AGENDA ITEM TRANSMITTAL FORM
1. VILLAGE COUNCIL MEETING:
Meeting Date: Meeting Type: Regular Ordinance #: N/A
June 10, 2010
Consent Agenda: No Resolution #: 17 -10
Originating Department: Community Development
2. AGENDA ITEM TITLE: (Wording form the SUBJECT line of your staff report)
Community Development Permit Fee Adjustment
3. BUDGET / FINANCIAL IMPACT:
Account #: Amount of this item: Click here to enter text.
N/A
Current Budgeted Amount Available: N/A Amount Remaining after item: N/A
Budget Transfer Required: No Appropriate Fund Balance: No
4. EXECUTIVE SUMMARY OF MAJOR ISSUES: (This is a snap shot description of the agenda item)
Proposing to simplify and increase the current Community Development Fee Schedule, which is too complex and has
fallen behind the industry standards. Proposed fee schedule will be based on percentage method where possible with a
non refundable application fee as opp 74110 the c rent square foot method.
5. APPROVALS:
Dept. Head: Finance Dire * roved
inancial Impact
Attornt • (for legal sufficiency) Yes No
Village Manager:
• SUBMIT FOR COUNCIL DISCUSSION:
• APPROVE ITEM:
• DENY ITEM: El
Form amended 08/26/08
memorandum
TO: MICHAEL R. COUZZO, VILLAGE MANAGER
FROM: JAMES M. WEINAND, FIRE CHIEF /COMMUNITY DEVELOPMENT DIR
SUBJECT: COMMUNITY DEVELOPMENT FEE ADJUSTMENT
DATE: MAY 24, 2010
1 am requesting this item be placed on the June 10, 2010, Village Council Agenda for their
consideration.
The current permit fee schedule was established in April of 2006 has fallen behind the industry
standards; the fee schedule is too complex for individuals to figure out the proper fee without the
assistance of the Building Official. Contractors should not have to call the Building Official for
the appropriate permit fee when bidding a project.
I am proposing a simplified fee schedule so contractors will know in advance what the permit
fees are and, per Section 14 -152 of the Village Code of Ordinances, the office staff can
determine and collect the proper fee at the time of application without the assistance of the
Building Official.
The current fee schedule is one of, if not the lowest, fee schedules in Palm Beach County. The
proposed fee schedule has been revised to percentage method where possible with a non-
refundable application fee.
Palm Beach County, Jupiter, Palm Beach Gardens and North Palm Beach all calculate their
fees with the percentage method. Juno Beach is the only other northern Palm Beach County
city to charge by the square footage price. Attached are their fee schedules for comparison.
Below I have given you various projects with applicable agencies' fee schedule and Tequesta's
proposed fee schedule.
Project Current PB Proposed
Tequesta Jupiter PBG Juno NPB County Te uesta
3,200 sq. ft.
Residential 960 9,080 5,040 13,771 6,152 5,005 9,075
S/F home
$450,000.00
500 sq. ft.
$40,000.00 150 800 600 225 1,620 2,600 875.00
Addition
1,500 sq. ft.
$20,000.00 525 400 300 600 810 450 475.00
Com Build -out
$20,000 pool 500 400 300 300 810 450 475.00
$10,000 roof 105 200 150 255 405 275 275.00
Attached is a Resolution for consideration.
RESOLUTION NO. 17 -10
A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF
TEQUESTA, FLORIDA REVISING APPENDIX C, IN CHAPTER 14,
ARTICLE VI, PERMIT FEES, SEC. 14.152, BUILDING PERMITS;
WHEREAS APPENDIX C, PERMIT FEES IN HEREBY OFFICIALLY
ADOPTED BY THIS RESOLUTION; PROVIDING FOR SEVERABILITY;
PROVIDING AN EFFECTIVE DATE; AND FOR OTHER PURPOSES.
WHEREAS, the current fee schedule adopted in 2006 is obsolete; and
WHEREAS, the new fee schedule will better provide for actual operating costs,
and
WHEREAS, the new fee schedule Appendix C, Permit Fees of the Village of
Tequesta is hereby officially adopted.
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE
VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS:
Section 1 Resolution No. 17 -10 is hereby adopted, revising Appendix C,
Permit Fees, as referenced in Chapter 14, Section 14 -152, Building Permits, and is
officially adopted by this Resolution.
Section 2 This Resolution shall become effective immediately upon passage.
RESOLUTION NO. 67 -05/06
A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF
TEQUESTA, PALM BEACH COUNTY, FLORIDA, REVISING
APPENDIX C, IN CHAPTER 14, ARTICLE VI, PERMIT FEES, SEC.14-
152, BUILDING PERMITS; WHEREAS APPENDIX C, PERMIT FEES IS
HEREBY OFFICIALLY ADOPTED BY THIS RESOLUTION.
WHEREAS, the current fee schedule adopted in 1975 is obsolete; and
WHEREAS, the new fee schedule will provide for actual operating costs, and
WHEREAS, the new fee schedule Appendix C, Permit Fees of the Village of Tequesta
is hereby officially adopted.
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE
VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS:
SECTION 1 — The Village Council of the Village of Tequesta hereby adopts the revised
Appendix C, Permit Fees, as referenced in Chapter 14, Section 14 -152, Building
Permits, and is officially adopted by this resolution.
