HomeMy WebLinkAboutDocumentation_Regular_Tab 10F_5/8/1997 Memorandum
To: Thomas G. Bradford, Village Manager
From: Allan Oslund, Coordinator of Stormwater Utilities 4052
Date : May 1, 1997
Subject: Change Order to Master Drainage Modification Contract
Please find attached, A.K.A. Services of West Palm Beach
proposals in the amount of $61, 800 to install new drainage pipe
at Shay Place and to correct 540 feet of drainage pipe south of
Tequesta Drive to south of Church Street along Seabrook Road.
These proposals include all necessary materials, labor and
equipment to complete the job. $71, 000 has been encumbered in
the Stormwater Utility Enterprise Fund to complete these
improvements . I would recommend acceptance of these proposals .
TGB/mk
Attach.
e
FROM : AKA Services, Inc.
13676 Hamlin Blvd
West Palm Beach, FL 33412
•
TEL : 561-791-7561
FAX : 561-791-7565
II
TO : Village of Tequesta I
357 Tequesta Drive
Tequesta, Fl. 33469 I
ATTN Al Oslund :i
PROJECT : Seabrook Road, South of Tequesta Drive
LOCATION : Tequesta, FI. •
1,
PREP BY : Tom Richardson I
DATE : April 30, 1997 l
Proposal Summary I I
Excavate&re-install elliptical 540 If
Drainage Pipe
Reconnect to existing structures 2 ea
Asphalt restoration 430 sy
Proposal Total $41,800.00 I
i .
General notes:
Prices based upon unrestricted access to work areas
Prices include ellowanco for one(1)mobilization ,
Prices include layout&survey
Prices exclude all permits&fees •
Prices exclude any work associated with existing facilities other than
those specifically detailed in this proposal
Payment to be based upon agreed upon schedule
Proposal subject to execution of'mutually agreed upon contract
6Th'( J5pe,s is lid for 30 days from date above
Torn14
•
Richardson .�.,
• I
I
i i
r ro
•
•
FROM : AKA Services, Inc.
13676 Hamlin Blvd
West Palm Beech, PI. 33412
TEL : 581-791-7561
FAX : 561-791-7585
TO : Village of Tequeste
357 Tequesta Drive
Tequesta, H. 33469
ATTN : Al Oslund
PROJECT : Shay Drive
LOCATION : Tequesta, Fl.
PREP BY : Tom Richardson
DATE .: April 30, 1997
Proposal Summary i
1 5"CDX Drainage Pipe 450 If
Type"C"Catch Basin 1 ea
In-Line Drain 3 ea •
Mitered End Section 1 ea
Asphalt Patch 167 sy
Proposal Total $20,000.00
General notes:
Prices based upon unrestricted access to work areas
Prices include allowance for one(1)mobilization
Prices include layout&survey I.
Prices exclude all permits a.fees ' !
Prices exclude any work associated with existing facilities other than ;
those specifically detailed in this proposal
Payment to be based upon agreed upon schedule
Proposal subject to execution of mutually agreed upon contract
This proposal is valid for 30 days from date above
0-1711 .
•
Torn Richardson w�
i
f
{ I
I