HomeMy WebLinkAboutDocumentation_Regular_Tab 09_1/8/2026 Agenda Item #9. Regular Council A-1 STAFF MEMO Meeting: Regular Council - Jan 08 2026 Staff Contact: Allyson Felsburg Department: Utilities Consider Approval of Change Order No. 1 for the Water Treatment Plant (WTP) Filter Pressurized Vessel Upgrades Project, Authorizing a Sixty (60) Calendar-Day Extension to the Contract Time and Decrease in Contract Value in the Amount of$157,296.96 The Utilities Department (UD) recommends approval of Change Order No. 1 for the Water Treatment Plant (WTP) Filter Pressurized Vessel Upgrades project, authorizing a sixty (60) calendar-day extension to the contract time and decrease in contract value in the amount of$157,296.96. The UD has evaluated the future viability of the existing filter treatment system in light of ongoing uncertainty regarding long-term treatment options to address per- and polyfluoroalkyl substances (PEAS). Because the existing filter vessels do not remove PEAS, staff does not recommend continued investment in fully rehabilitating all vessels until the direction of future treatment is finalized. However, it remains necessary to maintain the system in operable condition until a transition strategy is implemented. Operational analysis confirms that the WTP can reliably operate the majority of the time with four (4) rehabilitated filter vessels. Based on this determination, the project scope has been reduced from six (6) vessels to four (4) vessels. Vessels 1 and 3 will remain available as ready/reserve units and must be rehabilitated in the future if the Kimley-Horn Treatment Master Plan concludes that continued use of the existing filter treatment system is required. Florida Design Contractors (FDC) submitted a formal deductive change proposal to remove Vessels 1 and 3 from the contract scope. The total credit associated with this scope reduction is $191,900.00, which reflects the removal of labor, equipment, media removal, cleaning, coatings, and testing activities, less the cost of non-returnable, custom-fabricated internal components that will be turned over to the Village for future use. During the rehabilitation process, unforeseen pitting corrosion was discovered in the interior shell bottoms of Vessels 4 and 6 once media and internal components were removed. Kimley-Horn inspected the vessels and recommended additional welding repairs to properly restore the integrity of the vessels. These conditions could not have been identified prior to dismantling and were outside the original contract scope. FDC performed time-and-material (T&M) welding repairs, including TIG welding of the pitted areas, replacement of sample point strainers, and installation of female threaded couplings to connect PVC inlet arms to the stainless steel inlet headers. The total cost for these unforeseen welding repairs and associated materials for Vessels 4 and 6 is $34,603.04. Page 213 of 572 Agenda Item #9. Change Order No. 1 incorporates both the deductive credit for the scope reduction and the additional cost for unforeseen welding repairs. The net result is a decrease in the contract amount of $157,296-96, reducing the contract from $869,974.00 to $712,677.04. Additionally, due to the extent of the unforeseen welding repairs, a sixty (60) calendar-day time extension is included in this change order. This extends substantial completion from January 5, 2026, to March 6, 2026, and final completion from February 4, 2026, to April 5. 2026. This change order reflects a fiscally responsible approach by reducing investment in treatment infrastructure that may not align with future PFAS treatment requirements, while still maintaining reliable operation of the Water Treatment Plant. The Utilities Department will continue to rely on the four rehabilitated vessels and will revisit rehabilitation of the remaining vessels if future planning efforts determine they are required. The full Water Treatment Plant (WTP) Filter Pressurized Vessel Upgrades Project Contract documents can be viewed by contacting the Utilities Department at 561-768-0459. This document and any attachments may be reproduced upon request in an alternative format by completing our Accessibility Feedback Form, sending an e-mail to the Village Clerk or calling 561- 768-0443. BUDGET • - • BUDGET AMOUNT N/A AMOUNT AVAILABLE N/A EXPENDITURE AMOUNT: N/A FUNDING SOURCES: N/A IS THIS A PIGGYBACK: ❑ Yes 0 N/A DID YOU OBTAIN 3 QUOTES? ❑ Yes 0 N/A QUOTE 1 - BUSINESS NAME N/A QUOTE AMOUNT N/A QUOTE 2 - BUSINESS NAME N/A QUOTE AMOUNT N/A QUOTE 3 - BUSINESS NAME N/A QUOTE AMOUNT N/A COMMENTS/EXPLANATION ON SELECTIONApproval of Change Order No. 1 TACHMENTS: 1) Rev1 Change Order 1 - WTP Filter Vessel Upgrades (Par Signed) Page 214 of 572 Agenda Item #9. WTP Filter (Pressurized Vessel) Plant Upgrades CHANGE ORDER NO, 1 DATE ISSUED: December 18, 2025 EFFECTIVE DATE: December 18, 2025 OWNER: Village of Tequesta OWNER'S PROJECT NO.: UTIL 02-10-2025/AF-1 CONTRACTOR: Florida Design Contractors, LLC PURCHASE ORDER#: PROJECT NAME: Water Treatment Plant(WTP) Filter(Pressurized Vessel) Plant Upgrades The Contract is modified as follows upon execution of this Change Order: Description: T&M for Pitting Repairs for Vessels 4 & 6 and Time Extension, and Credit for Scope Reduction of vessels 1 & 3. Reasons for Change Order:This change order includes 1) additional welding services on vessels 4 & 6 due to unforeseen Pitting in the shell of the vessels, and time extension of sixty (60) days; 2) credit for scope reduction to remove vessels 1 & 3 from contract. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price: Original Contract Times for Initial Milestone: Substantial Completion: January 5,2026 $ $869,974.00 Ready for final payment: February 4, 2026 IN�re�ce rlle�re-,�e�from previously approved Change Ir�r-rence r0er-re-,re1 from previously approved Change Orders No.0 to No. 0: Orders No.0 to No.0: Substantial Completion: 0 Calendar Days $ 0 Ready for final payment: 0 Calendar Days Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: January 5,2026 $ $869,974.00 Ready for final payment: February 4, 2026 'M^re,&e [Decrease]this Change Order: Increase r^e^re,Ce'this Change Order: Substantial Completion: 60 Calendar Days $ (157,296.96) Ready for final payment: 60 Calendar Days Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial Completion: March 6, 2026 $ $712,677.04 Ready for final payment: April 5, 2026 This change order(with accompanying documentation) meets the requirements of the Contract Documents and execution of the change order is recommended. K'ml y-Ho Asociates, Engineer NicrloiasP Dated: By: 2025.12.29 09:00:25 -05'00' Nick Black, P.E. APPROVED BY OWNER: ACCEPTED BY CONTRACTOR: By: By: 2f: Z�) Ila M4,x a Molly Young,Village of Tequesta Florida Design Contractors, LLC Title: Village Mayor Title: Asst. PM Date: Date: 12/23/2025 Page 215 of 572 Agenda Item #9. Initial, Date Initial, Date Initial, Date WTP Filter (Pressurized Vessel) Plant Upgrades CHANGE ORDER NO. 1 (CONTINUED) Description of Changes Change in Contract Price: Approved CO# Reason for Change Order (Decrease) 1 Additional welding services on vessels 4 & 6 due to unforeseen pitting in the ($157,296.96) shell of the vessels, and credit for scope reduction to remove vessels 1 & 3 from contract. Net Change in Total Contract Price for ($157,296.96) Change Order No. 1 Change in Contract Time: Approved Increase/ CO# Reason for Change Order 1 Time extension of sixty(60) days for additional welding repairs performed on +60 vessels 4&6. Net Change to Total Contract Time,Substantial Completion for 60 Calendar Days Change Order No. 1 Net Change to Total Contract Time,Final Completion for 60 Calendar Days Change Order No. 1 List of Supporting Documents Attachments: 1. Kimley-Horn &Associates letter of recommendation for Contract value decrease and Contract time increase 2. Florida Design Contractors, LLC time and materials request for repairs associated with vessels 4 and 6 3. Florida Design Contractors, LLC credit proposal associated with vessels 1 and 3 Copyright°2018 National Society of Professional Engineers,American Council of Engineering Companies and American Society of Civil Engineers.All rights reserved. Page 2 of 2 Page 216 of 572 Agenda Item #9. Attachment 1 1 K'i ley))) Horn December 19, 2025 Allyson Felsburg Utilities Director The Village of Tequesta 901 N Old Dixie Hwy. Tequesta, Florida 33469 RE: Village of Tegeusta WTP Filter(Pressurized Vessels) Upgrades- Change Order#1 for Weld Repairs, Time Extension and Deductive Credit Dear Ms. Felsburg, Florida Design Contractors, LLC is under contract to construct improvements to the six(6)existing pressure filter vessels at the Water Treatment Plant. On October 9t", 2025) FDC notified Kimley-Horn via email that pitting on the interior shell bottom of vessels 4 and 6 was observed. Shortly after, Kimley-Horn visited the site and observed the extent of pitting corrosion and recommended weld repairs commence to restore the vessels. FDC identified approximately 25 pit holes ranging in depth from 0.05"-0.5".The unforeseen pitting discovered was recommended to be tig welded in order to properly rehabilitate the vessels. FDC's certified welding subcontractor has performed the additional necessary welding to repair the pitting in both vessels. This work was unforeseen as the condition of the inside of the pressure vessels was unknown and could not be determined without performing the work to unload the media and remove the internal components for investigation. This work was necessary to restore the condition of the vessels and additional unforeseen repairs may potentially be required for other vessels to be rehabilitated under this contract. Due to the existing flow from the surficial aquifer and the treatment capacity provided by four (4) filter vessels, it is recommended to deduct filter rehabilitation from Vessels 1 and 3 from the contract and utilize those vessels as ready/reserve. It is understood that this rehabilitation work will provide additional redundancy for the Village, but is not needed to treat the demands. Furthermore,the vessels may continue to be utilized for treatment. This deduction is made in effort to minimize costs associated with treatment infrastructure improvements that may potentially contradict the overall direction of the Water Treatment Master Plan and the goal of eliminating contaminants of emerging concern (CEC) from the Village's water supply to customers. If you should have any questions or require additional information, please contact me by phone at (561) 421-1979 or email at nick.black@kimley-horn.com Thank you, Kimley-Horn and Associates, Inc. 7". 