Loading...
HomeMy WebLinkAboutOrdinance_348_03/24/1987• • ORDINANCE N0. 34g • AN ORDINANCE OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, FLORIDA, AMENDING SECTION IV OF THE OFFICIAL ZONING ORDINANCE OF THE VILLAGE RELATING TO DEFINITIONS, TO INCLUDE DEFINITIONS OF "MANUFACTURED HOME", "MEAN SEA LEVEL" AND "START OF CONSTRUCTION"; BY P.EVISING THE DEFINITION "MOBILE HOME"; BY AMENDING SECTION X, SUPPLE- MENTAL REGULATIONS, REVISING SUBSECTION (A) ITEM N0. (12) AND ADDING NEW SUBSECTION (A) ITEM N0. (13); BY AMENDING SECTION XV, FLOOD HAZARD AREAS, TO INCLUDE THE FEDERAL EMERGENCY MANAGEMENT AGENCY OCTOBER 1, 1986 REVISIONS TO THE NATIONAL FLOOD INSURANCE PROGRAM; PROVIDING FOR SEVERABILITY; PROVIDING FOR CODIFICATION; PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, • • ~~ FLORIDA, AS FOLLOWS: Section IV of the Official Zoning Ordinance of the Village is here- by amended as follows: Section 1. Section IV - Definitions - is hereby amended by adding and/or revising and including the following: A. Manufactured Home. A structure, transportable in one or more sections, which is built on a permanent chassis and is designed for use with or without a permanent foundation when connected to the required utilities. For flood hazard area management purposes the term also includes park trailers, travel trailers, and other similar vehicles placed on a site for greater than 180 consecutive days. B. Mean Sea Level (MSL). The National Geodetic Verticle Datum (NGVD) of 1929 or other datum, to which base flood elevations shown on the C. Mobile Home. See "Manufactured Home". Flood Insurance Rate Map (FIRM) are referenced. D. Start of Construction. Date the building permit was issued. • Includes new construction and substantial improvements. Actual construction must occur within 180 days of permit date. With regard to flood hazard area regulations, actual start of construction is the first placement of permanent construction of a structure on a site, such as pouring a slab or footings, installation of piles, construction of columns or work beyond the excavation stage, permanent construction does not include land preparation (clearing, grading, filling) or construction of streets, sidewalks, bike paths or walk- ways. i • • E' ,, Section X of the Official Zoning Ordinance of the Village is here- by amended as follows: ,` Section 2. Section X, Supplemental Regulations, is hereby amended r, `s by adding and/or revising and including the following: ~~ A. Section X(A)(12). Revise to read as follows: (12) Except as may be permitted as temporary facilities, manufactured homes are prohibited throughout all zoning districts of the Village. B. Section X(A)(13). Add new section (A)(13) to read as follows: (13) Minimum finish first floor elevation above mean sea level (MSL) for all new construction, additions and substantial improvements to ~~ existing structures shall be 8.5' (feet)(MSL), 18" (inches) above the crown ,' ~ of any road, street, cul-de-sac or highway or meet the requirements of i g"~ Section XV, Flood Hazard Areas, whichever is more stringent. 4~ Section XV of the Official Zoning Ordinance of the Village is here- by amended as follows: Section 3. Section XV, Flood Hazard Areas, is hereby amended by adding, deleting and/or revising and including the following: A. Section XV (C)(1)(c). Revise to read as follows: (c) All new construction and substantial improvements to existing structures shall be constructed and placed on the building site subject to ;§ the following requirements: 1. Minimize obstruction to the flow of flood waters. 2. Anchored to prevent flotation, collapse, or lateral movement of ,: the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy, which may result in damage or ~'+ restriction of the flow of flood waters. ~~ 11 ~~ 3. Be constructed with materials and utility equipment resistant ~~ to flood damage. ,A ~` 4. Be constructed by methods and practices that minimize flood j. ~~ damage. ~~ R~ ~+ 5. Electrical, plumbing, air conditioning, heating and ventilation a: ;~ !' equipment, and other service facilities shall be designed and/ Y: or located so as to prevent water from entering or accumulating j' within the components during flood conditions. - 2 - • 6. Fully enclosed areas below the lowest floor