Loading...
HomeMy WebLinkAboutAgreement_General_1/8/2026_Fike Corporation Village of Tequesta 345 Tequesta Drive 561-768-0700 Tequesta, FL 33469 www.tequesta.org .y STAFF MEMO Date: December 17, 2025 To: Jeremy Allen,Village Manager From: Allyson Felsburg, Director, Utilities Department Re: Consider Approval of a Quote from Fike Corporation for Rupture Plate Replacement in the Amount of$14,668.77 The Village of Tequesta (VOT) Utilities Department(UD) recommends approval of a quote from Fike Corporation for treatment system rupture disk replacement in the amount of$14,668.77. The VOT UD water treatment plant operates three reverse osmosis (RO)trains. Each train uses high- pressure pumps to force water through membranes as part of the treatment process. Due to normal wear and declining performance,the membranes are currently being replaced. During startup of Train 2 following membrane replacement,the rupture plate failed (ruptured) as designed.This event resulted in the immediate release of pressure and shutdown of the train, preventing damage to critical equipment. At the time, the Village had only one spare rupture plate, which was installed to return the train to service. Given the ongoing replacement of membranes in the remaining trains, staff determined that proceeding without adequate spare rupture plates posed an unacceptable operational and safety risk. In addition, during review of the system, it was identified that the rupture plate installed on Train 1 was not appropriately pressure-rated for current operating conditions.To prevent a potential failure during startup, staff proactively decided to replace the rupture plate on Train 1 with a correctly rated unit prior to placing the train back into service. A rupture plate (also known as a rupture disk) is a critical safety device installed on high-pressure piping associated with the RO system and is standard industry practice for high-pressure water treatment systems. It is engineered to burst at a specific pressure threshold. If pressure exceeds safe limits due to a blockage, membrane fouling, valve malfunction, or control failure,the rupture plate activates instantly to relieve pressure. Rupture plates: - Protect RO membranes, pressure vessels, pumps, and piping - Prevent catastrophic equipment failure - Protect plant staff from high-pressure hazards - Are single-use devices and must be replaced once activated As a result of the rupture plate activation on Train 2 during startup, the limited number of spare rupture plates available, the proactive correction of an improperly rated rupture plate on Train 1, and the This document may be reproduced upon request in an alternative format by contacting the Village Clerk's Office at 561-768-0440 or by completing our accessibility form: https://bit.ly/3mnfeU4 upcoming startup of additional RO trains following membrane replacement, it is necessary to procure additional rupture plates and holders to ensure adequate spare inventory is available, safe startup and operation of all RO trains, and compliance with best practices for high-pressure system safety. The attached vendor quote from Fike Corporation includes rupture plates rated for the correct operating pressure, compatible holders, and expedited delivery to minimize operational risk. Please see the attached quote for more details.The procurement will be funded by the Water Fund Production Water System Maintenance account. WATER FUND-Account 401-242-546.342—Water System Maintenance Budgeted amount: $ 15,000.00 Available amount: $ 214,452.83 Amount of this proposal: $ 14,668.77 Total Remaining: $ 199,784.06 Page 2 of 2 Quotation F k�e, ( Quote#: Q-224151 Date: 12/04/2025 Prepared By: Jackson Griffith BECAUSE SO MUCH Email: jgriffith@flotechinc.com IS AT STAKE - Expires On: 12/31/2025 704 S 10th Street Blue Springs, Missouri 64015 USA Phone: 1-800-YES-FI KE Email:fikeorders@fike.com Reference: Village Of Tequesta Water Treatment Customer PO:Juan Rivas Sold To Bill To Ship To VILLAGE OF TEOUESTA WATER TREATMENT Village Of Tequesta Water Treatment Village Of Tequesta Water Treatment 901 N OLD DIXIE HWY 901 N Old Dixie Hyw 901 N Old Dixie Hyw TEQUESTA, Florida 33469 Tequesta, Florida 33469 Tequesta, Florida 33469 United States United States United States PAYMENT TERMS INCOTERMS FREIGHT