Loading...
HomeMy WebLinkAboutPresentation_Environmental Advisory Committee_8/14/2024Michael Tompkins Senior Project Manger Ecosystem Restoration Planning Bureau Project Overview Loxahatchee River Watershed Restoration Project (LRWRP) Lainhart Dam on Loxahatchee River 2 Purpose of the LRWRP Project Purpose Improve freshwater flows to the Northwest Fork of the Loxahatchee River, which is a nationally designated Wild and Scenic River, and to restore the hydrology and connectivity of wetlands and watersheds that form the historic headwaters of the river 3 LRWRP Objectives , hydroperiods, natural sheetflow Restore oysters, seagrass and other Restore watershed connections among Restore abundance and diversity of native Restore wet and dry season flows to the : : : Increase spatial extent and function of : : Objective 1 nationally designated Wild Scenic Northwest Fork of the Loxahatchee River Objective 2 estuarine communities in the Loxahatchee River Estuary Objective 3 wetlands Objective 4 the Loxahatchee River headwater natural areas to improve hydrology, storage and vegetative communities Objective 5 plant and animal species in watershed, natural areas, river and estuary 4 1 Pump Station - 160 Structure161 Structure -- 18W Impoundment (9,500 ac/ft & 4 M - GGGrassy Waters Triangle C ASR wells) – Kitching CreekMoonshine Creek/Gulfstream EastCypress Creek CanalGulfstream WestPalmar East --- - ----- 7 8 9 6 10 1 2 3 4 5 Flow Way 2Flow Way 1 Authorized Plan: Alt 5R Flow Way 3 5 sp. Vallisneria Loxahatchee Floodplain Project Benefits 91% dry season98% wet seasonPromotes recovery of riverine freshwater species and estuarine zones for fish, seagrass, oysters and other protected species17,000 acres existing or former agricultural lands10,000 acres existing natural areas Northwest Fork of Loxahatchee River target flowsImproves watershed wetland hydrologyImproves/maintains ecological connectivity for ~78,000 acresProvides additional recreation opportunities 6 Project Schedule 7 way 1 - Flow Canal Pump Station - MGrassy Waters Triangle RegradingCapture excess water from ITID Lower Basin that would otherwise be lost to tide and redirect to NW Fork of Lox River.Restore and enhance connectivity for WildlifeDesign SOW pending execution in FY24 Status Project FeaturesPurpose 8 way 2 - Flow 18W Canal - located Aquifer Storage - Floridan aquifer from (4) ASR - J.W. Corbett Wildlife Management - 18W Impoundment & 4 co - Cand Recovery (ASR) wellsProvide water delivery to the Northwest Fork of the Loxahatchee River to achieve restoration target flowsWater will be stored during the wet season and recovered during the dry season to establish a more natural seasonal delivery of water to the riverCapture water that would otherwise be delivered outside of the Lox River Watershed and redirect to the NW Fork of the Lox River.Surface water Area, Indian Trail Improvement District, CRecovered groundwater wells Project FeaturesPurposeSources of Water for Impoundment 9 way 2 Status - Flow 2025) - 2024)2024) -- General Info: 2024 to Jun 2023 to Jul - - 2023 to Apr - Jul (Oct Survey & GeotechModeling Preliminary Design ( (Dec Preliminary Design Contract Executed FY23 with ArcadisContract IncludesIntermediate and Final Design Phases to Follow 10 way 3 - Flow Gulfstream East Regrading, Moonshine Creek Weir, OTL Bridge (not shown)Gulfstream West Flow Thru MarshPalmar East Restoration and ConnectivityCypress Creek Weir and Berm Improvements Mack Dairy Spreader SwaleKitching Creek Spreader Swale (not shown)Improve hydroperiod and ecological function of wetlands.Improve timing of discharges to NW fork.Restore historic topography.Reduce over draining.Enhance habitat for wildlife by restoring connectivity and hydrology.Design contract executed with WSP in FY23. Survey, Geotech, and Modeling are in progress Status Project FeaturesPurpose 11 After (April 26, 2024) Before (June 6, 2023) Flowway 3 Gulfstream East Before and After Mowing 12 Gulfstream East Brazilian Pepper Mowing Discussion Palm Beach County Loxahatchee River in mtompkin@sfwmd.govmticknor@sfwmd.govjleeds@sfwmd.gov 1173 •1895 •6338 • --- way 1 Project Manager - SFWMD LOX RIVER CONTACTS Lox River Overall Project Manager – Lox River Flow 6900 Cell: (954) 6432989 Cell: (561) 6576088 Cell: (561) 906 --- – , PMP EEDS L ICKNOR T OMPKINS T IKEEGAN ENNIFER M Senior Project Manager Ecosystem Restoration Planning & Project Management SectionSouth Florida Water Management District3301 Gun Club Road, MS 8312 • West Palm Beach, Florida 33406Office: (561) 682 M Project Manager Ecosystem Restoration Planning & Project Management SectionSouth Florida Water Management District3301 Gun Club Road, MS 8312 • West Palm Beach, Florida 33406Office: (561) 682 J Bureau Chief, Ecosystem Restoration Planning & Project Management SectionSouth Florida Water Management District3301 Gun Club Road, MS 8312 • West Palm Beach, Florida 33406Office: (561) 682