66 W,41 Nick Black, P.E. Kimley-Horn 11920 Wekiva Way, Suite 200, West Palm Beach, FL 33411 Direct: 561-421-1979 kimley-horn.com 1920 Wekiva Way, Suite 200,West Palm Beach, FL 33411 561 8450665 Page 217 of 572 Agenda I lAttachment 2 . :f:il IrL, 1;1it December 18, 2025 Mrs. Allyson Felsburg, MBA, Deputy Utilities Director, The Village of Tequesta, Florida 901 N Old Dixie Hwy Tequesta, Florida 33469 Regarding: The Village of Tequesta WTP Pressure Vessel Plant Upgrades Subject: FDC No.21 T&M Change of Work Order&Time Extension Request Dear Ms. Felsburg: Following the removal of the internal components and the media in pressure vessels 6 &4 we discovered unforeseen pitting in the shell of the vessel. With the vessel walls being%2" thick and the depth of the corrosion that had occurred over time we concluded that additional welding would need to be performed to resolve this issue. Furthermore, we have discussed using the original stainless steel inlet headers also replacing the sample point strainers inside of vessels 6&4. We concluded ordering female threaded couplings were needed to merge the PVC inlet arms and the SST inlet header. Also ordered was the new sample point strainer caps. With the additional welding that was required we have acquired our rates through T&M directive for additional welding services on Pressure Vessels No. 6 &4. Costs are limited to work sequences and personnel. Additional insurance and bond cost are not listed on the daily ticket and are included within the final cost summary for vessels 4& 6. T&M tickets are attached to this document. Hours and rates are included with each T&M ticket accompanied by the Labor and Equipment it is associated with. Totals of Labor, Equipment, Supplemental Field Costs, and Subcontractors pricing are shown on each ticket with fees included. The total sum for the additional welding required as well as additional materials needed (Female threaded fittings & sample point strainer caps) in vessels 4 & 6, outside of our contracts scope, totals: $34,603.04. Included in this total are the additional totals of Labor, Equipment, Field costs, Subcontractors as well as additional Bond and Insurance costs. 1326 South Killian Drive, West Palm Beach, FL 33403 www.FloridaDesignContractor5.cum Phone: 561-845-1233 Fax: 561-848-5992 CGC1528648 Page 218 of 572 Agenda Item #9. al,LGSti n;ily Following the additional work, our project will require an additional excusable extension of time for sixty(60) days. Should you have any questions, feel free to contact me. Regards, Zachary D. Hamman, Assistant Project Manager, Florida Design Contractors. 1326 South Killian Drive, West Palm Beach, FL 33403 rnrww.FloridaDesignContractor5.cum Phone: 561-845-1233 Fax: 561-848-5992 CGC-040304 Page 219 of 572 Agenda Item #9. "9"l PROPOSAL COST SUMMARY DATE: 12/4/2025 FLORIDA DESIGN CONTRACTORS,LLC FKEI: 1326 S.Killian Drive FDC No. 2 °ROA _��c;-�MRACTORS Lake Park,FL 33403 i1CGCM8649 Job No. 25102 PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFP No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: Clarifications: 1.Time is of the essence 2.Proposal includes only direct costs.No indirect,main office or extended overhead costs are included. 3.A time impact analysis has not been performed for this work but can be prepared at the Owner's request. 4.T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel summarized below. T&M Ticket Summary Sheet Date: Direct Labor Materials Equipment Other Costs Subcontractors Total 10/30/2025 753.73 $0.00 $481.07 $6.54 $1,491 $2,732.34 10/31/2025 753.73 $0.00 $481.07 $6.54 $1,344 $2,585.34 11/12/2025 $830.16 $0.00 $495.63 $6.54 $1,677.38 $3,009.71 11/13/2025 $868.38 $0.00 $491.41 $6.54 $1,770.56 $3,136.89 11/14/2025 $715.52 $0.00 $473.79 $6.54 $1,200.00 $2,395.85 11/18/2025 $944.81 $0.00 $517.45 $6.54 $11764.00 $3,232.80 11/20/2025 $753.73 $0.00 $481.07 $6.54 $1,491.00 $2,732.34 11/21/2025 $753.73 $0.00 $481.07 $6.54 $1,491.00 $2,732.34 11/24/2025 $1,132.31 $0.00 $481.07 $6.54 $1,491.00 $3,110.92 11/25/2025 $753.73 $0.00 $481.07 $6.54 $15491.00 $2,732.34 11/26/2025 $753.73 $0.00 $481.07 $6.54 $1,491.00 $2,732.34 12/18/2025 $268.93 $761.06 $0.00 $0.00 $15260.00 $2,289.99 Comments: SUBTOTAL $ 33,423.20 TOTAL $ 33,423.20 Bond Cost 2.00% $ 668.46 Contractor's Insurance 1.50% $ 511.37 GRAND TOTAL $ 341603.04 Page 220 of 572 Agenda Item #9. TIME AND MATERIAL SHEET DATE: 10/30/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 LORIL- w: y,f:O NTRACTORS Lake Park,FL 33403 NCGC162SfM PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Field weld test areas for compatiablity. 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ - h.Superintendent Hr $77.95 $ - b.Skilled Laborer Hr $41.28 $ - i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ - j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ - k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ _ Subtotal $ 655.42 f. Plumber Hr $44.52 $ _ Fee $ 98.31 g.Asst.Superintendent Hr 8.00 $66.46 $ 531.68 Total Labor Costs $ 753.73 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ - Subtotal Materials $ - $ - Fee $ - $ _ Total Material Costs $ - Comments: 3. EQUIPMENT-Summary of Specialty Equipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $ - B.Scaffolding Day 1 $28.16 $ 28.16 $ - C.A/C Unit&Components Day 1 $145.12 $ 145.12 $ - D.Generator Day 1 $ 214.66 $ 214.66 $ - E.Welding Machine and Leads Day $ - Subtotal $ 418.32 F.Pick Up Truck Day $ 133.00 $ - Fee $ 62.75 G.WilScot Combo Office Day 1 $ 30.38 $ 30.38 Total Equip.Costs Fs 481.07 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $ 6.54 $ - $ - $ - $ - Subtotal $ 6.54 $ - Fee $ - Total Other Costsl $ 6.54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(8)w/ per diem $ 1,420.00 b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(8) $ - Subtotal $ 1,420.00 Fee $ 71.00 Total Sub.Costs $ 1,491.00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,732.34 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE Page 221 of 572 Agenda Item #9. TIME AND MATERIAL SHEET DATE: 10/31/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 LORIL- w: y,f:O NTRACTORS Lake Park,FL 33403 NCGC162SfM PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Field weld test areas for compatiablity. 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ - h.Superintendent Hr $77.95 $ - b.Skilled Laborer Hr $41.28 $ - i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ - j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ - k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ _ Subtotal $ 655.42 f. Plumber Hr $44.52 $ _ Fee $ 98.31 g.Asst.Superintendent Hr 8.00 $66.46 $ 531.68 Total Labor Costs $ 753.73 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ - $ - $ _ Subtotal Materials $ - $ _ Fee - $ _ Total Material CostsFT - Comments: 3. EQUIPMENT-Summary of Specialty Equipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $B.Scaffolding Day 1 $28.16 $ 28.16 $C.A/C Unit&Components Day 1 $145.12 $ 145.12 $D.Generator Day 1 $ 214.66 $ 214.66 $ - E.Welding Machine and Leads Day $ - Subtotal $ 418.32 F.Pick Up Truck Day $133.00 $ - Fee $ 62.75 Wiliscot Combo Conex Day 1 $30.38 $ 30.38 Total Equip.Costs $ 481.07 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $ 6.54 $ - $ - $ - $ - Subtotal $ 6.54 $ - Fee $ - Total Other Costsl $ 6.54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(8)w/ per diem b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(8) $ 1,280.00 Subtotal $ 1,280.00 Fee $ 64.00 Total Sub.Costs $ 1,344.00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,585.34 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE Page 222 of 572 Agenda Item #9. TIME AND MATERIAL SHEET DATE: 11/12/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 LORIL- w: y,f:O NTRACTORS Lake Park,FL 33403 NCGC162SfM PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Welders mobilized to site and began the pit welding in the vessels. 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ - h.Superintendent Hr $77.95 $ - b.Skilled Laborer Hr $41.28 $ - i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ - j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ - k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ _ Subtotal $ 721.88 f. Plumber Hr $44.52 $ _ Fee $ 108.28 g.Asst.Superintendent Hr 9.00 $66.46 $ 598.14 Total Labor Costs $ 830.16 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ - $ - $ _ Subtotal Materials $ - $ _ Fee - $ _ Total Material CostsFT - Comments: 3. EQUIPMENT-Summary of Specialty Equipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $B.Scaffolding Day 1 $28.16 $ 28.16 $C.A/C Unit&Components Day 1 $145.12 $ 145.12 $D.Generator Day 1 $ 227.32 $ 227.32 $ - E.Welding Machine and Leads Day $ - Subtotal $ 430.98 F.Pick Up Truck Day $133.00 $ - Fee $ 64.65 Day 1 $30.38 $ 30.38 Total Equip.Costs $ 495.63 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $6.54 $ - T- $ $ - Subtotal $ 6.54 $ - Fee $ - Total Other Costsl $ 6.54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(9)w/ per diem $ 1,597.50 b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(0) Subtotal $ 1,597.50 Fee $ 79.88 Total Sub.Costs $ 1,677.38 TOTAL COST WORK DESCRIBED THIS TICKETI $ 3,009.70 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE Page 223 of 572 Agenda Item #9. TIME AND MATERIAL SHEET DATE: 11/13/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 LORIL- w: y,f:O NTRACTORS Lake Park,FL 33403 NCGC162SfM PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Day 2 of welding the pitting inside of each vessel. 