HomeMy WebLinkAboutResolution_28-04/05_12/09/2004RESOLUTION NO. 28-04/05 A RESOLUTION OF THE VILLAGE COUNCII. OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AWARDING A CONTRACT TO DIVERSIFIED DRILLING, INC (EAST COST DIVISION) OF WEST PALM BEACH, FLORIDA, IN THE AMOUNT OF $836,000.00, FOR THE DRILLING OF THE REVERSE OSMOSIS WELL #3, HAVING BUDGETED $750,000.00 IN FISCAL YEAR 2004/2005 IN ACCOUNT #401-414 662.700, IN THE WATER UTILITY ENTERPRISE FUND AND APPROPRIATING AN ADDITIONAL $86,000.00 FROM DESIGNATED FUND BALANCE ACCOUNT #401-000-247.303, AND AUTHORIZING THE VILLAGE MANAGER TO EXECUTE THE APPLICABLE CONTRACT ON BEHALF OF THE VILLAGE. WHEREAS, the Village of Tequesta budgeted $750,000.00 to be used to develop Well #3 and, WHEREAS, the Village of Tequesta anticipated and therefore designated $900,000.00 to be set aside for the development of Well #3 and, WHEREAS, the Village of Tequesta has set aside $900,000.00 in cash and investments for the development of Well #3 and, WHEREAS, an additional $86,000.00 needs to be appropriated into account # 401-414- 662.700 to develop Well #3 in the 2004-2005 Budget year and, NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS: Section 1. Consideration to award a bid proposal to Diversified Drilling, Inc., (East Coast Division) of West Palm Beach, Florida, in the amount of $836,000.00, for the drilling of the Reverse Osmosis (RO) Well #3, attached hereto as Exhibit "A" and incorporated by reference as a part of this Resolution is hereby approved and the Village Manager of the Village of Tequesta is authorized to execute the same on behalf of the Village. ~7 THE FOREGOING RESOLUTION WAS OFFERED by Councilmember Humpage, who moved its adoption. The motion was seconded by Councilmember von Frank, and upon being put to a vote, the vote was as follows: FOR ADOPTION Pat Watkins Geraldine A. Genco Edward D. Resnik MAYOR OF TEQUESTA ,, ;, Pat Watkins ATTEST: Russell J. von Frank Jim Humpage AGAINST ADOPTION The Mayor thereupon declared the Resolution duly passed and adopted this 9th day of December, A.D, 2004. 1\1,11111, 'Gwen Carlisle ``~~~~~ ~ F TF~~i~i~ Villa e Clerk ~` ~? • O ~~~ g ` v Dip ORq~ li~N ~, ~;. >~ SEAL ~= s tINCORPORATED: ~9 GNE a `~~h : `p``~. ii ~" Q~ ~ i~~~~F,~F'F; O``~~~ CHANGE ORDER . No. 1 PROJECT: Floridan (RO) Well No. 3 DATE OF ISSUANCE: December 3, 2004 • • EFFECTIVE DATE: Upon Owner Approval OWNER: Village of Tequesta OWNER's Contract No.: N/A CONTRACTOR: Diversified Drilling, Inc. ENGINEER: ARCADIS 13EESE, MACON & ASSOCIATES, INC. You are directed to make the following changes in the Contract Documents. Description: Contract deducts and time extension. Reason for Change Order: Identify cost saving items within contract. Attachments: (List documents supporting change) Cost Summary CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price Original Contract Times Substantial Completion: 120 Davs $ 836,000.00 Ready for final payment: 150 Davs days or dates Net changes from previous Change Orders No. =to No. = Net change from previous Change Orders No. _to No. $ 0 0 Contract Price prior to this Change Order Contract Times prior to this Change Order $836,000.00 Substantial Completion: 120 Davs Ready for final payment: 150 Davs days or dates Net Decrease of this Change Order Net Increase of this Change Order $30,000.00 30 days Contract Price with all approved Change Orders Contract Times with all approved Change Orders $806,000.00 Substantial Completion: 150 Davs Ready for final payment: 180 Davs days or dates f:\wp60\Forms\chordpsl l RECOMMENDED: APPROVED: ACCEPTED: ARCADIS REESE, MACON & ASSOCIATES VILLAGE OF TEQUESTA DIVE IE L jG, INC. By: By: .~ ,. .,.~~ ` y: gineer (A prized Signature) Owner (Authoriz ignature) ~ Contracto (Auth o Signature) n Tho en, P.E. Michael Couzzo, lage Manager Ne Joh$ /z-3-o¢ Date : Date: Y' Date: :~ ~ 3 ~ • • Village of Tequesta Floridan (RO) Well No. 3 Change Order No. 1 -Cost Summary- The following items are deducts to the above referenced project. 1. The Village of Tequesta will construct the pond to the Contractors requirements. Contractor shall be required to install and remove the pond liner and Village will be responsible for the restoration of the pond area. ------------------------($14,000.) 2. The Village of Tequesta will be responsible for the main connection as follows: a. Raw Water Main tie in at WTP. The Village will be responsible for the connection into the main and bringing it up to grade with a 12-inch PVC/DIP piping for the Contractor to connect his 12-inch discharge piping to.------------------------------------------------------ b. Reject main tie in within Old Dixie Hwy. The Village will be responsible for the connection to the existing 12-inch reject main, bringing the piping up to grade and running this piping on grade or below grade to the inside of the WTP fence. The connection for the contractor will be SFT inside the fence with the pipe at grade, for the Contractor to connect his 12-inch discharge piping to.------------------------------------------ 3. The Village of Tequesta will extend the contract an additional 30 days, which will extend the substantial completion date out to 150 days and final to 180 days.--- -($2,000.) -------------------------($2,000.) ---($12,000.) Total Deducts ------------------------($30,000.) (Change Order No. 1) •