Loading...
HomeMy WebLinkAboutPresentation_Workshop_2/2/2026 (3)TEQUESTA PARK IMPROVEMENTS PROJECT UPDATE FEBRUARY 2026 JUP!TER HI-LS CLUB GO.F COURSE 160 80 S C A L E : 1 = B 0 O SMALL SYMBOL LEGEND NATURAL EDOCA TIONAL PLAOUE (TYP.) TRASH RECEP TACLE / DOG STA TION (TCP.) GAZEBO (TCP.) EXERCISE STATION (TCP.) PICNIC TABLE V! THM8RELLA (TCP.) DIRECTIONAL SUB (TCP ) " 4 / PAVILION 1 EXISTING BASKETBALL COURTS 5 - ' 9 7 48'-4 1/2" PROPOSED NEW SIDEWALK COMMUNITY GIRL SCOUT BLDG NATURAL SAND TRAIL RESTROOM SINGLERAM LY EXISTIARKING RESIDENTIAL COUNTY BOUNDARY FAMILY RESIDED TIAL TEQUESTA PARK - 2022 MASTER PLAN PREPARED BY NZ CONSULTANTS TEOUESTA PARK TEQUESTA, FL 3 8 ' - 8 1 / 4 " " 4 / 1 1 - ' 8 7 111 New Parking Spaces Maintenacne Facility FAMILY FUN ZONE: -VOLLEYBALL -LARGE PICNIC PAVILION -SPLASH PAD -PLAYGROUND ACTIVE RECREATION ZONE: -300' AND 225' BALL FIELDS -ARTIFICIAL TURF MULTI-USE FIELD -PICKLEBALL/ TENNIS IMPROVEMENTS -DOG PARK -BASKETBALL COURTS LEGEND PROPERTY LINE MILLING AND RESURFACING ASPHALT CONCRETE ALT PAVEMENT GRAVEL AREA LANDSCAPE AREA SYNTHETIC TURF AREA SAND AREA PRESERVE EXISTING CLAY AREA VEGETATION (TYP.) PERVIOUS / IMPERVIOUS CALCULATIONS IMPERVIOUS AREA351,376 SF8.066 AC19.8% BUILDING COVERAGE TOTAL:5,998 SF (1)RESTROOM:499 SF (2)CONCESSIONS BUILDING:576 SF (1)MAINTENANCE FACILITY:3,200 SF DUGOUT (TYP.) (1)EXISTING ONE-STORY BUILDING:1,723 SF (5) OPEN AIR PAVILIONS:6,033 SF BLEACHERS (TYP.) (2) BASKETBALL COURTS:11,280 SF (1) TENNIS COURT:7,203 SF BASEBALL FIELD (TYP.) (8) PICKLEBALL COURTS:18,692 SF ASPHALT LOT & DRIVES:94,923 SF SIDEWALKS / PEDESTRIAN AREAS:79,401 SF ARTIFICIAL TURF TOTAL:119,773 SF PLAYGROUND:5,743 SF MULTI-USE FIELD: 114,030 SF FOUR ENCLOSED BASEBALL FIELD CLAY:8,073 SF BATTING CAGES PERVIOUS AREA1,422,445 SF32.655 AC80.2% CONCESSION STAND EXISTING UNPAVED PEDESTRIAN TRAIL: 56,984 SF 8,817 SF 225' x 360' MULTI-USE FIELDGRAVEL LOT: 1,063,366 SF NATURAL / UPLAND LANDSCAPE: 6' HT CHAIN LINK FENCE 159,592 SF CULTIVATED LANDSCAPE: 125,686 SF BASEBALL FIELDS (BERMUDA GRASS): 8,000 SF BEACH VOLLEYBALL SAND: SITE DATA TWO SAND VOLLEYBALL TOTAL SITE AREA 1,773,821 SF COURTS ZONINGPublic Service FUTURE LAND USE Recreational 19-40-43-000-000-00410-0 PCN Recreational / Public Park PROPOSED / EXISTING USE PARKING REQUIREMENTS PARK AND RECREATION AREAS, ACTIVE: (MARTIN COUNTY CODE: SEC 4.624 10' HT CHAIN LINK FENCE 1 SPACE / 2 AC UP TO 10AC =5 WITH WIND SCREEN 1 SPACE / 5AC FOR 30AC =6 75% OF REQUIRED PARKING FOR EACH COURT / FIELD / ETC:218 8' HT CHAIN LINK FENCE WITH WIND SCREEN (2) BASKETBALL:15 (7.5 PER COURT) 65 PARKING SPACES TWO PICKLEBALL (2) VOLLEYBALL:18 (9 PER COURT) (INCLUDING 2 ADA COURTS (9) PICKLEBALL / TENNIS:27 (3 PER COURT) ACCESSIBLE) (2) BASEBALL FIELDS:50 (25 / FIELD) SPLASH PAD EQUIPMENT (1) MULTI-USE FIELD:30 (30 / FIELD) AREA ON GRAVEL PAD (3) PICNIC PAVILION:21 (1 / 150 SF) (1)PLAYGROUND:24 (1 / 250 SF) PAVILION 4 (40' x 80') (1)SPLASH PAD:15 (EST.) (3,200 SF) MAINTENANCE (2)DOG PARK:18 (1 / 1000 SF) PROPOSED BUILDING AND GRAVEL YARD SIDEWALK (TYP.) DOG WASHING FUNBRELLA REQUIRED229 STATION SPLASH PAD EXISTING PARKING SPACES TO REMAIN: 118 NEW PARKING SPACES PROVIDED: 111 28 PARKING SPACES 229 TOTAL PROVIDED: (INCLUDING 2 ADA (INCLUDES 8 H/C SPACES) ACCESSIBLE) EXISTING ONE-STORY 43' x 43' x 46' BUILDING SHADE SAIL (TYP.) PAVILION 1 PLAYGROUND POD (TYP.) PAVILION 3 (500 SF) PRE-FAB DOG DRINKING RESTROOM 4' HT CHAIN LINK FENCE (TYP.) FOUNTAIN (TYP.) PLAN PAVILION 2 6' HT CHAIN LINK 18 PARKING SPACES FENCE TWO BASKETBALL COURTS EXISTING GRAVEL LOOP SITE TRAIL TO REMAIN PROPERTY LINE (TYP.) PARK FOR TEQUESTA OF PREPARED NORTH IMPROVEMENTS TEQUESTA VILLAGE C1.00 PROJECT SCHEDULE By end of January 2026: Finalize site design Discuss playground equipment, theming, design Discuss splashpad equipment, theming, design Determine pre-engineered buildings, style, finishes Confirm other park features, layout February 2026: Preliminary site plan Prepare a preliminary site plan for Pre-App meeting with County Prepare an Environmental Assessment Feb-April 2026: Site Plan Package Prepare site plan package per checklist (prelim engineering, landscape arch, building designs elevations and floor plans) Environmental:Environmental Assessment update and PAMP update April-June 2026: Site Plan review and responses to comments Anticipating 3 - 6 months min for site plan review/approval through Martin County. July November 2026: 60% and 90% Plans production Production on 90% plans can happen while the site plan is being processed. December 2026: Deliver 90% plans to Village.