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ - h.Superintendent Hr $77.95 $ - b.Skilled Laborer Hr $41.28 $ - i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ - j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ - k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ _ Subtotal $ 755.11 f. Plumber Hr $44.52 $ _ Fee $ 113.27 g.Asst.Superintendent Hr 9.50 $66.46 $ 631.37 Total Labor Costs $ 868.38 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ - $ - $ _ Subtotal Materials $ - $ _ Fee - $ _ Total Material CostsFT - Comments: 3. EQUIPMENT-Summary of Specialty Equipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $B.Scaffolding Day 1 $28.16 $ 28.16 $C.A/C Unit&Components Day 1 $145.12 $ 145.12 $D.Generator Day 1 $ 223.65 $ 223.65 $ - E.Welding Machine and Leads Day $ - Subtotal $ 427.31 F.Pick Up Truck Day $133.00 $ - Fee $ 64.10 Day 1 $30.38 $ 30.38 Total Equip.Costs $ 491.41 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $6.54 $ - T- $ $ - Subtotal $ 6.54 $ - Fee $ - Total Other Costsl $ 6.54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(9.5)w/ per diem $ 1,686.25 b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(0) Subtotal $ 1,686.25 Fee $ 84.31 Total Sub.Costs $ 1,770.56 TOTAL COST WORK DESCRIBED THIS TICKETI $ 3,136.89 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE Page 224 of 572 Agenda Item #9. TIME AND MATERIAL SHEET DATE: 11/14/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 LORIL- w: y,f:O NTRACTORS Lake Park,FL 33403 NCGC162SfM PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. No work on site the day of 11/3/25 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ - h.Superintendent Hr $77.95 $ - b.Skilled Laborer Hr $41.28 $ - i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ - j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ - k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ - Subtotal $ 622.19 f. Plumber Hr $44.52 $ _ Fee $ 93.33 g.Asst.Superintendent Hr 7.50 $66.46 $ 498.45 Total Labor Costs $ 715.52 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ - $ - $ _ Subtotal Materials $ - $ _ Fee - $ _ Total Material CostsFT - Comments: 3. EQUIPMENT-Summary of Specialty Equipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $B.Scaffolding Day 1 $28.16 $ 28.16 $C.A/C Unit&Components Day 1 $145.12 $ 145.12 $D.Generator Day 1 $ 208.33 $ 208.33 $ - E.Welding Machine and Leads Day $ - Subtotal $ 411.99 F.Pick Up Truck Day $133.00 $ - Fee $ 61.80 G.Combo Connex Day 1 $30.38 $ 30.38 Total Equip.Costs $ 473.79 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $6.54 $ - T- $ $ - Subtotal $ 6.54 $ - Fee $ - Total Other Costsl $ 6.54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(0)w/ per diem $ - b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(7.5) $ 1,200.00 Subtotal $ 1,200.00 Fee $ 60.00 Total Sub.Costs $ 1,260.00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,455.85 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE Page 225 of 572 Agenda Item #9. TIME AND MATERIAL SHEET DATE: 11/18/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 LORIL- w: y,f:O NTRACTORS Lake Park,FL 33403 NCGC162SfM PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Day 4 of the pitting welds in vessels 4 and 6 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ - h.Superintendent Hr $77.95 $ - b.Skilled Laborer Hr $41.28 $ - i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ - j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ - k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ _ Subtotal $ 821.57 f. Plumber Hr $44.52 $ _ Fee $ 123.24 g.Asst.Superintendent Hr 10.50 $66.46 $ 697.83 Total Labor Costs $ 944.81 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ - $ - $ _ Subtotal Materials $ - $ _ Fee - $ _ Total Material CostsFT - Comments: 3. EQUIPMENT-Summary of Specialty Equipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $B.Scaffolding Day 1 $28.16 $ 28.16 $C.A/C Unit&Components Day 1 $145.12 $ 145.12 $D.Generator Day 1 $ 246.30 $ 246.30 $ - E.Welding Machine and Leads Day $ - Subtotal $ 449.96 F.Pick Up Truck Day $133.00 $ - Fee $ 67.49 G.Combo Connex Day 1 $30.38 $ 30.38 Total Equip.Costs $ 517.45 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $6.54 $ - T- $ $ - Subtotal $ 6.54 $ - Fee $ - Total Other Costsl $ 6.54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(0)w/ per diem $ - b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(10.5) $ 1,680.00 Subtotal $ 1,680.00 Fee $ 84.00 Total Sub.Costs $ 1,764.00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 3,232.80 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE Page 226 of 572 Agenda Item #9. TIME AND MATERIAL SHEET DATE: 11/20/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 LORIL- w: y,f:O NTRACTORS Lake Park,FL 33403 NCGC162SfM PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Day 5 of pitting welds in vessels 4 and 6 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ - h.Superintendent Hr $77.95 $ - b.Skilled Laborer Hr $41.28 $ - i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ - j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ - k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ _ Subtotal $ 655.42 f. Plumber Hr $44.52 $ _ Fee $ 98.31 g.Asst.Superintendent Hr 8.00 $66.46 $ 531.68 Total Labor Costs $ 753.73 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ - $ - $ _ Subtotal Materials $ - $ _ Fee - $ _ Total Material CostsFT - Comments: 3. EQUIPMENT-Summary of Specialty Equipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $B.Scaffolding Day 1 $28.16 $ 28.16 $C.A/C Unit&Components Day 1 $145.12 $ 145.12 $D.Generator Day 1 $ 214.66 $ 214.66 $ - E.Welding Machine and Leads Day $ - Subtotal $ 418.32 F.Pick Up Truck Day $133.00 $ - Fee $ 62.75 G.Combo Connex Day 1 $30.38 $ 30.38 Total Equip.Costs $ 481.07 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $6.54 $ - T- $ $ - Subtotal $ 6.54 $ - Fee $ - Total Other Costsl $ 6.54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(8)w/ per diem $ 1,420.00 b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(0) Subtotal $ 1,420.00 Fee $ 71.00 Total Sub.Costs $ 1,491.00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,732.34 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE Page 227 of 572 Agenda Item #9. TIME AND MATERIAL SHEET DATE: 11/21/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 LORIL- w: y,f:O NTRACTORS Lake Park,FL 33403 NCGC162SfM PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Day 6 of pitting welds in vessels 4 and 6 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ - h.Superintendent Hr $77.95 $ - b.Skilled Laborer Hr $41.28 $ - i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ - j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ - k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ _ Subtotal $ 655.42 f. Plumber Hr $44.52 $ _ Fee $ 98.31 g.Asst.Superintendent Hr 8.00 $66.46 $ 531.68 Total Labor Costs $ 753.73 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ - $ - $ _ Subtotal Materials $ - $ _ Fee - $ _ Total Material CostsFT - Comments: 3. EQUIPMENT-Summary of Specialty Equipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $B.Scaffolding Day 1 $28.16 $ 28.16 $C.A/C Unit&Components Day 1 $145.12 $ 145.12 $D.Generator Day 1 $ 214.66 $ 214.66 $ - E.Welding Machine and Leads Day $ - Subtotal $ 418.32 F.Pick Up Truck Day $133.00 $ - Fee $ 62.75 G.Combo Connex Day 1 $30.38 $ 30.38 Total Equip.Costs $ 481.07 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $6.54 $ - T- $ $ - Subtotal $ 6.54 $ - Fee $ - Total Other Costsl $ 6.54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(8)w/ per diem $ 1,420.00 b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(0) Subtotal $ 1,420.00 Fee $ 71.00 Total Sub.Costs $ 1,491.00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,732.34 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE Page 228 of 572 Agenda Item #9. TIME AND MATERIAL SHEET DATE: 11/24/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 LORIL- w: y,f:O NTRACTORS Lake Park,FL 33403 NCGC162SfM PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Day 7 of welds in vessels 4 and 6.Additional labor cost for another laborer staffed. 