THE FOREGOING RESOLUTION WAS OFFERED by Councilmember Watkins,
who moved its adoption. The motion was seconded by Councilmember Paterno, and
upon being put to a vote, the vote was as follows:
FOR ADOPTION AGAINST ADOPTION
Jim Humpage
Tom Paterno
Pat Watkins
Geraldine A. Genco
The Mayor thereupon declared the Resolution duly passed and adopted this 13th" day of
April, A.D, 2006.
MAYOR OF TEQUE
%X X%tuuj Humpage
ATTEST: �����0� O F
SE
Cowen Carlisle Village Clerk N
,
OF o ; pP``�
•
APPENDIX C
PERMIT FEES
•
•
APPENDIX C
PERMIT FEES
(A) BUIILDING PERMIT FEES:
1. Minimum Fee: $75. .
2. Building permit applicants for new or replacement commercial buildings,
new or replacement multi - family buildings and new or replacement duplexes shall pay a
non - refundable $3,000 fee at the time of filing for a building peiinit. Building permit
applicants for a new or replacement conventional single - family residences shall pay a
non - refundable $1,500 fee at the time of filing for a building permit. Building permit
applicants for a new or replacement modular homes shall pay a non- refundable $750 fee
• at the time of filing for a building permit. Building permit applicants for a new or
replacement mobile home are exempt from paying an application fee at the time of filing.
Upon approval and permitting the application fee shall be deducted from any other
amount which may be due and owing under the other terms of this subsection.
3. Buildings including balconies, additions, garages, enclosures and
accessory structures, for each 100 square feet of enclosed area or'a fraction thereof:
residential $30; commercial $35.
4. Structures other than buildings and miscellaneous construction (unless
specified herein) for each $1,000 of cost or a fraction thereof: residential $35;
commercial $40.
5. Seal coat parking lot; re- striping, for each $1,000 of cost or a fractional
part thereof: residential $30; commercial $40.
• 6. State approved modular units (building only, electrical, plumbing,
mechanical require separate permits): residential $650; commercial $300.
7. Foundations for modular units (slabs, auger /pilings, columns or tie beam):
residential $200; commercial $300.
8. Flatwork and decks on grade (concrete, wood, etc.), for each 1000 square
feet or a fractional part thereof: residential $35; commercial $45.
9. Fences and walls (all types), for each '100 lineal feet or a fractional part
thereof. residential $35; commercial $45.
10. Tile and metal roofing (including repairs and new roofs), for each roofing
square or a fractional part thereof. residential $7; commercial $8.
11. Modified, built -up, shingle roofing (including repairs and new roofs), for
each roofing square or a fractional part thereof: residential $6; commercial $7.
• 12. Air conditioner stands on roofed areas and waterproofing for roofed areas:
residential $35; commercial $45.
4 4 13. Swimming pools including 3ft. wide deck surround (plumbing and
electrical excluded): residential $500; commercial $800.
14. Spa and hot tubs (up to 12ft. diameter) (decks plumbing and electrical
excluded): residential $100; commercial $200.
15. Cisterns (non - potable): residential $250; commercial $350.
16. 'Mobile home installation, tie downs, blocking, setbacks and stairs:
residential $300; commercial $500.
17. Temporary construction/sales trailer annual fee, removal required before
certificate of occupancy will be issued: residential $200; commercial $250.
. 18. Tents (temporary only -3 day maximum): residential $50; commercial
$100.
19. Tanks (all types )—for each 1,000 gallons of capacity or fractional part
thereof: residential $9.00; commercial $10.
20. Moving building: residential $350; commercial $600.
21. Demolition of interior- or exterior of any structure, for each 1,000 square.
feet or fractional part thereof: residential $80; commercial $90.
22. 'Gutter, downspouts, french drains: for each 100 lineal feet or fractional
part thereof residential $35; commercial $45.
23. Awnings or canopies, for each 100 square feet or a fractional part thereof.:
residential $35; commercial $55.
24. Hurricane shutters, retrofit or new: residential or commercial $50..
25. Certification of hurricane protection for insurance purposes $30.
26. Commercial flood proofing panels for FEMA compliance: $200 flat fee.
27. Wood lattice /screening including framing and material —no roofing
allowed, for each 100 square feet or a fractional part thereof. residential $25; commercial.
$35.
28. Windoe oval and replacement: $20 per window.
29. Commercial vent hoods, for each $1,000 of the estimated cost or a
fractional part thereof.
30. Signage:
(a) New signs, for each 40 square feet of signage or a fractional part
thereof: residential N /A; commercial $35.
•
• (b) Modify, repair, repaint existing signs, for each 40 square feet or a
fractional part'thereof: residential N /A; commercial $30.
(c) Political signs: $50 unlimited signs.
Note: The permits and associated fees listed below may also require additional
biological inspection fees.
31. Seawalls per 50 lineal feet or fractional part thereof residential $35;
commercial $50.
32. Docks for each 10 square feet or a.fractional part thereof: residential $35;
commercial $50.
33. Dock piling (wood piling and concrete), each: residential $25; commercial
35.
