Loading...
HomeMy WebLinkAboutAgreement_General_7/10/2025_Wynn & Sons Environmental WYNN &SONS ENVIRONMENTAL CONSTRUCTION CO. LLC 7268 BELVEDERE ROAD WEST PALM BEACH,FL 33411 US +15616866077 rick.wynnandsons@yahoo.com Estimate a)DPESS SHiP T0 ESTIMATE 10367 VILLAGE OF TEQUESTA Mr.Doug Chambers DATE 06/24/2025 357 Tequesta Drive Tequesta Drive Tequesta,FL 33469 Sidewalk,Curb&Aprons Removal&Replacement Add pbc ann.contract 2022-063 ADAMatts-Venus to US1 ACTIVITY DESCRIPTION QTY RATE AMOUNT 63-007 SHALLOW EXCAVATION(DEPTH<4 FT)PER CY 79 10.00 790.00 63-008 EMBANKMENT PER CY 20 10.00 200.00 63-010 FINISH GRADING PER SY 1,352 10.00 13,520.00 63-022 MISC.ASPHALT(0-50 TONS)(INCL TACK)PER TN 16 200.00 3,200.00 63-107 CONCRETE F CURB 100 20.00 2,000.00 63-108 CONCRETE F CURB REMOVAL PER LF 100 13.50 1,350.00 63-125 CONCRETE SIDEWALK(6"THICK)(DRIVEWAY)(35 SY 700 63.00 44,100.00 OR GREATER)PER SY 63-126 CONCRETE SIDEWALK(6"THICK")(CURB RAMPS)PER 255 89.00 22,695.00 SY 63-127 CAST IN PLACE TACTILE SURFACE PER SF 344 44.00 15,136.00 63-128 PUMP MIX FOR CONCRETE PUMPING PER CY 122 35.00 4,270.00 63-130 PUMPING OR HAND PLACEMENT OF CONCRETE(1 DAY) 10 2,000.00 20,000.00 63-131 4"CONCRETE REMOVAL PER SY 789 12.50 9,862.50 63-150 SOD TO MATCH EXISTING PER SY 200 6.99 1,398.00 63-159 ROOT PRUNING(0"-36"DEEP)PER LF 200 20.00 4,000.00 63-168 3 CY LOADER TIME PER DAY 6 2,000.00 12,000.00 1 10%CONTINGENCY 1 15,453.00 15,453.00 Proposal Does Not Include Sprinkler Repair-We cap the Pipe if Broken This Proposal Does Not CoverApron Removal& 0.00 Replacement but Does Cover Small Apron Transitions Tv $169,974.50 Accepted By to - • VIA ID rn�or Page 1 of 2 Accepted Date to IVI _ z Pace 2 of 2