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr 8.00 $41.15 $ 329.20 h.Superintendent Hr $77.95 $ - b.Skilled Laborer Hr $41.28 $ - i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ - j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ - k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ _ Subtotal $ 984.62 f. Plumber Hr $44.52 $ _ Fee $ 147.69 g.Asst.Superintendent Hr 8.00 $66.46 $ 531.68 Total Labor Costs $ 1,132.31 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ - $ - $ _ Subtotal Materials $ - $ _ Fee - $ _ Total Material CostsFT - Comments: 3. EQUIPMENT-Summary of Specialty Equipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $B.Scaffolding Day 1 $28.16 $ 28.16 $C.A/C Unit&Components Day 1 $145.12 $ 145.12 $D.Generator Day 1 $ 214.66 $ 214.66 $ - E.Welding Machine and Leads Day $ - Subtotal $ 418.32 F.Pick Up Truck Day $133.00 $ - Fee $ 62.75 G.Combo Connex Day 1 $30.38 $ 30.38 Total Equip.Costs $ 481.07 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $6.54 $ - T- $ $ - Subtotal $ 6.54 $ - Fee $ - Total Other Costsl $ 6.54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(8)w/ per diem $ 1,420.00 b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(0) Subtotal $ 1,420.00 Fee $ 71.00 Total Sub.Costs $ 1,491.00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 3,110.92 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE Page 229 of 572 Agenda Item #9. TIME AND MATERIAL SHEET DATE: 11/25/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 LORIL- w: y,f:O NTRACTORS Lake Park,FL 33403 NCGC162SfM PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Day 8 of welds in vessels 4 and 6 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ - h.Superintendent Hr $77.95 $ - b.Skilled Laborer Hr $41.28 $ - i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ - j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ - k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ _ Subtotal $ 655.42 f. Plumber Hr $44.52 $ _ Fee $ 98.31 g.Asst.Superintendent Hr 8.00 $66.46 $ 531.68 Total Labor Costs $ 753.73 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ - $ - $ _ Subtotal Materials $ - $ _ Fee - $ _ Total Material CostsFT - Comments: 3. EQUIPMENT-Summary of Specialty Equipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $B.Scaffolding Day 1 $28.16 $ 28.16 $C.A/C Unit&Components Day 1 $145.12 $ 145.12 $D.Generator Day 1 $ 214.66 $ 214.66 $ - E.Welding Machine and Leads Day $ - Subtotal $ 418.32 F.Pick Up Truck Day $133.00 $ - Fee $ 62.75 G.Combo Connex Day 1 $30.38 $ 30.38 Total Equip.Costs $ 481.07 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $6.54 $ - T- $ $ - Subtotal $ 6.54 $ - Fee $ - Total Other Costsl $ 6.54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(8)w/ per diem $ 1,420.00 b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(0) Subtotal $ 1,420.00 Fee $ 71.00 Total Sub.Costs $ 1,491.00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,732.34 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE Page 230 of 572 Agenda Item #9. TIME AND MATERIAL SHEET DATE: 11/26/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 LORIL- w: y,f:O NTRACTORS Lake Park,FL 33403 NCGC162SfM PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Day 9 of welds in vessels 4 and 6 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ - h.Superintendent Hr $77.95 $ - b.Skilled Laborer Hr $41.28 $ - i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ - j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ - k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ _ Subtotal $ 655.42 f. Plumber Hr $44.52 $ _ Fee $ 98.31 g.Asst.Superintendent Hr 8.00 $66.46 $ 531.68 Total Labor Costs $ 753.73 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ - $ - $ _ Subtotal Materials $ - $ _ Fee - $ _ Total Material CostsFT - Comments: 3. EQUIPMENT-Summary of Specialty Equipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $B.Scaffolding Day 1 $28.16 $ 28.16 $C.A/C Unit&Components Day 1 $145.12 $ 145.12 $D.Generator Day 1 $ 214.66 $ 214.66 $ - E.Welding Machine and Leads Day $ - Subtotal $ 418.32 F.Pick Up Truck Day $133.00 $ - Fee $ 62.75 G.Combo Connex Day 1 $30.38 $ 30.38 Total Equip.Costs $ 481.07 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $6.54 $ - T- $ $ - Subtotal $ 6.54 $ - Fee $ - Total Other Costsl $ 6.54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(8)w/ per diem $ 1,420.00 b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(0) Subtotal $ 1,420.00 Fee $ 71.00 Total Sub.Costs $ 1,491.00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,732.34 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE Page 231 of 572 Agenda Item #9. TIME AND MATERIAL SHEET DATE: 12/18/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 LORIL- w: y,f:O NTRACTORS Lake Park,FL 33403 NCGC162SfM PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on inlet header corrosion prior to sandblast.Included is the female threaded coupling order charge as well as the sample strainers order charge.An additional 3 hours is added to the superintendent to make the connections between the SST inlet headed and the PVC inlet arms. 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ - h.Superintendent Hr 3.00 $77.95 $ 233.85 b.Skilled Laborer Hr $41.28 $ - i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ - j.Asst Project Manager Hr $61.87 $ - d.Pipefitter Hr $55.89 $ - k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ - Subtotal $ 233.85 f. Plumber Hr $44.52 $ _ Fee $ 35.08 g.Asst.Superintendent Hr $66.46 $ - Total Labor Costs $ 268.93 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) Harrington-Female thread adapter(6)&Glue and Primer $ 520.51 $ - Hungerford&Terry Inc.1/2"Strainer Caps $ 141.28 Subtotal Materials $ 661.79 $ _ Fee 99.27 $ _ Total Material Costs Comments: 3. EQUIPMENT-Summary of Specialty Equipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $B.Scaffolding Day $28.16 $ - $C.A/C Unit&Components Day $145.12 $ - $D.Generator Day $ 159.10 $ - $E.Welding Machine and Leads Day $ - Subtotal $F.Pick Up Truck Day $133.00 $ - Fee $G.Combo Connex Day $30.38 $ _ Total Equip.Costs $ - 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day $6.54 $T- $ - $ - Subtotal $ - $ - Fee $ - Total Other Costs 5. SUBCONTRACTORS List of Subcontractors and Description Collective Mind Mobile Welding-Repair of inlet header corrosion cracks prior to sandblasting of the header. $ 1,200.00 Subtotal $ 1,200.00 Fee $ 60.00 Total Sub.Costs $ 1,260.00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,289.99 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE Page 232 of 572 Agenda Item #9. Page 1 of 1 INVOICE INVOICE NUMBER: RS06600-IN "UNGERFORD & TERRY, INC. INVOICE DATE.. 12/10/2025 Manufacturers of Water Treatment Equipment SALESPERSON: 1814 MTS ENVIRONMENTAL 226 N ATLANTIC AVE ORDER NUMBER: 12190P P.O. BOX 650—CLAYTON NEW JERSEY 08312-0650 ORDER DATE: 12/05/2025 Phone: 856-881-3200 Fax: 856-881-6859 PROCESSED BY: EH CUSTOMER NO: 0003217 SOLD TO: SHIP TO: FLORIDA DESIGN CONTRACTORS FLORIDA DESIGN CONTRACTORS ATTN.:ACCOUNTS PAYABLE TELEPHONE: 561-845-1233 1326 KILLIAN DR 1326 SOUTH KILLIAN DRIVE WEST PALM BEACH, FL 33403 WEST PALM BEACH, FL 33403 FAX: 561-845-1233 CONFIRM TO: Zachary Hammann<ZHammanna{)Floridadesign( CUSTOMER P.O. SHIP VIA F.O.B. TERMS SHIP DATE 25102-002 DESTINATION NET 30 DAYS 12/09/2025 ITEM NO. UNIT ORDERED SHIPPED BACK ORDERED PRICE AMOUNT INVOICE EMAILED TO:JRandolph@floridadesigncontractors.com INVOICE FOR: K-1 EACH 8.00 8.00 0.00 17.660 141.28 Whse:000 1/2 IN. PLASTIC ORTHO STRAINER Part#is K1.0.2.1/2"N PT.PP **INTERCHANGEABLE PART S-12 SEE MEMO BILL PROBASCO 5/4/09 UPS TRACKING No. 1Z 069 780 03 9022 2684 SUPPORTING DOCUMENTS ENCLOSED 2% INTEREST CHARGED ON PAST DUE ACCOUNTS (24% PER ANNUM) Net Invoice: $141.28 Less Discount: $0.00 Freiqht: $0.00 Sales Tax: $9.89 PAYABLE IN US FUNDS Invoice Total: $151.17 Page 233 of 572 TELE HONE N 856 881-3200 FAX No.: 856 881-6859 Agenda Item �9. PACKING LIST HUNGERFORD & TERRY, INC. 226 N ATLANTIC AVENUE CLAYTON N] 08312 P.O. No. 25102-002 DATE 12/09/2025 OUR P.O. No. 12190P PAGE 1 OF 1 SHIP TO: FLORIDA DESIGN CONTRACTORS MARKS: ZACHARY HAMMAN 1326 S KILLIAN DR (P) 561-275-2282 WEST PALM BEACH, FL 33403 VIA: PKG. NO. OF QUANTITY AND DESCRIPTION WEIGHT PKGS. HT-RP-1 1 BOX ORTHO STRAINER 2 LBS . 12 IN. L x 7 IN. W x 4 IN. H 8 1/2 IN. PLASTIC ORTHO SAMPLE STRAINER P/N: K1. 0 .2 . 1/2" NPT.PP UPS TRACKING : 1Z 069 780 03 9022 2684 Page 234 of 572 12/12/25 06: 12 AM PST Harrington Ind PZast Page 1 of 2 #291576 Agenda Item #9. Harrington Industrial Plastics LLC Harrington Industrial Plastics 5251 Powerline Road Fort Lauderdale FL 33309 Phone: 954-351-0088 Fax: 954-351-0300 Attention: ZACHARY Company: FLORIDA DESIGN CONTRACTORS To: KABERCROMBIE@HIPCO.COM From: Kevin A. Abercrombie Subject: QUOTE 04458312 Memo: Page 235 of 572 12112125 0 : 12 AM PST Harrington Ind Plast Page 2 of 2 #29157 C i4qLQaL,,Zndustrial Plastics Quotation## 04458312 Aggoy I-ne Road Written: K A Fort Lauderdale FL 33309 Quote Date 12 0 2 954-351-0088 Expire Date 12172 94- 1-000 Fax Page 1 OF 1 Quotation 075456 Ship T FLORIDA DESIGN CONTRACTORS Florida Design Contractors Village of Te due to WTP 1326 SOUTH KILLIAN DRIVE 901 North Old Dixie Hwy LAKE PARK, FL 33403 T e clue t a, FL 33469 Job: 1F # Contact : ZA H Ship via: BEST WAY POSSIBLE Pi ne## : 561-660-0015 FOB Deliverer Al : SHIPPING POINT Fax: 1- 4 - 992 Frt-Terms : P1EPAID & CHARGE Product/Description Quantity Price U ICI Extension ------------------------------------------------------------------------------- -0 0 47 . 32 EA 283 . 92 ff ADAPTER SXFPT GRY PVC SCH80 724 G 1 49 . 89 EA 49 . 89 SOLVENT CEMENT CPVC QT GRY LOW vC HEAVY BODIED DIED SET MC/AC P70C 1 35 . 50 EA 35 . 50 PRINTER QT CLR FOR PVC CPVC LOW vGC MC/AC 14108 3 12 . 38 EA 37 . 14 SUPER SWAB HANDLE W REPLACABLE SWAB 411 D I A 099 ACCESSORIES IIIC 1 80 . 00 EA 80 . 00 ESTIMATED SHIPPING Harrington' s standard Terms and conditions apply. Please visit https -: //www.hipco.com/terms-and-conditions-sale for the full Terms and Conditions Due to recent volatility in U.S . government tariff regulations --whether enacted or under review--all quotes remain provisional and are subject to price adjustments r surcharges . Pricing provided is valid for 24 hours from the time of the quotation and may be adjusted up until receipt of a confirmed Purchase Order and approval to proceed with production. Merchandise Tax Est .Freight Handling Net Quote Total 486 .45 4 . 