34. Boat davit, (each): residential $45; commercial $60.
• 35. Boat lift: residential $100; commercial $200.
36. Retaining and rip rap walls per 100 lineal feet or a fractional part thereof:
residential $60; commercial $80.
37. Land filing, per each 100 cubic yards: residential $35; commercial $60.
38. Land clearing (invasive exotics): no fee.
39. Land clearing for construction.purposes for each lot: residential $75;
commercial $95.
40. Non - refundable plan review fee to be added with the total permit fee:
residential $3 per $1,000 of estimated cost; commercial $4 per $1,000 of estimated cost.
41. Archived plan retrieval fee $25 per request,.copies priced per Section
119.07(l)(a), Florida Statutes. /� K L
A4 4z4
42. Extension of a permit if no new codes are in effect: $50.
43. Radon fee: 5% of additional living area.
44. BCAIF fee: 5% of additional living area.
45. Re- inspection fee due to rejection of work due to faulty construction, work
not ready, failure to call for inspection and work covered up, work not per plans and no
access to jobsite: flat fee: $100.
46. After the fact permit fees for work done without benefit of a permit. Price
for after the fact permits will be assessed to each category, building, plumbing, electrical,
mechanical and roofing at double the regular permit fee.
47. Plans revision fee (for substantially revised plans): flat fee $75.
48. Plans revision fee (for minor revisions to plans): flat fee $45.
�---� 49. Contractor registration fee: initial fee $40; annual update fee $25'.
• iness license fee (annual): $200; home occupation license fee (annual)
$100.
51. Lost permit card or lost plans fee: residential $20; commercial $40.
– 52 —FEIVl- inspections: $150.
(B) PLUMBING PERMIT FEES: 7 j
1. Minimum fee: $75.
2. Each fixture roughed in and set: residential $25; commercial $35.
3. Sewer /drainage - building interior lines and connection: residential $70;
commercial $80.
4. . Outside sanitary and storm lines (site work) for each $1,000 of cost of
fractional part thereof: residential $70; commercial $90.
� c -
(�
• 5. Manholes (each): flat fee: $70.
6. Floor or roof drain (each): flat fee $10.
7. Water piping:
(a) Connection to supply system (each): residential $35; commercial
$55.
(b) Connection to any appliance or fixture not covered by paragraph
(b)2: residential $35; commercial $45.
(c) irrigation systems for each $1,000 of cost or fractional part thereof:
residential $25; commercial $40.
8. Water mains and distribution lines, for each $1.000 of cost or a fractional
part thereof residential $30; commercial $40.
9. Swimming pools, spas, hot tubs: residential $60; commercial $200.
• 10. Solar water heater new complete installation: residential $50; commercial
$85.
' ��► 11. Jobsite temporary toilet (valid for the length of the project): residential
$45; commercial $60.
12. Miscellaneous plumbing not covered or included herein, for each $1,000
of the estimated cost or fractional part thereof. residential $30; commercial $45.
13. Plumbing after the fact fees: refer to (a)46.
(C) ELECTRICAL PERMIT FEES:
1. Minimum fee: $75.
2. Site work: residential and commercial, for each $1,000 of the estimated
cost of construction or a fractional part thereof: residential $50; commercial $60.
• bS d* .
�� 7'11b
• 3. Outlets -- (general, receptacles, switches, lighting, telephones, computer,
TV, etc: for each 100 square feet or fractional part thereof: residential $11; commercial
$12.
4. Each appliance outlet including ceiling fans: residential $11; commercial
$12.
5. Each exterior light --- exclusive of sign lighting: residential $10;
commercial $15.
— 6. Temporary electrical service: residential $100; commercial $200.
7. Single phase service, 0 -300 amps; residential $80; commercial $100.'
8. Single phase service, over 300 amps to 400 amps: residential $95;
commercial $110.
9. Single phase service, over 400 amps to 600 amps: residential $120;
• commercial $135.
10. Single phase service, over 600 amps: residential $300; commercial $400.
11. Three phase service, 0 to 300 amps: residential $95; commercial $150.
12. Three phase service, over 300 amps to 400 amps: residential $110;
commercial $135.
13. Three phase service, over 400 amps to 600 amps: residential $160;
commercial $195.
14. Three phase service, over 600 amps: residential $250; commercial $350.
Note: Sub feeds to be charged by amps at the same rate as services.
15. Each motor throughout the project: 0 to 10 hp: residential $60;
commercial $75.
•
• 16. Each motor over 10 to 25 hp: residential $125; commercial $145.
17. Each motor over 25 hp: residential $165; commercial $180.
18. Generators, transformers and transfer switches (each) 0 to 25 KW:
residential $60; commercial $75.
19. Generators, transformers and transfer switches (each) over 25 KW to 50
KW: residential $120; commercial $180.
20. Generators, transformers and transfer switches (each) over 50 KW:
residential $160; commercial $180.
21. X -ray machines (each): flat fee: $500.
22. Welding machines (each): flat fee: $300.
23. Air conditioner (each), window or wall unit if new service is needed:
residential $70; commercial $95.
• 24. Central systems, up to 20 tons: residential $60; commercial $85.
