Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 11G_7/25/1996 MEMORANDUM TO: Thomas G. Bradford, Village Manager FROM: Gary Preston, Director of Public Works A•P. DATE: July 18, 1996 SUBJECT: Village Council Agenda Item for July 25, 1996; Consideration to Award Dover Ditch Maintenance Dredging and Related Drainage Improvements to AKA Services, Inc., in the amount of $88,260. Please find attached, the following support documents for Councilmembers' review for the above referenced agenda item: • A letter dated July 16, 1996 from Allan F. Oslund, Gee & Jenson Project Manager, recommending contract award to AKA Services, Inc. • Bid tabulation sheet • Contractor's Unit Price Bid Schedule The Village Council allocated $110,000 in the FY 1996 Capital Improvement Budget for Dover Ditch Improvements. This amount included $11,000 for engineering services and $99,000 for dredging, bank stabilization, permits and related drainage work. Please place this item on the July 25, 1996 Village Council Meeting Agenda for Councilmembers' consideration. GP/mk Attachs. GEE &JENSON Engineers-Architects-Planners.Inc One Harvard Circle West Palm Beach.FL 33409 Telephone(407)683-3301 July 16, 1996 Fax(407)686-7446 Gary Preston Village Tequesta P.O. Box 3273 Tequesta, FL 33469 Re: Dover Ditch Maintenance Dredging. Recommendation to Award Contract • Dear Gary: . . Please find enclosed one copy of Exhibit "A" (Bid Tabulation) for each of the bidders to the above referenced project. The apparent low bidder was AKA Services, Inc., with a lump sum bid of$76,750. We have reviewed and checked the bids as submitted and would recommend awarding this contract to AKA Services, Inc. for the above referenced amount. In addition to this award, we would recommend a 15% contingency be added to cover the cost for unknown utility services and replacement of the storm pipe crossing Seabrook road at Dover Ditch, this would bring the total contract price to $88,260. If you have any questions regarding this matter or need additional information, please do not hesitate to call. Very truly yours Allan F. Oslund, PLS Project Manager AFO/tic 96004.03 cc Tom Bradford Mitch Thomas D:\AFO\PRESTON2.DOC BID TABULATION GEE&JENSON Project Name:Village of Tequesta Bid Date/Time:July 16,1996/2:00 PM Owner: Village of Tequesta. UNQNEU"s•A"artICT$- Dover Ditch "uwH11"" Project No:96-004.02 Conducted By:Gee&Jenson Owner No.: Opening Location:Tequesta Village Proj.Arch/Eng: Hall z:i�%rICNY�i`%`•#iEi�>i�i<r F:i'ift:E::::: '•>E` E: ';'C3'�` '»i>3;•11f1r3ttJ 11 /1 r 2;';isisi'.;i:::::: ::::::':::::::r :::£::::>::::::i:::;::.';:i `:%":;>: : ;:i:::: :::::::::';:i:::::::: $?:::::::: :::::::::::'i::i::;;;:�i:: :;:;: ;: ;:%;: $;: :;;:;; ;;•r„>:::::;:;;.:;:;::;::;:::;:i::::::::: :;:<:iS';••:;.>:::.»>::.:::>:::`;:::::.>:,::.::.::.;::;:::<;;::;`{::: ;:i;::;:;i;::;:::;:;;.;::;::;::;::i::ii:::::;::::::::::i::i::i::i::i:::;::�:� <:>>;<:»>:�>'�>::`::;:�>::::: ::{•i:;::i;•:;•ii�}>:.:;.