0 0 . 00 520 . 51 ------------------------------------------------------------------------------- Thanks For Thinking Harrington. Respectfully Kevin A. Abercrombie All Quotations are subject to review upon placement of order. Freight/Handling and applicable taxes if not listed above will be added. Harrington standard terms and conditions apply to this quote . Page 236 of 572 Agenda Item #9. INVOICE CM Mobile Welding Brett@collectivemindwelding.com 6306 Glen Abbey Ln +1 (941)313-0073 Bradenton, FL 34202 Bill to Ship to Florida Design Contractors, LLC MHN Industrial Group,LLC MHN Industrial Group, LLC 1326 South Killian Drive 1326 South Killian Drive Lake Park, FL 33403 USA Lake Park,FL 33403,USA Invoice details Invoice no.:1052 Terms:Net 10 Invoice date: 12/17/2025 Due date: 12/27/2025 # Date Product or service Description Qty Rate Amount 1. Welding Repair of three way water splitter for 2 $600.00 $1,200.00 teq uesta Total $1,200.00 Ways to pay VISA 40 615CWERffAZM BANK #Jlvypoq 11MnW Checks can be made out to CM Mobile Welding Note to customer Thank you for your business. View • •. Page 237 of 572 enda1 • Tequesta WTP Filter —EST.1979 Upgrades RIDA DESIGN Cc 90 • • • Dixie Highway Tequesta, FL 33469 Date •b# 25102 pilpj. 11 1E k LA � 1 11 111 Itr jl.r Ir 1! C I � X 7 I i IIL K I� �l � IIIIII -i -+ �t� .� ice.,* p� uu—a s■�. +#rr+u■Fsr6 7. r .i T! 4' ■ � r Weather 6:00 AM 12:00 PM 4:00 PM 1 O O� � O 68 72 1♦ 75 Partially cloudy Clear Partially cloudy Wind:14 MPH Precipitation:.0'' Humidity:87% Wind:13 MPH I Precipitation:.0'' 1 Humidity:52% Wind:17 MPH I Precipitation:.0" Humidity:51% ff 6= Work Logs Name Description Quantity Total Total Hours Hours To Date nO FDC Removing seized bolts and studs 1 8 12 Cleaning threads of flanges Zachary Hammann 1 12/4/25,1:24 PM Co Welder Welding pitting 2 32 32 Zachary Hammann 1 12/4/25,1.24 PM Total 3 40 48 Time Cards No entry Agenda Item #9. Work Log Photos FDC: I QTY-. 1 1 H RS: 8.01 HTD: 12.0 I 101:23PM 10/30/25101-I�PM Welder: I QTY-.21 H RS: 16.01 HTD:32.0 } 1 1 1 Div 1� r , 1� /�! L1� c' 1 a ,1 5�c''� ��S01G215 �0,2:2)iN)1. r EGA , J L 6L Materials No entry Equipment No entry General 1. Starting welding in tank#4 Total of 61 holes She-,vv., ,0z.,�,,,,,-1 1 0/30/25 1 01-.50PM Agenda Item #9. Site Safety Observations L Quality Control Observations No entry Questions N/A No Yes Description 1 Were there any schedulled or performed -1 F-1 F-1 inspections or tests today? ( Pass/ Fail ) F*/ 2. How were the site conditions today? ❑./ F-1 F-1 3. Any accidents on site today? F*-/] F-1 F-1 4. Any schedule delays occur? ❑./ F-1 F-1 5. Any weather delays occur? -1 F-1 F*/1 6. Any visitors on site? P/1 7 F] 7. Any areas that can't be worked on? P/1 7 F] 8. Any equipment rented on site? ❑./ V.- enda1 • Tequesta WTP Filter -EST.1979 Upgrades RIDA DESIGN Cc 90 • • • Dixie Highway Tequesta, FIL 33469 Date •b# 25102 L! k m"RL•P-q i I -mom% Weather -1 6:00 AM 12:00 PM 4:00 PM 5 1 � 9 O4Av 6 8 O� O 10,1♦ 73 1♦ Clear Clear Clear Wind:6 MPH I Precipitation:.0" I Humidity:84% Wind:10 MPH I Precipitation:.0" I Humidity:56% Wind:12 MPH I Precipitation:.0" I Humidity:49% "IF lila� JEM& Work Logs Name Description Quantity Total Total Hours Hours To Date FDC Removing seized bolts and studs 1 8 20 Cleaning threads of flanges Zachary Hammann 1 12/4/25,1:29 PM Co Welder Welding pitting 2 16 48 Zachary Hammann 1 12/4/25,1.29 PM Total 3 24 72 Time Cards No entry Agenda - Work Log Photos Welder: • y _ } I 10/`31/25 10:06AM 10/31/25 10:06AM 1 C 1 1,21110:06AM Jv 10/31/25�02:27PM Attachments* 1 1 Materials No entry Equipment No entry General Notes pitted places Sherwin Josh• .. 0• Site Safety Observations No entry Quality Control Observations No entry Survey • Description Aggada ft"aalpschedulled or performed F*-/] F-I F-I inspections or tests today? ( Pass/ Fail ) 2. How were the site conditions today? ❑�/ F-I F-I 3. Any accidents on site today? ❑./ F-I F-I 4. Any schedule delays occur? F*/-] F-I F-I 5. Any weather delays occur? F*/ F-I F-I 6. Any visitors on site? ❑•/ F-I F-I 7. Any areas that can't be worked on? F*/-] F-I F-I 8. Any equipment rented on site? ❑•/ F-I F-I , t I enda Tequesta WTP Filter W6V -EST.1979 Upgrades RIDA DESIGN Cc 90 • • Dixie Highwaye• . FL 33469 Date e• I 1/12/2025 Job# 25102 km�% Weather llr� A& 6:00 AM 12:00 PM 4:00 PM 5004,1-, 710 720 - Clear Partially cloudy Partially cloudy Wind:7 MPH I Precipitation:.0" 1 Humidity:87% Wind:11 MPH I Precipitation:.0" 1 Humidity:57% Wind:8 MPH I Precipitation:.0" Humidity:51% &0616m =MEL Work Logs Name Description Quantity Total Total Hours Hours To Date FDC Supervise and assist subcontractors 1 9 29 Sherwin Josh Osborne 1 11/14/25,6:53 AM no Stalin George Welding pitting in bottom of vessel #6 2 18 18 Welding Sherwin Josh Osborne 1 11/14/25,6.53 AM Total 3 27 L Time Cards o - • • • Photos Stalin George Welding: I QTY-. 21 HRS-. 9.01 HTD: 18.0 r - f - r 1/12/25��• 9PM /25� 12:39�`M 11/12/25� 12:39PM 11/12/25� 12:39PM r 4 r - 2: /25� 12:39PM 12:40P - ; Materials No entry Equipment No entry General Notes No entry Site Safety Observations No entry Quality Control Observations No entry Survey • Description A9pjW&eff6M #9ests today? ( Pass / Fail ) F*/-] El El 2. How were the site conditions today? F/-1 F-I F-I 3. Any accidents on site today? 0 F-I F-I 4. Any schedule delays occur? F*/-] F-I F-I 5. Any weather delays occur? F*/-] F-I F-I 6. Any visitors on site? Q F-I F-I 7. Any areas that can't be worked on? F*/-] F-I F-I 8. Any equipment rented on site? Fv F-I F-I enda1 • Tequesta WTP Filter -EST.1979 Upgrades RIDA DESIGN Cc 90 • • • Dixie Highway Tequesta, FL 33469 1 , • • # 25102 n ell s■� I 1• - (I [IF MAI LC bFF�_ r RWWr r n=snmmnI - 4 iF I oiiapidA I [ MENNEN III aL r M i .-.'. LN ■i +IA i 4 + f i• + i i uo=a}ii*Nanu� ■ou ouLF64 nr4c m*F p 11W In ii 7 4 ��..r.5w,�-Zt t -- ��r yu4 ^T ��h-'l`� �+�-1�,�� ��1�/� �� ���1� � 1? r��,��n �����/l 1,1' Z�; ��� �ISIS Weather 6:00 AM 12:00 PM 4:00 PM 58 1 � O 74O� O 10 1♦ 74 Clear Clear Clear Wind:8 MPH Precipitation:.0" 1 Humidity:67% Wind:9 MPH Precipitation:.0" Humidity:36% Wind:8 MPH Precipitation:.0" Humidity:42% ff li,06� AM L 6= Work Logs Name Description Quantity Total Total Hours Hours To Date FDC Supervise and assist subcontractors 1 9.5 38.5 Sherwin Josh Osborne 1 11/14/25,6:53 AM OO Stalin George Welding pitting in bottom of vessel #6+4 2 19 37 Welding Grinding welds back flush Sherwin Josh Osborne 1 11/14/25,6.53 AM Total 3 28.5 127.5 Time Cards A PF-Wr No entry • - • . - Work Log Photos Alk 30 ;- 11/13/25 1 09:30AM / AM 11/13/25 1 09:30,�RV1 11;n6gi-I n9.30AM �+ w y i FA ' ' . `,• or +�r 11/13/25 1 09:30AM /25 10:04AM 11/13/25 1 01:07PM 5 1 01:11 PM Materials No entry Equipment No entry General Notes No entry Site Safety Observations No entry Quality Control Observations No entry Survey 0 Agenda Item #9. 3. Any accidents on site today? ❑V F-1 F-1 4. Any schedule delays occur? F*—/] F-1 F-1 5. Any weather delays occur? F*/1 ❑ F-1 6. Any visitors on site? F*—/] F-1 F-1 7. Any areas that can't be worked on? FV F-1 F-1 8. Any equipment rented on site? F*/1 ❑ F-1 Attachments iff _ I� �i �� -,G4N�IME w*n Ewmy f hmn Ir T —fill , � enda1 • Tequesta WTP Filter —EST.1979 Upgrades RIDA DESIGN Cc 901 North • • Dixie Highway Tequesta, 69 D.te Fri 11/14/2025 Job# 25102 I I ' - •tr sii Iw _ :� i ¢aa an�oa Il��nl�ll5� ■Fnaq&iiYt ± r a ■ r ; r r I r +N ��j �r� C� �����i �I � � I�t� •�tlI�K _=.,����n � �TFTY Yhw.�l _was �r•R`�i ' _. 771 f I �, . I Ifs Yi/.�� q �� f'r'�I �r��w �a_, _ r'+++� ��i+�I 1 �' ''JAI ��I �I.�� �•�- 1�r"L ��1�� 1 0 :3,1U)l — � h,� 1���1�11 11/1��1�� 07:2���iN)I 11P ���I..M ■iL — �^ Nor Ll- Weather Ad 6:00 AM 12:00 PM 4:00 PM 5 O 77O� O 9 �1♦ 76 Clear Clear Partially cloudy Wind:7 MPH Precipitation:.0'' 1 Humidity:80% Wind:8 MPH Precipitation:.0" Humidity:49% Wind:10 MPH I Precipitation:.0" Humidity:56% ff li,06� AM L 6M Work Logs Name Description Quantity Total Total Hours Hours To Date nO FDC Supervise and assist subcontractors 1 8 46.5 Removed frozen bolt from bottom of tank#6 Sherwin Josh Osborne 111/17/25,2:30 PM Co Stalin George Welding pitting in bottom of vessel #6+4 2 15 52 Welding Grinding welds back flush Sherwin Josh Osborne 1 11/17/25,2:29 PM Total 3 23 150.5 Time Cards No entry Agenda Item #9. Wam ork Log Photos • - - . NJ �W k :52AM 11/14/25 08:23AM 11/14/25 08:23AM 1 •�f` y I •�r � T- T i Materials No entry Equipment No entry General Notes No entry Site Safety Observations No entry Agenda Item #9. Quality C• • Observations No entry =96M a Questions N/A No Yes Description 1 Were there any schedulled or performed -1 F-1 F-1 inspections or tests today? ( Pass / Fail ) FV 2. How were the site conditions today? ❑•/ F-1 F-1 3. Any accidents on site today? ❑�/ F-1 F-1 4. Any schedule delays occur? ❑�/ F-1 F-1 5. Any weather delays occur? ❑�/ F-1 F-1 6. Any visitors on site? ❑�/ F-1 F-1 7. Any areas that can't be worked on? F*/ r � I 8. Any equipment rented on site? enda _ • _ WTP Filter• Upgrades -EST.1979 RIDA DESIGN Cc 90 • • • Dixie Highway Tequesta, FL 33469 Date - I 1/18/2025 Job • Lbs 0 Jill r i 5 1 I I lily -1 i11l Ul. o u� •}14 Tr 75 I FE . E 1 - I� �� � � �'� � I I � I�•. �F� rir.:riinqoayuom�umo■all aGnnwMiFi i +1 41111 � r 07 07V7 ,,r Ii,$ N1�171 N] � I I� 2 . IN i It Weather ------ 6:00 AM 12:00 PM 4:00 PM 6200 0 - O 80 Clear Partially cloudy Partially cloudy Wind:1 MPH Precipitation:.0" 1 Humidity:99% Wind:6 MPH I Precipitation:.0" 1 Humidity:58% Wind:8 MPH I Precipitation:.0" Humidity:59% "IF 2=11L Am L Work Logs Name Description Quantity Total Total Hours Hours To Date FDC Supervise and assist subcontractors 1 10.5 57 Removed frozen bolt from bottom of tank#6 Sherwin Josh Osborne 111/20/25,8:59 AM Co Stalin George Welding pitting in bottom of vessel #6+4 2 21 73 Welding Grinding welds back flush Sherwin Josh Osborne 1 11/20/25,8:59 AM Total 3 31.5 182 L Time Cards No entry Agenda Item #9. Work Log Photos Stalin George Welding: I QTY: 21 HRS: 10.51 HTD: 73.0 rl l�.L L IJ d i r IJ,r-.EWEEFRWF Materials No entry Equipment No entry General Site Safety Observations No entry Quality Control No entry An Questions N/A No Yes Description Were there any schedulled or performed F*/I F-1 F-1 inspections or tests today? ( Pass/ Fail ) 2. How were the site conditions today? ❑*/ F-1 F-1 3. Any accidents on site today? F*/—] F-1 F-1 4. Any schedule delays occur? ❑*/ F-1 F-1 5. Any weather delays occur? F*/—] F-1 F-1 Agenda Item #9. 