25. Central systems, over 20 tons: residential $85; commercial $120.
26. Refrigeration system, up to 20 tons: flat fee: $95.
27. Refrigeration system, over 20 tons: residential and commercial $5 /per ton.
28. Heat pump, residential and commercial: minimum fee $60.
29. Elevators, residential and commercial: flat fee: $200.
30. Dumbwaiters, chairlifts: residential and commercial: flat fee: $200.
31. Signage first connection: $60.
32. Signage each additional sign connection: $30.
33. Plug mold and track lighting for each 100 lineal feet or fractional part
thereof. residential $60; commercial $85:
•
• 34. Low voltage alarm system: residential $100; commercial $35 per $1,000
of estimated cost.
35. Commercial vent hoods: price per motors, see paragraph (c)15- (c)l7.
36. Electrical repairs /remodeling same as new work: minimum fee $75.
37. Swimming pools, spas and hot tubs (lights, pump, bonding, grounding and
timer): residential $200; commercial $300.
38. Miscellaneous electrical work not included herein, for each $1,000 of cost
or a fractional part thereof: residential $30; commercial $45.
39. After the fact electrical work: refer to paragraph (a)46.
(D) MECHANICAL PERMIT FEES:
1. Minimum fee: $75.
2. Air conditioning systems (excluding window units) and refrigeration:
• (a) 0 -2 ton $55
(b) 2 -5 ton $70
(c) 5 -10 ton $85
(d) 10 -25 ton . $100
(e) 25 -50 ton $130
(f) 50 -100 ton $210
(g) over 100 ton $320
3. Duct work per drop (including return air plenums): residential $10;
commercial $12.
4. Vent hoods (each): residential $50; commercial $100:
5. Heat pump (per unit): residential $50; commercial $70.
• 6. Miscellaneous mechanical work not included herein, for each $1,000 of
cost or a fractional part thereof: residential $35; commercial $70.
7. Gas equipment and piping (per fixture unit inclusive of all required
piping): residential $45; commercial $60.
8. Mechanical elevators (up to two floors), dumbwaiters, moving sidewalks,
escalators: flat fee: $150.
9. Mechanical elevators (over two floors): additional $75 per floor.
10. After the fact mechanical and gas fees: refer to Section (a)46.
(E) PLANNING AND DEVELOPMENT SERVICE. FEES:
1. Consultant reports for approvals: fee subject to time expended.
2. Plan review (for all required landscape plans, i.e. buffer yards and
mitigation): flat fee $75.
• 3. Site visit inspection (for environmental compliance review or vegetation
plan review): flat fee $100.
4. Land filling permits: residential $40; commercial $50.
5. Dock/seawall /riprap applications: flat fee, canal $40; open water $80.
6. Planning or environmental inspection fee: flat fee $75.
7. Reinspection fee. (Inspection requested job not ready): flat fee $40.
8. Planning review fee: new residential $40; modification to existing
residential $20; new commercial $50; modification to existing commercial $30.
(G) OPERATIONS /PUBLIC WORKS FEES:
1. Minimum fee: flat fee $75.
2. Utility work in the right of way not performed by Village personnel: flat
fee $75.
3. Driveway connection approval to Village roadways: flat fee $50.
THIS RESOLUTION SHALL BECOME EFFECTIVE IMMEDIATELY UPON ITS
ADOPTION.
3/06
CH/mm
• 3:
Town of Jupiter Building Department
Schedule of Permit Fees
Master construction permits will include all sub - contracting work
Permit fee is 2% of the value of the work being performed
30% due when the application is submitted
Demolition permit shall be the greater of the following: 2% of the permit valuation or $250.00
The minimum permit fee is $75.00
Surcharge / Building ............................................. ............................... $0.005 per square foot under roof
Surcharge/ Radon ............................................... ............................... $0.005 per square foot under roof
Failure to Obtain A Permit ..................................................... ............................... TWO (2) TIMES FEE
• Inspection Fee ............................................................................................. ............................... $75.00
(occupancy use classification, structure compliance, structure relocation, demolition, condemnation, occupational license,
compliance, fire damage, re- inspection) Sec. 21 -81 INSPECTION FEES
Revisions ........................................ ............................... $75.00 per hour (minimum $75.00)
Permit renewal .................................... ............................30% of original permit fee (minimum $75.00)
Permit refunds only within 30 days of the date of issuance ..............70% of the amount over $100.00
Change of contractor .......................................... ............................... .........................$75.00
Research............................................................... ............................... .........................$16.00 per hour
Photo copies letter or legal size ............................. ............................... ..........................$0.15
Largeformat blueprint copies .................................. ............................... ..........................$3.00
Town of Jupiter amendments ............................. ............................... .........................$10.00
Construction board of adjustments and appeal filing . ............................... ........................$200.00
•
•
JUPITER ROAD IMPACT FEES:
20% of Palm Beach County Road Impact Fee (Effective April 21, 2004)
NOTE: DO NOT COLLECT PALM BEACH COUNTY ROAD IMPACT FEES FOR
FRENCHMAN'S CREEK (BEAR'S CLUB / RITZ CARLATION)
JUPITER COUNTRY CLUB
NOTE: DO NOT COLLECT PALM BEACH COUNTY SCHOOL IMPACT FEES FOR
MAPLEWOOD
NOTE: DO NOT COLLECT PALM BEACH COUNTY FIRE IMPACT FEES FOR
MAPLEWOOD
NOTE: DO NOT COLLECT JUPITER ROAD IMPACT FEES FOR:
MAPLEWOOD
is
PARK FEES:
MAPLEWOOD $ 50.00
JUPITER COMMERCE $250.00
WATERS EDGE ESTATES $833.30
RAStai1\WP51 \98C0UNTR \Fee Schedules\Feeschd 2007.wpd
• Rev 6/96, 12/93, 10/93,10/92, 8/98, 10/01, 4/21104, 08/06/07
rwi
E K.
