocation and easement from Mobil Oil Corporation.
18 . Water System Manager requested to provide status report
relative to right-of-way permit for reverse osmosis
discharge lines on Old Dixie Highway.
19 . Water System Manager requested to provide explanation of
water loss calculation of 7 . 85% .
10
20 . Director of Public Works requested to provide up-date on
implementation of YMCA Programs at Tequesta Recreation
Center.
21 . All Department Heads advised to avoid comp time
associated with lunch time activities .
22 . Water System Manager and Finance Director requested to
formalize transfer of Customer Service Reps to Finance
Department .
23 . Building Official requested to provide status report
relative to on-site investigation relative to enforcement
of hedge requirement on old BRITT Building.
24 . Chief of Police requested to provide recommendation to
traffic counter alternatives and to take all action
necessary to cause scheduled traffic counts to occur on
time.
25 . Building Official and Director of Public Works directed
to ensure maintenance recording activities as required
for stormwater utility in conjunction with requirements
of community rating system and NPDES.
26 . Director of Public Works requested to provide status
report on efforts to acquire information relative to
Beautiful Palm Beaches Grant.
27 . Chief of Police requested to provide status report on
stop sign review outcome.
28 . Building Official questioned relative to removal of
awnings at BRITT.
29 . Director of Public Works requested to provide drainage
outfall recommendation for southern Tequesta Peninsula in
thirty days .
30 . Director of Public Works advised that YMCA draft
agreement for recreation service was received by him on
February 3, 1997 .
31 . Director of Public Works reviewed crosswalk issue on
Seabrook Road and advised of problems associated with
same.
32 . Chief of Police sought direction relative to E-911 budget
preparation procedures .
33 . Chief of Police advised of surplus vehicle bid award at
March 3, 1997 , Village Council Meeting and for all others
to join in to dispose of vehicles.
11
•
34 . Water System Manager reported on revolving loan fund for
Clean Water Act compliance .
35 . Water System Manager commented on hiring procedures and
proper place to document same .
• Served as an American Cancer Society Celebrity Bag Boy at
• Tequesta Winn-Dixie at 4 : 00 p.m. on February 5 .
• Attended the Regional Roadway Mediation at 6 : 30 p.m. at Village
Hall on February 5 .
• Attended meeting with Building Official and Director of Public
Works regarding right-of-way permit requirements at 10 : 30 a.m.
on February 6 .
• Letter to Margaret Inserra, Executive Director, Lighthouse
Gallery and School of Art; Susan Emley, Coastal Playhouse, and
Sir John Van Kesteren. Regarding Public Meeting for Community
Input on Future Cultural Facilities and Programs for the People
of Palm Beach County.
The Department of Fire-Rescue Village Manager ' s Report for the
month of January 1997 is attached hereto and made a part of this
Report.
The Department of Community Development Monthly Report, .for the
month of January 1997 is attached hereto and made a part of this
Report.
The Water Department Monthly Water Usages Report and Monthly
Water Quality Analysis Report for the Months of December 1996 and
January 1997 are attached hereto and made a part of this Report .
/krb
Attachments
aocs\vmreo-2.sam
12 •
DERMEN RE
VI-1 r • LLPAAGET MANAGERSTOFFIRE REPORT
JANUARY 1997
Number of days included in this report 31
Total number of calls 52 Number of medical calls 35
Number of fire calls 5 Number of calls classified as others 12
Resources utilized for incident mitigation
Number of Engine company responses 26 Number of ladder company responses 8
Number of times Mutual Aid was received 0 Number of times Mutual Aid was given 1
Total number of hours needed for incident mitigation 218
