Subject:
Tequesta Drive Bridge Replacement & Roadway Improvements
Additional Engineering Services
WATER RESOURCES
Date:
Dear Mr. Couzzo: November 24, 2009
As we discussed, ARCADIS and our subconsultant, Bridge Design Associates, Inc., coMa~c:
have incurred additional costs in the performance of work that is considered to be Thomas C. Jensen, PE
outside of our original scope for the above referenced project. This additional work
effort was due to the Village acquiring FDOT stimulus funds for the bridge Plpne:
561.697.7065
construction which was not anticipated when this project first commenced. In order to
ensure that this project move forward expeditiously ARCADIS diligently moved err~a:
forward in addressing FDOT issues relative to their internal requirements and Tom.jensen@arcadis-
schedules. As you know, this project was never intended to be a FDOT project, but us.com
once the FDOT stimulus funds were engaged, and FDOT was chosen as the
Administrator (The Village lacked LAP cert~cation), the project quickly turned into a ourret
full FDOT project, with numerous design and drawing format changes, technical RF005106.001
specification revisions, up-front document additions, cost estimating/ schedule of
value re-formatting, several design report submittals, numerous meetings with Fbrida License Numbers
County and FDOT ofFcials, alt of which were completed within compressed
schedules so that the Federal stimulus funding time tables were met. All of this work EBOOOO si9
referenced above was completed between May and August 2009.
Geology
G6564
There was na time to sit down and determine what the FDOT required, as they
themselves did not know what was expected of them. As they adopted the project as escape Architecture
~c2sooo2ss
one of their own, they were constantly having internal issues as to how they could
get this project through to Tallahassee with minimal impact. In the end, they had us Surveying
~s~o62
develop a modified version of a FDOT project which took considerable effort on our
part as you can see from the attached invoice.
The attached invoice is in the amount of $110,523.94 which covers ARCADIS and
Bridge Designs costs between May and August 2009. Please let me know if you
Imagine the result
ARCADIS Michael Couzzo
November 24, 2009
~~
would like to meet to discuss this in mare detail, or if you feel {should be meeting
with each Council Member individually.
ff you have questions or wish discuss further.
Sincerely,
ARCADIS
Thomas C. Jensen, PE
Associate Vice President
Page:
2/2
~ ARCADIS
VILLAGE OF TEQUESTA
ATTN: MICHAEL COUZZO
345 TEQUESTA DRIVE
TEQUESTA, FL 33469
Professional Services from~jv 27.2009 to Au4ust 23, 200
Professional Personnel
HOURS
SENIOR ENGINEER/SR. SURVEYOR 535.50
ENGINEERISR.DESIGNER 330.10
SECRETARY 46.50
TOTALS 912.00
REIMBURSABLE EXPENSES
TOLLS
POSTAGE, SHIP 8~ MESSENGER
OUTSIDE REPRODUCTIONS
REIMS EMPLOYEE MILEAGE
RAFT
September 29, 2009
Project No: RF005106.0001
Invoice No: 0290727
RATE
80.0
65.00
40.00
TOTAL THIS PAGE
AMOUNT
42,840.00
21,450.00
1,860.00
66,156.10
12.05
9.22
49.97
5o2.7a
573.94
66,156.50
573.94
66,730.44
Sant: Wale Fargo Sank W W MA ACH Omk.oWlnp BABA) nunbar: 10l000A! PNar Meld To: ARCAd! U.l, Mc
Aeceorrlnunbar tO1HN7lt Wln,nn•hr Dank reWp~ABAl rxanbar: 1770007Y DapL,Nl, Darn.. Cdonda M7H.ON7, 770.SN.7lOQ
Awwrnl rrma: AgCAI!! u.0., Irro Lmkbw AoooOnt TEBMl: Nat M rip
~ ARCADIS
VILLAGE OF TEQUESTA
ATTN: MICHAEL COUZZO
345 TEQUESTA DRIVE
TEQUESTA, FL 33469
QR
qF~'
September 29, 2009
Project No: RF005106.0001
Invoice No: 0292009
Professic,~nal Servires~frgm,,~uly 2009 to August 23 2009
Subconsultant Expenses
BRIDGE DESIGN ASSOCIATES
TOTAL
43,800.00
43,800.00
43,800.00
110,530.44
a.nk: w.le ~..oo e..~ w..t rug AcN u.nk ~wlno (ASV n~.ne..: ~oioooo~s vl.... s.ne r.: AacAns u.s., uw.