that are subject to flooding shall be designed to automatically equalize hydrostatic f]_ood forces on exterior walls by allowing for the entry and exit of flood waters. Designs for meeting this requirement must be certified by a Florida Registered Profess- Tonal Engineer or Architect. B. Section XV (C)(1)(d). Delete C. Section XV (E)(1). Add new paragraphs (f), (g) and (h) to read i as follows: (f) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system. signed to minimize or eliminate infiltration of flood waters) into the system and discharges from the system into flood waters. (h) Any alteration, repair, addition, reconstruction or im- provements to a structure which is in compliance with the provisions of this ordinance, shall meet the requirements of "new construction" as contained in this ordinance. D. Section XV (J)(1). Revise to read as follows: (1) Located within the flood hazard areas established in • • (g) New and replacement sanitary sewage systems shall be de- Section XV are areas designated as coastal high hazard areas and coastal con- struction zone areas. The coastal high hazard areas (Zones V & U1-30) are referenced in this Ordinance and the regulations governing are as required by the Federal Emergency Management Agency National Flood Insurance Program. The coastal construction zone (entire barrier island within the corporate limits of the Village of Tequesta) is as referenced in Ordinance No. 347 and the regulations governing are as provided for in the Coastal Construction Code as required by the State of Florida. In the event of a conflict between these sections, ordinances or codes and any other sections, ordinances or codes, as adopted by the Village of Tequesta, the more restrictive require- (Zones V & V1-30) shall be subject to the following provisions: - 3 - (2) All construction or development within coastal high hazard areas read as follows: ments shall apply. E. Section XV (J)(1)(a)-(1). Delete (a)-(1) F Section X`J (J)(2)(a)-(1) Add new subsection (2)(a)-(1) to • • s n LJ • • (a) All new construction and substantial improvements shall be located landward of the coastal construction control line. (b) All new construction and substantial improvements shall be elevated on pilings or columns so that the bottom of the lowest horizontal structural member of the lowest floor is at or above the base flood level. (c) All new construction and substantial improvements shall be securely anchored on pilings and/or columns. (d) Pilings and/or columns used as structural support shall be designed and anchored to withstand flotation, collapse and lateral movement due to the effects of wind and water loads acting simultaneously on all building components. (e) Compliance with provisions contained in this section shall be certified to by a professional engineer or architect that the design and methods of construction are in accordance with accepted standards for meeting the provisions. (f) There shall be no fill used as structural support. (g) There shall be no alteration of sand dunes or mangrove stands which would increase potential flood damage. (h) Breakaway walls or frangible walls may be used to enclose the area below the lowest floor subject to the requirements of the "Coastal Construction Code". (See Ord. No. 347) (i) Non-supporting open wood lattice-work, and/or insect screen- ing intended to collapse under wind and water loads without causing collapse, displacement, or other structural damage to the elevated structure or supporting foundation system may be used to enclose the area below the lowest floor. (j) Lattice-work and/or insect screening material shall consist of wood or mesh screening only. (k) If breakaway walls, frangible walls, lattice-work or insect screening are utilized, such enclosed space shall not be used for human habitation. (1) Prior to construction, plans for any structure that will have breakaway walls, frangible walls, lattice work or insect screening shall be submitted to the building official for approval. - 4 - • • • • (m) Any alteration, repair, reconstruction or improvement to a structure shall not enclose the space below the lowest floor except as provided for in (h) and (i) above. G, Section XV (K). Add new subsection (K) to read as follows: (K) Use of available