HomeMy WebLinkAboutDocumentation_Regular_Tab 10E_7/24/1997 DEE
Memorandum
•
To: Thomas G. Bradford,' Village Manager //�� Y
From: Gary Preston, Director of Public Works h' • •
Date : 07/15/1997
Subject: Village Council Agenda Item for July 24, 1997 :
Consideration to Award Annual Street Paving Contract to
County Contractor Ranger Construction Industries, Inc.
in the Amount of $51, 744 . 00
Please find attached, a proposal from Ranger Construction
Industries, Inc. in the amount of $51, 744 . 00 for ,-the above
referenced work. The roadways scheduled for an overlay are as
follows :
Street Name Lane Miles
Cedar Avenue . 0 . 16
Elm Avenue 0 . 11
Maple Avenue 0 . 09
Oak Avenue 0 . 11
Dover Circle 0 . 06
Dover Road. (south of Tequesta Dr. ) 0 . 80
Beacon Street (west of Seabrook Rd. ) 0 . 57
Evergreen Avenue (south of Tequesta Dr. ) 0 . 15
Seabrook Road (south of Tequesta Dr. ) 0 . 38
Seabrook Road (north of Willow Rd. ) 0 . 57
Cypress Drive (north of Tequesta Dr. and 0 . 60
south of Cypress Ridge)
Total Lane Miles 3 . 60
Total Roadway Miles 1 . 80
• The anticipated starting period for this project is early to mid
September. The Village Council allocated $58, 500 . 00 in the FY
1996/1997 Capital Improvement Fund for roadway paving and
striping. The striping proposal for these and other Village
roadways will be in the September Village Council Agenda.
Please place this, item on the July 24, 1997 Village Council
Meeting Agenda for Councilmembers ' consideration.
Gp/ts
gary71597.sam
RANGER CONSTRUCTION INDUSTRIES, INC.
P.O.Box 15065 West Palm Beach,Fl 33416-5065 QUOTE NO :
(407) 793-9400 FAX (407) 790-4332
PAGE NO. 1 OF 2
QUOTATION AND CONTRACT
DATE : 09-Jul-97
VILLAGE OF TEQUESTA
P.O. BOX 3273
TEQUESTA FL. 33469-0273 PROJECT; VILLAGE OF TEQUESTA
(561)575-6240 . LOCATION : VARIOUS STREETS
(561)575-6239
ATTN : GARY PRESTON COUNTY : WPB
RANGER CONSTRUCTIOI shall provide all of the necessary equipment, materials and supervision to perform the following work.
THIS QUOTATION IS SUBJECT TO ALL TERMS AND CONDITIONS WHICH ARE ATTACHED AND MADE A-PART
OF THIS QUOTATION, and becomes a contract when acceptance below is signed by an authorized agent of each party.
SCOPE OF WORK
Quantity Unit Inches Description Unit Price Total
$0.00
$0.00
$0.00
1,848.000 TN TYPE S-3 $28.00 $51,744.00
$0.00
$0.00
$0.00
$0.00
1. RANGER CONSTRUCTION WILL EDGE BACK GRASS AT' SIDE OF ROADS. $0.00
VILLAGE OF TEQUESTA IS RESPONSIBLE FOR HAULING AWAY ALL MATERIAL. $0.00
2. MANHOLE RISER RINGS IF REQUIRED, ADD $220.00/EACH. $0.00
3. WATER VALVE RISER RINGS IF REQUIRED, ADD $220.00/EACH. $0.00
4. IF MOBILIZATION IS REQUIRED TO MOVE PAVING MACHINE, AN ADDITIONAL $0.00
CHARGE OF $1,000. WILL BE ADDED. $0.00
$0.00
$0.00
$0.00
$0.00
PROVISIONS : TOTAL BID $51,744.00
1. The General Terms&Conditions on attached sheet are also part of Contract.
2. Unless stated as a specific bid item, quote does not include any Engineering Layout , Testing ,
As Builts, Permit Fees or Bond.
3. Bid based on 1 Mobilization (s). Each additional mobilization to to be 1,000.00 •
4. Contractor/Owner agrees to pay Asphalt Over-runs at SEE CTY CONTRACT
5. Base to be stable, unyielding and graded to plan prior to Ranger starting work.
6. This quotation subject to price increase in Bituminous material per FDOT price adjustment clause.
-- ---�------ -- Accepted By
Ranger Construction Industries, Inc.
L BY:
HAEL S.MILLS Estimator Title Date :
Contractor Licenses --- Florida : CU CO 56779