HomeMy WebLinkAboutAgreement_General_1/8/2026_Florida Design Contractors WTP Filter (Pressurized Vessel) Plant Upgrades CHANGE ORDER NO. 1 DATE ISSUED: December 18, 2025 EFFECTIVE DATE: December 18, 2025 OWNER: Village of Tequesta OWNER'S PROJECT NO.: UTIL 02-10-2025/AF-1 CONTRACTOR: Florida Design Contractors, LLC PURCHASE ORDER#: PROJECT NAME: Water Treatment Plant (WTP) Filter(Pressurized Vessel) Plant Upgrades The Contract is modified as follows upon execution of this Change Order: Description:T&M for Pitting Repairs for Vessels 4 &6 and Time Extension, and Credit for Scope Reduction of vessels 1 & 3. Reasons for Change Order:This change order includes 1) additional welding services on vessels 4& 6 due to unforeseen Pitting in the shell of the vessels, and time extension of sixty(60) days; 2) credit for scope reduction to remove vessels 1 &3 from contract. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price: Original Contract Times for Initial Milestone: Substantial Completion: January 5,2026 $ $869,974.00 Ready for final payment: February 4, 2026 ,..Feria[DeriFeaSC from previously approved Change 4aoFease[DecFeasel from previously approved Change Orders No.0 to No.0: Orders No.0 to No.0: Substantial Completion: 0 Calendar Days $ 0 Ready for final payment: 0 Calendar Days Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: January 5,2026 $ $869,974.00 Ready for final payment: February 4,2026 4v.Fea"[Decrease]this Change Order: Increase[Deffeasel this Change Order: Substantial Completion: 60 Calendar Days $ (157,296.96) Ready for final payment: 60 Calendar Days Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial Completion: March 6,2026 $ $712,677.04 Ready for final payment: April 5,2026 This change order(with accompanying documentation) meets the requirements of the Contract Documents and execution of the change order is recommended. NiXollasor MaCs(ociates, Engineer Dated: By: 2025.12.29 09:00:25 -05'00' Nick Black, P.E. APPROVED BY OWNER: ACCEPTED BY CONTRACTOR: By: / By: Z/1 /l 7 Molly Young-,'Village of Tequesta Florida Design Contractors, LLC Title: Village Mayor Title: Asst. PM Date: 1 -- N At Date: 12/23/2025 Initial, Date Initial, Date Initial, Date WTP Filter (Pressurized Vessel) Plant Upgrades CHANGE ORDER NO. 1 (CONTINUED) Description of Changes Change in Contract Price: Approved lnefease¢ CO# Reason for Change Order (Decrease) 1 Additional welding services on vessels 4&6 due to unforeseen pitting in the ($157,296.96) shell of the vessels, and credit for scope reduction to remove vessels 1 & 3 from contract. Net Change in Total Contract Price for ($157,296.96) Change Order No.1 Change in Contract Time: Approved Increase/ CO# Reason for Change Order (Decfease) 1 Time extension of sixty(60)days for additional welding repairs performed on +60 vessels 4&6. Net Change to Total Contract Time,Substantial Completion for 60 Calendar Days Change Order No. 1 Net Change to Total Contract Time,Final Completion for 60 Calendar Days Change Order No. 1 List of Supporting Documents Attachments: 1. Kimley-Horn &Associates letter of recommendation for Contract value decrease and Contract time increase 2. Florida Design Contractors, LLC time and materials request for repairs associated with vessels 4 and 6 3. Florida Design Contractors, LLC credit proposal associated with vessels 1 and 3 Copyrights 2018 National Society of Professional Engineers,American Council of Engineering Companies and American Society of Civil Engineers.All rights reserved. Page 2 of 2 Attachment 1 Kimley>>>Horn December 19, 2025 Allyson Felsburg Utilities Director The Village of Tequesta 901 N Old Dixie Hwy. Tequesta, Florida 33469 RE: Village of Teqeusta WTP Filter(Pressurized Vessels) Upgrades— Change Order#1 for Weld Repairs, Time Extension and Deductive Credit Dear Ms. Felsburg, Florida Design Contractors, LLC is under contract to construct improvements to the six(6)existing pressure filter vessels at the Water Treatment Plant. On October 9th, 2025, FDC notified Kimley-Horn via email that pitting on the interior shell bottom of vessels 4 and 6 was observed. Shortly after, Kimley-Horn visited the site and observed the extent of pitting corrosion and recommended weld repairs commence to restore the vessels. FDC identified approximately 25 pit holes ranging in depth from 0.05"-0.5".The unforeseen pitting discovered was recommended to be tig welded in order to properly rehabilitate the vessels. FDC's certified welding subcontractor has performed the additional necessary welding to repair the pitting in both vessels. This work was unforeseen as the condition of the inside of the pressure vessels was unknown and could not be determined without performing the work to unload the media and remove the internal components for investigation. This work was necessary to restore the condition of the vessels and additional unforeseen repairs may potentially be required for other vessels to be rehabilitated under this contract. Due to the existing flow from the surficial aquifer and the treatment capacity provided by four (4) filter vessels, it is recommended to deduct filter rehabilitation from Vessels 1 and 3 from the contract and utilize those vessels as ready/reserve. It is understood that this rehabilitation work will provide additional redundancy for the Village, but is not needed to treat the demands. Furthermore,the vessels may continue to be utilized for treatment. This deduction is made in effort to minimize costs associated with treatment infrastructure improvements that may potentially contradict the overall direction of the Water Treatment Master Plan and the goal of eliminating contaminants of emerging concern (CEC) from the Village's water supply to customers. If you should have any questions or require additional information, please contact me by phone at (561) 421-1979 or email at nick.black@kimley-horn.com Thank you, Kimley-Horn and Associates, Inc. 7" a" Nick Black, P.E. Kimley-Horn 11920 Wekiva Way, Suite 200, West Palm Beach, FL 33411 Direct: 561-421-1979 192000 West Palm Beach �.. no% Attachment2 rcoc+szesae December 18, 2025 Mrs. Allyson Felsburg, MBA, Deputy Utilities Director, The Village of Tequesta, Florida 901 N Old Dixie Hwy Tequesta, Florida 33469 Regarding: The Village of Tequesta WTP Pressure Vessel Plant Upgrades Subject: FDC No.2,T&M Change of Work Order&Time Extension Request Dear Ms. Felsburg: Following the removal of the internal components and the media in pressure vessels 6 &4 we discovered unforeseen pitting in the shell of the vessel. With the vessel walls being%2" thick and the depth of the corrosion that had occurred over time we concluded that additional welding would need to be performed to resolve this issue. Furthermore, we have discussed using the original stainless steel inlet headers also replacing the sample point strainers inside of vessels 6&4. We concluded ordering female threaded couplings were needed to merge the PVC inlet arms and the SST inlet header. Also ordered was the new sample point strainer caps. With the additional welding that was required we have acquired our rates through T&M directive for additional welding services on Pressure Vessels No. 6&4. Costs are limited to work sequences and personnel.Additional insurance and bond cost are not listed on the daily ticket and are included within the final cost summary for vessels 4& 6.T&M tickets are attached to this document. Hours and rates are included with each T&M ticket accompanied by the Labor and Equipment it is associated with.Totals of Labor, Equipment, Supplemental Field Costs, and Subcontractors pricing are shown on each ticket with fees included. The total sum for the additional welding required as well as additional materials needed (Female threaded fittings&sample point strainer caps) in vessels 4&6, outside of our contracts scope, totals: $34,603.04. Included in this total are the additional totals of Labor, Equipment, Field costs, Subcontractors as well as additional Bond and Insurance costs. 1326 South Killian Drive, West Palm Beach, FL 33403 www.FloridaDesignContractors.com Phone: 561-845-1233 Fax: 561-848-5992 CGC1528648 -ram Following the additional work, our project will require an additional excusable extension of time for sixty(60) days. Should you have any questions, feel free to contact me. Regards, Zachary D. Hamman, Assistant Project Manager, Florida Design Contractors. 1326 South Killian Drive, West Palm Beach, FL 33403 www.FloridaDesignContractors.com Phone: 561-845-1233 Fax: 561-848-5992 CGC-040304 PROPOSAL COST SUMMARY DATE 12/4/2025 FLORIDA DESIGN CONTRACTORS,LLC FMA 1326 S.Killian Drive FDC No 2 Lake Park,FL 33403 Job No 25102 PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No LOCATION: 901 Old Dixie Hwy N Tequesta FL RFP No. OWNER: Village of Tequesta DRAWING NO ENGINEER: Kimley Horn SPEC.SECTION. Clarifications 1 Time is of the essence 2.Proposal includes only direct costs No indirect,main office or extended overhead costs are included. 