City of Palm Beach Gardens
FYE 2010 Master Fees & Charges Schedule
Effective Date October 1, 2009
Adopted by Resolution 69, 2009
BUILDING DIVISION
Building Permit Fee* Based on current fair market value of proposed
improvement, executed contract, or cost of
construction using nationally - recognized sources
such as ICC Building Valuation data, RS Means
Cost Data, Marshall Swift or similar publications. A
copy of the contract may be required.
Building Permits with Fire Department, CPTED Building Permit Fees plus applicable Fire
and Engineering Review and Inspections Department, CPTED, and Engineering Fees
Minimum Permit Fee $50
Percentage of Valuation: Unit Value:
1.5 The first $100,000 plus
1 The remainder over $100,000)
Plan Review Surcharge (due upon submittal, based 10% of Building Permit Fee, $25 minimum. Penalty
• upon estimated construction) not applicable to over- fee of 3 times the base plan fee will be assessed on
the - counter permits the 3rd and subsequent plan reviews.
Reference: FS 553.80(2)(b
Training Surcharge 1% of the Building Permit Fee and/or Revision
fee,$1 minimum
Sub - Permit Administrative Fee (applicable to all $10
sub - permits that are issued over the counter and do
not require an independent review
Right-of-Way Permit Fee 7% of Project Valuation, $50 minimum
Temporary Construction Storage Container $50
Expedited or out-of-sequence review fee 10% of Building Permit Fee, $50 minimum
Re- inspection Fee $50 for first re- inspection, $100 for second re-
inspection, and $200 for third re- inspection and any
subsequent re-inspections
Penalty for commencing work without first securing Regular fee plus up to three (3) times the normal
a permit or written approval Building Permit Fee (at the discretion of the
Building Official)
Revision fees: (as stated, but not to exceed original
permit fee; additional incremental value charges
may apply
Major Revision Prior to plan review being completed: no charge;
(i.e., changes in square footage, model, layout) After plan review is complete: $75 plus $10 per
sheet reviewed
Minor Revision Prior to plan review being completed: no charge;
(i.e., minor changes to electrical, plumbing, After plan review is complete: $25 plus $10 per
windows, pro duct approvals, etc.) sheet reviewed
Inspections by special request, same day, after $75/hour, 2 -hour minimum
hours, or weekend (subject to staffing availability
• and as sub to review by the Building Official
1
• Change of contractor after permit issuance (same $75 regardless of permit type
location
Other Professional Services (i.e., permit research, $50/hour, or portion thereof
due diligence reports, insurance affidavits, etc.
Address Correction after permit issuance $50 per permit issued with incorrect address
Contractor Registration $10
Special Foundation Permit ( Phased Construction) Residential: $250 plus surety
Commercial: $1,000 plus suret
Application Extension Fee (prior to original $25
ex iration date
Application Renewal Fee (after, but within, 90 days $50
of original expiration date)
Permit Extension Fee (prior to expiration) $25
Permit Renewal Fee (within 180 days after original $50
date
Permit Reissuance Fee (after 180 days of original 30% of original Building Permit Fee,
expiration date) $50 minimum plus Plan Review Fee
(Must meet current code and may require new
submittal)
Open Permit Status Request $40
Annual No -fee Sub - Permit Fax Program $200 annually not pro-rated
Stocking Permit <5,000 SF = $250
>5,000 SF = $750
Phased Occupancy, Conditional Certificate of Residential: $2501125
Occupancy, or Completion Agreement (non- Commercial <5,000 SF: $750/$750
refundable and at Building Official discretion; Commercial >5,000 SF: $1,5001$1,500
original issuance valid for 90 days /extension
renewals for 45 days
• Radon and Building Certification Per State of Florida Statutes
Land Clearing:
- 25 acres or less $250
- Greater than 25 acres $250 + $5 per acre for cleared land
Temporary Tents $50 per trade inspected, plus Plan Review and Fire
Department Fees
Temporary Signs Commercial (per City code $75 + $25 Code Inspection Fee
Temporary Signs — Residential and Not - for - profit $25 Code Inspection Fee
(excludes garage sale, residential open house, and
residential real estate signs, up to six square feet,
p er City code)
* After a permit has been issued, no inspections have been performed, and the permit is not in an expired
status, permits that are withdrawn or cancelled shall be refunded at 50% of the Building Permit Fee above
$100. Building Permit Fees less than $100 will not be refunded. All other fees associated with the reviews
or issuances of permits, aside from impact fees, are non - refundable. Building Permit fees on any permits
with inspections completed, regardless of their status, will not be refunded. Requests for impact fee refunds
may require a separate request to be filed with Palm Beach County. All requests for refund must be made in
writing at the time the withdrawal or cancellation is submitted. All fees are subject to review at the
discretion of the Building Official or authorized agents to ensure fees assessed are consistent with the
legislative intent of FS 553.80.
