HomeMy WebLinkAboutAgreement_General_12/11/2025_Florida Drilling FLORIDA
DRLLLLNG
November 14,2025
Allyson Felsburg
Deputy Utilities Director
The Village of Tequesta
901 N Old Dixie Hwy
Tequesta FL,33469
afelsburg@tequesta.org
Subject: Village of Tequesta Test Well at Site#28(R)
Florida Design Drilling LLC(FDD)is pleased to offer this estimate to furnish all labor,equipment,and materials to perform
well rehabilitation services identified below.The price below is derived from Broward County Water&Wastewater
Piggyback Bid PNC2127733B 1.The proposed work includes the following scope of work provided by JLA Geosciences,
Inc.:
The Village of Tequesta(Village)has a proposed public water supply well site that is west of the Florida East Coast
(FEC)railroad owned for the railroad tracks. FEC is west of Old Dixie Highway and the Village water plant. The
Village would like to consider moving the proposed well site 28 to the water treatment plant site and to evaluate the
hydrogeology and water quality there,we request a proposal from Florida Drilling to drill at test well. It understood
that you can utilize the pricing in the existing piggyback contract to price and perform the tasks below. Please
provide your estimated available dates and pricing on a unit price basis.
1. Mobilize to a location at the Village water plant site with a drilling rig and support equipment.
2. Drill a borehole using the mud rotary method to a depth of approximately 130 feet,circulate to clear the hole of
cuttings. FDD will be drilling to 150 feet,so the logging tool has room for the 130-foot inter-aL
3. Log the borehole using a geophysical logger including,caliper,gamma and dual induction(or short,long normal
resistivity if DIL is not available).
4. Install a 2-inch diameter temporary well that includes 10 feet of slotted screen(0.020"or 0.030"slot or other
approved slot)and pipe to land surface. Initial depth will be based on geology and geophysical log.
5. Install gravel pack and develop the well in interval#1 until it produces clear water for sampling. JLA will obtain the
samples for field analysis.
6. After sampling,pull up the 2-inch diameter well to the next interval(#2)decided by the logging. Develop as per
interval#1 and ILA will sample.
7. After sampling interval#2,pull up to interval#3,develop and sample as per intervals#1 and#2.
8. Based on the results,we may need to pull up and do a 4'interval.
9. After interval testing,remove the 2-inch diameter well,redrill the hole to the depth recommended by JLA based on
sample results,and complete a monitor well at the JLA recommended depth using the well materials used for the
test well provided they are in good condition. Gravel pack and cement the well in place.Develop the well. Leave
the well casing 30 inches above grade. Install a lockable,sealing cap.
10. Prior cement hardening,install a protective casing outside the stickup casing that extends 30 inches above grade and
24 inches below ground.
7733 Hooper Road,West Palm Beach,FL 33411
www.FLDrilling.cont
Phone:561-844-2966
Florida Water Well Contractor#11148
FLORIDA
ORILUNG
Description Qty Unit Price Extd
I
Line Item 24-Well Rehabilitation,Drill New Well 12 LF $3,540.00 $42,480.00
Line Item 70-Miscellaneous,Project Manager 10 HR $200.00 $2,000.00
Total $44,480.00
If you have any questions,please feel free to contact me at any time.
Digitally signed by Jeremy
JeremyAll Allen
en Deie.2025.11.1709:27:11
Approved By: -05'00'
Sincerely, Jeremy Allen,Village Manager
Date: See Digital Signature Date
Miguel Lequerica—Project Manager
Florida Design Drilling LLC
954.234.0939
miguel@fldrilling.com
7733 Hooper Road,West Palm Beach,FL 33411
www.FLDri11ing.cont
Phone:561-844-2%6
Florida Water Well Contractor#11148