Average daily staffing
Daily on duty firefighting force 5.27
Daily on duty career firefighting force 5.03
Daily on duty volunteer firefighting force 0.23
Average number of volunteer firefighters on duty during daytime hours 0.19
Average number of volunteer firefighters on duty during night time hours 0.27
Fire Code Enforcement
Total hours utilized on Code Enforcement 11 Hours spent on pre-fire planning 10
Number of violations found this month 3 Number of violations corrected this month 2
Required Duties
Hours needed for vehicle maintenance 51 Hours utilized for equipment testing 19
Hours needed for equipment maintenance 40 Hours needed for equipment checks 139
Hours needed for building maintenance 126 Hours needed for hose testing 0
Hours needed for hydrant testing 0 Total gallons of water used 1425
Miscellaneous
Hours dedicated to community service 26
Hours required for administrative support 182
Firefighter physical fitness program 75.5
l
PERMITS ISSUED DURING THE PERIOD 01/01/9/ THROUGH 01/31/97
PAGE 1
THIS REPORT WAS PR I N I E D ON FEBRI IA1:Y 3, 1997 l
VILLAGE OF TEQUESTA
l
MIT TYFC AND DESCRIPTION - It OF PERMITS VALUATION FEES DUE FEES PAID
- PIMPING - NEW RESIDENTIAL 4 575,594.45 8,633.92 8,633.92
COMMERCIAL ALTERATIONS & ADDITIONS - 2 25,950.00 435.00 435.00
- DEMIII I f ION 1 5,000.00 50.00 50.00 `
- ELECTRICAL - MISCELLANEOUS 14 0.00 450.00 450.00
- ELECTRICAL - NEW CONSTRUCTION - - • 1 0.00 165.00 165.00
- I ANIi ;( Ar•E PERMIT 2 29,400.00 435.00 435.00 4
- MECHANICAL 8 31 ,840.00 481 .00 481 .00
- MISC. PERMITS - --- 29 802,714.00 12,482.95 12,482.95
- PUDIIC CONSTRUCTION 2 20,150.00 0.00 0.00
- PLUMPING - RESIDENTIAL & COMMERCIAL 3 0.00 242.00 242.00
- RESIDENTIAL ALTERATIONS &-ADDITIONS 1 5,000.00 55.00 55.00
- SIGN •RMIIG 3 2,521 .00 85.00 85.00 ,
- SWIMMING FOOLS 1 10,000.00 270.00 270.00
TOTA1 FOR ALL PERMIT TYPES 71 1 ,516,169.45 23,784.87 23,784.87 l
l
. `
l
4
l
I
l
1
l
l
l
PF"RMIIS ISSUED DURINII THE PFRI D 10/II1/Y6 IIIROIIGH 0I/3I/91 /
PAGE 1
THIS REPORT WAS PRINTED ON FEBRUARY 3, 1997
VILLAGE OF TEQUESTA
4
MIT TYPE. AND'DESCRIPTION --- - - • ----- - 11 OF PERMITS VALUATION FEES DUE FEES PAID
- BUILDING - COMMERCIAL NEW 1 300,0OO.00 4,500.00 4,500.00
- BUILDING - NEW RESIDENTIAL- • - - 6 918,466.00 13,776.99 13,776.99
- COMMERCIAL ALTERATIONS & ADDITIONS 3 27,000.00 505.00 505.00 .
- DEMOLITION 1 5,000.00 50.00 50.00
- ELECTRICAL - MISCELLANEOUS------ --- ••--• -- 51 5,610.00 2,785.10 2,785.10
- ELECTRICAL - NEW CONSTRUCTION 2 0.00 255.00 255.00 4
- LANDSCAPE PERMIT 13 91 ,403.50 1 ,506.30 1,506.30
MECHANICAL - - ---- - - - 38 105,336.00 1 ,823.00 1 ,823.00
- MISC. PERMITS 160 2,133,680.05 34,830.68 34,830.68
- PUBLIC CONSTRUCTION 10 117,022.00 0.00 0.00
- PLUMBING - RESIDENTIAL & COMMERCIAL ---- 24 0.00 1,859.50 1,859.50
- RESIDENTIAL ALTERATIONS & ADDITIONS 1 5,000.00 55.00 55.00
- SIGN PERMITS 8 5,181 .00 220.00 220.00
- SWIMMING POOLS ---- - 2 35,00O.00 525.00 525.00
,TOTAIS FOR ALL PERMIT TYPES 320 / 3,748,698.55 62,691 .57 62,691 .57
.
4
• - 4
•
•
1
l
l
I\ - _
i •
MEMORANDUM
TO: Thomas G. Bradford, Village Manager
FROM: Thomas C. Hall, Water System Manager
DATE: January 10, 1997
SUBJECT: Monthly Water Usages
The following is a summary of water pumpage for the month of
December 1, through December 31, 1996 .
TEQUESTA WATER TREATMENT PLANT
DECEMBER 1996 1995
Target Pumpage 39 . 500 m.g. 39.500 m.g.
Actual Pumpage 41 .281 m.g. 43 . 958 m.g.
Maximum Day 2 . 137 m.g. 2 . 153\m.g.
Minimum Day 0 .462 m.g. 0 .737 m.g.
Average Day 1 . 332 m.g. 1 .418 m.g.
Backwash Water Used 2 . 752 m.g. 2 . 265 m.g.
Hydrant Flushing 1 . 920 m.g. 1 . 950 m.g.
WATER PURCHASED FROM. JUPITER
DECEMBER _ 1996 1995
Target Pumpage 47 . 500 m.g. 47 .500 m.g.
Actual Pumpage 47 . 632 m.g. 45 . 694 m.g.
Maximum Day 1 . 806 m.g. 1 . 967 m.g.
( Minimum Day 0 . 986 m.g. 0 .837 m.g. ;
Average Day 1 . 537 m.g. 1.474 m.g.
