HomeMy WebLinkAboutAgreement_Water Service_5/8/2025_Mock Roos & Associate VILLAGE OF TEQUESTA
CONSULTING SERVICES WORK AUTHORIZATION
DATE: VILLAGE RFQ.NO.:
WORK AUTHORIZATION NO. FOR CONSULTING SERVICES
PROJECT No. G/L CODE:
CONSULTANT PROJECT NO.: C5013.10
PROJECT TITLE: Well SA 19 Replacement—Construction Engineering Services
This Work Authorization, when executed, shall be incorporated in and shall become an integral
part of the Agreement for Professional Services dated September 10, 2020 between the VILLAGE
of Tequesta ("VILLAGE"), and Mock, Roos & Associates, Inc. ("CONSULTANT") hereafter
referred to as the Agreement.
I. PROJECT DESCRIPTION
The VILLAGE has a water use permit(No. 50-00046-W) from the South Florida Water
Management District(SFWMD)that allows the withdrawal of 401 million gallons (MG)
per year from the surficial aquifer and 1,251 MG from the brackish Upper Floridan Aquifer
(UFA).
In 2021,the CONSULTANT completed the design for the replacement of Well No. 19,
followed by the permitting in 2023. Although the project was placed on hold,the
VILLAGE is now prepared to move forward with updating the drawings, finalizing FPL
coordination, and advertising the project for bid.No significant plan revisions are
anticipated before the VILLAGE proceeds with the bid advertisement.
II. SCOPE OF SERVICES
The following is a description of the anticipated services to be provided under this Work
Authorization.
TASK 1 —CONSTRUCTION ENGINEERING SERVICES
1. Prepare and deliver the As-Bid drawings and specifications to the VILLAGE for
issuance to the contractor, incorporating all addenda and design modifications made
during the bidding process. Provide the CONTRACTOR with up to two full size
signed and sealed drawing sets. Provide the CONTRACTOR with the AutoCAD
WORK AUTHORIZATION NO. 1 of 5
2025 files for the CONTRACTOR's use preparing record drawings for the project.
2. Prepare an agenda and conduct a pre-construction meeting with the CONTRACTOR,
the VILLAGE and other stakeholders identified by the VILLAGE.
3. Attend up to ten (10)construction meetings between the CONTRACTOR,
CONSULTANT, and the VILLAGE during the construction period(based on a 5-
month active construction duration). Prepare and distribute meeting minutes taken at
construction meetings. Review CONTRACTOR's project construction schedule,and
request and/or review schedule updates as necessary at meetings. Up to five (5)
meetings to be held virtually of the 10 proposed meetings.
4. Review CONTRACTOR's fabrication shop drawings and engineering submittals for
conformance with the Contract Documents. One review per shop drawing submittal is
included to address comments as appropriate. Provide electronic copies of the
reviewed submittal with a submittal log to the CONTRACTOR and VILLAGE.
5. Provide site visits by Project Engineer to review the construction progress. A total of
4 site visits are included. Review field observation reports provided by the VILLAGE.
6. Provide a CONSULTANT representative for up to 8 hours per week to perform site
observations during the active construction phase of the wellhead and above-grade
improvements. The CONSULTANT will prepare and review field observation
reports. Due to the long lead times for construction components,the overall project
duration is anticipated to be 14 months,with 5 months of active onsite construction
(well drilling,well head, and above grade improvements).
7. Review and respond to CONTRACTOR's Requests for Information(RFI).
8. Review CONTRACTOR-submitted pay applications for completeness based on
progress to date. Provide review and payment recommendations for the
CONTRACTOR's pay applications(up to 4 pay applications are anticipated).
9. Perform one substantial completion walk-through with the CONTRACTOR,
CONSULTANT, and the VILLAGE. Prepare and distribute the EJCDC "substantial
completion statements"and associated punch lists.
10. Perform one final completion walk-through with the CONTRACTOR,
CONSULTANT, and the VILLAGE.
11. Assist the CONTRACTOR and VILLAGE with compiling,reviewing and providing
the VILLAGE with a project closeout package.
12. Provide the services of an Electrical subconsultant during the construction of the well
as listed in the attached proposal. Electrical subconsultant services are anticipated to
include assisting with electrical shop drawing review, FPL coordination, field
observations, attend up to one meeting, respond to up to two (2) RFI's submitted by
the CONTRACTOR, and attend a substantial and a final completion walkthrough.
13. Provide the services of a Hydrogeologic subconsultant during the construction of the
well as listed in the attached proposal. Hydrogeologic subconsultant services are
anticipated to include attending critical phases of production well construction
including drilling, screen and casing installation, well development,pump testing,and
water quality testing. Provide recommendations for the selection of screen and gravel,
WORK AUTHORIZATION NO. 2 of 5
as well as the constructed depths of the borehole and casing. Spot check during well
development and monitor progress based on daily well CONTRACTOR testing.
Attend CONTRACTOR's step drawdown and constant rate testing, including the
geologic evaluation of drill cuttings,collection of water samples and field water
quality measurements. Geophysical logs provided by the geophysical logger will be
reviewed and evaluated for well construction. Digital photos will be taken of
significant activities during well construction. Observe the CONTRACTOR's
abandonment of existing Well 19 and prepare a well completion report.
