Loading...
HomeMy WebLinkAboutAgreement_General_12/11/2025_Wynn and Sons Environmental WYNN &SONS ENVIRONMENTAL CONSTRUCTION CO. LLC 7268 BELVEDERE ROAD WEST PALM BEACH, FL 33411 US +15616866077 rick.wynnandsons@yahoo.com Estimate ADDRESS SHiF TO ESTIMATE 10605 VILLAGE OF TEQUESTA Mr.Doug Chambers DATE 10/31/2025 357 Tequesta Drive 362 Riverside Drive(S.Side)to N.Side of Dover Ditch Tequesta,FL 33469 Asphalt Path Removal 8 Replacement With Concrete pbc ann.contract 2022-063 Sidewalk-294 LF X 6 FW ACTIVITY DESCRIPTION QTY RATE AMOUNT 63-005 REMOVE EXISTINGASPHALT(FULL DEPTH)PER SY 1,372 2.00 2,744.00 63-007 SHALLOW EXCAVATION(DEPTH<4 FT)PER CY 25 10.00 250.00 63-008 EMBANKMENT PER CY 20 10.00 200.00 63-010 FINISH GRADING PER SY 196 10.00 1,960.00 63-125 CONCRETE SIDEWALK(6"THICK)(DRIVEWAY)(35 SY 196 63.00 12,348.00 OR GREATER)PER SY 63-128 PUMP MIX FOR CONCRETE PUMPING PER CY 33 35.00 1,155.00 63-130 PUMPING OR HAND PLACEMENT OF CONCRETE(1 DAY) 2 2,000.00 4,000.00 63-150 SOD TO MATCH EXISTING PER SY 200 6.99 1,398.00 63-159 ROOT PRUNING(0"-36"DEEP)PER LF 200 20.00 4,000.00 63-168 3 CY LOADER TIME PER DAY 3 2,000.00 6,000.00 1 10%CONTINGENCY 1 3,405.50 3,405.50 Proposal Does Not Include Sprinkler Repair-We cap the Pipe if Broken TOTAL $37,460.50 Accepted By Accepted Date /'3 11 � Pace" ;J1 WYNN &SONS ENVIRONMENTAL CONSTRUCTION CO. LLC 7268 BELVEDERE ROAD WEST PALM BEACH, FL 33411 US +15616866077 rick.wynnandsons@yahoo.com Estimate ADDRESS SHIP TO ESTIMATE 10584 VILLAGE OF TEQUESTA Mr.Doug Chambers DATE 10/28/2025 357 Tequesta Drive Willow Road Beginning at Seabrook Road Working East& Tequesta,FL 33469 South-Both Sides of Road pbc ann.contract 2022-063 Sidewalk Removal&Replacement ACTIVITY DESCRIPTION QTY RATE AMOUNT 63-007 SHALLOW EXCAVATION(DEPTH<4 FT)PER CY 12 10.00 120.00 63-008 EMBANKMENT PER CY 11 10.00 110.00 63-010 FINISH GRADING PER SY 410 10.00 4,100.00 63-125 CONCRETE SIDEWALK(6"THICK)(DRIVEWAY)(35 SY 342 63.00 21,546.00 OR GREATER)PER SY 63-128 PUMP MIX FOR CONCRETE PUMPING PER CY 50 35.00 1,750.00 63-130 PUMPING OR HAND PLACEMENT OF CONCRETE(1 DAY) 2.40 2,000.00 4,800.00 63-132 6"CONCRETE REMOVAL PER SY-Or 4" 312 12.50 3,900.00 63-150 SOD TO MATCH EXISTING PER SY 143 6.99 999.57 63-159 ROOT PRUNING(0"-36"DEEP)PER LF 228 20.00 4,560.00 63-168 3 CY LOADER TIME PER DAY 1.70 2,000.00 3,400.00 1 10%CONTINGENCY 1 4,528.56 4,528.56 Proposal Does Not Include Sprinkler Repair-We cap the Pipe if Broken TOTAL $49,814.13 Accepted B Accepted Date Pace 1 J I WYNN &SONS ENVIRONMENTAL CONSTRUCTION CO. LLC 7268 BELVEDERE ROAD WEST PALM BEACH, FL 33411 US +15616866077 rick.wynnandsons@yahoo.com Estimate ADDRESS SHIP TO ESTIMATE 10603 VILLAGE OF TEQUESTA Mr.Doug Chambers DATE 10/30/2025 357 Tequesta Drive Eastwinds