Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 07_3/12/2026 Agenda Item V. Regular Council A-1 STAFF MEMO Meeting: Regular Council - Mar 12 2026 Staff Contact: Allyson Burg Department: Utilities Consider Approval of a Proposal from Wynn & Sons Environmental Construction Co., LLC, for Emergency Road Restoration for a Total Not to Exceed $39,259 SUMMARY: A The Village of Tequesta Utilities Department recommends approval of a proposal provided by Wynn & Sons Environmental Construction Co., LLC, in accordance with our current piggyback agreement for N. Dover Road Repair, as a result of an emergency water main break, for a total not to exceed $393259-00. On Wednesday, February 11, 2026, the Village experienced an emergency water main break on N. Dover Road in the vicinity of Constitution Park. Due to the location, roadway conditions, and severity of the break, immediate action was required to protect public safety, restore potable water service, and reopen the roadway to vehicular traffic as quickly as possible. N. Dover Road serves as a primary access route to Constitution Park and surrounding residential areas. Given the traffic volume and community impact, delaying repairs was not a viable option. Village Utilities staff performed the emergency water main repair. Following completion of the utility work, Wynn & Sons Environmental Construction Co., LLC, mobilized under emergency conditions to perform the necessary roadway restoration. The emergency restoration services included: • Emergency response and traffic-related restoration efforts • Full-depth removal of existing asphalt pavement • Finish grading and preparation of existing rock base • Installation of 8-inch base material, including prime coat • Milling of existing asphalt pavement • Placement of miscellaneous asphalt (including tack coat) • Equipment, loader time, and associated labor and materials necessary to safely restore and reopen the roadway The services were provided pursuant to Palm Beach County Annual Contract No. 2022-063, which the Village has piggybacked for roadway and utility-related construction services. Utilization of this competitively procured contract allowed the Village to respond immediately to the emergency while maintaining compliance with procurement requirements. The unit pricing contained in the proposal is consistent with the existing contract pricing structure. It is important to note that the Utilities Department typically budgets $20,000 for road repairs due to water main breaks. This fiscal year, there has been a substantial increase in water main breaks with a large impact to roadways (Tequesta Drive water main break on 1/4/26 and now N Dover Rd water main break). These breaks alone have totaled $61,624.52 in road repair costs. Due to the increase in Page 34 of 336 Agenda Item #7. repairs the approval of this item will result in the account being over budget by $12.,333-61. Staff will address this deficit through a future budget amendment or by reallocation within the Water Fund as part of the mid-year budget review process. Please see the attached proposal for more details. WATER FUND -Account 401-243-546.342—Water Distribution Water System Maintenance Budgeted in account: $ 841200.00 Available amount: $ 267925.39 Amount of this proposal: $ 391259.00 Total Remaining: ($ 12,333.61) This document and any attachments may be reproduced upon request in an alternative format by completing our Accessibility Feedback Form, sending an e-mail to the Village Clerk or calling 561- 768-0443. BUDGET INFORMATION:-,mmi BUDGET AMOUNT $84,200 AMOUNT AVAILABLE EXPENDITURE AMOUNT: $267925.39 $39Y259 FUNDING SOURCES: 401-243-546.342 Water IS THIS A PIGGYBACK: Distribution Water System Maintenance ❑ Yes ❑x N/A DID YOU OBTAIN 3 QUOTES? ❑ Yes 0 N/A QUOTE 1 - BUSINESS NAME N/A QUOTE AMOUNT N/A QUOTE 2 - BUSINESS NAME N/A QUOTE AMOUNT N/A QUOTE 3 - BUSINESS NAME N/A QUOTE AMOUNT N/A COMMENTS/EXPLANATION ON SELECTION Approval of Proposal .AW CEM =101 1) Emr Repairs Seabrook and Dover Proposal Executed Page 35 of 336 Agenda Item #7. WYNN &SONS ENVIRONMENTAL CONSTRUCTION CO. LLC 7268 BELVEDERE ROAD WEST PALM BEACH, FL 33411 US +15616866077 rick.wynnandsons@yahoo.com Estimate ADDRESS SHIP TO ESTIMATE 10766 DOUG CHAMBERS Mr. Doug Chambers DATE 02/09/2026 VILLAGE OF TEQ U ESTA Constitution Park-Dover Road 357 Tequesta Drive Emergency Asphalt Road&Apron Repair& Tequesta, FL 33469 Mill&Pave 25 ft in Each Direction from Edge of Repair pbc annual contract 2022-063 ACTIVITY DESCRIPTION QTY RATE AMOUNT 63-002 EMERGENCY RESPONSE(6 HOURS TO 24 HOURS)PER 1 1,000.00 1,000.00 EACH 63-005 REMOVE EXISTINGASPHALT(FULL DEPTH)PER SY 804 2.00 1,608.00 63-007 SHALLOW EXCAVATION (DEPTH <4 FT)PER CY 130 10.00 1,300.00 63-009 FINISH EXISTING ROCK BASE PER SY 226 7.50 1,695.00 63-010 FINISH GRADING PER SY 226 3.50 791.00 63-013 8"BASE INCL PRIME COAT PER SY 452 20.00 9,040.00 63-019 MILL EXISTINGASPHALT PAVEMENT(<5000 SY)PER 1/2 1.75 5,300.00 9,275.00 DAY 63-020 PORTABLE MILLING MACHINE PER HOUR 3 250.00 750.00 63-023 MISC ASPHALT(>50 TONS)(INCL TACK)PER TN 59 200.00 11,800.00 63-168 3 CY LOADER TIME PER DAY 1 2,000.00 2,000.00 TOTAL $39,259.00 Jerem Allen Digitally signed by Jeremy Allen Accepted By Y Date:2026.02.14 11:11:36-05'00' Accepted Date See Digital Signature Date Page 1 of 1 Page 36 of 336