3.A time impact analysis has not been performed for this work but can be prepared at the Owner's request. 4 T&M directive for additional welding services on Pressure Vessels No 4&6 Costs are limited to work sequences and personnel summarized below T&M Ticket Summmy Sheet Date Direct Labor Materials Equipment Other Costs Subcontractors Total 10/30/2025 753.73 $0.00 $481.07 $6.54 $1.491 $2,732.34 10/31/2025 753.73 $0.00 $481.07 $6.54 $1,344 $2,585.34 11/12/2025 $830.16 $0.00 $495.63 $6.54 $1,677,38 $3,009 71 11/13/2025 $868.38 $0.00 $491.41 $6.54 $1,770,56 $3,136.89 11/14/2025 $715.52 $0.00 $473.79 $6.54 $1.200,00 $2,395.85 11/18/2025 $944.81 $0.00 $517.45 $6.54 $1.764.00 $3,232.80 11/20/2025 $753.73 $0.00 $481.07 $6.54 $1,491.00 $2,732,34 11/21/2025 $753.73 $0.00 $481.07 $6.54 $1,491,00 $2,732.34 11/24/2025 $1,132.31 $0.00 $481.07 $6.54 $1,491,00 $3,110.92 11/25/2025 $753.73 $0.00 $481.07 $6.54 $1,491.00 $21732.34 11/26/2025 $753,73 $0.00 $481.07 $6.54 $1,491 00 $2.732.34 12/18/2025 $268,93 $761.06 $0.00 $0.00 $1,260,00 $2,289.99 Comments SUBTOTAL $ 33,423,20 TOTAL $ 33,423.20 Bond Cost 2 009-, $ 66846 Contractor's Insurance 1 50% 1 $ 511 37 GRAND TOTAL $ 34,603.04 TIME AND MATERIAL SHEET DATE: 10/30/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 Lake Park,FL 33403 PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N.Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Field weld test areas for compatiablity. 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ h.Superintendent Hr $77.95 $ b.Skilled Laborer Hr $41.28 $ i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55,89 $ k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ Subtotal $ 655.42 f. Plumber Hr $44.52 $ Fee $ 98,31 g.Asst.Superintendent Hr 8.00 $66.46 $ 531.68 Total Labor Costs $ 753.73 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount( ) $ Subtotal Materials $ $ Fee $ $ Total Material Costs $ Comments: 3. EQUIPMENT-gu-m-m-ary-Mpecial Equipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105,81 $ - $ B.Scaffolding Day 1 $28.16 $ 28.16 $ C.A/C Unit&Components Day 1 $145,12 $ 145,12 $ D.Generator Day 1 $ 214,66 $ 214.66 $ - E.Welding Machine and Leads Day $ - Subtotal $ 418.32 F.Pick Up Truck Day $ 133.00 $ - Fee 1 $ 62.75 G.WilScot Combo Office Day 1 $ 30.38 $ 30.38 Total Equip.Costs I $ 481.07 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $ 6.54 $ - $ $ $ $ $ Subtotal $ 6.54 $ Fee $ Total Other Costsl $ 6.54 & SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(8)w/ per diem $ 1,420.00 b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(8) $ - Subtotal $ 1,420.00 Fee $ 71.00 Total Sub Costs $ 1,491.00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,732.34 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: 7R"FICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE TIME AND MATERIAL SHEET DATE: 10/31/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 Lake Park,FL 33403 PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Field weld test areas for compatiablity. 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41,15 $ h.Superintendent Hr $77.95 $ b.Skilled Laborer Hr $41.28 $ i.General Superintendent Hr $123.57 $ c.Operator Hr $58.24 $ j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ Subtotal $ 655,42 f. Plumber I Hr 1 1 $44.52 1 $ Fee $ 98.31 g.Asst.Superintendent Hr 1 8.00 1 $66.46 1 $ 531.68 Total Labor Costs $ 753,73 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ Subtotal Materials $ $ Fee $ Total Material Costs Comments: 3. EQUIPMENT-Summary of SpecialtyEquipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $ B.Scaffolding Day 1 $28.16 $ 28.16 $ C.A/C Unit&Components Day 1 $145.12 $ 145,12 $ D.Generator Day 1 $ 214.66 $ 214.66 $ - E.Welding Machine and Leads Day $ - Subtotal $ 418.32 F.Pick Up Truck Day $133.00 $ Fee $ 62,75 WIIIScot Combo Conex Day 1 $30.38 $ 30.38 Total Equip.Costs $ 481.07 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $ 6.54 $ $ $ $ L $ $ Subtotal $ 6,54 $ Fee $ Total Other Costs $ 6,54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177,50/Hr(8)w/ per diem b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(8) $ 1,28000 Subtotal $ 1,280.00 Fee $ 64,00 Total Sub.Costs $ 1,344 00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,585.34 Comments AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE TIME AND MATERIAL SHEET DATE: 11/12/2025 F21 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 Lake Park,FL 33403 PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: KimleyHom SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Welders mobilized to site and began the pit welding in the vessels. 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit city Rate Amount a.Laborer Hr $41.15 $ h.Superintendent Hr $77.95 $ b.Skilled Laborer Hr $41.28 $ i.General Superintendent Hr $123.57 $ c.Operator Hr $58.24 $ j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ Subtotal $ 721.88 f. Plumber Hr $44.52 $ Fee $ 108.28 g.Asst.Superintendent Hr 9.00 $66.46 $ 598.14 Total Labor Costs $ 830.16 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ Subtotal Materials $ $ Fee $ Total Material Costs Comments: Summary of SpecialtyEquipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $ B.Scaffolding Day 1 $28.16 $ 28.16 $ C.A/C Unit&Components Day 1 $145.12 $ 145.12 $ D.Generator Day 1 $ 227.32 $ 227.32 $ - E.Welding Machine and Leads Day $ - Subtotal $ 430.98 F Pick Up Truck Day $133.00 $ - Fee 1 $ 64.65 Day 1 $30.38 $ 30.38 Total Equip.Costs I $ 495.63 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $6.54 $ - $ $ $ Subtotal $ 6.54 $ Fee $ Total Other Costs $ 6.54 & SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(9)w! per diem $ 1,597.50 b. Stalin George Welding -Crew Rate Inc[Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(0) Subtotal $ 1,597.50 Fee $ 79.88 Total Sub.Costs $ 1,677.38 TOTAL COST WORK DESCRIBED THIS TICKETI $ 3,009 70 Comments AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE TIME AND MATERIAL SHEET DATE: 11/1 3120 2 5 r FLORIDA DESIGN CONTRACTORS,LLC � ) 1326 S.Killian Drive FDC No.25102 Lake Park,FL 33403 PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta IDRAWING NO.: ENGINEER: Kimley Horn ISPEC SECTION. DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Day 2 of welding the pitting inside of each vessel. 1. DIRECT LABOR Trade/Craft/Skill Unit City Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ h.Superintendent Hr $77,95 $ b.Skilled Laborer Hr $41.28 $ i.General Superintendent Hr $123.57 $ c.Operator Hr $58.24 $ j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipeftter Hr $55.89 $ k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ Subtotal $ 755.11 f. Plumber Hr $44.52 $ Fee 1 $ 11327 g.Asst.Superintendent Hr 9.50 $66.46 1 $ 631,37 1 Total Labor Costs $ 868.38 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ Subtotal Materials $ $ Fee - $ Total Material Costs Comments Summary of SpecialtyEquipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $ B Scaffolding Day 1 $28.16 $ 2816 $ C.A/C Unit&Components Day 1 $145.12 $ 145.12 $ D.Generator Day 1 $ 223.65 $ 223,65 $ E.Welding Machine and Leads Day $ _ Subtotal $ 42731 F Pick Up Truck Day $133.00 $ _ Fee 1 $ 64.10 Day 1 $30,38 $ 30.38 Total Equip.Costs $ 491.41 4.OTHER COSTS-Supplemental Field Costs Description Unit City Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $6,54 $ - $ $ $ Subtotal $ 6.54 $ Fee $ Total Other Costs $ 654 & SUBCONTRACTORS List of Subcontractors and Description a Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177 50/Hr(9.5)w/ per diem $ 1,686.25 b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(0) Subtotal $ 1,686,25 Fee $ 84.31 Total Sub.Costs $ 1,770.56 TOTAL COST WORK DESCRIBED THIS TICKETI $ 3,136.89 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE wqo TIME AND MATERIAL SHEET DATE: 11/1412025 VIA FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 Lake Park.FL 33403 PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC,SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. No work on site the day of 11/3/25 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41,15 $ h.Superintendent Hr $77.95 $ b.Skilled Laborer Hr $41.28 $ i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ j.Asst Project Manager Hr 200 $61,87 $ 123,74 d.Pipefitter Hr $55,89 $ k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46 39 $ Subtotal $ 622.19 f Plumber Hr $44.52 $ Fee 1 $ 93.33 g-Asst Superintendent Hr 7.50 $66.46 $ 498.45 Total Labor Costs $ 715.52 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount Description/Vendor Amount($) $ Subtotal Materials $ $ Fee $ Total Material Costs Comments' Summary of SpecialtyEquipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $ B.Scaffolding Day 1 $28.16 $ 2816 $ C.A/C Unit&Components Day 1 $145 12 $ 145.12 $ D.Generator Day 1 $ 208.33 $ 20833 $ - E.Welding Machine and Leads Day $ - Subtotal $ 411.99 F Pick Up Truck Day $133,00 $ _ Fee 1 $ 61,80 G.Combo Connex Day 1 $30.38 $ 30.38 Total Equip.Costs I $ 473,79 4.OTHERSupplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $6.54 $ - $ $ $ Subtotal $ 6.54 $ Fee $ Total Other Costs $ 6.54 & SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(0)w/ per diem $ - b Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(7.5) $ 1,200.00 Subtotal $ 1,200,00 Fee $ 60,00 Total Sub.Costs $ 1.26000 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,455.85 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE TIME AND MATERIAL SHEET DATE: 11/18/2025 ^J� FLORIDA DESIGN CONTRACTORS,LLC C) 1326 S.Killian Drive FDC No.25102 Lake Park,FL 33403 PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO. ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Day 4 of the pitting welds in vessels 4 and 6 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ h.Superintendent Hr $77 95 $ b.Skilled Laborer Hr $41.28 $ i.General Superintendent Hr $123.57 $ c.Operator Hr $58.24 $ j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ Subtotal $ 821.57 f. Plumber Hr $44.52 $ Fee 1 $ 123.24 g.Asst.Superintendent Hr 10.50 $66.46 $ 697.83 Total Labor Costs $ 944.81 2. MATERIALS Summary List of Materials Summary List of Materials scripbon/Vendor Amount($) Description/Vendor Amount($) $ Subtotal Materials $ $ Fee $ Total Material Costs Comments: Summary of SpeciattyEquipment Pieces Description Unit Qty Rate Amount Description Unit City Rate Amount A.Telehandler Day $105,81 $ - $ B.Scaffolding Day 1 $28.16 $ 28.16 $ C A/C Unit&Components Day 1 $145.12 $ 145.12 $ D.Generator Day 1 $ 246.30 $ 246.30 $ - E.Welding Machine and Leads Day $ Subtotal $ 449.96 F.Pick Up Truck Day 1 $133.00 $ _ Fee $ 67.49 G.Combo Connex Day 1 $30.38 $ 30.38 Total Equip.Costs $ 517.45 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit City Rate Amount Port-O-Let Day 1 $6.54 $6.54 $ - $ $ $ Subtotal $ 6.54 $ Fee $ Total Other Costs $ 6.54 & SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(0)w/ per diem $ - b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(10.5) $ 1,680.00 Subtotal $ 1,680.00 Fee $ 84.00 Total Sub.Costs $ 1.764.00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 3.232.80 Comments AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE TIME AND MATERIAL SHEET DATE: 11/20/2025 FLORIDA DESIGN CONTRACTORS,LLC 1326 S.Killian Drive FDC No.25102 Lake Park,FL 33403 PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N.Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No 4&6. Costs are limited to work sequences and personnel described below Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Day 5 of pitting welds in vessels 4 and 6 1. DIRECT LABOR Trade/Craft/Skill Unit city Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ h.Superintendent Hr $77.95 $ b.Skilled Laborer Hr $41.28 $ i.General Superintendent Hr $123.57 $ c.Operator Hr $58.24 $ j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ Subtotal $ 655.42 f. Plumber Hr $44.52 $ Fee 1 $ 98.31 g.Asst.Superintendent Hr 8.00 $66.46 $ 531.68 Total Labor Costs $ 753.73 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ Subtotal Materials $ $ Fee $ Total Material Costs - Comments: Summary of SpecialtyEquipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $ B.Scaffolding Day 1 $28.16 $ 28.16 $ C.A/C Unit&Components Day 1 $145.12 $ 145.12 $ D.Generator Day 1 $ 214.66 $ 214.66 $ - E.Welding Machine and Leads Day $ _ Subtotal $ 418.32 F.Pick Up Truck Day $133.00 $ _ Fee $ 62.75 G.Combo Connex Day 1 $30.38 $ 30.38 Total Equip.Costs $ 481.07 4.OTHER COSTS-Supplemental Field Costs Description Unit city Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $&54 $6.54 $ - $ $ $ Subtotal $ 6.54 $ Fee $ Total Other Costs 1 $ 6.54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(8)w/ per diem $ 1,420,00 b. Stalin George Welding -Crew Rate Ind Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(0) Subtotal $ 1,420.00 Fee $ 71.00 Total Sub.Costs $ 1,491 00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,732.34 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE TIME AND MATERIAL SHEET DATE: 11/21/2025 I-\ FLORIDA DESIGN CONTRACTORS,LLC rJ� 1326 S.Killian Drive FDC No.25102 Lake Park,FL 33403 PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL JRFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: KimleyHorn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&& Day 6 of pitting welds in vessels 4 and 6 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit City Rate Amount a.Laborer Hr $41.15 $ h.Superintendent Hr $77.95 $ b,Skilled Laborer Hr $41.28 $ i.General Superintendent Hr $123.57 $ c.Operator Hr $58.24 $ j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ k.Project Manager Hr $126.22 $ - e,Pipe Layer Hr $46.39 $ Subtotal $ 655.42 f. Plumber Hr $44.52 $ Fee $ 98.31 g.Asst.Superintendent Hr 8.00 $66.46 $ 531.68 Total Labor Costs $ 753.73 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ Subtotal Materials $ $ Fee $ Total Material Costs Comments Summary of SpecialtyEquipment Pieces Description Unit Qty Rate Amount Description Unit City Rate Amount A.Telehandler Day $105.81 $ - $ B.Scaffolding Day 1 $28.16 $ 28.16 $ C.A/C Unit&Components Day 1 $145.12 $ 145.12 $ D.Generator Day 1 $ 214.66 $ 214.66 $ - E.Welding Machine and Leads Day $ - Subtotal $ 418.32 F.Pick Up Truck Day $133.00 $ - Fee 1 $ 62.75 G.Combo Connex Day 1 $30.38 $ 30.38 Total Equip.Costs $ 481.07 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $&54 $6.54 $ $ $ $ Subtotal $ 6.54 $ Fee $ Total Other Costs $ 6.54 S. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177 50/Hr(8)w/ per diem $ 1,420,00 b. Stalin George Welding -Crew Rate Inc]Welding Maching Leads Hand Tools and Fuel @$160-00/Hr(0) Subtotal $ 1,420,00 Fee $ 71.00 Total Sub.Costs $ 1,491,00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,732,34 Comments: AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE TIME AND MATERIAL SHEET DATE: 11/24/2025 FLORIDA DESIGN CONTRACTORS,LLC F O)l A 1326 S.Killian Drive FDC No.25102 Lake Park,FL 33403 PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N.Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.. ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Day 7 of welds in vessels 4 and 6.Additional labor cost for another laborer staffed. 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr 8.00 $41.15 $ 329.20 h.Superintendent Hr $77,95 $ b.Skilled Laborer Hr $41.28 $ - i.General Superintendent Hr $123.57 $ c.Operator Hr $58.24 $ I.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ Subtotal $ 984.62 f. Plumber Hr $44.52 $ Fee 1 $ 147.69 g.Asst.Superintendent Hr 8.00 $66.46 $ 531.68 Total Labor Costsi $ 1,132.31 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ Subtotal Materials $ $ Fee $ Total Material Costs Comments: Summary of SpeciatlyEquipment Pieces Description Unit Qty Rate Amount Description Unit City Rate Amount A Telehandler Day $105.81 $ - $ B.Scaffolding Day 1 $28.16 $ 28.16 $ C.A/C Unit&Components Day 1 $145.12 $ 145.12 $ D.Generator Day 1 $ 214.66 $ 214.66 $ - E.Welding Machine and Leads Day $ - Subtotal $ 418.32 F.Pick Up Truck Day $133 00 $ - Fee $ 62.75 G Combo Connex Day 1 $30 38 $ 30.38 Total Equip.Costs $ 481.07 4.OTHER COSTS-Supplemental Field Costs Description Unit City Rate Amount Description Unit City Rate Amount Port-O-Let Day 1 $6.54 $6.54 $ - $ $ $ Subtotal $ 6.54 $ Fee $ Total Other Costs $ 6.54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(8)w/ per diem $ 1,420.00 b. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(0) Subtotal $ 1,420.00 Fee $ 71.00 Total Sub-Costs $ 1,491 00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 3,110.92 Comments AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE TIME AND MATERIAL SHEET DATE: 11/25/2025 FLORIDA DESIGN CONTRACTORS,LLC J l ) 1326 S.Killian Drive FDC No.25102 Lake Park,FL 33403 PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No.4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Day 8 of welds in vessels 4 and 6 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ h.Superintendent Hr $77.95 $ b.Skilled Laborer Hr $41.28 $ i.General Superintendent Hr $123.57 $ c.Operator Hr $58.24 $ j.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ Subtotal $ 655.42 f. Plumber Hr 1 $44.52 1 $ Fee $ 98.31 g.Asst.Superintendent Hr 8.00 1 $66A6 1 $ 531.68 Total Labor Costs $ 753.73 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ Subtotal Materials $ $ Fee $ Total Material Costs Comments 3. EQUIPMENT-Summary of SpecialtyEquipment Pieces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A Telehandler Day $105.81 $ - $ B.Scaffolding Day 1 $28.16 $ 28.16 $ C A/C Unit&Components Day 1 $145.12 $ 145.12 $ D.Generator Day 1 $ 214.66 $ 214.66 $ - E.Welding Machine and Leads Day $ - Subtotal $ 418.32 F.Pick Up Truck Day $133.00 $ - Fee $ 62.75 G.Combo Connex Day 1 $30.38 $ 30.38 Total Equip.Costs $ 481.07 4.OTHER COSTS-Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $6.54 $ - $ $ $ Subtotal $ 6.54 $ Fee $ Total Other Costs $ 6.54 & SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Incl Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(8)w/ per diem $ 1,420.00 b. Stalin George Welding -Crew Rate Ind Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(0) Subtotal $ 1,420.00 Fee $ 71.00 Total Sub.Costs $ 1,491.00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,732.34 Comments. AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE TIME AND MATERIAL SHEET DATE: 11126/2025 FLORIDA DESIGN CONTRACTORS,LLC F2)rr 1326 S.Killian Drive FDC No.25102 Lake Park,FL 33403 PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N.Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO.: ENGINEER: Kimley Horn SPEC.SECTION: DESCRIPTION OF WORK:T&M directive for additional welding services on Pressure Vessels No 4&6. Costs are limited to work sequences and personnel described below. Additional insurance and bond costs are not listed on the daily ticket and will be included within the final cost summary for vessel 4&6. Day 9 of welds in vessels 4 and 6 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ h.Superintendent Hr $77.95 $ b.Skilled Laborer Hr $41.28 $ i.General Superintendent Hr $123.57 $ c.Operator Hr $58.24 $ I.Asst Project Manager Hr 2.00 $61.87 $ 123.74 d.Pipefitter Hr $55.89 $ k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ Subtotal $ 655.42 f. Plumber Hr $44.52 $ Fee $ 98.31 g.Asst.Superintendent Hr 8.00 $66.46 $ 531.68 Total Labor Costs $ 753.73 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) $ Subtotal Materials $ $ Fee $ Total Material Costs - Comments: Summary3. o pecta quipme feces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ - $ B.Scaffolding Day 1 $28.16 $ 28.16 $ C.A/C Unit&Components Day 1 $145.12 $ 145,12 $ D.Generator Day 1 $ 214.66 $ 214.66 $ - E.Welding Machine and Leads Day $ - Subtotal $ 418,32 F.Pick Up Truck Day $133.00 $ - Fee 1 $ 62.75 G.Combo Connex Day 1 $30.38 $ 30.38 Total Equip.Costs $ 481.07 4.OTHERSupplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day 1 $6.54 $&54 $ - $ $ $ Subtotal $ 6.54 $ Fee $ Total Other Costs $ 6.54 5. SUBCONTRACTORS List of Subcontractors and Description a. Stalin George Welding -Crew Rate Ind Welding Maching Leads Hand Tools and Fuel @$177.50/Hr(8)w/ per diem $ 1,420.00 b. Stalin George Welding -Crew Rate Ind Welding Maching Leads Hand Tools and Fuel @$160.00/Hr(0) Subtotal $ 1,420.00 Fee $ 71.00 Total Sub.Costs $ 1,491.00 TOTAL COST WORK DESCRIBED THIS TICKETI $ 2,732.34 Comments AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE TIME AND MATERIAL SHEET DATE: 12/18/2025 FZra FLORIDA DESIGN CONTRACTORS,LLC ' 1326 S.Killian Drive FDC No.25102 Lake Park,FL 33403 PROJECT NAME: Tequesta WTP Filter Plant Upgrades SUBMITTAL No. LOCATION: 901 Old Dixie Hwy N. Tequesta FL RFI No. OWNER: Village of Tequesta DRAWING NO. ENGINEER: Kimley Horn SPEC.SECTION DESCRIPTION OF WORK:T&M directive for additional welding services on inlet header corrosion prior to sandblast.Included is the female threaded coupling order charge as well as the sample strainers order charge.An additional 3 hours is added to the superintendent to make the connections between the SST inlet headed and the PVC inlet arms. 1. DIRECT LABOR Trade/Craft/Skill Unit Qty Rate Amount Trade/Craft/Skill Unit Qty Rate Amount a.Laborer Hr $41.15 $ h.Superintendent Hr 3.00 $77.95 $ 233.85 b.Skilled Laborer Hr $41.28 $ i.General Superintendent Hr $123.57 $ - c.Operator Hr $58.24 $ j.Asst Project Manager Hr $61.87 $ d.Pipefitter Hr $55.89 $ k.Project Manager Hr $126.22 $ - e.Pipe Layer Hr $46.39 $ Subtotal $ 233.85 f. Plumber Hr $44.52 $ Fee 1 $ 35.08 g.Asst.Superintendent Hr $66.46 $ Total Labor Costs 1 $ 268.93 2. MATERIALS Summary List of Materials Summary List of Materials Description/Vendor Amount($) Description/Vendor Amount($) Harrington-Female thread adapter(6)&Glue and Primer $ 520.51 $ Hungerford&Terry Inc.1/2"Strainer Caps $ 141.28 Subtotal Materials $ 661.79 $ _ Fee 99.27 $ Total Material Costs Comments Summary of Specialtyquipmertt teces Description Unit Qty Rate Amount Description Unit Qty Rate Amount A.Telehandler Day $105.81 $ $ B.Scaffolding Day $28.16 $ $ C.A/C Unit&Components Day $145.12 $ $ D.Generator Day $ 159.10 $ $ E.Welding Machine and Leads Day $ Subtotal $ F.Pick Up Truck Day $133.00 $ Fee $ G.Combo Connex Day $30.38 $ Total Equip-Costsl $ 4.OTHER COST -Supplemental Field Costs Description Unit Qty Rate Amount Description Unit Qty Rate Amount Port-O-Let Day $6.54 $ $ $ $ Subtotal $ $ Fee $ Total Other Costs 5. SUBCONTRACTORS List of Subcontractors and Description Collective Mind Mobile Welding-Repair of inlet header corrosion cracks prior to sandblasting of the header. $ 1,200.00 Subtotal $ 1,200.00 Fee $ 60.00 Total Sub.Costs $ 1,260.00 TOTAL COST WORK DESCRIBED THIS TICKET $ 2,289.99 Comments AUTHORIZED VERIFICATION OF TIME&MATERIALS PROVIDED BY: FDC VERIFICATION OF TIME&MATERIALS PROVIDED BY: PRINT NAME / DATE / SIGNATURE PRINT NAME / DATE / SIGNATURE Page 1 of 1 INVOICE HUNGERFO" & TERRY INC. INVOICE NUMBER: RS06600-IN INVOICE DATE: 12/10/2025 Manufacturers of Water Treatment Equipment SALESPERSON: 1814 MTS ENVIRONMENTAL 226 N ATLANTIC AVE ORDER NUMBER: 12190P P.O.BOX 650-CLAYTON NEW JERSEY 08312-0650 ORDER DATE: 12/05/2025 Phone:856-881-3200 Fax: 856-881-6859 PROCESSED BY: EH CUSTOMER NO: 0003217 SOLD TO: SHIP TO: FLORIDA DESIGN CONTRACTORS FLORIDA DESIGN CONTRACTORS ATTN.:ACCOUNTS PAYABLE TELEPHONE: 561-845-1233 1326 KILLIAN DR 1326 SOUTH KILLIAN DRIVE WEST PALM BEACH, FL 33403 WEST PALM BEACH, FL 33403 FAX: 561-845-1233 CONFIRM TO:Zachary Hammann<ZHammann( Floridadesignc CUSTOMER P.O. SHIP VIA F.O.B. TERMS SHIP DATE 25102-002 DESTINATION NET 30 DAYS 12/09/2025 ITEM NO. UNIT ORDERED SHIPPED BACK ORDERED PRICE AMOUNT INVOICE EMAILED TO:JRandolph@floridadesigncontractors.com INVOICE FOR: K-1 EACH 8.00 8.00 0.00 17.660 141.28 W hse:000 1/2 IN.PLASTIC ORTHO STRAINER Part#is K1.0.2.1/2"NPT.PP `INTERCHANGEABLE PART S-12 SEE MEMO BILL PROBASCO 5/4/09 UPS TRACKING No. 1Z 069 780 03 9022 2684 SUPPORTING DOCUMENTS ENCLOSED 2% INTEREST CHARGED ON PAST DUE ACCOUNTS (24%PER ANNUM) Net Invoice: $141.28 Less Discount: $0.00 Freiqht: $0.00 Sales Tax: $9.89 PAYABLE IN US FUNDS Invoice Total: $151.17 TELEPHONE No.: 856 881-3200 FAX No.: 856 881-6859 PACKING LIST HUNGERFORD & TERRY, INC. 226 N ATLANTIC AVENUE CLAYTON N] 08312 P.O. No. 25102-002 DATE 12/09/2025 OUR P.O. No. 12190P PAGE 1 OF 1 SHIP TO: FLORIDA DESIGN CONTRACTORS MARKS: ZACHARY HAMMAN 1326 S KILLIAN DR (P) 561-275-2282 WEST PALM BEACH, FL 33403 VIA: No. PKG. No. OF QUANTITY AND DESCRIPTION WEIGHT PKGS. HT-RP-1 1 BOX ORTHO STRAINER 2 LBS. 12 IN. L x 7 IN. W x 4 IN. H 8 1/2 IN. PLASTIC ORTHO SAMPLE STRAINER P/N: K1. 0 .2 . 1/2" NPT.PP UPS TRACKING : lZ 069 780 03 9022 2684 12/12/25 06: 12 Ali PST Harrington Ind Plast Page 1 of 2 #291576 C Harrington Industrial Plastics LLC Harrington Industrial Plastics 5251 Powerline Road Fort Lauderdale FL 33309 Phone: 954-351-0088 Fax: 954-351-0300 Attention: ZACHARY Company: FLORIDA DESIGN CONTRACTORS To: KABERCROMBIE@H PCO.COM From: Kevin A. Abercrombie Subject: QUOTE 04458312 Memo: 12/12/25 06: 12 AM PST Harrington Ind Plast Page 2 of 2 #291576 C Harrington Industrial Plastics Quotation# 04458312 5251 Powerline Road Written: KAA Fort Lauderdale FL 33309 Quote Date 12/03/25 954-351-0088 Expire Date 12/17/25 954-351-0300 Fax Page 1 OF 1 Quotation 075456 Ship To: FLORIDA DESIGN CONTRACTORS Florida Design Contractors Village of Tequesta WTP 1326 SOUTH KILLIAN DRIVE 901 North Old Dixie Hwy LAKE PARK, FL 33403 Tequesta, FL 33469 Job: RFQ# ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Contact : ZACH Ship Via: BEST WAY POSSIBLE Phone#: 561-660-0015 FOB / Delivery ARO: SHIPPING POINT Fax: 561-848-5992 Frt-Terms : PREPAID & CHARGE ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Product/Description Quantity Price U/M Extension ------------------------------------------------------------------------------- 835-0605 6 47 .32 EA 283 . 92 6" ADAPTER SXFPT GRY PVC SCH80 724QG 1 49 .89 EA 49 .89 SOLVENT CEMENT CPVC QT GRY LOW VOC HEAVY BODIED MED SET MC/AC P70QC 1 35 .50 EA 35 .50 PRIMER QT CLR FOR PVC CPVC LOW VOC MC/AC 14108 3 12 .38 EA 37 .14 SUPERSWAB HANDLE W/REPLACABLE SWAB 4" DIA *8099 ACCESSORIES MISC 1 80 . 00 EA 80 . 00 ESTIMATED SHIPPING Harrington' s standard Terms and conditions apply. Please visit https : //www.hipco.com/terms-and-conditions-sale for the full Terms and Conditions Due to recent volatility in U.S . government tariff regulations --whether enacted or under review--all quotes remain provisional and are subject to price adjustments or surcharges . Pricing provided is valid for 24 hours from the time of the quotation and may be adjusted up until receipt of a confirmed Purchase Order and approval to proceed with production. ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Merchandise Tax Est .Freight / Handling Net Quote Total ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- 486 .45 34 . 06 0 . 00 520 . 51 ------------------------------------------------------------------------------- Thanks For Thinking Harrington. Respectfully Kevin A. Abercrombie All Quotations are subject to review upon placement of order. Freight/Handling and applicable taxes if not listed above will be added. Harrington standard terms and conditions apply to this quote. INVOICE CM Mobile Welding Brett@collectivemindwelding.com 6306 Glen Abbey Ln +1 (941)313-0073 Bradenton,FL 34202 Bill to Ship to Florida Design Contractors,LLC MHN Industrial Group,LLC MHN Industrial Group,LLC 1326 South Killian Drive 1326 South Killian Drive Lake Park,FL 33403 USA Lake Park,FL 33403,USA Invoice details Invoice no.:1052 Terms:Net 10 Invoice date:12/17/2025 Due date:12/27/2025 # Date Product or service Description Qty Rate Amount 1. Welding Repair of three way water splitter for 2 $600.00 $1,200.00 tequesta Total $1,200.00 Ways to pay VISA ` W. — *� vcnmo Checks can be made outto CM Mobile Welding Note to customer Thank you for your business. • •. Village of • • Upgrades r� 901 North • • Dixie Highway -• - •• ' D• 1 1 .. ' i t 11 r rE'•ir`I � `J�I� '.rn y 71 J �r i 3�1 i Ifs rf I yl A ► a �( (� M ij fl �i l! C II I - IN_ Eti 0 ,true r i 1 Z r itll(��t(� ';J�1A/ lt�J,-/ 012``1 0e_J'J 1N1 1�!3?!"5 11c::7.11Y 1 1 OAM 6:00 AM 12:00 PM 4:00 PM 680 720 750 Partially cloudy Clear Partially cloudy Windt ?H I Precipitation:.0" Humidity:87% Wind:13 MPH I Precipitation: 0" Humidity:52% Wind:17 MPH I Precipitation: 0" Humidity:51% Work Logs Name Description Quantity Total Total Hours Hours To Date i(J FDC Removing seized bolts and studs 1 8 12 Cleaning threads of flanges Welder Welding pitting 2 32 32 Total 3 40 48 CardsTime • - Powered by 1 of 3 1 Village of Tequesta WTP Filter Plant Upgrades F.N Work Log Photos 10/30/25 I Ol:23PIVI l Of�30/25 101:23PM 10/30/2 �M l 0�301y��S 101:2�4 M _ }h y 012Q-W 1. Starting welding in tank#4 - ' ' t Materials No entry Equipment No entry General Notes otal of 61 holes VillagePowered by .. .. Site Safety Observations No entry Quality • • Observations No - Questions N/A No Yes Description 1. Were there any schedulled or performed ❑� ❑ ❑ inspections or tests today? ( Pass/ Fail) 2. How were the site conditions today? 0 ❑ ❑ 3. Any accidents on site today? ❑�/ ❑ ❑ 4. Any schedule delays occur? ❑Q ❑ ❑ 5. Any weather delays occur? 0 ❑ ❑ 6. Any visitors on site? 0 ❑ ❑ 7. Any areas that can't be worked on? © ❑ ❑ 8. Any equipment rented on site? © ❑ ❑ Attachments JIMPnE, 3 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Village of Tequesta Upgrades ■ �� 901 North -• 4• D.te Fri 10/31/2025 Job# 25102 m ,O rn O 11�1 r i G) ^- Z 10/31/25 S Weather 6:00 AM 12:00 PM 4:00 PM 590 680 730 Clear Clear Clear Wind Precipitation: 0" Humidity:84% Wind:10 MPH I Precipitation: o" I Humidity:56% Wind:12 MPH I Precipitation: 0" Humidity:49% Work Logs Name Description Quantity Total Total Hours Hours To Date FDC Removing seized bolts and studs 1 8 20 Cleaning threads of flanges V°ielder Welding pitting 2 16 48 Total 3 24 72 CardsTime • entry Powered by 1 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Work Log Photos 10' 1;''27 11006APJI 10/31/25I 10:06AM lOiBl/25�73J_06AM 10/3l/25� 10:06AM �V l/251 Ot50�M' 10 "� :' 0227PM 1 1 Materials No entry 1. Tank Equipment No entry General Notes •. has 63 pitted p Site Safety Observations No entry Questions N/A No Yes Description Powered by 4& Quality Control Observations No entry Survey Village of Tequesta WTP Pilter Plant Upgrades 1. Were there any schedulled or performed a ❑ ❑ inspections or tests today?(Pass/ Fail) 2. How were the site conditions today? ❑./ ❑ ❑ 3. An accidents on site today? ./ Y Y ❑ ❑ ❑ 4. Any schedule delays occur? 0 ❑ ❑ 5. Any weather delays occur? 0 ❑ ❑ 6. Any visitors on site? 0 ❑ ❑ 7. Any areas that can't be worked on? Q ❑ ❑ 8. Any equipment rented on site? 0 ❑ ❑ Powered by A& 3 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Village of eq Upgrades r� • • Dixie Highway -• 4• D.te Weci 11/12/2025 Job# 6:00 AM 12:00 PM 4:00 PM 500 710 720 Clear Partially cloudy Partially cloudy Wind:7 MPH Precipitation: 0' Humidity:8T/% Wind:11 MPH I Precipitation: 0 Humidity:57% Wind:8 MPH Precipitation. 0 Humidity:51! Name Description Quantity Total Total Hours Hours To Date FDC Supervise and assist subcontractors 1 9 29 Od Stalin George Welding pitting in bottom of vessel#6 2 18 18 Welding Total 3 27 Time Cards No entr Work Log Photos Stalin George Welding: Powered by 4P1 of 3 1 Village of Tequesta WTP Filter Plant Upgrades F.N 1 '/1�'/:'S 1 1�9PM !25�12:39 11/12/25�1239PM 11/�2/25�12.39PM 4 w Materials No entry Equipment No entry General Notes No entry Site Safety Observations No entry HMOii, ,illllservations No entry Survey VillageQuestions N/A No Yes Description Were there any schedulled or performed Powered by Ap .. ..- 1. inspections or tests today?(Pass/ Fail) MI/ ❑ ❑ 2. How were the site conditions today? 0 ❑ ❑ 3. Any accidents on site today? Q ❑ ❑ 4. Any schedule delays occur? ❑d ❑ ❑ 5. Any weather delays occur? Q ❑ ❑ 6. Any visitors on site? R ❑ ❑ 7. Any areas that can't be worked on? 0 ❑ ❑ 8. Any equipment rented on site? ❑./ ❑ ❑ Powered by 403 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Village of • Upgrades r� 901 North Old Dixie Highway TeqUesta, 4• D. 1 .. A M Ilk, IN Z 1- ZRi llit 'k l;tom.��+. �, =�1!�il i �" =-;-1t�/l: i,{ �!1,,�11:1 �``, ����_!�/l t i I 1 1;1G s•�.�.11' � �/1 r i 6:00 AM 12:00 PM 4:00 PM 580 740 740 Clear Clear Clear Wind:8 MPH ( Precipitation:.0" I Humidity:67% Wind:9 MPH Precipitation: 0" ( Humidity:36 o Wind:8 MPH Precipitation: 0" Humidity:42 0 Name Description Quantity Total Total Hours Hours To Date FDC Supervise and assist subcontractors 1 9.5 38.5 Stalin George Welding pitting in bottom of vessel#6+4 2 19 37 Welding Grinding welds back flush Total 3 28.5 127.5 CardsTime Powered by 4& 1 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Work Log Photos � r 11/13/25109:30AM 3/ AM �' 1113/ 51 0930AM 1lr'�3'25 i 0930AM Stalin George Welding: s 11/13/25 169:30AM � ' 25 I l Q604AM� 11/13/25 101:07PM 1 a 1 PM Materials No entry Equipment No entry General Notes No entry Site Safety Observations No entry Quality Control Observations No entry Survey Questions N/A No Yes Description inspections or tests today? 2. How were the site conditions •.. 3. Any accidents on site today? 0 ❑ ❑ 4. Any schedule delays occur? 0 ❑ ❑ 5. Any weather delays occur? 0 ❑ ❑ 6. Any visitors on site? 0 ❑ ❑ 7. Any areas that can't be worked on? F%-/] ❑ ❑ 8. Any equipment rented on site? 0 ❑ ❑ Attachments f mwunay.numnrr gill � Powered by 3 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Village of ' • Plant Upgrades r� 901 North Old Dixie Highway Tequesta, FL 33469 Date Fi i I I I sss .. y M A td Z I I. _ _ Z EF � 11111,11. €€r '1JYI 411'l�Rl l :ZIm -01 =11 I I I 6:00 AM 12:00 PM 4:00 PM 590 770 760 Clear Clear Partially cloudy Wind:7 MPH Precipitation:.0" Humidity:80 i Wind:8 MPH I Precipitation: 0" Humidity:49 i Wind:10 MPH ! Precipitation 0" Humidity 5 Name Description Quantity Total Total Hours Hours To Date FDC Supervise and assist subcontractors 1 8 46.5 Removed frozen bolt from bottom of tank#6 Stalin George Welding pitting in bottom of vessel#6+4 2 15 52 Welding Grinding welds back flush Total 3 23 IS" CardsTime Powered by 4& 1 of 3 1 Village of Tequesta WTP Filter Plant Upgrades q-r. Work Loci Photos 1i14;��I G9:D4AM 1ll1� �51 C9. �PII Stalin • • Welding: s 52AM 1/14/25 108:23AM Equipment No entry General Notes No entry Site Safety Observations No entry of Tecluesta WTP Filter Plant Upgrades Quality ControlObservations Questions N/A No Yes Description 1. Were there any schedulled or performed 0 ❑ ❑ inspections or tests today? ( Pass/ Fail) 2. How were the site conditions today? 0 ❑ ❑ 3. Any accidents on site today? 0 ❑ ❑ 4. Any schedule delays occur? 0 ❑ ❑ 5. Any weather delays occur? Q ❑ ❑ 6. Any visitors on site? 0 ❑ ❑ 7. Any areas that can't be worked on? 0 ❑ ❑ 8. Any equipment rented on site? 0 ❑ ❑ Powered by 4& 3 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Village of ' • Upgrades 901 NorthOld Dixie Highway TeqUesta, 46• Date - 11/18/2025 Job �I11 ii�i ;�1i1+ I�7jll {li a*l Z1 Ili a 1 i a� M do III l C Ln ll1�11fi ;I�I l Z Z 11 1 "5 J 1f��I tElnla�+t ;�rait�ar,4 f i�l`17�1A%l ? ? .=`` , '171"M 11!1S1 10.% %�1Pd !!11 1, 1111' �!"'