Circle Tequesta,FL 33469 Remove Concrete Road Replace with Road Base& pbc ann.contract 2022-063 Asphalt,Partial R&R of Curb ACTAATY DESCRIPTION ! ` ' RATE ��',C- 63-007 SHALLOW EXCAVATION (DEPTH <4 FT)PER CY 159 10.00 1,590.00 63-010 FINISH GRADING PER SY 2,650 10.00 26,500.00 63-109 CONCRETE VALLEY GUTTER PER LF 188 22,00 4,136.00 63-013 8"BASE INCL PRIME COAT PER SY 2,650 20.00 53,000.00 63-022 MISC.ASPHALT(0-50 TONS)(INCL TACK)PER TN 396 200.00 79,200.00 63-034 REMOVE PAVER BRICK PER SY 250 50.00 12,500.00 63-035 RESET PAVER BRICK PER SY 250 156.00 39,000.00 63-110 CONCRETE VALLEY GUTTER REMOVAL PER LF 188 12.50 2,350.00 63-132 6"CONCRETE REMOVAL PER SY 3,483 12.50 43,537.50 63-150 SOD TO MATCH EXISTING PER SY 250 6.99 1,747.50 63-159 ROOT PRUNING(0"-36"DEEP)PER LF 400 20.00 8,000.00 63-168 3 CY LOADER TIME PER DAY 14 2,000.00 28,000.00 63-169 1 1/2 CY BACKHOE PER DAY 10 2,000.00 20,000.00 1 BOND @ 2.5% 1 7,987.90 7,987.90 1 10%CONTINGENCY 1 32,754.89 32,754.89 Proposal Does Not Include Sprinkler Repair-We cap the Pipe if Broken TOTAL $360,303.79 Accepted By Accepted Date Page t of 1 WYNN &SONS ENVIRONMENTAL CONSTRUCTION CO. LLC 7268 BELVEDERE ROAD WEST PALM BEACH,FL 33411 US +15616866077 rick.wynnandsons@yahoo.com Estimate ADDRESS SHIP TO ESTIMATE 10479 VILLAGE OF TEQUESTA Mr.Doug Chambers DATE 08/21/2025 357 Tequesta Drive Eastwinds Circle,Tequesta Tequesta,FL 33469 Sidewalk Removal&Replacement pbc ann.contract 2022-063 ACTIVITY DESCRIPTION QTY RATE AMOUNT 63-007 SHALLOW EXCAVATION (DEPTH<4 FT)PER CY 30 10.00 300.00 63-008 EMBANKMENT PER CY 25 10.00 250.00 63-010 FINISH GRADING PER SY 727 10.00 7,270.00 63-125 CONCRETE SIDEWALK(6"THICK)(DRIVEWAY)(35 SY 525 63.00 33,075.00 OR GREATER)PER SY 63-128 PUMP MIX FOR CONCRETE PUMPING PER CY 87.50 35.00 3,062.50 63-130 PUMPING OR HAND PLACEMENT OF CONCRETE(1 DAY) 4 2,000.00 8,000.00 63-132 6"CONCRETE REMOVAL PER SY 525 12.50 6,562.50 63-150 SOD TO MATCH EXISTING PER SY 200 6.99 1,398.00 63-159 ROOT PRUNING(0"-36"DEEP)PER LF 460 20.00 9,200.00 63-168 3 CY LOADER TIME PER DAY 3 2,000.00 6,000.00 1 10%CONTINGENCY 1 7,511.80 7,511.80 Proposal Does Not Include Sprinkler Repair-We cap the Pipe if Broken TOTAL $82,629.80 Accepted By Accepted Date JA1111 ar Pace, A 1 WYNN &SONS ENVIRONMENTAL CONSTRUCTION CO. LLC 7268 BELVEDERE ROAD WEST PALM BEACH, FL 33411 US +15616866077 dck.wynnandsons@yahoo.com Estimate ADDRESS SHIP TO ESTIMATE 10599 DOUG CHAMBERS Mr.Doug Chambers DATE 10/28/2025 VILLAGE OF TEQUESTA Open Cut Removal,Replacement with Densities,Asphalt 136 Bridge Road Repair,Mill&Pave Tequesta,FL 33469 pbc annual contract 2022-063 ACTIVITY DESCRIPTION QTY RATE AMOUNT Open Cut Repair,Tequesta Drive&Riverside Drive 63-005 REMOVE EXISTING ASPHALT(FULL DEPTH)PER SY 