HomeMy WebLinkAboutAgreement_Water Service_9/12/2024_Holtz ConsultingDate: August 20, 2024 To: Jeremy Allen, Village Manager From: Marjorie G Craig, PE, Director, Utilities Department Re: Consider Approval of Holtz Engineering Work Authorization for State Revolving Fund (SRF) Loan Assistance for the Water Treatment Plant (WTP) Upgrades in the Amount of $24,860 The Utilities Department (UD or Utilities) recommends approval of a work authorization to Holtz Engineering (Holtz) for State Revolving Fund (SRF) Loan assistance for the water treatment plant (WTP) upgrades and for Water Main Project #2 Beach Road Phase II (WM#2 Project) at a cost of $24,860. The UD has engineering plans and specifications for the water treatment plant's hydraulic efficiency, process/ safety, and SCADA improvements project (WTP Project) and for WM#2 Project. The Village intends to fund the Projects through a 20-year, low-interest SRF loan. This scope of services provides professional engineering assistance to prepare and submit documentation to the FDEP Drinking Water SRF program to procure loan funding for the Projects. This includes updating the Facilities Plan to include modifications not included in the original plan as the Projects evolved through the design process, and preparing a “Request for Inclusion” package for FDEP. The “Request for Inclusion” package is submittal to the Florida Department of Environmental Protection (FDEP) for acceptance at one of their regular quarterly meetings. During those meetings, they determine which projects will be funded based on the RFI package and the amount of funding they have available. The projects must be approved before the project can be bid. The FDEP also reviews the bid documents for conformance with the SRF criteria, and performs other oversite as a part of the SRF loan process. The Request for Inclusion and other requirements are examples of tasks in which Holtz will assist the Village as a part of this work authorization. Funding for the work authorization will come from the Water Fund, Renewal and Replacement budget division, Account 401-411-663.632, Architectural and Engineering Services. Holtz has been successfully providing SRF assistance for Village since 2020 and helped put the current SRF loan in place. Water Fund Account 401-411-663.632 Budgeted amount: $150,000.00 Available amount: $102,495.06 Expenditure amount: $24,860.00 Funding source: Water enterprise fund This document may be reproduced upon request in an alternative format by contacting the Village Clerk’s Office at 561-768-0440 or by completing our accessibility form: https://bit.ly/3mnfeU4 VILLAGE OF TEQUESTA CONSULTING SERVICES WORK AUTHORIZATION DATE : 5-20-24 VILLAGE RFQ. NO. : UTIL 06-20 WORK AUTHORIZATION NO.14 FOR CONSULTING SERVICES PROJECT No. G/L CODE: ____________________ HOLTZ CONSULTING PROJECT NO.: PROJECT TITLE: State Revolving Fund (SRF) Assistance for Water Treatment Plant Upgrades This Work Authorization, when executed, shall be incorporated in and shall become an integral part of the Agreement for Professional Services dated September 10, 2020 between the Village of Agreement. I. PROJECT DESCRIPTION The VILLAGE owns and operates a potable water utility system to serve customers within the to fund the upcoming Water Treatment Plant Process Efficiency and Control Improvements project and Beach Road Phase II Water Main Replacement project using State Revolving Fund (SRF) loan funding. This scope of services provides for professional engineering assistance to prepare and submit documentation to the State of Florida Drinking Water SRF program to procure loan funding for the water treatment plant project and revise the Water Facilities Plan to incorporate the requested information from the FDEP for the proposed water main improvements as well as include the additional water treatment plant upgrades not previously included in the current Water Facilities Plan. SCOPE OF SERVICES The following is a description of the services to be provided under this Work Authorization. CONSULTANT shall meet with the VILLAGE to discuss the proposed SRF-funded project, the project schedule, and provide a written list of data needs necessary to prepare submittals to the State of Florida. WORK AUTHORIZATION NO. 14 1 of 4 CONSULTANT shall prepare and submit a Request for Inclusion (RFI) package and supporting equest for Inclusion on the Priority List for Drinking Water ting documentation will be submitted to the Drinking Water SRF program. CONSULTANT shall revise the existing Water Facilities Plan to incorporate the Request for Additional Information provided by FDEP SRF staff on May 9, 