HomeMy WebLinkAboutAgreement_General_10/15/2009 (2)PROPOSAL nay .~ c. ~ AARN R/O SYSTEMS, INC. _205 SEABOARD AVENUE - VEMCE, FLORIDA 34292 Village of Tequesta 901 North Old Dixie Hwy ATTN: JOHN COLLINGS Fax:561-996-1201 8/ 19/09 Tequesta, FL 33469 RE: Full R/O Membrane Replacement -REVISED Harn R/O Systems, Inc. is pleased to present the following proposal for replacement R/O membranes: 1. Provide one hundred and sixty (160) Koch Mode18060HR-590 Reverse Osmosis membrane elements. The membranes will be rated for 16,600 GPD with a minimum chloride rejection of 99.2%. Elements will come with brine seals, o-rings and interconnectors. End adaptors will be reused. For the sum of ............ Freight ................................................................................................ $117,000.00 ..................................................... $1,300.00 2. Membrane installation is based on three (3) men on-site for four (4) days including drive time from Ham RIO Systems facility in Venice, FL. All applicable living expenses aze included in the price. Installation to include but not limited to, disassembly of pressure vessel end caps, removal of old existing membranes, cleaning and swabbing vessels with sodium hypochlorite, proper lubrication of vessels and membrane seals, and installation in a clean environment. Hare R/O staff will start-up and profile the system after membrane installation. For the sum of............ .................................... .....................................$11,000.00 -Upon completion of the project a report will be provided to the owner summarizing the work that was performed. Included in this report will be a revised membrane loading sequence and start-up data. -Proper swabbing of the vessels and keeping the new vessels in a clean environment is an important step that will ensure that the bacteriological test come back negative. The owner is responsible for performing any bacteriological testing that is necessary. The owner is responsible for determining if these tests are necessary and for any lab fees associated with these tests. The owner is responsible for disposing of the old membranes. Note: If bacteriological clearance is required, you will not be allowed to use the R/O system to produce potable water until given clearance by the state. -Permits and any necessary bacteriological testing costs are not included. Upon receipt of a signed proposal we can verify membrane availability and schedule a firm date to complete the membrane replacement. HARK R/O SYSTEMS WILL NOT PROVIDE LABOR FOR THE REPLACEMENT IF NEW MEMBRANES ARE NOT PURCHASED FROM HARK R/O SYSTEMS. HARN R/O SYSTEMS WILL SELL JUST THE MEMBRANES IF REOUESTFn We Propose hereby to fi»nrsh material and labor -complete in accordance See above, taxes not included. Terms are Net 30 days All materials is guaranteed to be as speci5ed All work to be completed in a wor'1®anlilse manntt according to standard practices. Any alteratoa or deviation fmm above speci5ea- ions involving extra costs wUl be extxuted only upon written orders, and will become an extra charge over and above the estimate. ,411 agrccmcnts contingent uppn stn7ces accidems or delays beyond era control. Owner to caery 5rq tornado grid other necessary insurance. Ow workers arc Cully covered by Workmen's Compcrssation Insurance. Acceptance of Proposal -The above prices, specifications end wnditions aze satisfactory and are hereby accepted. You are authorized to do the work as specified Payment will be made as outlined above. Daze of above specifications, for the sum of: Authorized Siguahme QS011 ~ ~2Q~ NOTE: This proposal may be Withdrawn by us if not accepted within 30 days. Signature Signature: ~- w Vi (lq~e rY1Cx.n4~t,~