ENGINEERING
RESIDENTIAL/NON- RESIDENTIAL SECURITY DEPOSIT
Single Lot, Single Family Residential $1,000
Small: Generally a small, single user, single structure, out-parcel project $3,000
Medium: Less than 25 acres; generally a mid - range, single owner PUD $5,000
project that may have small out - parcels; a single user with multiple structures
or multi- phase project
2
Large: 25 acres or greater and/or multiple users, multiple owners, multiple $10,000
structures
Development of Regional Impact (DRI) To be determined
following completeness
review
Pre - Application Infrastructure Review* $5,000, plus $10,000
security deposit
First page $100
Preliminary conceptual review 6 Second page $75
Third page forward $50 per page
Plat Review Hourly rates based on current City's
Engineering hourly rates
Inspections for the enforcement of the National Pollutant Discharge Elimination System ( NPDES) will be
performed hourly based on current City's Engineering hourly rates, unless the developer/builder applies
for separate inspections as listed below
Single - family and multi - family building permits
larger than 1 acre (up to 10 acres) or discharging $460 plus $300 for every month of
NPDES into a storm water treatment serving a larger construction 7
development that is greater than 1 acre
NPDES All developments greater than 1 acre and up to 10 $460 plus $375 /month of construction 7
acres
All developments greater than 10 acres and up to $600 plus $500 for every month of
NPDES 50 acres construction 7
NPDES All developments greater than 50 acres $750 plus cons for every month of
construction
Code Enforcement Hourly rates based on current City's
Engineering hourly rates
Informal research request Hourly rates based on current City's
Engineering hourly rates
Work without permit Triple permit fee 2
Maintenance of traffic (MOT) plan review, not associated Hourly rates based on current City's
with any other engineering permit Engineering hourly rates
3
• Director of Engineering - $150/Hr.
Engineering Department hourly rates Engineering Associate - $105 /Hr.
Engineering Inspector - $75 /Hr.
Eng. Admin. Support - $50/Hr.
Other engineering service requests will be charged at the hourly rates established above
Overtime, weekend or holiday inspections will be charged a minimum of 2 hours at the rate of one and a
half (1.5) times the City's Engineering Department hourly rates. This service is subject to staffing
availability and subject to review and approval by the Director of Engineering.
ENGINEERING PERMIT FEES
Infrastructure permit or amendments to infrastructure permits See Schedule A or Schedule B 1,4
(Private or Public)
Site plan review during the development review process Hourly rates based on current City's
Engineering hourly rates
Site lighting /photometric permit Hourly rates based on current City's
Engineering hourly rates
Comprehensive Plan Amendment or rezoning engineering Hourly rates based on current City's
review (if required) Engineering hourly rates
Planned Community Development (PCD), Planned Unit Hourly rates based on current City's
• Development (PUD), or amendments to PCD /PUD Engineering hourly rates
Expedited permit review 5 One and a half (1.5) permit fee'
Driveway permit (non - residential) See Schedule A or Schedule B 1'4
Resurfacing permit (non - residential) See Schedule A or Schedule B 1 ' 4
Restriping modification permit (non - residential) See Schedule A or Schedule B 1,4
Single - family or multi - family lot grading plan $450 includes as -built review and
inspections
Surety reductions, releases, and any other changes in surety Hourly rates based on current City's
(each request or submittal) Engineering hourly rates
4
• Schedule A Projects with a construction cost estimate less than $100,000 will be charged hourly
rates based on current City's Engineering Department hourly rates. For purposes of
estimating a permit fee, the certified construction cost estimate does not need to
include items related to utilities or landscaping.
Schedule B Projects with a construction cost estimate equal to or greater than $100,000 will be
charged 2% of the certified construction cost estimate. For purposes of estimating a
permit fee, the certified construction cost estimate does not need to include items
related to utilities or landscaping.
1 Includes project review and construction site inspections (does not include NPDES inspections if
required). Projects requiring more than two (2) project reviews and/or more than two (2) failed
inspections will require additional hourly fees based on the current City's Engineering hourly
rates.
2 Included but not limited to all applicable permits and all past present and future associated
inspections. If the project is being charged at hourly, the hourly rates will automatically triple.
This fee can be lowered at the discretion of the Director of Engineering.
3 Double fee for only the review portion of the project, not the inspection portion, thus the fee
being 1.5 of the normal fee. If the project is being charged hourly, the current City's Engineering
hourly rates will be multiplied by 1.5.
4 At the discretion of the Director of Engineering, in lieu of a certified construction cost estimate, a
signed contract with a general contractor can be acceptable.
5 This fee applies only for non Targeted Expedited Permitting Program (TEPP) certified projects.
The expedited review will have a five (5) day turnaround time.
6 Conceptual review is non - binding and simply an informal review by staff prior to submitting an
application.
7 Construction starts at the time of site clearing and ends at the time of complete stabilization of
the site and submittal of the Notice of Termination (NOT) to FDEP.