6. Any visitors on site? F*/1 F F-1 7. Any areas that can't be worked on? F*/1 ❑ F-1 8. Any equipment rented on site? F*—/] F-1 F-1 ,Pr� F- Attachments M''- duals J&_.-- _,. cam-iis�M�� i✓� F�� 1 4 M L1J.'.. JIr •L:,.a, _ _ 1 •rw - rhr ..� _ I '� y ML Maiau.r j. a yy `` b1.i ffir ME -�wwwrf w w � ME Nip W rrawr�w7l7L �VIf ice•_ �i_ 11 I J I I MENEMWMww�.J77 EV ire wrult 11 r i a i�� •I r'F I -t orr■ ii� ._ ti Y -w ".l� ri _ w - 'll wi i q �� +�+`J L� WE Y�����a�.�iirr� �FIF"rr7}f li iT."= it �.rr• T -- _...�r�+r enda1 • Tequesta WTP Filter —EST.1979 Upgrades RIDA DESIGN Cc 90 • • • Dixie Highway Tequesta, FL 33469 Date •b# 25102 P CONFINED LPACF tNThT pEAMIT t ,. k Jul Jifil, —— ■rvr��rfYdf IYnvlllallu 1:rmud o:lm 11 --- 51 _ —�,••,—�IT c I r`li n h ��� r ��� � � I�' -ram:•,���� n.brl ..� ::. _ .•. I r p I r I I r I b 1 j 1.1 T 1 rrr, I Rr r ;7 ' r r �=s:.i• ��. !v�J-���� Weather 6:00 AM 12:00 PM 4:00 PM 6404Av 81 0 'W 79 1� Clear Partially cloudy Clear Wind:5 MPH Precipitation:.0'' 1 Humidity:98% Wind:5 MPH I Precipitation:.0" 1 Humidity:57% Wind:8 MPH Precipitation:.0" Humidity:61% ff li,06� AM L 6= Work Logs Name Description Quantity Total Total Hours Hours To Date nO FDC Supervise and assist subcontractors 1 8 65 Removed frozen bolt from bottom of tank#6 Sherwin Josh Osborne 111/21/25,7:10 AM Co Stalin George Welding deteriorated parts of ring in vessel #6 2 16 89 Welding Sherwin Josh Osborne 1 11/21/25,7.10 AM Total 3 24 206 No entry Agenda - Work Log Photos 1 • 1 1 r . l _ a 11/ 0/25 11/20/25 11/20/25� 03: Materials No entry Equipment No entry General Notes No entry Site Safety Observations No entry Quality Control Observations No entry Agenda Item #9. Questions N/A No Yes Description Were there any schedulled or performed F] F-1 inspections or tests today? ( Pass/ Fail ) 2. How were the site conditions today? 0 F-1 ❑ 3. Any accidents on site today? F*/—] F-1 F-1 4. Any schedule delays occur? 0 F-1 F-1 5. Any weather delays occur? F*/—] F-1 F-1 6. Any visitors on site? F*/ F-1 F-1 7. Any areas that can't be worked on? FV F-1 F-1 8. Any equipment rented on site? F*/—] F-1 F-1 Attachments eCk*1NEd SPACE NMMIT - 1 1 4 r `# T 1 • i•,4 `- T j�� �_ ��� �k;�����i�•�I� L • • L ti it N01 j;� enda1 • Tequesta WTP Filter -EST.1979 Upgrades RIDA DESIGN Cc 90 • • • Dixie Highway Tequesta, FIL 33469 1 , • • # 25102 MI j , ;1 +�! �� I I i I r s cl �� r r 1 'NW) con- Weather 6:00 AM 12:00 PM 4:00 PM 640 81 0 1W 80 • 1� Partially cloudy Partially cloudy Clear Wind:4 MPH I Precipitation:.0" Humidity:98% Wind:6 MPH I Precipitation:.0" 1 Humidity:57% Wind:9 MPH Precipitation:.0" Humidity:58% ff li,06� AM L 6M Work Logs Name Description Quantity Total Total Hours Hours To Date FDC Supervise and assist subcontractors 1 8 73 Removed frozen bolt from bottom of tank#6 Sherwin Josh Osborne 111/24/25,7:32 AM CO Stalin George Welding deteriorated parts of ring in vessel #6 and #4 2 16 105 Welding Sherwin Josh Osborne 111/24/25,7.32 AM Total 3 24 230 Time Cards No entry Agenda - Work Log Photos Stalin George - • • • • �� I t • 1/21/25� 07: .� M 11/21/25� 10:07AM 11/21/25� 10:10AM 11/21/25� 10:11 AM 11/21/25� 10:11AM Materials No entry Equipment No entry General Notes No entry Site Safety Observations No entry Quality Control Observations No entry Survey • Description 1. Were there any schedulled or performed 0 F-1 F-1 Agenda Item #9. 3. Any accidents on site today? ❑V F-1 F-1 4. Any schedule delays occur? F*—/] F-1 F-1 5. Any weather delays occur? F*/1 ❑ F-1 6. Any visitors on site? F*—/] F-1 F-1 7. Any areas that can't be worked on? FV F-1 F-1 8. Any equipment rented on site? F*/1 ❑ F-1 Attachments f.-MM�1�■■ n 1.1 o* A I �G iT rig 14W ' ■I Y �..a f._I� r u ��� rfF 4 9 lip ■WI..�ra.•ati...��i. r��.r-.�r�•.n• rl iI � � ' �: � i-•-� r T_ =�■�r■w� w11YIIM�F- - � I �l ` e T •��.,. �aaa NIA--�-IF••., Iww■ 04040 ilrl�YMn T �"�� J iGl JJ W—i IWr■ �i+rY4+l +I I m Y— •--• � .f.r •.I .� i1l7 ---• rw W ■■�H� r7rYI!!7 ��{F, C „ 11!"1`L� l�,J•�''J'�l�/1 11JG�� �h =L�/' '. l�jl 1'�1/1 •-•atY _ •� ._,..Lbb _ — V.- enda1 • Tequesta WTP Filter -EST.1979 Upgrades _�RIDA DESIGN CONTRACTORS 901 North • • Dixie Highway '• . FL 33469 Date •n 11/24/2025 Job# 25102 I i ]IF - m� ri ICJ U fl G -1-HIL (A 11 11 i � I _ i 0 u� aaona�n r A # i I /r ��i 1 •;ail i F� , �3, /11 ,� ;�ili� /��1 `r�i �E'' l i, Weather 6:00 AM 12:00 PM 4:00 PM 66 O 78014 - O Partially cloudy Partially cloudy Partially cloudy Wind:4 MPH I Precipitation:.0'' Humidity:97% Wind:10 MPH I Precipitation:.0'' 1 Humidity:73% Wind:10 MPH I Precipitation:.0'' Humidity:67% "IF Work Name Description Quantity Total Total Hours Hours To Date FDC Supervise and assist subcontractors 2 16 89 Sherwin Josh Osborne 1 11/25/25,8:10 AM F Sta l i n George Welding deteriorated parts of ring in vessel #6 and #4 2 16 121 Welding Sherwin Josh Osborne 1 11/25/25,8:10 AM Total 4 32 262 Time Cards • - • • • Photos A9p&gtjt#q@ fAlding: I QTY-. 21 HRS-. 8.01 HTD: 121.0 y -IT 17 Is h- Ilk 0/vo . I f ol 11 1 J� 1 Materials No entry Equipment General Notes No entry Site Safety Observations No entry Quality Control Observations No entry Questions N/A No Yes Description 1 Were there any schedulled or performed —1 F-I inspections or tests today? ( Pass/ Fail ) F*/1 F 2. How were the site conditions today? ❑�/ F-I F-I 3. Any accidents on site today? ❑•/ F-I F-I 4. Any schedule delays occur? ❑�/ F-I F-I 5. Any weather delays occur? ❑./ F-I F-I 6. Any visitors on site? ❑�/ F-I F-I AgeRda IteY m #9.n areas that cant be worked on? 8. Any equipment rented on site? VI F—I F—I Attachments h�Y��7W� �Jjs I.dL j� R �• 1>07 �1 ■1 iHYRiii■�F.� nl it �r iY�FiF Mr ■F 5l�11�v■1!�N�r �— �y��rr� `— �•.IJ ��■_may M IAI f �� —..Clef 9 M•1 MPffm _. 6-� —a i w7�M+w-i■�F�1�!� �Ire■r�� 9hPHM Y717R7 iiFiw Mom_ _ •.al M.1 , t I enda Tequesta WTP Filter W6V -EST.1979 Upgrades RIDA DESIGN Cc 90 • • Dixie Highway Tequesta, FL 33469 Date Tue • • # 25102 Weather EL A& 6:00 AM 12:00 PM 4:00 PM 69O 82O 0=- 8 0 Partially cloudy Partially cloudy Clear Wind:2 MPH I Precipitation:.0'' 1 Humidity:90% Wind:10 MPH I Precipitation:.0'' Humidity:62io Wind:9 MPH Precipitation:.0'' Humidity:62°io =MEL Work Name Description Quantity Total Total Hours Hours To Date r6l F D C Supervise and assist subcontractors 1 8 97 Sherwin Josh Osborne 1 11/26/25,8:21 AM no Stalin George Welding and grinding parts of ring in vessel #4 2 16 137 Welding Sherwin Josh Osborne 111/26/25,8.22 AM Total 3 24 286 Time Cards o - • • • Photos FDC: I QTY-. 1 1 H RS: 8.01 HTD: 97.0 F x enda Item #9. 11/2 � 08:26AM 11/25/2 � 08:26AM Stalin George Welding: I • - r 11/25/25� 08:2 11/25/25� 08:23AM 11/25/25� 08:23AM 11/25/25� 08:23AM 11/25/25� 08:23AM 1r1/2 25� 08:24AM 11/25/25� 08: �tA 11/25/25� 12:01 PM i12701:2 �M Materials No entry Equipment No entry General Notes No entry Agenda Item #9. Site Safety Observations Quality Control Observations No entry Questions N/A No Yes Description 1 Were there any schedulled or performed -1 F-1 inspections or tests today? ( Pass/ Fail ) F*/1 F 2. How were the site conditions today? ❑�/ F-1 F-1 3. Any accidents on site today? ❑•/ F-1 F-1 4. Any schedule delays occur? ❑�/ F-1 F-1 5. Any weather delays occur? ❑./ F-1 F-1 6. Any visitors on site? ❑�/ F-1 F-1 7. Any areas that can't be worked on? ❑./ F-1 F-1 8. Any equipment rented on site? ❑�/ F-1 F-1 enda _ • _ WTP Filter• Upgrades -EST.1979 RIDA DESIGN Cc 90 • • • Dixie Highway Tequesta, FL 33469 Date -• 11/26/2025 Job • r L i € �� G IIL - , I.�. a o a • � �,] E I F f I R 6` A All do •I I I I��•I 1 1_r I �I I f r !�1 I • Ida l r R111 [to fly 1pr 1 :1 , L ti. 1 TA 4 H i t il 4U i�til . i 1, Al #�+ I r n l 11 `{- -- I r f f I I I I � I I I I aluIP011 011 "=oajk#aff•k ' i . � l��� i ii•M+�~��,� �+` 1 r r V jr 14: ilk[ •!I � 1 r Weather 6:00 AM 12:00 PM 4:00 PM 67 ♦1♦ O 830 dW O 80 Partially cloudy Partially cloudy Partially cloudy Wind:0 MPH I Precipitation:.0" Humidity:96% Wind:10 MPH I Precipitation:.0" 1 Humidity:63% Wind:12 MPH I Precipitation:.0" Humidity:74% "F lila� Work Logs Name Description Quantity Total Total Hours Hours To Date FDC Supervise and assist subcontractors 1 8 105 Zachary Hammann 112/4/25,1:43 PM no Stalin George Welding deteriorated parts of ring in vessel #6 and #4 2 16 153 Welding Zachary Hammann 112/4/25,1.43 PM Total 3 24 bild Time Cards o - • • • Photos A9p&gtjt#q@fAlding: 1 Q TY: 2 HRS: 8.01 HTD: 153.0 Lm ry 71 I I•� • fir y .. • • i LL- AP" Tj I � 4 • •- 0'l�/1 Ij 6115 011 11/26/25 10 � � 4 IP 01 4 I. Y y 1 f I I Materials No entry Equipment General Notes No entry Site Safety Observations Quality Control No entry In Questions N/A No Yes Description Were there any schedulled or performed inspections or tests today? ( Pass/ Fail ) F*/] F 2. How were the site conditions today? ❑*/ F—I F—I 3. Any accidents on site today? ❑*/ F—I F—I Agenda Item #9. 4. Any schedule delays occur? F*/1 ❑ F-1 5. Any weather delays occur? ❑V F-1 F-1 6. Any visitors on site? F*/1 ❑ F-1 7. Any areas that can't be worked on? F*/1 ❑ F-1 8. Any equipment rented on site? F*/� FIIIIIIIIIIIII 1:1 qPlqqllPr Attachments 1!1lIMT V— Y' ` _4}+.