PAYMENT FREIGHT METHOD ADVANCE PAY FCA Factory Prepay&Add FedEx Priority Overnight® Thank you for choosing Fike.We are pleased to offer this quotation for your consideration. Please find additional information below: Lead times per line indicated are in working business days and reflect the information available at time of quotation. Estimated overall lead time is 10 Business Days to ship unless otherwise noted. Pagel of 3 LINE: P/N: DATA MANUAL: ITEM DESCRIPTION: LEAD TIME QTY NET PRICE EXT.PRICE SHEET: DAYS: 1 HOV-150- HOV Forward Acting Rupture Disc. 10 4 $1,041.30 $4,165.20 FP-316L- Size: DN 150 (NPS 6), Seal Material: Bus. Days 316L Fluoropolymer Seal, Top/Ring Material: 316L SST(1.4404), Bottom/Support Material:316L SST (1.4404) -Specified Burst Pressure: 60 PSIg @ 72 F -Burst Tolerance: Catalog Standard -Manufacturing Range: Standard -Seal Material Grade: FEP Fluoropolymer -Seat: Light Lip -Flange Standard:ASME B16_5 -Flange Class: Class 150 -Holder Type: Bolted Type -Size Units: IN (Inches) -Factory Certificates: Burst Test Certification -Tag Material:300 Series Stainless Steel -Prior Lot Number:0716077 2 CONV-GI- Link Link Conventional Holder,Type: GI, Size: DN 10 3 $3,161.22 $9,483.66 150- 150 (NPS 6), Flange: Class 150, Inlet Bus. Days A0150- Material:316/316L(1.4401/1.4404), 316L-316L Outlet Material:316/316L (1.4401/1.4404) -Flange Standard:ASME B16_5 -Pre-Assembly Material: SST(18-8) -Test Cert:ASME XIII, Latest Ed. (UD) 3 PREX4 Expedite Order Charge - Pressure 1 $750.00 $750.00 Relief Products, 3 Day Delivery. Subject to Fike authorization. 4 FREIGHT Freight Charge- Prepaid 1 $269.91 $269.91 Quote Total: $14,668.77 Estimated Tax: $ Estimated Total After Tax: $14,668.77 Estimated Freight: See Terms Jeremy Allen Digitally a ea210 .signed4 13 53 31Y-05I 00' Jeremy Allen, Village Manager Quote No:Q-224151 Prepared on:04 Dec 2025 Page 2 of 3 THANK YOU FOR YOUR BUSINESS! Additional Notes: Freight Terms&Conditions: Freight will be indicated as Prepaid only when offered with a Freight line with an amount listed.When Prepaid&Add, Fike will hire the carrier and invoice the amount at the time of carriage. If collect freight is considered,customer is responsible to provide the carrier and collect#at time of order. Ship to location must be indicated prior to acceptance of order. Tax Terms&Conditions of Sale: Taxes will be collected unless a tax exemption form is on file with Fike Treasury. Prior to order file the tax exemption with Fike. Any single use tax exemptions will be based on the customer purchase order number and must be on file with Fike prior to order. Tax is estimated and will be applied on the invoice as final based on any variation in shipment addresses or other applicable factors at time of fulfillment. Bank&Payment Information: Remit Payments to: Fike Corporation, PO Box 7411417 Chicago, IL 60674-1417 EFT Payments to: Bank of America, Account Number:355003946793 Routing Transit/ABA: 101000035, Wire:026009593,Swift Number(USD): BOFAUS3N, Swift Number(non USD):BOFAUS6S Fike Standard Warranty,Terms&Conditions of Sale Apply: https://www.fike.com/terms-conditions Disclaimer: ALL FIKE MARKETING MATERIALS, DATA SHEETS, MANUALS AND DRAWINGS ARE SUBJECT TO THE FOLLOWING: This document is only intended to be a guideline and is not applicable to all situations. Because of the many and varied circumstances and extreme conditions under which Fike's products are used,and because Fike has no control over this actual use, Fike makes no warranties based the contents of this document. FIKE MAKES NO IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A SPECIFIC PURPOSE. You should not act on any information,products or services described herein before you have formed your own opinion through investigation and research as to the suitability of the information,products or services for your specific application and circumstances. The content on Fike.com in English(fike.com/legal-notices/disclaimer/)is the governing version. Translation into any language other than English is for courtesy only. If there is a conflict between the English version and the translated version,the English version shall prevail in all respects including but not limited to interpretation and enforcement. Quote No:Q-224151 Prepared on:04 Dec 2025 Page 3 of 3