2024, which includes the requirement to conduct a new public meeting, submit a new business plan, and have the Village Council adopt the revised facilities plan. In addition to completing the items required in the May 9, 2024 correspondence, the CONSULTANT will incorporate the additional components and costs of the Water Treatment Plant Process Efficiency and Control Improvements project not currently listed in the Water Facilities Plan. T ASSISTANCE CONSULTANT shall assist the VILLAGE with the preparation, submission, and coordination of the loan application and loan agreement package for the SRF Drinking Water Facilities Loan Application (DEP Form 62-552.900(2). CONSTRUCTION CONTRACT DOCUMENTS CONSULTANT shall assist with SRF bid and construction contract documents for the project noted above. This may include supplementary conditions and Davis-Bacon wage requirements to be included in the contract documents, and assistance to the VILLAGE in submitting bid documents to the DEP such as addenda, debarment certification, copy of advertisement, bid tabulation and recommendation of award, and certification from Appendix A, FDEP Supplementary Conditions, and Davis Bacon wage rates. II. DELIVERABLES Task 1 - Deliverables: 1. Minutes distributed to all attendees of the kick-off meeting. 2. Written list of data needs to complete the SRF documentation. WORK AUTHORIZATION NO. 14 2 of 4 Task 2 - Deliverables 1. PDF copy of the completed SRF Request for Inclusion (RFI) package and supporting documentation submitted to the FDEP. Task 3 - Deliverables 1. PDF signed and sealed copy of the revised Facilities Plan. 2. Presentation slides and minutes from the Public Meeting. 3. Draft language to the Village for use in advertising the public meeting. 4. Draft language to the Village for the adopting resolution of the revised Facilities Plan. Task 4 - Deliverables: 1. PDF copy of all loan application and loan agreement items provided to the VILLAGE in assistance of submission to the FDEP. The VILLAGE will be required to submit the loan application and loan agreement to the FDEP. Task 5 - Deliverables: 1. PDF copy of all required SRF bid and construction contract documents required. III. SCHEDULE Upon receipt of Notice-To-Proceed the CONSULTANT will complete the services identified in this Work Authorization within the schedule outlined in Table 1. Table 1 Schedule Cumulative Time to Complete (Calendar Time to Days) Complete Activit (Calendar Days) 7 days from NTP 7 days Project Kick-of Meeting 18 days from NTP June 28, 2024 Request for Inclusion & Revised Water Facilities Plan 30 days after approval from FDEP Dependent upon Loan Application Submittal FDEP IV. COMPENSATION AND PAYMENT The CONSULTANT will perform the tasks as outlined in the scope of services for Lump Sum Fee of $24,860 in accordance with our approved billing rates with an estimate of costs by task provided WORK AUTHORIZATION NO. 14 3 of 4 in Table 2 and further detailed in Attachment A. Monthly progress payments will be authorized based on percent complete as determined by CONSULTANT and approved by VILLAGE. Table 2 Budget Summary DescriptionTotal 1.Project Kick-off Meeting$740.00 2.Prepare and Submit Request for Inclusion Package$3,800.00 3.Revisions to Facilities Plan$14,880.00 4.Loan Application and Agreement Packages Assistance$3,100.00 5.Assistance with SRF Compliance Components of Construction$2,340.00 Contract Documents $24,860.00 TOTAL V.ASSUMPTIONS Services and/or materials to be provided by the VILLAGE and other related key assumptions include: 1.Assistance with providing required data as part of the Request for Inclusion, Facilities Plan, and loan application including, but not limited to cost estimates, engineering plans and contract documents, financial, historical, and census data, and any required rate studies, capital financing plan, and financial information required to be provided per the request of SRF staff. 2.The Village is responsible for completing the Business Plan and providing to the CONSULTANT. This will be incorporated as an Appendix in the Facilities Plan. 3.Assistance with preparation of required exhibits and maps. 4.Prompt review of all deliverables. 