�(li0 r rl%%111t/1 / 6:00 AM 12:00 PM 4:00 PM 620 810 800 Clear Partially cloudy Partially cloudy Wind:1 MPH ( Precipitation:.0" Humidity:99% Wind:6 MPH I Precipitation: 0" ( Humidity:58 i Wind:8 MPH ( Precipitation: 0" ( Humidity:59% Name Description Quantity Total Total Hours Hours To Date FDC Supervise and assist subcontractors 1 10.5 57 Removed frozen bolt from bottom of tank#6 n Stalin George Welding pitting in bottom of vessel#6+4 2 21 73 Welding Grinding welds back flush Total 3 31.5 182 CardsTime • entry 1 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Work Log Photos Stalin George Welding: 4 •'40AM /?AA Materials No entry Equipment • entry NotesGeneral • entry ObservationsSite Safety No Control Observations No entry Questions N/A No Yes Description 1. Were there any schedulled or performed Rd ❑ ❑ inspections or tests today? ( Pass/ Fail) 2. How were the site conditions today? Q ❑ ❑ 3. Any accidents on site today? ❑./ ❑ ❑ 4. Any schedule delays occur? ❑d ❑ ❑ 5. Any weather delays occur? Q ❑ ❑ Powered by &nMF.N 2 of 3 i Village of Tequesta WTP Filter Plant Upgrades 6. Any visitors on site? ❑Q ❑ ❑ 7. Any areas that can't be worked on? 0 ❑ ❑ 8. Any equipment rented on site? Q ❑ ❑ Attachments .,A '~ �f 11.1:.� ` 1713P1ib1 11.1 S 5 1 d 71 E'Abj Powered by 3 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Village of .q r s- Upgrades 901 North • '• 469 D.te Thu 11/20/2025 Job - :,� 7 _ - a - i l 1Sr41 5 I l�/�3-':411t l 1. L!15 121 I- -'1Ab l 1 i-Ll��{Q 1-0-'::1��d 41;�1�5 I G 7:2;2,'AA I�Iif 11,111, Ir_ ' Weather 6:00 AM 12:00 PM 4:00 PM 640 810 790 Clear Partially cloudy Clear Wind:5 MPH Precipitation:.0" Humidity:98% Wind:5 MPH I Precipitation:.0" Humidity:57% Wind:8 MPH Precipitation: 0" Humidity:61 Work Logs Name Description Quantity Total Total Hours Hours To Date _ FDC Supervise and assist subcontractors 1 8 65 Removed frozen bolt from bottom of tank#6 Stalin George Welding deteriorated parts of ring in vessel#6 2 16 89 Welding Total 3 24 206 Time Cards No entry Powered by 1 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Work Log Photos 11/20/i 1 09 11AM : D�'11 FVI� Stalin George Welding: - r - y �"- �'112D/25' G2 59AM l U20/25 1 0 11/�0T25 1 03 07PM 11/20/25 1 03:O8PM 11/20/25 103:08PM Materials No entry Equipment No entry General Notes No entry Site Safety Observations No entry Quality Control Observations No entry i Questions N/A No Yes Description 1. Were there any schedulled or performed ❑ ❑ inspections or tests today? ( Pass/ Fail) 2. How were the site conditions today? Q ❑ ❑ 3. Any accidents on site today? 0 ❑ ❑ 4. Any schedule delays occur? 0 ❑ ❑ 5. Any weather delays occur? Q ❑ ❑ 6. Any visitors on site? ❑./ ❑ ❑ 7. Any areas that can't be worked on? ❑./ ❑ ❑ 8. Any equipment rented on site? 0 ❑ ❑ Attachments\ 'i � ca�xnnvntm+nmur a li �'j� e� i,; IMF z LA Cy LLJ ;FI Si ! (I 'll�lAiii't�� ii I��ifiitl�lV(' �,C .5! �1P/1 Powered by 3 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Ev Village of Tequesta Upgrades 901 NorthOld Dixie Highway TeqUesta, 46 D. .. Rn _ I ;- kli-4- 1 M { , i N i D 3 i---1 to I, i.' l , r I ii Vie e r i i t,�'li il: III , ti na r ` /y4 1 r, 6 q�, 1 Q. t 4 ,� isI I TJ 1T•'r 1 ._Z.�-ll� ��a„ t v: t l��:��a' �11;! �11r 1! ll��.;,.�:�,e �, li ,dll.�t �;��1�✓,.,�� '� Weather 6:00 AM 12:00 PM 4:00 PM 640 810 800 Partially cloudy Partially cloudy Clear Wind:4 MPH Precipitation:.0" Humidity:98% Wind:6 MPH I Precipitation:.0" I Humidity:57i Wind:9 MPH I Precipitation: 0" Humidity:58% M1191� Name Description Quantity Total Total Hours Hours To Date FDC Supervise and assist subcontractors 1 8 73 Removed frozen bolt from bottom of tank#6 OO Stalin George Welding deteriorated parts of ring in vessel#6 and#4 2 16 105 Welding Total 3 24 23 CardsTime Powered by 40 1 of 3 1 Village of Tequesta WTP Filter Plant Upgrades RAKEN Work Log Photos Stalin George Welding: I _ 11G h • ��' • 1 Materials No entr�= Equipment No - NotesGeneral • entri Site Safety Observations No entri Quality Control Observations No ' Questions N/A No Yes Description t Were there any schedulled or performed ❑ ❑ inspections or tests today? ( Pass/ Fail) 2. How were the site conditions today? ❑�/ ❑ ❑ powerr 0 DV 2 of 3 1 Village of Tequesta WTP Filter Plant Upgrades 3. Any accidents on site today? 0 ❑ ❑ 4. Any schedule delays occur? ❑- ❑ ❑ 5. Any weather delays occur? Q ❑ ❑ 6. Any visitors on site? 0 ❑ ❑ 7. Any areas that can't be worked on? Q ❑ ❑ 8. Any equipment rented on site? 0 ❑ ❑ Attachments jTJ Powered by 3 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Village of Tequesta Upgradesr� North901 Old Dixie Highway4• Date Mon .b# 25102 M I �' rn10 .r O � �� �I 111 f Ii.y=.�' (�; fit {f t 1 Z 11._-.21 1�1 1—11ANI 1 07:3;.1Fd t1�Ip! ��1l � l,2S 1�1: '.'AM l 1. "_S 1 0-:''ANI t, tr , Weather 6:00 AM 12:00 PM 4:00 PM 660 780 790 Partially cloudy Partially cloudy Partially cloudy Wind = =H I Precipitation 0 Humidity:9?< Wind 10 MPH I Precipitation: 0' 1 Humidity:73% Wind:10 MPH I Precipitation. 0' Humidity o-,- Work Logs Name Description Quantity Total Total Hours Hours To Date FDC Supervise and assist subcontractors 2 16 89 Stalin George Welding deteriorated parts of ring in vessel#6 and#4 2 16 121 Welding Total 4 32 211112 CardsTime • entry Work Log Photos Powered by i 1 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Stalin George Welding: i - 10A4Ato Materials No entry Equipment No entry NotesGeneral No entry Site Safety Observations No entry Quality Control ObservationsNo entry Questions N/A No Yes Description 1 Were there any schedulled or performed 0 ❑ ❑ inspections or tests today?(Pass/ Fail) 2. How were the site conditions today? Q ❑ ❑ 3. Any accidents on site today? 0 ❑ ❑ 4. Any schedule delays occur? Q ❑ ❑ 5. Any weather delays occur? Q ❑ ❑ 6. Any visitors on site? 0 ❑ ❑ Powered by 4& 2 of 3 1 Village of Tequesta WTP Filter Plant Upgrades gANEM 7. Any areas that can't be worked on? 0 ❑ ❑ B. Any equipment rented on site? 0 ❑ ❑ Attachments P°"e'e°by 3 of 3 1 Village of Tequesta WTP Filter Plant Upgrades EN Village of ' • Upgrades r� 901 Northe• 4• .. 6:00 AM 12:00 PM 4:00 PM 690 820 800 Partially cloudy Partially cloudy Clear Wind:2 MPH I Precipitation: 0" Humidity:90>, Wind:10 MPH I Precipitation: 0" 1 Humidity.62% Wind:9 MPH I Precipitation 0 I Humidity:62% Work Logs Name Description Quantity Total Total Hours Hours To Date FDC Supervise and assist subcontractors 1 8 97 Stalin George Welding and grinding parts of ring in vessel#4 2 16 137 Welding Total 3 24 Time Cards No entry Work Log Photos FDC: Powered 6y 1 of 3 I Village of Tequesta WTP Filter Plant Upgrades 11/2 �08:26AM 11/25/2�08:26AM Stalin • • • • I 11)25-25I08:23AM '11/25/ �8:23AM 11;' J823AM 11/25/25108:23AM y 11/25/25 1 08:23AM 1/- :'S C3:2AAM l �'25+ 11/25/25 1 12:01 PM 11/25/25 1 O121 PM Materials No entry Equipment No entry General Notes No entry Site Safety entry Observations No Quality ControlObservations No entry -M I Questions N/A No Yes Description 1. Were there any schedulled or performed 0 ❑ ❑ inspections or tests today? (Pass/ Fail) 2. How were the site conditions today? Q ❑ ❑ 3. Any accidents on site today? Q ❑ ❑ 4. Any schedule delays occur? ❑d ❑ ❑ 5. Any weather delays occur? 0 ❑ ❑ 6. Any visitors on site? ❑d ❑ ❑ 7. Any areas that can't be worked on? 0 ❑ ❑ 8. Any equipment rented on site? 0 ❑ ❑ Powered by 4& 3 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Y>YEN Village of • • ■ Filter Plant Upgrades 901 NorthOld Dixie Highway -• 4• Date Wed .. ih �o � 4 I I j D (•• '� I " I�! l ' 1 I+I i I( i t i,' i I r r r c.f ( C hill a I {r;t III"�1�,tllt r ..l ..,.�I I 1 Z p Z 6:00 AM 12:00 PM 4:00 PM 670 830 800 Partially cloudy Partially cloudy Partially cloudy Wind:0 MPH I Precipitation:.0" Humidity:96% Wind:10 MPH I Precipitation: 0" Humidity:63% Wind:12 MPH I Precipitation: 0" Humidity:74% 1 -E Name Description Quantity Total Total Hours Hours To Date FDC Supervise and assist subcontractors 1 8 105 O Stalin George Welding deteriorated parts of ring in vessel#6 and#4 2 16 153 Welding Total 3 24 378 CardsTime • entry Work Log Photos Powered by -- 1 of 3 1 Village of Tequesta WTP Filter Plant Upgrades Stalin George Welding: Ww .ter►'; `MIC Materials F! 1 /a S No entry Equipment No entry NotesGeneral • entry Site Safety Observations No entry Quality ControlObservations No entry Questions N/A No Yes Description 1. Were there any schedulled or performed 0 ❑ ❑ inspections or tests today? ( Pass / Fail ) 2. How were the site conditions today? 7 ❑ ❑ 3. Any accidents on site today? 0 ❑ ❑ Powered by 2 of 3 1 Village of Tequesta WTP Filter Plant Upgrades PAKEN 4. Any schedule delays occur? 0 77 5. Any weather delays occur? 