[—I I11�1 �1� 11�F�! �� ,��e,-�• : R rrYr rY� a�tea_ •..Y�� Ft�4 IM T! WFIY f �ti� •ram •�M�li I.1 ___ Il7 VY17.Y _ 1 .7l WL....� ...................................................................... INVOICE Ag n ' T Customer • • • Date Terms TM 6400 E MCDOWELL RD.SUITE 300 10433184 173716 9024992762 11/12/2025 NET 10 SCOTTSDALE,AZ 85257 (800)782-1500 PAYMENT $668.32 customersuccess@willscot.com INVOICEDUE DATE11/22/2025 www.willscot.com Fed I D#52-0665775 1259 � BRANCH: MD WEST PALM BEACH FL FLORIDA DESIGN CONTRACTORS 375 KELLY DRIVE 1326 S KILLIAN DR ROYAL PALM BEACH FL LAKE PARK FL 33403-1919 33411 (954)406-9139 Contract# Contract Start Date Customer PO Ordered By Rental Period Job Location 1002614560 10/15/2025 Zach Hammann 11/12/2025- 901 OLD DIXIE HWY 5618451233 12/9/2025 JUPITER FL 33469 • • . Amount Rental Pricing Per Billing Cycle 20'COMBO W/10'OFFICE AS20RYX0531 W/Desk and Chair $598.00 $598.00 T* 1 Personal Property Expense $26.60 $26.60 T* Sub-total $624.60 Tax $43.72 111, • • $668.32 Invoice in USD ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- P L E A S E REMIT WITH PAYMENT Downloadth WillScotINVOICE TOTAL $668.32 Solutions CenterAppInvoice#. 9024992762 Due Date: 11/22/2025 ■ ■ Easily manage your units,view and pay invoices,track deliveries and pickups,request Customer: FLORIDA DESIGN CONTRACTORS services,or get quotes for new units—all of this at any time,from anywhere. Customer#: 10433184 • Download on the GET IT ON ■ � �App Stare Ooogle Play REMITPLEASE 800.782. 500 WillScotSolutionsCenter.corn WILLIAMS SCOTSMAN, INC. You remain responsible for the invoice balance if there is an issue PO BOX 91975 with your method of payment.Late fees and interest charges may CH I CAG O I L 60693-1975 be assessed if payment is not made within terms. _j Page 271 of 572 5245101.2025110447304.01259 F_ INVOICE Agenda Item #9. SEND ALL PAYMENTS TO: SUNBELT RENTALS INC. Po Box 409211 INVOICE • 174 6 3 313 9 0004 SUMBELTO ATLANTA, GA 30384-9211 RENTALS ACCOUNT • 413156 INVOICEDA 11/06/25 rHut 1 of 1 INVOICE TO RECEIVED BY CONTRACT NO HAMMANN, ZACHARY 174633139 1oz-2599-2659 PURCHASE ORDER NO. FLORIDA DESIGN CONTRACTORS INC 1326 SOUTH KILLIAN DRIVE 30B# 25102 LAKE PARK, FL 33403 JOB NO. 36- FLORIDA DESIGN C JOB ADDRESS BRANCH FLORIDA DESIGN CONTRACTORS INC 901 OLD DIXIE HWY FORT LAUDERDALE CC PC483 TEQUESTA, FL 33469 2350 1701 GREEN RD STE H POMPANO BEACH, FL 33064 1074 561-862-7137 954-587-4277 QTY EQUIPMENT # Min Day Week 4 Week Amount 1.00 5 TON AIR CONDITION W/HEAT 480V 581.00 581.00 1005.00 1875.00 1875.00 PA40000021 Make: GOODMAN Model : GPC1460H41EC Ser #: 1801435684 3.00 12" X 25' DUCT 27. 54 27. 54 55.08 149.94 449.82 1.00 50' SPIDERBOX CABLE 6/4 42.64 42.64 102.96 267.28 267.28 Rental Sub-total : 2592.10 SALES ITEMS: Qty Item number Unit Price 1 ENVIRONMENTAL EA 28.120 28.12 2133XXX000 ENVIRON/HAZMAT/DISPOSAL FEE 1 RENTAL PROTECTION PLAN EA 388.81 BILLED FOR FOUR WEEKS 10/21/25 THRU 11/17/25. Equipment. Service. Guaranteed. = 3,009.03 REMIT TO: 183.42 SUNBELT RENTALS, INC. NET30 INVOICE • A 39192.45 PO BOX 409211 Invoices not paid within 30 days may be subject to a 1-1/2% ATLANTA, GA 30384-9211 per month charge. 4 WEEK BILL Page 272 of 572 ANGEL SOTO angel.soto@sunbeltrentals.com F_ INVOICE Agenda Item #9. SEND ALL PAYMENTS TO: SUNBELT RENTALS INC. Po Box 409211 INVOICE • 174 5 87960 0002 SUMBELTO ATLANTA, GA 30384-9211 RENTALS ACCOUNT • 413156 INVOICEDA 11/18/25 rHut 1 of 1 INVOICE TO RECEIVED BY CONTRACT NO HAMMANN, ZACHARY 174587960 1oz-2340-2375 PURCHASE ORDER NO. FLORIDA DESIGN CONTRACTORS INC all: 1326 SOUTH KILLIAN DRIVE NR LAKE PARK, FL 33403 JOB NO. TOWN OF TEQUESTA WAT JOB ADDRESS BRANCH TOWN OF TEQUESTA WATER 901 OLD DIXIE HWY WEST PALM BEACH PC090 TEQUESTA, FL 33469 2350 5770 N MILITARY TRL WEST PALM BEACH, FL 33407 184 561-862-7137 561-682-9888 QTY EQUIPMENT # Min Day Week 4 Week Amount 6.00 5' SCAFFOLD END FRAME GT 7.00 7.00 7.00 15.00 90.00 6.00 7' SCAFFOLD BRACE GT 2.00 2.00 2.00 8.00 48.00 4.00 SCAFFOLD LEVELING JACKS GT 4.00 4.00 4.00 10.00 40.00 20.00 PIN SNAP 2" GT/MP 1.00 1.00 1.00 1.00 20.00 6.00 GR7 GUARD RAIL 7'0" .05 .05 .38 1. 50 9.00 4.00 AP7 PLANK, ALUM 7'0"X19" .43 .43 3.03 12.10 48.40 Rental Sub-total : 255.40 1 RENTAL PROTECTION PLAN 34.44 BILLED FOR FOUR WEEKS 10/21/25 THRU 11/17/25. Equipment. Service. Guaranteed. = • 289.84 REMIT TO: 17.88 SUNBELT RENTALS, INC. NET30 INVOICE • A 307.72 PO BOX 409211 Invoices not paid within 30 days may be subject to a 1-1/2% ATLANTA, GA 30384-9211 per month charge. 4 WEEK BILL Page 273 of 572 ANGEL SOTO angel.soto@sunbeltrentals.com F_ INVOICE Agenda Item #9. SEND ALL PAYMENTS TO: SUNBELT RENTALS INC. Po Box 409211 INVOICE • 174663702 0002 SUMBELTO ATLANTA, GA 30384-9211 RENTALS ACCOUNT • 413156 INVOICEDA 11/18/25 rHut 1 of 1 INVOICE TO RECEIVED BY CONTRACT NO HAMMANN, ZACHARY 174663702 1oz-2341-2376 PURCHASE ORDER NO. pmFLORIDA DESIGN CONTRACTORS INC 1326 SOUTH KILLIAN DRIVE PENDING LAKE PARK, FL 33403 JOB NO. TOWN OF TEQUESTA WAT JOB ADDRESS BRANCH TOWN OF TEQUESTA WATER 901 OLD DIXIE HWY WEST PALM BEACH PC090 TEQUESTA, FL 33469 2350 5770 N MILITARY TRL WEST PALM BEACH, FL 33407 184 561-862-7137 561-682-9888 QTY EQUIPMENT # Min Day Week 4 Week Amount 6.00 5' SCAFFOLD END FRAME GT 7.00 7.00 7.00 19.00 114.00 6.00 7' SCAFFOLD BRACE GT 2.00 2.00 2.00 8.00 48.00 4.00 SCAFFOLD LEVELING JACKS GT 4.00 4.00 4.00 15.00 60.00 12.00 SCAFFOLDING GRAVITY PIN PIG TAIL GT 1.00 1.00 1.00 12.00 6.00 GR7 GUARD RAIL 7'0" .05 .05 .38 1. 50 9.00 4.00 AP7 PLANK, ALUM 7'0"X19" .43 .43 3.03 12.10 48.40 Rental Sub-total : 291.40 BILLED FOR FOUR WEEKS 10/21/25 THRU 11/17/25. Equipment. Service. Guaranteed. = • 291.40 REMIT TO: 20.40 SUNBELT RENTALS, INC. NET30 INVOICE • A 311.80 PO BOX 409211 Invoices not paid within 30 days may be subject to a 1-1/2% ATLANTA, GA 30384-9211 per month charge. 4 WEEK BILL Page 274 of 572 ANGEL SOTO angel.soto@sunbeltrentals.com Agenda Item #9. Precision Portables, LLC 1840 NW 33rd Street Pompano Beach, FL 33064 ) REC ISION (888) 920-5060 P 0 R T A B L E 'S www.coastalwasteinc.com INVOICE Invoice PP0000324957 Page Page 1 of 1 Date 11/10/2025 Bill To: FLORIDA DESIGN CONTRACTORS Customer 5239 1326 S KILLIAN DRIVE Site 0 WEST PALM BEACH,FL 33403 PO Number Due Date 12/10/2025 DATE DESCRIPTIONQTY. AMOUNT (0003) 901 N OLD DIXIE HWY 901 N OLD DIXIE HWY, TEQUESTA FL Sery#001 CONSTRUCTION TOILET(STANDARD) 1 -OEA 2x Week M ` 10-Nov CONSTRUCTION SITE TOILET CLEANING (Oct 12/25-Nov 08/25) M $120.00 1.00 $120.00 M � 10-Nov RECOVERY FEE $14.39 M � PALM BEACH COUNTY at 7.000% $9.41 M M M M � M � M M M M M M M M M M M M M M M M Account A surcharge of 5%on initial balance plus 2%per month will be charged on INVOICE TOTAL $143.80 Status accounts 30 days overdue. CURRENT 31-60 DAYS 61-90 DAYS OVER 90 DAYS ACCOUNT TOTAL $1,307.88 $0.00 $0.00 $0.00 $1,307.88 Payments made by credit card or debit card are subject to a 2.55%service fee Invoice PP0000324957 Please return this portion with payment to: Page Page 1 of 1 Precision Portables Date 11/10/2025 PO Box 632201 Customer 5239 Cincinnati, OH 45263-2201 AMOUNT REMITTED Site 0 www.coastalwasteinc.com PO Number Due Date 12/10/2025 0025756PP0052390000PP00003249570 �e$&gt$72 -4--J U cn 5� Lr) L) m C) e— 4-� >N Ln Ln v e e eP o � i q 0Ln a IA ur Agenda Item #9. Attachment 3 December 17, 2025 Mrs. Allyson Felsburg, MBA, Deputy Utilities Director, The Village of Tequesta, Florida 901 N Old Dixie Hwy Tequesta, Florida 33469 Regarding: The Village of Tequesta WTP Pressure Vessel Plant Upgrades Subject: FDC No.3 Credit for Scope Reduction to Remove Tanks 1 & 3 Dear Ms. Felsburg: In accordance with your request, Florida Design Contractors is providing a credit proposal to remove two (2) tanks from the scope of work of this project. We offer you the line items from the schedule of values for tanks 1 & 3. A deduct for the cost of the material already produced for this project that are not returnable and do not offer a restocking fee must be applied. These materials will be turned over to you for your use. Vessels 1 & 3 Schedule Updates 1 LS $ 11000 Scaffold System Complete ( 2 Mo.) 1 LS $ 1%000 HVAC/ Gen. System ( 2 Mo.) 1 LS $ 16,900 Remove Filter Media 1 LS $ 30,300 Haul and Dispose Media 1 LS $ 19,600 Clean Vessel's Interior 1 LS $ 51000 Interior Coatings 1 LS $ %900 Specialty Submittals 1 LS $ 13,200 Supply Install New Internal Appurtances 1 LS $ 60,000 Supply Install New Media 1 LS $ 48,000 Final BacT Test of Pressure Filter 1 LS $ 11000 $223,900 Deduct for Non-Returnable Materials Internal Components 1 LS $ 32,000 $191,900 1326 South Killian Drive, West Palm Beach, FL 33403 www.FloridaDesignContractor5.cum Phone: 561-845-1233 Fax: 561-848-5992 CGC1528648 Page 277 of 572 Agenda Item #9. al,LGSti n;ily The total sum for the deduct of vessels 1 & 3 totals: $191,900.00. This total includes all costs complete for the removal of this scope of work from our contract. This proposal is valid for 14 days. Should you have any questions, feel free to contact me. Regards, Zachary D. Hamman, Assistant Project Manager, Florida Design Contractors. 