>:.>:.:::;.::.>:.:>:<•>:•::.::.>:.:>::.::.>:..�ii:.i:.iiii.iiii:G•i;•::.;.:::•:::•:�:.:�:.>:.:;.>:.:::•>:.::.;:<:::>:•i:.i:.i:.:{-i:;•:;•i:L;•i;•:i::::C;:.>:.>::•>:.i;.i;•ii:•::>:.>:.c•;>::>:.::ry>:.::.::.>>:.::' AKA Construction $76,750.00 X X X X X Russell Trucking $96,150.00 X X X X X Construction Technology $104,940.00 X X X X X Rosso Paving $134,740.50 X X X X X Premier Dredge&Marine $138,166.00 X X X X X EXHIBIT A DOVER DITCH MAINTENANCE DREDGING VILLAGE OF TEQUESTA UNIT PRICE BID SCHEDULE Item Estimated Estimated No. Description Quantity Unit Unit Price Amount 1 . Mobilization 1 LS 3, 000 . on 3.000 .oc 2. Clearing & Grubbing 2.4 AC 2. SOO . oo (1,000 . 00 3. Excavation . 4,200 CY - LS 3. 25 13.& so. oo 4. Embankment 1 ,250 CY LS 2 2. 500. 00 5. 4" Coquina base 3,950 SY 3 1 6. Sod 9,500 SY Z . 30 Z� ,�.Sv, ao ' 7. Floating Turbidity Barrier 100 LF 15 1 . oo. oo 8. Mangrove staking 100 LF Z zoa. ov 9. 8" Filter Point Fabriform 225 SY Z 161200. 00'i TOTAL ESTIMATED AMOUNT $ ?(o , 750. ov NOTE: CONTRACTOR SHALL PROVIDE CONSTRUCTION SURVEYING. PAY ITEM NOTES: 1. Embankment shall include final grading for preparation of sod.• 2. Contractor shall use existing sod type within the 15 ft. maintenance area and outside of the Dover Ditch right-of-way. In areas where sod does not exist, Bahia sod shall be used. Ditch side slopes (2:1) shall be Bahia sod and shall be in accordance with Section 575 of the F.D.O.T. Specifications. 9600402 BFU-4 l` EXHIBIT A / . DOVER DITCH MAINTENANCE DREDGING VILLAGE OF TEQUESTA UNIT PRICE BID SCHEDULE Item Estimated Estimated No. Description Quantity Unit Unit Price __A—munt 1 . Mobilization 1 LS 7, 900,ce 7 gc .oO 2. Clearing & Grubbing 2.4 AC /o c7,00 247 cxx�,no 3. Excavation " 4,200 CY LS 3, SO /4 7c0;co 4. Embankment 1 ,250 CY LS ,Soo 6 2S0,06 5. 4" Coquina base 3,950 SY 67, 00 Z3, 700.op 6. Sod 9,500 SY /, 70 /6., !5 O,00 7. Floating Turbidity Barrier 100 LF /O,ov /, O0U'cc 8. Mangrove staking 100 LF 2 . CO 2CZo,0o 9. 8" Filter Point Fabriform 225 SY /O, 00 2 25-0.00 TOTAL ESTIMATED AMOUNT $ WJ /3 0. CO NOTE: CONTRACTOR SHALL PROVIDE CONSTRUCTION SURVEYING. PAY ITEM NOTES: 1. Embankment shall include final grading for preparation of sod. 2. Contractor shall use existing sod type within the 15 ft. maintenance area and outside of the Dover Ditch right-of-way. In areas where sod does not exist, Bahia sod shall be used. Ditch side slopes (2:1) shall be Bahia sod and shall be • in accordance with Section 575 of the F.D.O.T. Specifications. 9600402 BFU-4 • • EXHIBIT A DOVER DITCH MAINTENANCE DREDGING • VILLAGE OF TEQUESTA • UNIT PRICE BID SCHEDULE Item Estimated Estimated. No. Description Quantity Unit Unit Price Amount 1 . Mobilization 1 LS 1.5,600.00 15,600.00 — 2. Clearing & Grubbing 2.4 AC 4,500.00 10,800.00 - 3. Excavation 4,200 CY - LS 28,400.00 28,400.00 4. Embankment 1 ,250 CY LS . 4,000.00 4,000.00 5. 