*Security deposits for Engineering will only apply to permits with hourly rates. Applicants submitting for
an Engineering permit with fixed rates will not need to provide a security deposit. Security deposit, as
required above, will be returned only after all related outstanding invoice items have been billed and
outstanding invoice monies receipted. Request for return of security deposit must be made in writing. Fees
can be adjusted at the discretion of the Director of Engineering.
LEGAL DEPARTMENT
Legal Review Security Deposit for Development $1,000
Applications
PLANNING & ZONING DIVISION
Abandonment of right-of-way $825
Abandonment of easement $330
Administrative application $550
Administrative approval minor revision to current application $50
Administrative approval re- submittal $175
Administrative Pre-application Meeting $75
Administrative Variance 1 $150
5
• Advertising Actual Costs to Cit
Advertising Security Deposit $1,000
Appeal of an Administrative Determination Single - Family Residence (non-
commercial) $400
All Other Uses $1,000
Build Out Time Extensions $1,100
Build Out Determinations $2,750
Comprehensive Plan Land Use Map Amendment $3,500
Comprehensive Plan "Small Scale" Land Use Map Amendment $2,750
Comprehensive Plan Text Amendment $3,500
Concurrency Certificate 1 $550
Concurrent Processing $550
Conditional Use — Major $3,300
Conditional Use — Minor $550
Consultants /Other Security Deposi $1, 000
Development of Regional Impact (DRI) *minimum fee for first 6 $5,500
months
DRI Monthly fee after minimum 2 $825
DRI Amendment $3,300
DRI Re- Submittal Fee $825
*Additional costs for Developments of Regional Impact will be
billed to the applicant
DRC No Show Fee $170
Environmental Review $1,100
Environmental Review Security Deposit $1,000
Landscape CO Inspection for development projects $170
Landscape CO Re-Inspections $170 x number of re-inspections
Liquor License Review $170
Miscellaneous Petitions $1,650
Non-binding conceptual review by Planning & Zoning $1000
Non-binding conceptual review by City Council $2,500
Planned Community District (PCD) $3,850
Planned Unit Development (PUD) $3,300
PCD or PUD Amendment $2,475
PCD or PUD Re- Submittal $825
Plat Recordation $30 first page;
$15 each additional page
Plat Application $550
Pre - Application Meeting- (prior to submittal) $200
Rezoning Fee (PUD/PCD/Zoning District) $2,475
Site Plan Review (Major) & Site Plan Amendment $2,475
Site Plan Review Minor $1,650
Site Plan Re- submittal Fees $825
Applicant Postponement Fee (each occurrence ) $250
Special Event Permits that require Council Approval $550 + $50 Code Inspection Fee
Special Event Permit Application (Non - Profit Organizations $110 + $50 Code Inspection Fee
Exempt except for Code Inspection fee)
Special Events Appeal non - refundable $55
Subdivision $1,650
Text Amendment of Land Development Regulations $1,650
Variance- Single-family residences $440
Variance- All other land uses $1,100
Waiver for Residential Mixed -Use Requirements $1,100
Compliance:
Compliance Review - Building Permit $42 Single Residence (non-
commercial
6
TOWN. OF
Town of Juno Beach
340 Ocean Drive, Juno Beach, Florida 33408
Phone: (561) 626 -1122 Fax: (561) 775 -0812
BUILDING DIVISION PERMIT FEE SCHEDULE
MINIMUM BUILDING & UPFRONT FEES: Base Fees
Minimum Permit Fee: $75.00
Training Surcharge: Permit Fee x 1% (Minimum $1.00)
Upfront Fees:
For all Projects other than noted below: $75.00
New or Replacement of: Commercial,
Multi - Family, or Duplexes: $3,000.00
New or Replacement of : conventional
single - family residences: $1,500.00
New or Replacement of : Modular homes: $750.00
Base Fees only apply at permit submittal not
per each item or combination thereof.