1326 South Killian Drive, West Palm Beach, FL 33403 rnrww.FloridaDesignContractor5.cum Phone: 561-845-1233 Fax: 561-848-5992 CGC-040304 Page 278 of 572 Agenda Item #9. Jamie Meyer From: Zachary Hammann Sent: Wednesday, December 17, 2025 1:13 PM To: wowen@hungerfordterry.com; 'Walt Seitz'; 'Bill Probasco'; 'Brian Reynolds' Cc: Jamie Meyer; 'Christopher Ralph'; 'Tracy VanEtten'; 'Tom Carrocino'; epeters@mts- florida.com Subject: Re: 25102 - Tequesta WTP Filter Rehab - Owner Request Removal of 2 Vessels Off Scope Good afternoon, I have a meeting with the owners tomorrow discussing the removal of the 2 vessels from the scope and the costs that are affected. Can you put a formal proposal together stating the cost of the internals and the fact that they are custom fabricated and cannot be refunded. Also, I did recieve the strainers. Thank you Zachary D. Hammann Assistant Project Manager EST. 1979- F!ORIDA DESIGN CONTRACTORS #C0 C 1528648 1326 South Killian Drive, Lake Park, FL 33403 C: 561-862-7137 1 O: 561-275-2282 1 W: Florida Design Contractors zhammann(a-)floridadesigncontractors.com From:wowen@hungerfordterry.com <wowen@hungerfordterry.com> Sent:Wednesday, December 10, 2025 10:55 AM To: Zachary Hammann <ZHammann@Floridadesigncontractors.com>; 'Walt Seitz' <wseitz@hungerfordterry.com>; 'Bill Probasco'<bprobasco@hungerfordterry.com>; 'Brian Reynolds' <breynolds@hungerfordterry.com> Cc:Jamie Meyer<JMeyer@Floridadesigncontractors.com>; 'Christopher Ralph' <cralph@hungerfordterry.com>; 'Tracy VanEtten' <tvanetten@hungerfordterry.com>; 'Tom Carrocino' <tcarrocino@hungerfordterry.com>; epeters@mts- florida.com <epeters@mts-florida.com> Subject: RE: 25102 -Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Hello Zachary, The original proposal had $88,000 for 6 beds of media. Each set comes to$14,665.00 per filter.The tank internals were quoted as 6 sets of tank internals @ $96,000.00. $16,000 per set. That's with freight included for internals and media. Let me know when you are ready for the next set of material to ship.The strainers went out UPS. Page 279 of 572 Agenda Item #9. Thank you. wj&�� William L. Owen Sales Representative Hungerford &Terry, Inc. Manufacturers of Water Treatment Equipment 226 N Atlantic Avenue PO Box 650 Clayton NJ 08312 (P) 856 881-3200 ext. 273 (F) 856 881-6859 WOwen@HungerfordTerry.com www.HungerfordTerry.com From: Zachary Hammann <ZHammann@Floridadesigncontractors.com> Sent:Tuesday, December 9, 2025 2:51 PM To:wowen@hungerfordterry.com; 'Walt Seitz' <wseitz@hungerfordterry.com>; 'Bill Probasco' <bprobasco@hungerfordterry.com>; 'Brian Reynolds'<breynolds@hungerfordterry.com> Cc:Jamie Meyer<JMeyer@ Floridadesigncontractors.com>; 'Christopher Ralph' <cralph@hungerfordterry.com>; 'Tracy VanEtten' <tvanetten@hungerfordterry.com>; 'Tom Carrocino' <tcarrocino@hungerfordterry.com>; epeters@mts- florida.com Subject: Re: 25102 -Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Ok, thank you. Let me know when you get that breakdown. Zachary D. Hammann Assistant Project Manager EST. 1979 ti Cc:: 1326 South Killian Drive, Lake Park, FL 33403 C: 561-862-71 37 1 O: 561-275-2282 1 W: Florida Design Contractors zhammannPfloridadesigncontractors.com From:wowen@hungerfordterry.com <wowen@hungerfordterry.com> Sent:Tuesday, December 9, 2025 2:46 PM To: Zachary Hammann <ZHammann@Floridadesigncontractors.com>; 'Walt Seitz' <wseitz@hungerfordterry.com>; 'Bill Probasco'<bprobasco@hungerfordterry.com>; 'Brian Reynolds' <breynolds@hungerfordterry.com> Cc:Jamie Meyer<JMeyer@ Floridadesigncontractors.com>; 'Christopher Ralph' <cralph@hungerfordterry.com>; 'Tracy VanEtten' <tvanetten@hungerfordterry.com>; 'Tom Carrocino' <tcarrocino@hungerfordterry.com>; epeters@mts- florida.com <epeters@mts-florida.com> Subject: RE: 25102 -Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope 2 Page 280 of 572 Agenda Item #9. Hello Zach, We will waive any restocking fees on the media. I have to get the order from purchasing and break it out. Thank you. William L. Owen Sales Representative Hungerford &Terry, Inc. Manufacturers of Water Treatment Equipment 226 N Atlantic Avenue PO Box 650 Clayton NJ 08312 (P) 856 881-3200 ext. 273 (F) 856 881-6859 WOwen@HungerfordTerry.com www.HungerfordTerry.com From: Zachary Hammann <ZHammann@Floridadesigncontractors.com> Sent:Tuesday, December 9, 2025 2:30 PM To:wowen@hungerfordterry.com; 'Walt Seitz' <wseitz@hungerfordterry.com>; 'Bill Probasco' <bprobasco@hungerfordterry.com>; 'Brian Reynolds'<breynolds@hungerfordterry.com> Cc:Jamie Meyer<JMeyer@Floridadesigncontractors.com>; 'Christopher Ralph' <cralph@hungerfordterry.com>; 'Tracy VanEtten' <tvanetten@hungerfordterry.com>; 'Tom Carrocino' <tcarrocino@hungerfordterry.com>; epeters@mts- florida.com Subject: Re: 25102 -Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Also, what is the cost for the internals? On the P.O the media and internals are lumped into one sum of $28,000.00 each vessel. Zachary D. Hammann Assistant Project Manager - EST. 1 979 1326 South Killian Drive, Lake Park, FL 33403 C: 561-862-71 37 1 O: 561-275-2282 1 W: Florida Design Contractors zhammann(@floridadesigncontractors.com 3 Page 281 of 572 Agenda Item #9. From: Zachary Hammann <ZHammann@Floridadesigncontractors.com> Sent:Tuesday, December 9, 2025 2:27 PM To:wowen@hungerfordterry.com <wowen@hungerfordterry.com>; 'Walt Seitz' <wseitz@hungerfordterry.com>; 'Bill Probasco'<bprobasco@hungerfordterry.com>; 'Brian Reynolds' <breynolds@hungerfordterry.com> Cc:Jamie Meyer<JMeyer@ Floridadesigncontractors.com>; 'Christopher Ralph' <cralph@hungerfordterry.com>; 'Tracy VanEtten' <tvanetten@hungerfordterry.com>; 'Tom Carrocino' <tcarrocino@hungerfordterry.com>; epeters@mts- florida.com <epeters@mts-florida.com> Subject: Re: 25102 -Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Yes, I got that. Sorry, I meant say what is the restocking fee for the media? Zachary D. Hammann Assistant Project Manager FLOA iCIA CIE SIC;N ItONTAACTO&t$ • NOWISMW 1326 South Killian Drive, Lake Park, FL 33403 C: 561-862-71 37 1 O: 561-275-2282 1 W: Florida Design Contractors zhammann(@floridadesigncontractors.com From:wowen@hungerfordterry.com <wowen@hungerfordterry.com> Sent:Tuesday, December 9, 2025 2:03 PM To: Zachary Hammann <ZHammann@Floridadesigncontractors.com>; 'Walt Seitz' <wseitz@hungerfordterry.com>; 'Bill Probasco'<bprobasco@hungerfordterry.com>; 'Brian Reynolds' <breynolds@hungerfordterry.com> Cc:Jamie Meyer<JMeyer@ Floridadesigncontractors.com>; 'Christopher Ralph' <cralph@hungerfordterry.com>; 'Tracy VanEtten' <tvanetten@hungerfordterry.com>; 'Tom Carrocino' <tcarrocino@hungerfordterry.com>; epeters@mts- florida.com <epeters@mts-florida.com> Subject: RE: 25102 -Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Zach, The tank internals are non refundable. These are custom made parts.They are not a shelf item. Thank you. LJAAC�� William L. Owen Sales Representative Hungerford &Terry, Inc. Manufacturers of Water Treatment Equipment 226 N Atlantic Avenue PO Box 650 Clayton NJ 08312 (P) 856 881-3200 ext. 273 4 Page 282 of 572 Agenda Item #9. (F) 856 881-6859 WOwen@HungerfordTerry.com www.HuagerfordTerro From: Zachary Hammann <ZHammann@Floridadesigncontractors.com> Sent:Tuesday, December 9, 2025 1:48 PM To:wowen@hungerfordterry.com; 'Walt Seitz' <wseitz@hungerfordterry.com>; 'Bill Probasco' <bprobasco@hungerfordterry.com>; 'Brian Reynolds'<breynolds@hungerfordterry.com> Cc:Jamie Meyer<JMeyer@Floridadesigncontractors.com>; 'Christopher Ralph' <cralph@hungerfordterry.com>;Tracy VanEtten <tvanetten@hungerfordterry.com>; 'Tom Carrocino' <tcarrocino@hungerfordterry.com>; epeters@mts- florida.com Subject: Re: 25102 -Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Understood. What is the restocking fee and the credit associated with the internal components? Zachary D. Hammann Assistant Project Manager T-T. 1979 P 4Qk iL3A CI E WO N CONTAACTC]CtS 1326 South Killian Drive, Lake Park, FL 33403 C: 561-862-71 37 1 O: 561-275-2282 1 W: Florida Design Contractors zhammann(a-)floridadesigncontractors.com From:wowen@hungerfordterry.com <wowen@hungerfordterry.com> Sent:Tuesday, December 9, 2025 1:34 PM To: Zachary Hammann <ZHammann@ Floridadesigncontractors.com>; 'Walt Seitz' <wseitz@hungerfordterry.com>; 'Bill Probasco'<bprobasco@hungerfordterry.com>; 'Brian Reynolds' <breynolds@hungerfordterry.com> Cc:Jamie Meyer<JMeyer@Floridadesigncontractors.com>; 'Christopher Ralph' <cralph@hungerfordterry.com>;Tracy VanEtten <tvanetten@hungerfordterry.com>; 'Tom Carrocino' <tcarrocino@hungerfordterry.com>; epeters@mts- florida.com <epeters@mts-florida.com> Subject: RE: 25102 -Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Hello Zachary, We can remove the gravel and sand from the order. There may be a restocking fee associated with that material. Unfortunately the tank internals are made to order. It is suggested the owner take the extra sets as spare parts. We received a purchase order and made what was requested. Thank you. 5 Page 283 of 572 Agenda Item #9. wjb+� t William L. Owen Sales Representative Hungerford &Terry, Inc. Manufacturers of Water Treatment Equipment 226 N Atlantic Avenue PO Box 650 Clayton NJ 08312 (P) 856 881-3200 ext. 273 (F) 856 881-6859 WOwen@HungerfordTerry.com www.HungerfordTerr From: Zachary Hammann <ZHmmmann@Floridadesigncontractors.com> Sent:Tuesday, December 9, 2025 11:46 AM To: 'William Owen' <wowen@hungerfordterry.com>; 'Walt Seitz'<wseitz@hungerfordterry.com>; 'Bill Probasco' <bprobasco@hungerfordterry.com>; Brian Reynolds<breynoIds@hungerfordterry.com> Cc:Jamie Meyer<JMeyer@Floridadesigncontractors.com> Subject: 25102 -Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Gents, Unfortunately, The Village of Tequesta has requested that we take 2 vessels off of our scope of work.We will now only be doing the vessel rehabilitation of media & internals on 4 of the 6 vessels. The owner would like to know what credits or cancelation fees will occur resulting from the cancelation of 2 vessels off of the original scope. If you have any questions please reach out. Zachary D. Hammann Assistant Project Manager EST. 1 979 LQk iL3A(3E$i�N CON I AACT09t$ GC15W 1326 South Killian Drive, Lake Park, FL 33403 C: 561-862-7137 1 O: 561-275-2282 1 W: Florida Design Contractors zhammann(a-)floridadesigncontractors.com 6 Page 284 of 572