4" Coquina base 3,950 SY 3.20 12,640.00 6. Sod 9,500 SY. 2.50 23,750.00 7. Floating Turbidity Barrier 100 LF 8.00 800.00 8. Mangrove staking 100 LF 4.00 400.00 9. 8" Filter Point Fabriform 225 SY 38.00 8,550.00• TOTAL ESTIMATED AMOUNT $ 104,940.00 One hundred four thousand, nine hundred, forty and 00/100 DOLLARS NOTE: CONTRACTOR SHALL PROVIDE CONSTRUCTION SURVEYING. PAY ITEM NOTES: 1. Embankment shall include final grading for preparation of sod. 2. Contractor shall use existing sod type within the 15 ft. maintenance area and outside of the Dover Ditch right-of-way. In areas where sod does not exist, Bahia sod shall be used. Ditch side slopes (2:1) shall be Bahia sod and shall be in accordance with Section 575 of the F.D.O.T. Specifications. 9600402 BFU-4 • EXHIBIT A DOVER DITCH MAINTENANCE DREDGING VILLAGE OF TEQUESTA UNIT PRICE BID SCHEDULE Item Estimated �_ Des riation Estimated àjjjj illUnit Pri 1 • Mobilization ---c Amoun 2. CI 11111111111111131611111a s 4 a so . Oo earn• & Grubbin• I 2.4 AC , 0 S-0.00 3. Excavation Sy Loo,Od I 4,200 CY 4. Embankment 20 322,00 1,250 CY IEIII 5. 4" Coquina base IIIIIII-' y SyO.On� 3,950 MI' ki.SO • n l? 6. Sod SQ O I. 9,500 Mill. 2.S0 - 23 nSO.o0 111111 Floating Turbidity Barrier 8. Mangrove100 1E11� 3.00 4 300:00 staking 100 1E11 3.60 a 360.00 9. 8" Filter Point Fabriform 1111M111111 3 ,to 4' 9,89il So TOTAL ESTIMATED AMOUNT $ 13y,r)y0 . NOTE: CONTRACTOR SHALL PROVIDE CONSTRUCTION SURVEYING. PAY ITEM NOTES: 1. Embankment shall include final grading for preparation of sod. 2. Contractor shall use existing sod type within the 15 ft. maintenance area and outside of the Dover Ditch right-of-way. In areas where sod does not exist, Bahia sod shall be used. Ditch side slopes (2:1) shall be Bahia sod and shall be in accordance with Section 575 of the F.D.O.T. Specifications. • 9600402 BFU-4 • EXHIBIT A DOVER DITCH MAINTENANCE DREDGING VILLAGE OF TEQUESTA UNIT PRICE BID SCHEDULE Item Estimated Estimated tt No. Description Quantity Unit Unit Price Amount 1 . Mobilization 1 LS 141800.c° 14,Sob.oc 2. Clearing & Grubbing 2.4 AC 1 '�aooA 3,a,ggo, 3. Excavation 4,200 CY LS N � oao,oc 4. Embankment 1,250 CY LS N f A �i,glab.oc 5. 4" Coquina base 3,950 SY 6. 5 o 025, G7S.44 6. Sod 9,500 SY I .SS 14rIa5,cc 7. Floating Turbidity Barrier 100 LF 6, oo (000.oc 8. Mangrove staking 100 LF 4.0 0 40 o,oc 9. 8" Filter Point Fabriform 225 SY 7�.0o I bao.o.oc TOTAL ESTIMATED AMOUNT . . Q9, 1 G6.4a one hu.nc�re.ci �✓'+y �eic�ll't -f-�o��Sc�rlor�� Inu‘v S,rc4"1 - S j0c,ll.a2, NOTE: CONTRACTOR SHALL PROVIDE CONSTRUCTION SURVEYING. PAY ITEM NOTES: 1. Embankment shall include final grading for preparation of sod. 2. Contractor shall use existing sod type within the 15 ft. maintenance area and outside of the Dover Ditch right-of-way. In areas where sod does not exist, Bahia sod shall be used. Ditch side slopes (2:1) shall be Bahia sod and shall be in accordance with Section 575 of the F.D.O.T. Specifications. • 9600402 BFU-4