flood data. (1) The building official shall obtain, review and reasonably utilize any base flood elevation and floodway data avail- able from a Federal, State, County, or other source, as criteria for requiring that new construction, substantial improvements, or other development in Zone A meet the requirements as put forth in this Ordinance. H. Section XV (L). Add new subsection (L) to read as follows: (L) Elevation certification required. (1) Tie-in survey and lowest floor elevation (above MSL) are required of all new construction and substantial improve- ments to existing structures, prior to erecting walls, within Zones A, B and C. (2) Tie-in survey and bottom of lowest structural member of the lowest floor (above MSL) are required of all new construction and substantial improvements to existing structures, prior to erecting walls, within Zones V and V1-30. Section 4. It is hereby declared to be the intention of the Village of Tequesta that the sections, paragraphs, sentences, clauses and phrases of this Ordinance are severable, and if any phrase, clause, sentence, paragraph or section of this Ordinance shall be declared unconstitutional or otherwise invalid by the valid judgement or decree of a court of competent jurisdiction, such unconstitutionality or invalidity shall not affect any of the remaining phrases, clauses, sentences, paragraphs and sections of this Ordinance. Section 5. Permission to codify this Ordinance is hereby granted. Section 6. passage and approval. This Ordinance shall take effect immediately upon its - 5 - t \_J • • • THE FOREGOING ORDINANCE was offered by Councilmember Edwin J. g els on who moved its adoption. This Ordinance was ' seconded by Councilmember I•;on Mackail and upon being put to a vote, the vote was as follows: FOR ADOPTION AGAINST ADOPTION Carlton D. Stoddard _;~,lward C. Howell ?arl L. Collins Ron Macl:ail Edwin ~. Nelson The Mayor thereupon declared the Ordinance duly passed and adopted this 24th day of March 1987 . i ATTEST: MAYOR OF TEQUESTA Carlton D. Stoddard THE ~LM BEACH POST ~ Published Daily and Sunday West Palm Beach, Palm Beach County, Florida Nt PROOF OF PUBLICATION P~ Nor~c TO CONSI PUeLtC NO' STATE OF FLORIDA n a., wr aoA COUNTY OF PALM BEACH oROSU'u f Before the undersi ned authorit • uoE of " g y personally appeared Barbara M . McCord ~ oA, AMENDI who on oath says that she/he is C I a s s . A d y . M~ r . of The Palm Beach Post, u' T"~iNC To etcLtwE o a daily and Sunday newspaper published at West Palm Beach in Palm Beach County, ::~ NF ~ Florida; that the attached co g, g Notice ••srARr of t py of advertisin bein a sT REVlsato a No. w o r d i n a n c e n o. 3 4 8 in the matter of ~w~ neu~vti~~.a, e¢~~nci sussECT1oN u-- rcEM No. (12J AND ADDINO NEW SU& in the ~"~' ~- - Court, was published in said newspaper in S$CTIWI (A) tTEM NO. (13); er AMENOeiO SECrwtt xv, FLOOO NA:ARD ARE/1s, ro the issues of March 8 t ~.4 8 7 NVCLUDE Tiff FEDERAL M" na n t i~v oc 'E~ " e Affiant further says that the said The Post is a news a er ublished at West Palm P P P roe E E i a e REVISIONS TO THE NATIONAL FLOOD weuRANCE WIO• DRAM; Pnovwstc F011 sEV- Beach, in said Palm Beach County, Florida and that the said newspaper has heretofore c" c~ i~ M ° ~DW° o , been continuously published in said Palm Beach County, Florida, daily and Sunday and w RQa et r cs , AN EFFEt:T1YE DATE t« «~ ~w ~ +A• ve- .CrOI111Ce MNtlne b tN has been entered as second class mail matter at the post office in West Palm Beach, in "~ td's'"' ~' "''~ ~' said Palm Beach County, Florida, for a period of one year next preceding the first Florlit T~ ~.Y. TT~ Y. M.-eA ~, tom. publication of the attached copy of advertisement; and affiant further says that she/he ~ P ~ +~ >a: Aa~.alaaaeton ot- has neither paid nor promised any person, firm or corporation any discount rebate ; , , commission or refund for the purpose of securing this advertisement for publication in n~ Faa"d'"o A.°r~" w soo the said newspaper. PJL Int~rosbe partN~ may wv.« .t en. eN.nnp to w n...a WMn rM l t tn C p~e o • p.s Ve.i.AtiE OF TEQUESTA CARLTON D.fTODDARO M Sworn to and subscribed before me this 9 day of March A.D. 19 8 7 >tY~ sr• eILL c. KASCAVELIs `~° ~ r ~ v r,,. , s..en Post Much a leer ' / L' ~ ~ ~;~- / U /' y ,.", 1`,_~bt~ 'rV. ryri,