HomeMy WebLinkAboutPresentation_Regular_2/12/2026 (3)201 COUNTRY CLUB DRIVE 1 Main ClubhousePhase 2–Special Exception & Site Plan Review 25 -25 & SPM 08-SEU 04
2 located within the Recreation Open Space Zoning District 25) approval is needed for any project that is 04Special Exception Use (SEU•stormwater, and landscape improvements.main clubhouse,
construction of a new cart barn, and associated site, parking, 25) approval needed for demolition and reconstruction of the Site Plan (SPM 08•APPROVALS NEEDED
3 Phase 2Phase 1No changes to east parking lot proposedstormwater, and landscape improvements.construction of a new cart barn, and associated site, parking, Demolition and reconstruction
of the main clubhouse, Phase 2 Summary Approved in December 2025parking lotNew Maintenance Facility, Café, pickleball courts, &Phase 1 Summary
4 Internal Circulation •Architecture•Site Organization •Stormwater Management •East Lot Use•Parking •Country Club Drive–Landscape •Signage•Construction Phasing•Traffic•Items of focus:Approval.
have been captured in the Conditions of Any items requiring additional information plan modification. that would prevent the approval of this site There are no unresolved DRC comments
review. The project went through three rounds of The DRC met on October 3, 2025.DEVELOPMENT REVIEW COMMITTEE
5 hedge along the north boundary. clusialot does not have commercial uses and to install an 8’ The PZB made a recommendation to ensure the east parking the review of Phase 1. start of
the project, during the DRC review and again during These items respond directly to concerns brought up at the holeConstruction staging will occur on 10•Parking area will not be utilized
for activities or events•Regarding the East Parking Lot, the applicant has confirmed:EAST LOT USE & LIMITATIONS
6 CRITERIA FOR REVIEW Materials shall express their function clearly and not appear as a material foreign to the rest of the building.All facades visible to public or adjacent property
shall be designed to create a harmonious whole. Facades.(3) design concepts, and be appropriate to the village.undeveloped areas, the three primary requirements shall be met: express
honest design construction, show proper a unified multibuilding complex shall strive to achieve visual harmony with the surroundings. If they are built in Buildings or structures located
along strips of land or on single sites and not a part of Harmony with surroundings.(2) surroundings.and location on the site shall enhance rather than detract from the character, value,
and attractiveness of the is immediately adjacent to or otherwise clearly affects the future of any established section of the village, the design color of materials shall be such as
to create an harmonious whole. When the area involved forms an integral part of, group or complex shall have a unity of character and design, and a relationship of forms, and the use,
texture and Buildings or structures which are a part of a present or futureHarmony with other buildings.(1)
7 of gasoline and other establishments, would not be acceptable in most cases. they are harmonious with the atmosphere of the neighborhood. For example, royal blue, which symbolizes
a brand but are not limited to gasoline stations. Symbolic colors of the exterior facades or roofs may not be used unless The following are added criteria that pertain to Use of symbolic
colors; exterior storage and display of merchandise.(13) to the building. They shall be an asset both to the aesthetics of the site and to the neighborhood.All exterior forms, attached
or not attached to buildings, shall be in conformity to and secondary Exterior forms.(10) Building surfaces, walls and roofs that are considered garish by the board will be denied approval.Garish
design.(8) Florida, that do not conform to the existing or to the evolving atmosphere of the village will not be approved.be allowed. It is also to be understood that buildings, even
though they have a historical significance to South Buildings of a style or style type foreign to South Florida and/or its climate will not Inappropriate building styles.(7) materials
and color.harmonious. Harmony can be achieved through the proper consideration of proportions, site planning, landscaping, It is not to be inferred that buildings must look alike or
be of the same style to be Methods of harmonious design.(4)
At its January 15, 2026, meeting, the Planning and Zoning Board voted unanimously (5 RECOMMENDATION25 PZB -SPM 08 8 the Village.3. Prior to the issuance of building permits, a Construction
Staging Plan shall be submitted and approved by approved by the Village. 2. Prior to the issuance of building permits, a Maintenance of Traffic (MOT) Plan shall be submitted and demonstrate
the project meets the Village’s stormwater treatment requirements. proposed impervious/pervious areas. Drainage calculations shall be submitted and approved that 1. Prior to the issuance
of building permits, civil plans shall be provided that indicate the existing and 25 with the following conditions that were proposed by Village Staff:-approval of SPM 080) to recommend
-
The following condition of approval was provided by Village of Tequesta Utilities Engineer consultant David PZB CONDITIONS OF APPROVAL 9 A zoning district.-perimeter of the east parking
lot. No trailers shall be permitted in the portion of the property that is in the R1hedge shall be installed and maintained by the Country Club as a landscape buffer on the north clusia5.
An 8' The following condition was added by the Planning and Zoning Board: Coordinate with Loxahatchee River District and submit proof of coordination •Provide confirmation of water
and wastewater capacity•4. Prior to Utilities permit, the applicant must: Cowan, of Baxter & Woodman:
10 25 pending PZB’s recommendation. -SPM 0825, will be presented to Council congruent with the -179, a Special Exception Use Review 04-As required by section 78•0). -approved by Council
at the December 11, 2025 meeting (525 was -A Special Exception Use Review was conducted by the Village Council to examine the proposed use, SEU 03•-by a vote of 525 took place on November
13, 2025 and was approved by Village Council -25 and 09-The second reading of Ordinance 08•-0925 and -Village Council had the initial reading of the Ordinances on October 9, 2025, and
voted to approve Ordinance 08•25. -25 and Ordinance 08-0 to recommend Ordinance 09-The Agency voted 5•classification were reviewed by the Planning and Zoning Board sitting as the Local
Planning Agency on September 18, 2025. To facilitate the Tequesta Country Clubs renovation applications to amend the future land use designation and zoning •All required land use and
zoning approvals have been completed FLUMA & SEU
11 THANK YOU