Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Agreement_General_05/04/2009
VILLAGE OF TEQIJ~STA WATER SYSTEM AND GENERAL UTILITY/CIVIC., PROJECTS WORK AUTHORIZATIQN Tequesta Drive Bridge Replacement and Roazl lmprvvements "Design Plan Revisions" (Revised 4/23/(19) This Work Authorization authorizes ARCADTS GBcM, Inc...to pcrfonn the work set forth Notes: 1. There is no landscaping design services provided within. this work authorization. 2. The Village will be responsible for paying for all related permit fees. 3, Construction Administration and Inspection services are not included within this work authorization and will be provided prior to the contractor construction award. CQMPENSATION For Scope Items 1 thru 3, the Engineer shall be paid a lump sum fee of seven thousand five hundred dollars ($7,500). Refer to the attached fee breakdown. TIME OF PERFORMANCE The Engineer understands that this is a priority project for the Village and that they desire to have construction commence in summer 2009. 'The Engineer will complete Scope Items 1 thru 3 within 30 days of receipt of an executed authorization, exclusive of delays beyond the control of the Engineer. This authorization can be cancelled with or without cause by the Village with 30 days written notice. Should said cancellation occur, the Engineer will be paid for all services performed through the cancellation date. VILLAGE OF TEQUESTA (Tequesta Drive Bridge Replacement and Road Improvements, "Design Plan Revisions ") ATTEST: DATE: j - ~ - L7 ~j Lori McWilliams, CIVIC Village Clerk DATE: S/~~ Michael Couzzo Village Manager Page 2 of 4 [VILLAGE SEAL] APPROVED AS TO FORM AND LEGAL SUFFICIENCY DATE: i ~ d 1, i Lc. Trela White, Esq. Village Attorney ARCADIS G&M, INC. (Tequesta Drive Bridge Replacement and Road Improvement, "Design Plan Revisions ") DATE: ~ `2 ~ ~ D °~ ~ _~~~- Thomas C. J n,P Associate V ce Pr ident Page 3 of 4 VILLAGE ~F TEQUESTA Tequesta Drive Bridge Replacement and R©ad Improvements "Design Plan Revisions" - Fee Breakdown- ARC~UIS Bridge I)esig~ Assoai~tes Dunkelberger (Geotech) Telfrin, Debra From: Jensen, Tom [Tom.Jensen@arcadis-us.com] Sent: Friday, April 24, 2009 8:13 AM To: Couzzo; Midfiae L Cc: - Telfrin, Debra Subject: ~ Bridge Revisions Attachments: vot. bridge, rev2. pdf Mike- As we discussed, I revised our work authorization for the above. You felt the fee was too high, so the only flexibility I had was to lower ARCADIS' portion. There was not much I could do with the subs, they already incurred their costs and have sent mean invoice. Let's discuss when you return next week. ARCADIS Thomas C. Jensen, P.E. Associate Vice President 2081 Vista Parkway West Palm Beach, FL 33411 Tel 561.697.7065 Fax 561.697.7193 Mobile 561.248.5967 Thomas.Jensen anarcadis-us.com www.arcadis-us.corn ARCADIS, Imagine the result NOTICE: This e-mail and any files transmitted with it are the property of ARCADIS U.S., Inc. and its affiliates. All rights, including without limitation copyright, are reserved. The proprietary information contained in this a-mail message, and any files transmitted with it, is intended for the use of the recipient(s) named above. If the reader of this a-mail is not the intended recipient, you are hereby notified that you have received this a-mail in error and that any review, distribution or copying of this a-mail or any files transmitted with it is strictly prohibited. If you have received this a-mail in error, please notify the sender immediately and delete the original message and any files transmitted. The unauthorized use of this e- mail or any files transmitted with it is prohibited and disclaimed by ARCADIS U.S., Inc. and its affiliates. *** eSafe scanned this email for malicious content *** *** IMPORTANT: Do not open attachments from unrecognizE:d senders ***