5.Participation of key personnel at progress meetings VI.AGREEMENTREFERENCE The work authorized under this Work Authorization shall be performed under the terms and conditions described within the Professional Services Agreement dated September 10, 2020, by and Compensation shall not exceed the hourly rates currently in effect under this Agreement. HOLTZ CONSULTING VILLAGE OF TEQUESTA LTZ COCCCCCCCCCCOCCCCCCCCCCCCCCCCCCCCOCCCCCCCCCCCOCOCCCCCOCCCCCCCCCCCCCCCCCOCCCCCCCCCCCCCCCCOCCCCCCCCCCCCCCCCCCCCCCCCCCOCOCOCOCOCOCCOCCOCOCOCOCOCOCOCOCOOOOOOOOOOO OOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOONSULTINGNNNN Ejhjubmmz!tjhofe!cz!Kfsfnz!Bmmfo! Ebuf;!3135/19/39!25;63;32! Kfsfnz!Bmmfo .15(11( By: By: Christine Miranda, PE Print Name: Vice President Title: Date: WORK AUTHORIZATION NO. 14 4 of 4 PUBLIC RECORDS. In accordance with Sec. 119.0701, CƌƚƩźķğ {ƷğƷǒƷĻƭ, CONTRACTOR must keep and maintain this Agreement and any other records associated therewith and that are associated with the performance of the work described in the Proposal or Bid. Upon request from the requested records, or allow such records to be inspected or copied, within a reasonable time in accordance with access and cost requirements of Chapter 119, CƌƚƩźķğ {ƷğƷǒƷĻƭ. A CONTRACTOR who fails to provide the public records to the Village, or fails to make them available for inspection or copying, wit pursuant to Sec. 119.0701, CƌƚƩźķğ {ƷğƷǒƷĻƭ, and other penalties under Sec. 119.10, CƌƚƩźķğ {ƷğƷǒƷĻƭ. Further, CONTRACTOR shall ensure that any exempt or confidential records associated with this Agreement or associated with the performance of the work described in the Proposal or Bid are not disclosed except as authorized by law for the duration of the Agreement term, and following completion of the Agreement if the CONTRACTOR does not transfer the records to the Village. Finally, upon completion of the Agreement, CONTRACTOR shall transfer, at no cost to the Village, all public records in possession of the CONTRACTOR, or keep and maintain public records required by the Village. If the CONTRACTOR transfers all public records to the Village upon completion of the Agreement, the CONTRACTOR shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the CONTRACTOR keeps and maintains public records upon completion of the Agreement, the CONTRACTOR shall meet all applicable requirements for retaining public records. Records that cust technology systems. IF CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER RELATING TO THIS AGREEMENT, PLEASE CONTACT THE VILLAGE CLERK, RECORDS CUSTODIAN FOR THE VILLAGE, AT (561) 768-0440, OR AT lmcwilliams@tequesta.org, OR AT 345 TEQUESTA DRIVE, TEQUESTA, FLORIDA 33469. Pursuant to Article XII of the Palm Beach County Charter, the Office of the Inspector General has jurisdiction to investigate municipal matters, review and audit municipal contracts and other transactions, and make reports and recommendations to municipal governing bodies based on such audits, reviews, or investigations. All parties doing business with the Village shall fully authority, and power. The inspector general has the power to take sworn statements, require the production of records, and to audit, monitor, investigate and inspect the activities of the Village, as well as contractors and lobbyists of the Village in order to detect, deter, prevent, and eradicate fraud, waste, mismanagement, misconduct, and abuses. to comply with the requirements of Title II of the by ensuring that the Con to individuals with disabilities. To comply with the ADA, the Contractor shall provide a written statement indicating that all \[ agreement /bid documents and specifications\], from Contractor, including files, images, graphics, text, audio, video, and multimedia, shall be provided in a format that ultimately conforms to the Level AA Success Criteria and Conformance Requirements of the Web Content Accessibility Guidelines 2.0 (Dec. 11, 2008) ("WCAG 2.0 Level AA"), published by the World Wide Web Consortium ("W3C"), Web Accessibility Initiative ("WAI"), available at www.w3.org/TR/WCAG/ Attachment A: Village of Tequesta SRF Funding Assistance for WTP Upgrades & Facilities Plan Revisions Principal Engineer Associate Engineer Project Engineer (PE) Project Engineer (EI)Senior DesignerConstruction InspectorAdministrative AssistantSubconsultantItem Cost (Includes 5% Subconsultant Markup)Task Cost Rate$190$180$120$105$110$95$70-- TaskItem HoursFees 1. Project Kick-Off Project Kick-off Meeting22 $740.00$740.00 Meeting 2. Prepare and Submit Prepare and Submit RFI Package to the FDEP8216$3,800.00 Request for Inclusion $3,800.00 Package 3. Revisions to Revisions to Facilities Plan Including Public Meeting2030408$14,880.00 Facilities Plan $14,880.00 4. Loan Application and $3,100.00 Agreement Package Assist Client with Loan Application and Agreement Packages882 Assistance $3,100.00 5. Assistance with SRF Compliance Assistance with Construction Contract Docuements482$2,340.00 Components of $2,340.00 Construction Contract Subconsultant 4250560804$0.00 HCE Total $24,860.00 $24,860.00