0 El D 6. Any visitors on site? 0 7. Any areas that can't be worked on? 0 8. Any equipment rented on site? 0 7 El Attachments Powered by �EN 3 of 3 Village of Tequesta WTP Filter Plant Upgrades I Customer# Bill to# Invoice# Invoice W I LLSCOT I INVOICE Date Terms na 6400 E MCDOWELL RD.SUITE 300 10433184 173716 9024992762 11/12/2025 NET 10 SCOTTSDALE,AZ 85257 (800)782-1500 " $668.32 customersuccess@willscot.com • • 11/22/2025 www.willscot.com Fed ID#52-0665775 lzss BRANCH: MD WEST PALM BEACH FL FLORIDA DESIGN CONTRACTORS 375 KELLY DRIVE 1326 S KILLIAN DR ROYAL PALM BEACH FL LAKE PARK FL 33403-1919 33411 I-I1ll�ul�un�lnn�l�ll�nl� l�r1111-1FI-1 �lll�llllll, (954) (954)406-9139 Contract# Contract Start Date Customer PO Ordered By Rental Period Job Location 1002694560 10/15/2025 Zach Hammann 11/12/2025- 901 OLD DIXIE HWY 5618451233 12/9/2025 JUPITERFL33469 Quantity Rental Pricing Per Billing Cycle 20'COMBO W/10'OFFICE AS20RYX0531 W/Desk and Chair $598.00 $598.00 T* 1 Personal Property Expense $26.60 $26.60 T* Sub-total $624.60 Tax $43.72 • • $668.32 Invoice in USD PLEASE REMIT WITH PAYMENT Download the WiliScot INVOICE TOTAL $668.32 Solutions Center App Invoice#: 9024992762 Due Date: 11/22/2025 Easily manage your units,view and pay invoices,track deliveries and pickups,request Customer: FLORIDA DESIGN CONTRACTORS }�{ services,or get quotes for new units—all of this at any time,from anywhere. Customer#: 10433184 Wn'ON ❑■ �• s App Store Google PIW PLEASE R , 800.782.1500 Q WillScotSolutionsCenter.com WILLIAMS SCOTSMAN, INC. You remain responsible for the invoice balance if there is an issue PO BOX 91975 with your method of payment.Late fees and interest charges may be assessed if payment is not made within terms. CH I CAG 0 IL 60693-1975 5245101.2025110447304.01259 F INVOICE SEND ALL PAYMENTS TO- SUNBELT SUNBELT RENTALS, INC. • • 174633139-0004 PO BOX 409211 ATLANTA, GA 30384-9211 RENTALS • • 413156 • • 11/06/25 "E iofl INVOICE TO RECEIVED BY CONTRA'` HAMMANN, ZACHARY 174633139 1 oz-2599-2659 R FLORIDA DESIGN CONTRACTORS INC 1326 SOUTH KILLIAN DRIVE JOB# 25102 LAKE PARK, FL 33403 JOE, l;n 36- FLORIDA DESIGN C JOB ADDRESS BRANCH FLORIDA DESIGN CONTRACTORS INC 901 OLD DIXIE HWY FORT LAUDERDALE CC PC483 TEQUESTA, FL 33469 2350 1701 GREEN RD STE H POMPANO BEACH, FL 33064 1074 561-862-7137 954-587-4277 QTY EQUIPMENT # Min Day Week 4 Week Amount 1.00 5 TON AIR CONDITION W/HEAT 480v 581.00 581.00 1005.00 1875.00 1875.00 PA40000021 Make: GOODMAN Model : GPC1460H41EC Ser #: 1801435684 3.00 12" X 25' DUCT 27.54 27.54 55.08 149.94 449.82 1.00 50' SPIDERBOX CABLE 6/4 42.64 42.64 102.96 267.28 267.28 Rental Sub-total : 2592.10 SALES ITEMS: Qty Item number unit Price 1 ENVIRONMENTAL EA 28.120 28.12 2133XXX000 ENVIRON/HAZMAT/DISPOSAL FEE 1 RENTAL PROTECTION PLAN EA 388.81 BILLED FOR FOUR WEEKS 10/21/25 THRU 11/17/25. I I Equipment. Service. Guaranteed. SUBTOTAL 3,009.03 REMIT TO: 183.42 SUNBELT RENTALS, INC. NET30 • • 3192.45 PO Box 409211 Invoices not paid within 30 days maybe subject to a 1-'/�% ' ATLANTA, GA 30384-9211 per month charge. 4 WEEK BILL ANGEL SOTO angel.soto@sunbeltrentals.com L INVOICE SEND ALL PAYMENTS TO: SUMBELT SUNBELT RENTALS, INC. • • 174587960-0002 PO BOX 409211 ® ATLANTA, GA 30384-9211 RENTALS • • 413156 • • 11/18/25 PAGE 1 of 1 INVOICE TO RECEIVFp RY CONTRACT 1\IC HAMMANN, ZACHARY 174587960 1.7-2340-2375 PURCHASE ORDER NO. FLORIDA DESIGN CONTRACTORS INC 1326 SOUTH KILLIAN DRIVE NR LAKE PARK, FL 33403 JOB NO, TOWN OF TEQUESTA WAT JOB ADDRESS BP TOWN OF TEQUESTA WATER 901 OLD DIXIE HWY WEST PALM BEACH PC090 TEQUESTA, FL 33469 2350 5770 N MILITARY TRL WEST PALM BEACH, FL 33407 184 561-862-7137 561-682-9888 QTY EQUIPMENT # Min Day Week 4 Week Amount 6.00 5' SCAFFOLD END FRAME GT 7.00 7.00 7.00 15.00 90.00 6.00 7' SCAFFOLD BRACE GT 2.00 2.00 2.00 8.00 48.00 4.00 SCAFFOLD LEVELING JACKS GT 4.00 4.00 4.00 10.00 40.00 20.00 PIN SNAP 2" GT/MP 1.00 1.00 1.00 1.00 20.00 6.00 GR7 GUARD RAIL 7'0" .05 .05 .38 1.50 9.00 4.00 AP7 PLANK, ALUM 7'0"X19" .43 .43 3.03 12.10 48.40 Rental Sub-total : 255.40 1 RENTAL PROTECTION PLAN 34.44 BILLED FOR FOUR WEEKS 10/21/25 THRU 11/17/25. Equipment. Service. Guaranteed. SUBTOTAL 289.84 REMIT TO: 17.88 SUNBELT RENTALS, INC. NET30 • • 307.72 PO BOX 409211 Invoices not paid within 30 days may be subject to a 1-/2% ATLANTA, GA 30384-9211 per month charge. 4 WEEK BILL ANGEL SOTO angel.soto@sunbeltrentals.com L F_ INVOICE SEND ALL PAYMENTS TO- S E LT SUNBELT RENTALS, INC. • • 174663702-0002 PO BOX 409211 ® ATLANTA, GA 30384-9211 RENTALS • • 413156 • 11/18/25 PA E1 of 1 INVOICE TO CONTR^',T HAMMANN, ZACHARY 174663702 1 oz-2341-2376 FLORIDA DESIGN CONTRACTORS INC 1326 SOUTH KILLIAN DRIVE PENDING LAKE PARK, FL 33403 TOWN OF TEQUESTA WAT JOB ADDRESS TOWN OF TEQUESTA WATER 901 OLD DIXIE HWY WEST PALM BEACH PC090 TEQUESTA, FL 33469 2350 5770 N MILITARY TRL WEST PALM BEACH, FL 33407 184 561-862-7137 561-682-9888 QTY EQUIPMENT # Min Day Week 4 Week Amount 6.00 5' SCAFFOLD END FRAME GT 7.00 7.00 7.00 19.00 114.00 6.00 7' SCAFFOLD BRACE GT 2.00 2.00 2.00 8.00 48.00 4.00 SCAFFOLD LEVELING JACKS GT 4.00 4.00 4.00 15.00 60.00 12.00 SCAFFOLDING GRAVITY PIN PIG TAIL GT 1.00 1.00 1.00 12.00 6.00 GR7 GUARD RAIL 7'0" .05 .05 .38 1.50 9.00 4.00 AP7 PLANK, ALUM 7'0"x19" .43 .43 3.03 12.10 48.40 Rental Sub-total : 291.40 BILLED FOR FOUR WEEKS 10/21/25 THRU 11/17/25. .......... Equipment. Service. Guaranteed. SUBTOTALr 291.40 REMIT TO: 20.40 SUNBELT RENTALS, INC. NET30 • • 311.80 PO Box 409211 Invoices not paid within 30 days may be subject to a 1-%2% ATLANTA, GA 30384-9211 per month charge. 4 WEEK BILL P NGEL SOTO angel.soto@sunbeltrentals.com L Precision Portables, LLC 1840 NW 33rd Street Pompano Beach, FL 33064 PRED ISION (888) 920-5060 - -R T A E - www.coastalwasteinc.com INVOICE Invoice PP0000324957 Page Page 1 of 1 Date 11/10/2025 Bill To: FLORIDA DESIGN CONTRACTORS Customer 5239 1326 S KILLIAN DRIVE Site 0 WEST PALM BEACH, FL 33403 PO Number Due Date 12/10/2025 R-M DESCRIPTION REFERENCE •A (0003) 901 N OLD DIXIE HWY 901 N OLD DIXIE HWY, TEQUESTA FL • Sery#001 CONSTRUCTION TOILET(STANDARD) 1 -OEA 2x Week 10-Nov CONSTRUCTION SITE TOILET CLEANING (Oct 12/25-Nov 08/25) $120.00 1.00 $120.00 10-Nov RECOVERY FEE $14.39 PALM BEACH COUNTY at 7.000% $9.41 Account A surcharge of 5%on initial balance plus 2%per month will be charged on INVOICE TOTAL $143.80 status accounts 30 days overdue. CURRENT 31-60 DAYS 1 61-90 DAYS I OVER 90 DAYS I ACCOUNT TOTAL $1,307.88 $0.00 $0.00 $0.00 $1,307.88 Payments made by credit card or debit card are subject to a 2.55%service fee Invoice PP0000324957 Please return this portion with payment to: Page Page 1 of 1 Precision Portables Date 11/10/2025 PO Box 632201 Customer 5239 Cincinnati, OH 45263-2201 ;AMOUNT REMITTED Site 0 www.coastalwasteinc.com PO Number Due Date 12/10/2025 0025756PP0052390000PP000032495700001307884 �rp m LL 3 : d L r o 0 c N O N Q� C 47 O C O v N N N L u Q d d V) r- Ln _a ry X M cD O� F X fV s d' /C • W • L Q o Q J \ • 7 /7 • C .p N N E y o E E ; • C 3 U ) c v • W 11 O Attachment 3 December 17, 2025 Mrs.Allyson Felsburg, MBA, Deputy Utilities Director, The Village ofTequesta, Florida 901 N Old Dixie Hwy Tequesta, Florida 33469 Regarding: The Village ofTequesta WTP Pressure Vessel Plant Upgrades Subject: FDC No.3 Credit for Scope Reduction to Remove Tanks 1 & 3 Dear Ms. Felsburg: In accordance with your request, Florida Design Contractors is providing a credit proposal to remove two (2)tanks from the scope of work of this project. We offer you the line items from the schedule of values for tanks 1 & 3. A deduct for the cost of the material already produced for this project that are not returnable and do not offer a restocking fee must be applied. These materials will be turned over to you for your use. Vessels 1 & 3 Schedule Updates ___ 1 LS $ 1,000 Scaffold System Complete ( 2 Mo.) 1 LS $ 19,000 HVAC/ Gen. System ( 2 Mo.) ___ 1 ___ LS $ 16,900 Remove Filter Media 1 LS $ 30,300 Haul and Dispose Media ___ 1 LS $ 19,600 Clean Vessel's Interior 1 LS $ 5,000 Interior Coatings ___ 1 LS $ 9,900 Specialty Submittals 1 LS $ 13,200 Supply Install New Internal Appurtances 1 LS $ 60,000 Supply Install New Media i LS $ 48,000 Final BacT Test of Pressure Filter 1 LS $ 1,000 $223,900 Deduct for Non-Returnable Materials Internal Components 1 LS $ 32,000 $191,900 1326 South Killian Drive, West Palm Beach, FL 33403 www.FloridaDe�-ignContractors.com Phone: 561-845-1233 Fax: 561-848-5992 CGC1528648 "OA The total sum for the deduct of vessels 1 & 3 totals: $191,900.00. This total includes all costs complete for the removal of this scope of work from our contract. This proposal is valid for 14 days. Should you have any questions, feel free to contact me. Regards, Zachary D. Harriman, Assistant Project Manager, Florida Design Contractors. 