III. DELIVERABLES
Task 1 —Construction Engineering Services
• Signed and Sealed Construction Drawings(PDF and Prints)
• Pre-Construction Meeting Minutes and Meeting Notes(Word and PDF)
• Reviewed Shop Drawings (PDF)
• Field Observation Reports(PDF)
• Recommendation for Payment(PDF)
• Substantial Completion Form and Punchlist(PDF)
• Closeout Documents and Well Completion Report(PDF)
IV. SCHEDULE
Upon receipt of Notice-To-Proceed the CONSULTANT will complete the services
identified in this Work Authorization within the schedule outlined in Table 1.
Table 1
Schedule
Cumulative
Time to Time to
Complete Complete
(Calendar (Calendar
Activity Days) Days)
Task I —Construction Engineering Services 420 555
* If significant delays of the above are encountered, the overall schedule for this Work
Authorization is subject to change. The CONSULTANT will keep the VILLAGE apprised
of issues potentially affecting this schedule.
WORK AUTHORIZATION NO. 3 of 5
V. COMPENSATION AND PAYMENT
The total fee for the services outlined in Tasks 1 is estimated not to exceed $83,000 as
outlined in Table 2, which includes $38,606 for subconsultant lump sum services and
$44,394 for CONSULTANT's hourly, not-to-exceed services.
Table 2
Budget Summary
Description Total
Task 1 —Construction Engineering Services $82,476.00
eimbursables $524.00
OTAL $83,000.00
*This fee estimate is based on specific labor classifications but may include other approved
classifications per the Master Agreement with Mock-Roos.Task fees are for reference only,
as the project is billed time and expenses (subconsultants are lump sum expenses). While
the total fee will not be exceeded without prior approval, Mock-Roos invoices will reflect
actual hours worked rather than individual task estimates.
ASSUMPTIONS
1. Any services not included in the Scope of Services will be considered Additional Services.
2. Additional Services can be provided upon CONSULTANT receiving signed authorization
from the VILLAGE.
3. Project deliverables will generally be emailed PDF files.
4. The Construction Engineering Services are based on an assumed 14-month construction
duration,with up to three (3)months being active onsite well drilling and development,
followed by two (2) active onsite months for constructing surface features and performing
the well startup.
5. The VILLAGE owns the property or has an easement for the proposed well. A title search
and sketch and legal description are not anticipated.
6. No additional permitting will be required for the project. VILLAGE to direct pay all
permit fees for the project.
WORK AUTHORIZATION NO. 4 of 5
VI. AGREEMENT REFERENCE
The work authorized under this Work Authorization shall be performed under the terms
and conditions described within the Professional Services Agreement dated September 10,
2020, by and between the VILLAGE of Tequesta ("VILLAGE") and Mock, Roos &
Associates("CONSULTANT"). Compensation shall not exceed the hourly rates currently
in effect under this Agreement.
MOCK, ROOS& SOCIATES,INC. VILLAGE OF TEQUESTA
By: to Zvi By:
--2�
Molly Young,Mayor
Print Name: Gam G. Gruber, P.E.
Title: Senior Vice President Date: S ' S-
WORK AUTHORIZATION NO. 5 of 5
o I� wc
o cc
G 60 O CD O o O C) C) O O
N
O f- OV O N O OO .M OO M O mOM ` NV O
06
C co b9 (H (A 60 V) (A EA V) Efl U) � U) a0 69 d « O
J 69. ca M
U
r+ N N
C O Y
w O
O Y
j O 00 M N
C O LL7 COM M ~ 7
O N 00 O O
U V3 M M O L
69 O
Y U
U
O
C w O O
O
Qy N N N O co CO
N —
cn Q ifl m
E N
au aD
N .0
p O
N Y ` o O Q C
d U y O o N
C G1 V
O O O M � LO Ln cc
O
A d C Cl)
C51 N
C n.m
U o >
y m o o c o
d o o a) o g a
Q C C LO CO
C?cn co (o (O v co M
� � J � w :N
LU W Y m o a
=y C �G � °c
V O V C L
U m m o o C > ' o
W ` d � o o (D . o o
LL N LPL d C V co ON N m � N w 'R C N N N V 0 p a N CD
U
N N
C O V N v
O o cO � z
C a7 69 tr> L U o
LU U +r v� (a o axi
y Q C C y y m o U 41 v 0 U
a
U C cn3 U
3
Q. U 81 E j C
O d y
o �
a d o Z
w
Q a a 3
c � m t of
d o c c
� U O O
a+ ? O �9
o N N a a o
3 c E m
L d
N y > c o o LU a
y L o U U a)
M d 7 > > O N
O
H L C Y p O O .C-. m O n
E O) fn O 0 3 O` C V 7 7 O O CD ai
d U C N N N 3 C L N C C N V7 N a N
c 0 a) m 3 c o Y .N o o � w cu
c E m c > m 3 N -0 c o E c
C O N > O O N O a (6 C 3 7 N C �i
LU '- o rn is c E o 3 o cn U) o m e
c ` E m o ` � o_ o � U = c E > s u
O U C C U N CO) 3 O) Q1 T -O _ C (n O
N o � a o U) o .2 � > ;n O M 5 0
` O C ` O "6 ❑. C EO U O N O O O O U O
•. U O 45 N O O a :.0 U �7 U 01 cm = O C
O to O L L C N (9 C O N L1 N N y0
U a U (n W O � a U) I L a w = = J J J c o
C z
R