RE: Village of Tequesta FY26 VOT SW CIPP Revised
Dear David,
SAK Construction, LLC is pleased to offer the following quotation on this project:
unit of
Item No. - DESCRIPTION Measure-I Unit Price - Quantity -T Total Amount
Group 1 Cured In Place(CIPP)Main Unin Lining
7115m.x 6 mm CIPP LF $ 100.00 33 1 $3,300.00
13124 in.x 7.5 mm CIPP ILF $ 150001 285 $42,750 00
14Cost foreach l.Smm increase in Thickness of 24 in.Liner ILF I$ 14.00 1 436 $6,104.00
Group 4 Common Work Tana
48Mobilization,c/=1,200LForc/=10 Lateral Uners per Task Order EA $ 5,00000 3.0 $15.GOO 00
52 Maintenance of Traffic,City/County Minor/Residentsal DAY $ 50.00 5 1 $250.00
53 Work in Rear Easements and/or Away From Travelways EA $ 1.60000 5 $8,000.00
55 Specialty Cleaning,10"-18"Dia.(Groups 1,and 2) LF $ 8.50 33 $280.50
56 Specialty Cleaning,24"-36"Dia.(Group 1 Only( LF $ 1600 285 $4.560 00
61 Warranty Cleaning and CCTV Inspection LF $ 2.75 318 $874.50
Total $81.119.00
NOTE:
• Proposal based contract between SAK Construction and City of Largo, FL
Trenchless Sanitary and Storm Sewer Rehabilitation Services Contract No. 24-B-806 .
• SAK Construction will provide City with a final inspection video of rehabilitated sewer.
• Subject to pre-CCTV Inspection by SAK Construction to verify installation of CIPP Liner.
• Does not include point repairs, if required, prior to the installation of CIPP Liner.
• This proposal includes resurfacing the structure on Dover Road and Oak Ave with
cementitious repair mortar.
Thank you for the opportunity to quote on this project. Please call with any questions.
Sincerely,
SAK Construction, LLC
Dav"FsGtwkCw -IQ ` Z
Dan Banken Accepted By Date
Area Manager Molly Young, Mayor
Village of Tequesta
636.385.1100 rei
faSAK*" 636.38fRoad fax
O'F Hoff Road
0"Fallon.MO 63366
Pipeline Infrastructure.Solved." www.sakcon.com
October 22, 2025
David Tinoco
Village of Tequesta
561-262-4335
dtinoco@tequesta.org
RE: Village of Tequesta Outfall Inspections
Dear David,
SAK Construction, LL C is pleased to offer the following quotation on this project:
Inspect 13 EA (Thirteen each) outfalls using diver services with still photos and written
report of findings.
Lump Sum Proposal: $14,650
NOTE:
• Proposal assumes 2 days total to inspect 13 different submerged outfalls and provide
still photos of each outfalls along with a written report of the findings.
• If additional days are needed to complete these inspections, a daily charge of$4,980 will
be assessed.
• This proposal assumes this work will be completed in conjunction with our proposal
dated 10/15/2025 for sewer rehabilitation services.
Thank you for the opportunity to quote on this project. Please call with any questions.