TOTAL DISTRIBUTION SYSTEM PUMPAGE
DECEMBER 1996 1995 1
Total Pumpage 88 . 913 m.g. 89 ..652 m.g.
Maximum Day 3 . 514 m.g. 3 . 284 m.g.
Minimum Day 2 . 264 m.g. 2 .426 m.g.
Average Day _ 2 . 868 m.g. 2 . 892 m.g.
1996 1995
Metered Service Connections 4 . 659 4, 604
Rainfall 2 . 17" 1 . 53"
Jupiter Purchased Water - Annual Contract . . . 547 .500 m.g.
Water Received from Jupiter to-date . . . 196.944 m.g.
Balance 350 .556 m.g.
MONTHLY WATER QUALITY ANALYSIS
DECEMBER
PARAMETER 1996 1995
Ph 7.6 7. 6
Total Alkalinity 180 mg/1 181 mg/1
Total Hardness 180 mg/1 '193 mg/1
Calcium Hardness 172 mg/1 188 mg/1
Color 8 pcu 8 pcu .
Iron 0. 05 mg/1 0 . 04 mg/1
Chlorides 53 mg/1 56 mg/1
. Turbidity 0. 20 ntu 0 .29 ntu
Chlorine (total) 2 .8 mg/1 3 .3 mg/1
DISTRIBUTION SYSTEM MAINTENANCE
Meter Installation - Replacements: 1
New Installs: 0
Hydrant Maintenance - Flushed: 231
Replaced: 0
Serviced: 0
Blow Offs Flushed: 41
/mk
c : Bill Kascavelis, Director of Finance \
Roy Fallon, Chief Operator
Tom Jensen, P.E. , Reese, Macon& Associates
MEMORANDUM
TO: Thomas G. Bradford, Village Manager
FROM: Thomas .C. Hall , Water System Manager
DATE: February 6, 1997
SUBJECT: Monthly Water Usages
The following is a summary of water pumpage for the month of
January 1, through January 31, 1997 .
TEQUESTA WATER TREATMENT PLANT
JANUARY 1997 _ 1996
1 Target Pumpage 41 . 500 m.g. 41 . 500 m.g.
1 Actual Pumpage 38 . 919 m.g. 42 . 634 m.g.
Maximum Day 1 . 716 m.g. 1 . 899 m.g.
Minimum Day 0 . 702 m.g. 0 . 671 m.g.
Average Day 1 . 255 m.g. 1 . 375 m.g.
1 Backwash Water Used 2 . 763 m.g. 2 . 157 m.g.
Hydrant Flushing . 275 m.g. . 069 m.g.
WATER PURCHASED FROM JUPITER
1 JANUARY 1997 1996
Target Pumpage 45 . 500 m.g. 45 . 500 m.g.
Actual Pumpage 43 .370 m.g. 43 .714 m.g.
Maximum Day 1 . 709 m.g. 1 . 958 m.g.
Minimum Day 0 . 844 m.g. 0 . 829 m.g.
Average Day 1 . 399 m.g. 1 .410 m.g.
TOTAL DISTRIBUTION SYSTEM PUMPAGE
JANUARY 1997 1996
Total Pumpage 82 . 289 m.g. 86 . 348 m.g.
Maximum Day 3 . 125 m.g. 3 . 149 m.g.
Minimum Day 2 . 026 m.g. 2 .432 m.g.
Average Day 2 . 654 m.g. 2 .785 m.g. I
1997 1996
Metered Service Connections 4 . 664 4, 617
Rainfall 4 .21" 1 .40"
Jupiter Purchased Water - Annual Contract . . . 547 .500 m.g.
Water Received from Jupiter to-date . . . 241.749 m.g.
Balance 305.751 m.g.
MONTHLY WATER QUALITY ANALYSIS
JANUARY
. PARAMETER 1997 1996
Ph 7 . 5, 7.8
Total Alkalinity 197 mg/1 186 mg/1
Total Hardness 204 mg/1 194 mg/1
Calcium Hardness 196 mg/1 186 mg/1
Color 7 pcu 7 pcu
Iron 0 .04 mg/1 .04 mg/1
Chlorides 49 mg/1. 54 mg/1
Turbidity 0 .12 ntu • 0.11 ntu
Chlorine (total) 3 .2 mg/1 3 .3 mg/1
• DISTRIBUTION SYSTEM MAINTENANCE
Meter Installation - Replacements: 7
New Installs: 5
Hydrant Maintenance - Flushed: 2
Replaced: 0
• Serviced: 0
Blow Offs Flushed: 1
/mk
c: • Bill Kascavelis, Director of Finance
Roy Fallon, Chief Operator
Tom Jensen, P.E. , Reese, Macon & Associates