Accoun! nvnb.r. 101H01767 Wh Ir.~M h.n4 roW rq ~/1BA) m.nOw: 1}10002M D.N~ 617, dnw, Corona. w1a1-0d17, 740.b/4.i000
Acrewrt .rrw: ARCAps U.7., IncLWbm Aoewet Tewlu ~md~
;•~~ ,
VILLAGE OF TEQUESTA ~F
WATER SYSTEM AND GENERAL UTILITY/CIVIL PROJECTS
WORK AUTHORIZATION
Tequesta Drive Bridge
"Engineering Services During Construction"
This Work Authorization authorizes ARCADIS G&M, Inc. to perform the work set forth
herein and is issued pursuant to the "Professional Engineering Consulting Services
Agreement for Water System and General Utility/Civil Projects" dated November 17,
2005. All terms and conditions of said agreement shall be applicable to this Work
Authorization.
SCOPE
The Engineer understands that this work authorization shall cover Engineering Services
During Construction (ESDC) as requested by the Village for services required by the
Design Engineer, or for those services not being performed by the on-site CEI or FDOT
representative.
The Engineer has established the team to assist with the ESDC, consisting of the
following consultant;
• Bridge Design Associates, Inc.
The following is a list of tasks that could be performed during the construction
administration of the Tequesta Drive Bridge;
1. Attend the construction status meeting, one meeting per month.
2. Provide responses to RFI's that require input from the Design Engineer.
3. Provide responses to Field requests as required by FDOT and the CEI.
4. Assist FDOT and the CEI on the certifications required by the regulatory agencies.
5. Review and approve shop drawings that require review of the Design Engineer
to include the following;
- Asphalt
- Drainage structures
- Embankment material
- Production piles
- Post -tensioning
- Railings
Page 1 of 3
- Precast panels and associated hardware ~~
- Prestressed deck units
- Sheet piles
COMPENSATION
For Scope Items 1 thru 5, the Engineer shall be paid according to the fee schedule.
delineated within the November 17, 2005 Agreement on the basis of actual time spent,
plus any applicable taxes and reimbursement for non-salary expenses, including but not
limited to, automobile travel at $0.42/mile, and reproduction.
For services of the other team member that will be sublet, the Engineer shall order their
services after obtaining the written authorization of the Client. The Subcontractor shall
work directly for the Engineer as delineated within the November 17, 2005 agreement.
We estimate the total cost for the services under Scope Item 1 thru 5 will not exceed
Forty -Seven Thousand Dollars and Zero Cents ($47,000.00). This amount shall not be
exceeded without prior written approval by the Client. Refer to the attached fee
breakdown.
TIME OF PERFORMANCE
The Engineer will complete Scope Items 1 thru 5 commensurate with the construction
schedule, which is estimated to be 231 days from November 16, 2009, exclusive of
delays beyond the control of the Engineer.
This authorization can be cancelled with or without cause by the Village with 30 days
written notice. Should said cancellation occur, the Engineer will be paid for all services
performed through the cancellation date.
Page 2 of 3
RAFT
ACCEPTED BY:
VILLAGE OF TEQUESTA
(Tequesta Drive Bridge - "Engineering Services During Construction')
Michael R. Couzzo, Village Manager
DATE:
ARCADIS G&M, INC.
(Tequesta Drive Bridge -Engineering Services During Construction ")
Thomas C. Jensen, P.E., Associate Vice President
DATE:
Page 3 of 3
TEQUESTA DRIVE BRIDGE
ENGINEERING SERVICES DURING CONSTRUCTION
FEE BREAKDOWN
a
~,«
ARCADIS ~`°'
Project Sr. w. ~~'
Manager Engineer Sr. Tech Admin.
Task 130 80 65 40
Fied Requests 21.0
RFI's 4.0 2.0
Certifications 1.0 4.0 4.0 2.0
Site Meetings 22.0 33.0 4.0
General Coordination 14.0
Shop Drawings
Asphalt 2.5
Drainage Structures 4.0
Embankment 1.5
Totals 58.0 49.0 4.0 8.0
$ 7,540.00 $ 3,920.00 $ 260.00 $ 320.00 $12,040.00
TEQUESTA DRIVE BRIDGE
ENGINEERING SERVICES DURING CONSTRUCTION
FEE BREAKDOWN
Bridge Design Associates, Inc
Task Chief
Engineer
195
Sr Engineer
150.00
Fied Requests 24.0 24.0
RFI's 24.0 24.0
Certifications 2.0 4.0
Site Meetings 38.5
General Coordination
Shop Drawings
Production Piles 2.0
Post Tensioning 6.0
Railing 8.0
Precast Panels 6.0
Prestressed Desk 4.0 12.0
Sheet Piles 6.0 4.0
Totals 106.5 82.0
$ 20, 767.50 $ 12,300.00
$ 33, 067.50
~RAFp
TEQUESTA DRIVE BRIDGE
ENGINEERING SERVICES DURING CONSTRUCTION
FEE BREAKDOWN
Summary
ARCADIS ~ 12,040.00
Bridge Design Assoc., Inc a 33,067.50
Reimbursables a 2,000.00
Total 3 47,107.50
Say ~ 47,000.00