HomeMy WebLinkAboutOrders_Planning and Zoning_4/17/2025_SPM 02-25_Bilodeau Construction ORDER OF THE PLANNING AND ZONING BOARD
VILLAGE OF TEQUESTA
REQUEST FOR SITE PLAN MODIFICATION APPROVAL
CASE NO.: SPM 02-25 FILED: Village of Tequesta
Date:
IN RE: Tamwest Realty,INC, Owner Tim-
Bilodeau Construction,LLC,Applicant
PROPERTY LOCATION: 500—704 US Highway One
LEGAL DESCRIPTION: 30-40-43, SLY 450 FT OF GOV LT 1 LYG WLY OF&ADJ TO US HWY
1 R/W(LESS SLY 291.75 FT OF ELY 209.21 FT&S 11 FT OF W 430 FT
OF ELY 639.21 FT) &N 68.33 FT OF W 115.70 FT&N 23.33 FT OF E
193.33 FT OF W 309.03 FT OF GOV LT 2; 30-40-43, SLY 291.75 FT OF
ELY 209.21 FT(LESS NLY 186.99 FT OF SLY 256.99 FT OF WLY 154.33
FT OF ELY 174.33 FT) & S I 1 FT OF W 430 FT OF ELY 639.21 FT OF
GOV LT 1 LYG W OF &ADJ TO US HWY 1 R/W& PT OF GOV LT 2
LYG N OF& ADJ TO VILLAGE BLVD& W OF &ADJ TO US HWY 1
R/WS(LESS N 68.33 FT OF W 115.70 FT N 23.33 FT OF E 193.33 FT OF
W 309.03 FT, SLY 250 FT OF WLY 125 FT OF ELY 840.83 FT & SLY
272.59 FT OF ELY 178 FT) & PT OF NW 1/4 LYG E OF & ADJ TO
PB89PI08&W OF&ADJ TO GOV LT 2
PARCEL CONTROL NUMBER: 60-43-40-30-00-001-0190;60-43-40-30-00-001-0080
1. REQUEST: Application from Tamwest Realty, INC for a Minor Site Plan Modification
for new paint colors on existing buildings in the C-2 Zoning District.
ORDER APPROVING SITE PLAN MODIFICATION APPLICATION
This cause came on to be heard upon the above application and the Planning and Zoning Board of the
Village of Tequesta having considered the evidence presented by the Applicant and other interested persons at
a hearing called and properly noticed, and the Planning and Zoning Board of the Village of Tequesta being
otherwise duly advised,
THEREUPON, THE PLANNING AND ZONING BOARD OF THE VILLAGE OF
TEQUESTA FINDS AS FOLLOWS:
1. The subject property is located in the C-2 (Community Commercial) Zoning District in the
Village of Tequesta.
2. The Applicant has submitted all documents required by the Village's Code of Ordinances for
Planning and Zoning site plan modification review and final action.
3. The application and all supporting documentation and presentation materials as reviewed by
the Planning and Zoning Board at its April, 171', 2025 meeting, and as kept on file by the
Village, are made a part hereof and are hereby incorporated by reference.
Page 1
4. According to Village Code Sections 22-53,and 78-331 through 78-333,site plan modification
approval by the Village Planning and Zoning Board is required.
5. The Applicant has applied for site plan modification approval for new paint colors on existing
buildings in the C-2 Zoning District.
6. Under the provisions of the Village Code of Ordinances, the Planning and Zoning Board has
the right,power and authority to act upon the request herein made.
IT IS THEREUPON CONSIDERED, ORDERED AND ADJUDGED BY THE PLANNING
AND ZONING BOARD OF THE VILLAGE OF TEQUESTA,FLORIDA,AS FOLLOWS:
The application for site plan modification approval,Case No. SPM 05-25 with reference to the above-
described property within the Village of Tequesta, Palm Beach County, Florida, for a Minor Site Plan
Amendment for new paint colors on existing buildings in the C-2 Zoning District, in accordance with the
application and all supporting documentation and presentation materials attached hereto as Exhibit "A" is
hereby APPROVED subject to the following conditions:
1. Within six (6) months of painting completion, property owner must apply for site plan
modification to create an updated Master Sign Program for plaza.
Please note:
4 The term Applicant(s)shall include all successors and assigns.
* The Applicant's site plan approval shall expire in twelve (12)months unless a building permit has been
obtained in accordance with Sec. 78-334(h). If the building permit expires or is voided, the site plan
approval also expires or becomes void.
DONE AND ORDERED THIS 17t'DAY OF April,2025.
Zi�
*By: ESLEE DASHER
BOARD CHAIR
OF
RP0 pG=;
LORI McWILLIAMS,MMC
VILLAGE CLERK I NCpRPpRgTED:'
Page 2