Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 8H_8/10/2000 9f o/Av Memorandum To: Joann Manganiello, Acting Village Manager/Village Clerk From: Gary Preston, Director of Public Works & Recreation Date: August 1, 2000 Subject: Village Council Agenda Item for August 10, 2000; Consideration To Award a Change Order for Seabrook Road Street Light Conduit Installation to Ric-Man International, Inc., in the Amount of $16,508.75, Subject to Funds Being Appropriated for FY 2001, Having a Total Proposed FY 2001 Budget Allocation of $20,600 Please find attached, a Change Order in the amount of$16,508.75 from Ric-Man International, Inc., for street light conduit installation on Seabrook Road at Tequesta Pines. Tequesta Pines Property Owners Association requested the additional street lights at the March 23, 2000 Public Works Committee Meeting. The proposal would provide an additional sixteen (16) street lights between Willow Road and Russell Street. This Change Order would provide for required directional bore, sod replacement and the installation of PVC conduit and pull boxes. Florida Power & Light (FPL) would be responsible for providing labor to install wiring and to provide required fiberglass poles and lamps. Unless directed otherwise by yourself or the Village Council, I will request FPL install the Traditional Post Top Luminaire. I have attached a picture of the Traditional Post Top Luminaire which is presently used in Tequesta Oaks. The proposed FY 2001 budget has funding available for installation and monthly street light expenditures. I would recommend the.Village Council award this Change Order to Ric-Man International, Inc. Please place this item on the August 10, 2000 Village Council Agenda for Councilmembers' consideration. GP/mk Attachments Agendaltem.Ric-Man ,.:RANGE ORDER No.2 Tequesta Country Club/Bermuda Terrace Water Main Replacement & Drainage system Improvements Phase I _ VILLAGE OF TEQUESTA TEQUESTA COUNTRY CLUB/BERMUDA TERRACE WATER MAIN REPLACEMENT AND DRAINAGE SYSTEM IMPROVEMENTS UNIT PRICE BID SCHEDULE W/ RIC MAN'S UNIT COSTS J. STREET LIGHT CONDUIT A. SEABROOK ROAD 1. PVC Conduit* a. 2" 1350 LF $ 5.50 $7,425.00 2. Pull Boxes* 25 Ea. $ 80.50 $2,012.50 3. Directional Bore (HDPE/PVC) a. Seabrook Road (45 LF Ea.) 8 Ea. $517.50 $4,140.00 b. Pine Hill Trail East (50 LF Ea.) 1 Ea. $575.00 $ 575.00 4. Asphalt Driveway 20 SY $ 10.00 $ 200.00 5. Sod 375 SY $ 5.75 $2,156.25 TOTAL $16,508.75 * Installation only, material supplied by FPL. tcjchgordteg2/161.1 s CHANGE ORDER No.2 • Tequesta Country C1ubBermuda Terrace Water Main Replacement & Drainage system Improvements Phase I VILLAGE OF TEQUESTA. TEQUESTA COUNTRY CLUBBERMUDA TERRACE WATER MAIN REPLACEMENT AND DRAINAGE SYSTEM IMPROVEMENTS UNIT PRICE BID SCHEDULE W/ RIC MAN'S UNIT COSTS I. STREET LIGHT CONDUIT A. SEABROOK ROAD 1. PVC Conduit* a. 2" 1350 LF $ 5.50 $7;425:00 2. Pull Boxes* 25 Ea. S 80.50 $2,012.50 3. Directional Bore (HDPE/PVC) a. Seabrook Road (45 LF Ea.) 8 Ea. $517.50 S4,140.00 b. Pine Hill Trail East (50 LF Ea.) I Ea. S575.00 $ 575.00 4. Asphalt Driveway 20 SY $ 10.00 . S 200.00 • 5. Sod 375 SY $ 5.75 S2,156.25 TOTAL S16,508.75 * Installation only, material supplied by FPL. tcjchgordtcg2/161.1 • / DATE DISTRIBUTION ENGINEERING REFERENCE MANUAL 11-29-93 ?D BY SUBJECT SECTION:PAGE J. McAdams STREET AND AREA LIGHTING COMPUTER PROGRAMS 6.5: 24 OF 26 �p ,STRIBUTION ENGINEERING TRADITIONAL POST TOP LUMINAIRE r!. • • M&S # VOLTS WATTS LUMENS 170-86100-3 120 70 6300 170-86101-1 120 100 9500 170-86102-0 120 150 16000 PHOTOMETRIC DATA FOR G.E. TC-100R LUMINAIRES WATTS LAMP LAMP IES CURVE SOCKET DSBN NUMBER POSITION TYPE 70, 100, 150 HPSV Fixed M-S-III 35-177503 k - . ' RESOLUTION NO. 78-99/00 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AWARDING A CHANGE ORDER FOR SEABROOK ROAD STREET LIGHT CONDUIT INSTALLATION TO RIC-MAN INTERNATIONAL, INC. , OF POMPANO BEACH, FLORIDA, IN THE AMOUNT OF $16, 508 . 