Loading...
HomeMy WebLinkAboutPresentation_Regular_11/14/2024 (4)Financial Progress Update November 2024707CRtoA1ACRfrom ProjectReplacementBridge 1US D421056B#:AidFederal01 -52-2-428400ID#:Project KEY SUCCESSES operational control systemImplemented a safety design change to incorporate a new pedestrian detection system into bridge Successfully coordinated all utility relocations without impacting construction including FPL and FGT architectural features of the wall.design allowed the wall to be precast in effort to safeguard the -Bascule Piers Exterior Wall face reCompletion of the foundation installations with unfavorable environmental conditions and restrictions.integrity of these historic landmarks were not compromised.Vibration monitoring of the Museum and lighthouse during foundation installations ensured the structural adjustments made as needed to improve traffic flow. Beach County Traffic Management Center. The detour has been closely monitored and signal timing Implementation of SMART Work zone for Detour which connected all major intersections with Palm traffic communication devices for the detour route.Complete all intersection improvements, existing Alternate A1A bridge repairs and installation of new 2 PROJECT 3 BeganConstructionPhase detour-Pre 2021Fall Project 2026Early toopenlanesfour(All CompletedConstruction BridgeNew 2025Spring toopendirection eachinlane(One Ends PhaseDetour 5202Early anBegPhase Detour 2023Spring change)to subject(SCHEDULE PROGRESS 4 SOUTH SIDE APPROACH–UPDATE PROGRESS UPDATE 5 SOUTH SIDE APPROACH– PROGRESS UPDATE 6 BASCULE PIERS– PROGRESS UPDATE 7 BASCULE PIERS– PROGRESS UPDATE 8 Hydraulic Power Unit Assembly Assembly PinnionTrunnion Assembly MECHANICAL– PROGRESS UPDATE 9 Control System Equipment ELECTRICAL– PROGRESS UPDATE 10 BASCULE SPANS– PROGRESS UPDATE 11 CONTROL HOUSE– PROGRESS UPDATE 12 CONTROL HOUSE– PROGRESS UPDATE 13– PROGRESS UPDATE 14– PROGRESS UPDATE 15– REMAINING MILESTONES TO OPEN SAFELY OPEN ONE LANE OF TRAFFIC IN EACH DIRECTION! CHECKOUTBRIDGE INSPECTIONS AND FUNCTIONAL COMPLETE, south side then north side of projectPAVE THE BRIDGE APPROACHES, south side of bascule bridgePOUR CONCRETE DECK FOR SPAN 3, south side of bascule bridgeSET BEAMS FOR SPAN 3, under the bascule bridgeSHIFT BOAT TRAFFIC INTO THE MAIN CHANNELnorthwest leaf then southwest leafPOUR CONCRETE DECK ON BASCULE BRIDGE, , north side of bascule bridgePOUR CONCRETE DECK FOR SPAN 5Major activities over the following months include… 16 WEST SIDE OF BRIDGE TO TRAFFIC STATUS OF REMAINING MILESTONES TO complete, north side of bascule bridge is POUR CONCRETE DECK FOR SB SPAN 5 17 STATUS OF REMAINING MILESTONES TO , under the bascule bridgeSHIFT BOAT TRAFFIC INTO THE MAIN CHANNELnorthwest leaf then southwest leafPOUR CONCRETE DECK ON BASCULE BRIDGE, 18 STATUS OF REMAINING MILESTONES TO PLACEHOLDERPHOTO, south side of bascule bridgePOUR CONCRETE DECK FOR SPAN 3, south side of bascule bridgeSET BEAMS FOR SPAN 3 19 STATUS OF REMAINING MILESTONES TO COMPLETED-SIDE SOUTH, PAVE THE BRIDGE APPROACHES 02 STATUS OF REMAINING MILESTONES TO , NORTH SIDEPAVE THE BRIDGE APPROACHES 12 SPRING 2025 MILESTONE PLACEHOLDERPHOTO OPEN EAST SIDE OF BRIDGE TO TRAFFIC 22 SUMMER 2025 MILESTONE OPEN RIVERWALK CONNECTION UNDER SOUTH SIDE OF BRIDGE 23 SPRING 2026 MILESTONE PROJECT COMPLETION!24 ADDITIONAL 25 YOU!THANK QUESTIONS/COMMENTS