1326 South Killian Drive, West Palm Beach, FL 33403 www.FloridaDesignContractors.com Phone: 561-845-1233 Fax: 561-848-5992 CGC-040304 Jamie Meyer From: Zachary Hammann Sent: Wednesday, December 17, 2025 1:13 PM To: wowen@hungerfordterry.com; 'Walt Seitz'; 'Bill Probasco'; 'Brian Reynolds' Cc: Jamie Meyer; 'Christopher Ralph'; 'Tracy VanEtten'; 'Tom Carrocino'; epeters@mts- florida.com Subject: Re: 25102 -Tequesta WTP Filter Rehab - Owner Request Removal of 2 Vessels Off Scope Good afternoon, I have a meeting with the owners tomorrow discussing the removal of the 2 vessels from the scope and the costs that are affected. Can you put a formal proposal together stating the cost of the internals and the fact that they are custom fabricated and cannot be refunded. Also, I did recieve the strainers. Thankyou Zachary D. Hammann Assistant Project Manager r --�ser� 'orirencrous #CGC1528648 ✓ 1326 South Killian Drive,Lake Park, FL 33403 C: 561-862-71 37 1 O: 561-275-2282 1 W: Florida Design Contractors zhammann(afloridadesigncontractors.com From:wowen@hungerfordterry.com <wowen@hungerfordterry.com> Sent: Wednesday, December 10, 2025 10:55 AM To:Zachary Hammann <ZHam man n@Floridadesigncontractors.com>; 'Walt Seitz' <wseitz@hungerfordterry.com>; 'Bill Probasco' <bprobasco@hungerfordterry.com>; 'Brian Reynolds' <breynolds@hungerfordterry.com> Cc:Jamie Meyer<MMeyer@ Florida designcontractors.com>; 'Christopher Ralph'<cralph@hungerfordterry.com>; 'Tracy VanEtten'<tvanetten@hungerfordterry.com>; 'Tom Carrocino' <tcarrocino@hungerfordterry.com>; epeters@mts- florida.com <epeters@mts-florida.com> Subject: RE: 25102-Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Hello Zachary, The original proposal had $88,000 for 6 beds of media. Each set comes to$14,665.00 per filter.The tank internals were quoted as 6 sets of tank internals @ $96,000.00. $16,000 per set.That's with freight included for internals and media. Let me know when you are ready for the next set of material to ship.The strainers went out UPS. 1 Thank you. William L. Owen Sales Representative Hungerford &Terry, Inc. Manufacturers of Water Treatment Equipment 226 N Atlantic Avenue PO Box 650 Clayton NJ 08312 (P) 856 881-3200 ext. 273 (F) 856 881-6859 WOwen@HungerfordTerry.com www.HungerfordTerr ccoom_ From:Zachary Hammann<ZHammann@Floridadesigncontractors.com> Sent:Tuesday, December 9, 2025 2:51 PM To:wowen@hungerfordterry.com; 'Walt Seitz' <wseitz@hungerfordterry.com>; 'Bill Probasco' <bprobasco@hungerfordterry.com>; 'Brian Reynolds'<breynolds@hungerfordterry.com> Cc:Jamie Meyer<JMeyer@ Florida designcontractors.com>; 'Christopher Ralph'<cralph@hungerfordterry.com>; 'Tracy VanEtten'<tvanetten@hungerfordterry.com>; 'Tom Carrocino'<tcarrocino@hungerfordterry.com>; epeters@mts- florida.com Subject: Re: 25102 -Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Ok,thank you. Let me know when you get that breakdown. Zachary D. Hammann Assistant Project Manager FmOl 1326 South Killian Drive, Lake Park, FL 33403 C: 561-862-7137 1 O: 561-275-2282 1 W: Florida Design Contractors zhammann(&floridadesigncontractors.com From:wowen@hungerfordterry.com <wowen@hungerfordterry.com> Sent:Tuesday, December 9, 2025 2:46 PM To:Zachary Hammann <ZHam man n@Florida designcontractors.com>; 'Walt Seitz'<wseitz@hungerfordterry.com>; 'Bill Probasco'<bprobasco@hungerfordterry.com>; 'Brian Reynolds' <breynolds@hungerfordterry.com> Cc:Jamie Meyer<JMeyer@ Floridadesigncontractors.com>; 'Christopher Ralph'<cralph @ hungerfordterry.com>; 'Tracy VanEtten'<tvanetten@hungerfordterry.com>; 'Tom Carrocino'<tcarrocino@hungerfordterry.com>;epeters@mts- florida.com <epeters@mts-florida.com> Subject: RE: 25102-Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope 2 Hello Zach, We will waive any restocking fees on the media. I have to get the order from purchasing and break it out. Thank you. O.,.t au.c..v William L. Owen Sales Representative Hungerford &Terry, Inc. Manufacturers of Water Treatment Equipment 226 N Atlantic Avenue PO Box 650 Clayton NJ 08312 (P) 856 881-3200 ext. 273 (F) 856 881-6859 WOwenPHungerfordTer ,ram www.HungerfordTerEy.com From:Zachary Hammann<ZHammann@Floridadesiencontractors.com> Sent:Tuesday, December 9, 2025 2:30 PM To:wowen@hungerfordterry.com; 'Walt Seitz'<wseitz@huneerfordterry.com>; 'Bill Probasco' <bprobasco@huneerfordterry.com>; 'Brian Reynolds'<breynolds@huneerfordterry.com> Cc:Jamie Meyer<JMeyer@Floridadesigncontractors.com>; 'Christopher Ralph'<cralph@hungerfordterry.com>; 'Tracy VanEtten'<tvanetten@ hungerfordterry.com>; 'Tom Carrocino'<tcarrocino@huneerfordterry.com>;epeters@mts- florida.com Subject: Re: 25102 -Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Also,what is the cost for the internals?On the P.O the media and internals are lumped into one sum of $28,000.00 each vessel. Zachary D. Hammann Assistant Project Manager F 1326 South Killian Drive, Lake Park, FL 33403 C: 561-862-7137 1 O: 561-275-22821 W: Florida Design Contractors zhammannC&floridadesigncontractors.com 3 From:Zachary Hammann <ZHammann@Floridadesigncontractors.com> Sent:Tuesday, December 9, 2025 2:27 PM To:wowen@hungerfordterry.com <wowen@hungerfordterry.com>; 'Walt Seitz'<wseitz@hungerfordterry.com>; 'Bill Probasco'<bprobasco@hungerfordterry.com>; 'Brian Reynolds'<breynolds@hungerfordterry.com> Cc:Jamie Meyer<JMeyer@ Flo ridadesigncontractors.com>; 'Christopher Ralph'<cral ph@ hungerfordterry.com>; 'Tracy VanEtten' <tvanetten@hungerfordterry.com>; 'Tom Carrocino' <tcarrocino@hungerfordterry.com>; epeters@mts- florida.com <epeters@mts-florida.com> Subject: Re: 25102-Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Yes, I got that. Sorry, I meant say what is the restocking fee for the media? Zachary D. Hammann Assistant Project Manager FMI 1326 South Killian Drive, Lake Park, FL 33403 C: 561-862-7137 1 O: 561-275-2282 1 W: Florida Design Contractors zham man nCa)floridadesigncontractors.com From:wowen@hungerfordterry.com <wowen@hungerfordterry.com> Sent:Tuesday, December 9, 2025 2:03 PM To:Zachary Hammann<ZHammann@Floridadesigncontractors.com>; 'Walt Seitz'<wseitz@hungerfordterry.com>; 'Bill Probasco' <bprobasco@hungerfordterry.com>; 'Brian Reynolds'<breynolds@hungerfordterry.com> Cc:Jamie Meyer<JMeyer@ Floridadesigncontractors.com>; 'Christopher Ralph'<cralph@hungerfordterry.com>; 'Tracy VanEtten' <tvanetten@hungerfordterry.com>; 'Tom Carrocino' <tcarrocino@hungerfordterry.com>;epeters@mts- florida.com <epeters@mts-florida.com> Subject: RE: 25102-Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Zach, The tank internals are non refundable.These are custom made parts.They are not a shelf item. Thank you. William L. Owen Sales Representative Hungerford &Terry, Inc. Manufacturers of Water Treatment Equipment 226 N Atlantic Avenue PO Box 650 Clayton NJ 08312 (P) 856 881-3200 ext. 273 4 (F) 856 881-6859 WOwen@HungerfordTerry.com www.HungerfordTerU.com From:Zachary Hammann<ZHammann@Floridadesigncontractors.com> Sent:Tuesday, December 9, 2025 1:48 PM To: wowen@hungerfordterry.com; 'Walt Seitz'<wseitz@hungerfordterry.com>; 'Bill Probasco' <bprobasco@hungerfordterry.com>; 'Brian Reynolds'<brevnolds@hungerfordterry.com> Cc:Jamie Meyer<JMever@ Floridadesigncontractors.com>; 'Christopher Ralph'<cral ph@ hungerfordterry.com>;Tracy VanEtten<tvanetten@hungerfordterry.com>; 'Tom Carrocino'<tcarrocino@hungerfordterry.com>;epeters@mts- florida.com Subject: Re: 25102-Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Understood. What is the restocking fee and the credit associated with the internal components? Zachary D. Hammann Assistant Project Manager F=DA 1326 South Killian Drive, Lake Park, FL 33403 C: 561-862-7137 1 O: 561-275-2282 1 W: Florida Design Contractors zham man n(cbfloridadesigncontractors.com From:wowen@hungerfordterry.com <wowen@hungerfordterry.com> Sent:Tuesday, December 9, 2025 1:34 PM To:Zachary Hammann<ZHammann@Floridadesigncontractors.com>; 'Walt Seitz'<wseitz@hungerfordterry.com>; 'Bill Probasco'<bprobasco@hungerfordterry.com>; 'Brian Reynolds'<brevnolds@hungerfordterry.com> Cc:Jamie Meyer<JMever@ Floridadesigncontractors.com>; 'Christopher Ralph'<cralph@hungerfordterry.com>;Tracy VanEtten<tvanetten@hungerfordterry.com>; 'Tom Carrocino'<tcarrocino@hungerfordterry.com>;epeters@mts- florida.com <epeters@mts-florida.com> Subject: RE: 25102-Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Hello Zachary, We can remove the gravel and sand from the order.There may be a restocking fee associated with that material. Unfortunately the tank internals are made to order. It is suggested the owner take the extra sets as spare parts. We received a purchase order and made what was requested. Thank you. 5 W -f 0,4-� William L. Owen Sales Representative Hungerford &Terry, Inc. Manufacturers of Water Treatment Equipment 226 N Atlantic Avenue PO Box 650 Clayton NJ 08312 (P) 856 881-3200 ext. 273 (F) 856 881-6859 WOwen@HungerfordTerr, .com www.HungerfordTerry.com From:Zachary Hammann <ZHammann@Floridadesigncontractors.com> Sent:Tuesday, December 9, 2025 11:46 AM To: 'William Owen' <wowen@hungerfordterry.com>; 'Walt Seitz'<wseitz@ h u ngerfordterry.com>; 'Bill Probasco' <bprobasco@hungerfordterry.com>; Brian Reynolds<breynolds@hungerfordterry.com> Cc:Jamie Meyer<(Meyer@Floridadesigncontractors.com> Subject: 25102-Tequesta WTP Filter Rehab-Owner Request Removal of 2 Vessels Off Scope Gents, Unfortunately,The Village of Tequesta has requested that we take 2 vessels off of our scope of work. We will now only be doing the vessel rehabilitation of media & internals on 4 of the 6 vessels. The owner would like to know what credits or cancelation fees will occur resulting from the cancelation of 2 vessels off of the original scope. If you have any questions please reach out. Zachary D. Hammann Assistant Project Manager FmD3 1326 South Killian Drive, Lake Park, FL 33403 C: 561-862-7137 1 O: 561-275-2282 1 W: Florida Design Contractors zhammann@floridadesigncontractors.com 6