35 2.00 70.00 63-007 SHALLOW EXCAVATION(DEPTH<4 FT)PER CY 4 10.00 40.00 63-009 FINISH EXISTING ROCK BASE PER SY 7 7.50 52.50 63-012 6"BASE(INCL PRIME COAT)PER SY 7 10.00 70.00 63-013 8"BASE INCL PRIME COAT PER SY 7 20.00 140.00 63-022 MISC.ASPHALT(0-50 TONS)(INCL TACK)PER TN 2 200.00 400.00 63-169 1 1/2 CY BACKHOE PER DAY 1 2,000.00 2,000.00 Mill&Pave 63-019 MILL EXISTING ASPHALT PAVEMENT(<5000 SY)PER 1/2 1.50 5,300.00 7,950.00 DAY 63-020 PORTABLE MILLING MACHINE PER HOUR 2 250.00 500.00 63-022 MISC.ASPHALT(0-50 TONS)(INCL TACK)PER TN 8 200.00 1,600.00 Open Cut Repair-404 Tequesta Drive 63-005 REMOVE EXISTING ASPHALT(FULL DEPTH)PER SY 200 2.00 400.00 63-007 SHALLOW EXCAVATION(DEPTH<4 FT)PER CY 12 10.00 120.00 63-009 FINISH EXISTING ROCK BASE PER SY 45 7.50 337.50 63-012 6"BASE(INCL PRIME COAT)PER SY 45 10.00 450.00 63-013 8"BASE INCL PRIME COAT PER SY 45 20.00 900.00 63-022 MISC.ASPHALT(0-50 TONS)(INCL TACK)PER TN 6 200.00 1,200.00 63-169 1 1/2 CY BACKHOE PER DAY 1 2,000.00 2,000.00 Mill&Pave 63-019 MILL EXISTINGASPHALT PAVEMENT(<5000 SY)PER 112 2 5,300.00 10,600.00 DAY 63-020 PORTABLE MILLING MACHINE PER HOUR 2 250.00 500.00 63-022 MISC.ASPHALT(0-50 TONS)(INCL TACK)PER TN 29 200.00 5,800.00 Pace 1 _f 2 Open Cut Repair-Medical Center Entrance 63-005 REMOVE EXISTING ASPHALT(FULL DEPTH)PER SY 200 2.00 400.00 63-007 SHALLOW EXCAVATION(DEPTH<4 FT)PER CY 12 10.00 120.00 63-009 FINISH EXISTING ROCK BASE PER SY 45 7.50 337.50 63-012 6"BASE(INCL PRIME COAT)PER SY 45 10.00 450.00 63-013 8"BASE INCL PRIME COAT PER SY 45 20.00 900.00 63-022 MISC.ASPHALT(0-50 TONS)(INCL TACK)PER TN 6 200.00 1,200.00 63-169 1 1/2 CY BACKHOE PER DAY 1 2,000.00 2,000.00 Mill&Pave 63-019 MILL EXISTING ASPHALT PAVEMENT(<5000 SY)PER 1/2 2 5,300.00 10,600.00 DAY 63-020 PORTABLE MILLING MACHINE PER HOUR 2 250.00 500.00 63-022 MISC.ASPHALT(0-50 TONS)(INCL TACK)PER TN 27 200.00 5,400.00 Open Cut Repair-N.Cypress Drive&Tequesta 63-005 REMOVE EXISTINGASPHALT(FULL DEPTH)PER SY 150 2.00 300.00 63-007 SHALLOW EXCAVATION(DEPTH<4 FT)PER CY 17 10.00 170.00 63-009 FINISH EXISTING ROCK BASE PER SY 32 7.50 240.00 63-012 6"BASE(INCL PRIME COAT)PER SY 32 10.00 320.00 63-013 8"BASE INCL PRIME COAT PER SY 32 20.00 640.00 63-022 MISC.ASPHALT(0-50 TONS)(INCL TACK)PER TN 5 200.00 1,000.00 63-169 1 1/2 CY BACKHOE PER DAY 1 2,000.00 2,000.00 Mill&Pave 63-019 MILL EXISTINGASPHALT PAVEMENT(<5000 SY)PER 1/2 2 5,300.00 10,600.00 DAY 63-020 PORTABLE MILLING MACHINE PER HOUR 3 250.00 750.00 63-022 MISC.ASPHALT(0-50 TONS)(INCL TACK)PER TN 41 200.00 8,200.00 TOTAL $81,257.50 Accepted By Accepted Date Page 2 of 2 ESTIMATE WYNN&SONS ENVIRONMENTAL rick.wynnandsons@yahoo.com CONSTRUCTION CO.LLC +1 (561)686-6077 7268 BELVEDERE ROAD WEST PALM BEACH,FL 33411 THE VILLAGE OF TEQUESTA Bill to Ship to DOUG CHAMBERS Mr.Doug Chambers VILLAGE OF TEQUESTA Birch Place,Hickory Hill,&Quail Trail 345 Tequesta Drive Open Cut Repair With Densities,Mill&Pave Tequesta,FL 33469 pbc annual contract 2022-063 Shipping info Estimate details Ship date:06/24/2022 Estimate no.:10598 Estimate date:10/28/2025 I # Date Product or service Description Qty Rate Amount 1. Birch Place $0.00 2. 