75, SUBJECT TO FUNDS BEING APPROPRIATED IN FY 2001 BUDGET, HAVING A TOTAL PROPOSED FY 2001 BUDGET ALLOCATION OF $20 , 600 AND AUTHORIZING THE ACTING VILLAGE MANAGER TO EXECUTE THE CONTRACTUAL CHANGE ORDER ON BEHALF OF THE VILLAGE. NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS: Section 1. A Contractual Change Order with Ric-Man International , Inc . , of Pompano Beach, Florida, for Seabrook Road Street Light Conduit Installation, in the amount of $16, 508 . 75, attached hereto as Exhibit "A" and incorporated by reference as part of this Resolution, is hereby approved subject to funds being appropriated for such in FY 2001, and the Acting Village Manager of the Village of Tequesta is authorized to execute the applicable contract on behalf of the Village of Tequesta . THE FOREGOING RESOLUTION WAS OFFERED by Councilmember , who moved its adoption. The motion was seconded by Councilmember , and upon being put to a vote, the vote was as follows : FOR ADOPTION AGAINST ADOPTION The Mayor thereupon declared the Resolution duly passed and adopted this loth day of August, A.D, 2000 . MAYOR OF TEQUESTA Joseph N. Capretta ATTEST: Joann Manganiello Village Clerk R esolution.Ric ManlnternationalSeabrook Exhibit "A" CHANGE ORDER 99-161.1 No. 2 PROJECT: Tequesta Country Club/Bermuda Terrace:Water Main Replacement&Drainage System Improvements-Phase I DATE OF ISSUANCE: July 5,2000 . EH-ECTIVE DATE: Upon Village Approval OWNER: Village of Tequesta OWNER's Contract No. N/A . . CONTRACTOR: Ric Man International,Inc. ENGINEER: Reese;Macon and Associates.Inc. You are directed to make the following changes in the Contract Documents. Description: Identify unit costs for items not in original contract. Reason for Change Order: Installation of conduit/pull boxes for street lights;Seabrook Road. Attachments:(list documents supporting change) Unit Cost breakdown as supplied by Ric Man International,Inc. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price • . Original Contract Times Substantial Completion: 240 days S 2,069,000.00 Ready for final payment: 270 days • • days or dates Net changes from previous Change Orders No. 1 to No.- Net change from previous Change Orders No._to No.- S 61,227.40 (Pending) . . . 0 days Contract Price prior to this Change Order Contract Times prior to this Change Order Substantial Completion: 240 Days S 2,130,227.40 (Pending C.O./1 Approval) Ready for final payment: 270 Days days or dates Net Increase(dese)of this Change Order Net Increase(de e)of this Change Order S 16,508.75 15 days days Contract Price with all approved Change Orders Contract Times with all approved Change Orders Substantial Completion: 255 Days S 2,146,736.15 Ready for final payment: 285 Days days or dates Thomas C. Jensen,P.E. Joann Manganiello,Acting Rene Castilla ecret. RECOMMEND D: APPROVED:Village Manager ACCEP D: • By: By. By: DV' Omer(Authorized Signature) Contractor • ilfirmod Sigta re) Date: 7" 2� —�j0 Date: Date: 1 44/v Reese,Macon&Associates,Inc. Village of Tequesta Ric Man In ernational,Inc. tcj chordteg2/99-161.I