63-005 REMOVE EXISTING ASPHALT(FULL 400 $2.00 $800.00 DEPTH)PER SY 3. 63-013 8" BASE INCL PRIME COAT PER SY 200 $20.00 $4,000.00 4. 63-023 MISC ASPHALT(>50 TONS)(INCL 20 $200.00 $4,000.00 TACK)PER TN 5. 63-020 PORTABLE MILLING MACHINE PER 12 $250.00 $3,000.00 HOUR 6. 63-019 MILL EXISTING ASPHALT PAVEMENT 3 $5,300.00 $15,900.00 PER 1/2 DAY 7. 63-023 MISC ASPHALT(>50 TONS)(INCL 143 $200.00 $28,600.00 TACK)PER TN- 8. 63-052 ADJUST EXISTING MANHOLE OR 1 $1,250.00 $1,250.00 INLET PER EACH 9. 63-169 1 1/2 CY BACKHOE PER DAY 1.5 $2,000.00 $3,000.00 10. 63-178 TRAFFIC PAINT PER SF 120 $4.80 $576.00 11. 63-179 THERMOPLASTIC PAVEMENT 120 $8.50 $1,020.00 MARKING PER SF 12. NIC REFLECTIVE PAVEMENT MARKINGS- 6 $9.00 $54.00 STANDARD 13. Services REFLECTIVE PAVEMENT MARKINGS- 1 $9.00 $9.00 FIRE HYDRANT BLUE 14. Hickory Hill 15. 63-005 REMOVE EXISTING ASPHALT(FULL 35 $2.00 $70.00 DEPTH)PER SY 16. 63-013 8" BASE INCL PRIME COAT PER SY 14 $20.00 $280.00 17. 63-023 MISC ASPHALT(>50 TONS)(INCL 3 $200.00 $600.00 TACK)PER TN 18. 63-020 PORTABLE MILLING MACHINE PER 10 $250.00 $2,500.00 HOUR 19. 63-019 MILL EXISTING ASPHALT PAVEMENT 3 $5,300.00 $15,900.00 (<5000 SY)PER 1/2 DAY 20. 63-023 M ISC ASPHALT(>50 TONS)(INCL 127 $200.00 $25,400.00 TACK)PER TN 21. 63-052 ADJUST EXISTING MANHOLE OR 1 $1,250.00 $1,250.00 INLET PER EACH 22. 63-169 1 1/2 CY BACKHOE PER DAY 1 $2,000.00 $2,000.00 23. 63-178 TRAFFIC PAINT PER SF 120 $4.80 $576.00 24. 63-179 THERMOPLASTIC PAVEMENT 120 $8.50 $1,020.00 MARKING PER SF 25. NIC REFLECTIVE PAVEMENT MARKINGS 6 $9.00 $54.00 AT STOPS 26. NIC REFLECTIVE PAVEMENT MARKINGS 1 $9.00 $9.00 AT HYDRANTS 27. Quail Trail $0.00 28. 63-019 MILL EXISTING ASPHALT PAVEMENT 3 $5,300.00 $15,900.00 (<5000 SY)PER 1/2 DAY 29. 63-020 PORTABLE MILLING MACHINE PER 10 $250.00 $2,500.00 HOUR 30. 63-023 MISC ASPHALT(>50 TONS)(INCL 102 $200.00 $20,400.00 TACK)PER TN 31. 63-052 ADJUST EXISTING MANHOLE OR 1 $1,250.00 $1,250.00 INLET PER EACH 32. 63-178 TRAFFIC PAINT PER SF 120 $4.80 $576.00 33. 63-179 THERMOPLASTIC PAVEMENT 120 $8.50 $1,020.00 MARKING PER SF 34. NIC REFLECTIVE PAVEMENT MARKINGS- 6 $9.00 $54.00 STANDARD 35. NIC REFLECTIVE PAVEMENT MARKINGS- 1 $9.00 $9.00 FIRE HYDRANTS 36. 1 BOND 2.5%OF Estimate 1 $3,761.00 $3,761.00 37. Services CONTINGENCY 10%OF ESTIMATE 1 $15,419.80 $15,419.80 Total $172,757.80 Accepted date l A/ 1l Accepted by uA