BASE
Building Permit Fees: FEES
Accessory Structure Additions, Enclosures,
Garages & Balconies will be charged an additional
fee per each 100 square foot or fraction thereof. -
Residential $75+ $30.00 (each 100 sq. ft. or fraction thereof)
Commercial $75+ $35.00 (each 100 sq. ft. or fraction thereof)
Main Structures, (other than specified herein) will
be charged an additional fee per each $1,000.00 of
cost or a fraction thereof. -
New Residential $750 + (or) $1500 + $30.00 (each $1,000 cost or fraction thereof)
New Commercial $3000+ $35.00 (each $1,000 cost or fraction thereof)
Seal Coat parking lot; re- stripping, for each
$1,000.00 of cost or fractional part thereof:
Residential $75+ $30.00 (each $1,000 cost or fraction thereof)
Commercial $75+ $40.00 (each $1,000 cost or fraction thereof)
State Approved modular units
building only, electrical, plumbing, mechanical require
separate permits:
Residential FLAT $650.00
Commercial FLAT $300.00
Foundations for modular units
(slabs, auger /pilings, columns or tie beams):
Residential FLAT $200.00
Commercial FLAT $300.00
Interior Remodels or Additions
Residential Remodel or Addition $75+ $30.00 (each $1,000 cost or fraction thereof)
Commercial Remodel or Addition $75+ $35.00 (each $1,000 cost or fraction thereof)
•
Building Permit Fees: FBASE
EES
• Flatwork, repairs, and flat decks on grade
for each 1,000 square feet or a fraction thereof. for each 1,000 square feet
Residential $ 75+ $35.00
Commercial $75+ $45.00
Fences and Walls (all types)
for each 100 linear feet or a fraction thereof: for each 100 linear feet
Residential $ 75+ $35.00
Commercial $75+ $45.00
Tile & Metal Roofing (includes repairs & new roofs)
for each roofing square or a fraction thereof. for each 100 square feet
Residential $ 75+ $7.00
Commercial $75+ $8.00
Modified, built -up, shingle roofing
(includes repairs and new roofs) for each roofing
square or a fractional part thereof: for each 100 square feet
Residential $ 75+ $6.00
Commercial $75+ $7.00
Air Condition Stands on Roofed areas and
waterproofing for roofed areas: for each
Residential FLAT $35.00
Commercial FLAT $45.00
Swimming pools including three feet wide deck
surround (plumbing and electrical excluded) for each
Residential FLAT $300.00
Commercial FLAT $600.00
Spa and hot tubs (up to 12' diameter)
(decks, plumbing and electrical excluded) for each
Residential FLAT $100.00
Commercial FLAT $200.00
Cisterns (non - portable) for each
Residential FLAT $250.00
Commercial FLAT $350.00
Mobile home installation, tie downs, blocking,
setbacks and stairs: for each
Residential FLAT $300.00
Commercial FLAT $500.00
Temporary construction /sales trailer annual fee,
removal required before certificate of occupancy will
be issued: for each
Residential FLAT $200.00
Commercial FLAT $250.00
Tents (temporary only -- Three -day maximum):
Residential FLAT $75.00 (each additional tent $25.00)
Commercial FLAT $100.00 (each additional tent $25.00)
Tank (all types) - -for each 1,000 gallons of capacity
or fractional part thereof. for each 1,000 gallons of capacity
Residential $ 75+ $9.00
Commercial $75+ $10.00
Moving Building: for each
Residential FLAT $350.00
Commercial FLAT $600.00
•
Building Permit Fees: FEE
S
• Demolition Interior - non structural:
Residential FLAT $150.00
Commercial $250.00 (per 50,000 sq. area or increment)
Demolition Exterior or Interior - structural:
Residential FLAT $250.00
Commercial $250.00 or $ 90.00 for each 1,000 square ft. or
fractional part thereof. Whichever is greater
Accessory buildings and vacant lot landscaping $150.00 or $ 80.00 for each 1,000 square ft. or
fractional part thereof. Whichever is greater
Gutter, downspouts, french drains: for each 100
linear feet or fractional part thereof: for each 100 linear feet
Residential $75+ $35.00
Commercial $75+ $45.00
Awnings or canopies: for each 100 square feet or a
fractional part thereof: for each 100 square feet
Residential $75+ $35.00
Commercial $75+ $45.00
Hurricane Shutters: per each opening
(with exception of 4 or less shutters which will be
charged the minimum permit fee) for each
Residential FLAT $20.00
Commercial FLAT $25.00
Garage Doors: per three (3) openings or increment:
Residential FLAT $100.00
Commercial FLAT $100.00
• Wood lattice /screening including framing and
material -- no roofing allowed, for each 100 square
feet or a fractional part thereof: for each 100 square feet
Residential $75+ $25.00
Commercial $75+ $35.00
Window Removal and replacement:
Residential FLAT $20.00 (per window)
Commercial FLAT $25.00 (per window)
New Signs - for each 40 square feet of signage or a
fractional part thereof: for each 40 square feet
Residential $75+ $25.00
Commercial $75+ $35.00
Modify, repair existing signs - for each 40 square
feet or a fractional part thereof: for each 40 square feet
Residential $75+ $25.00
Commercial $75+ $30.00
Political Signs- Reference Zoning Code
Seawalls - per 50 linear ft or fractional part thereof.' per 50 linear ft
Residential $75+ $35.00
Commercial $75+ $50.00
Docks - for each 10 square feet or a fractional part
thereof. for each 10 square feet
Residential $75+ $35.00
Commercial $75+ $50.00
is
Building Permit Fees: FE
ES
Dock Piling (wood piling and concrete) EACH: for each
Residential FLAT $25.00
Commercial FLAT $35.00
Boat Davit (each): for each
Residential FLAT $45.00
Commercial FLAT $60.00
Boat Lift: (per a lift) for each
Residential FLAT $100.00
Commercial FLAT $200.00
Retaining and rip rap walls per 100 lineal feet or a
fractional part thereof. per 100 lineal feet
Residential $75+ $60.00
Commercial $75+ $80.00
Land Filing - per each 100 cubic yards: per each 100 cubic yards
Residential FLAT $35.00
Commercial FLAT $60.00
Land Clearing (invasive exotics): Reference Zoning Code
Fire Suppression, Sprinkler, or Standpipes 10% of Total Job Cost divided by 1000 X $40.00
Plus $75.00 Stand Pipe and $55.00 Supply Connection
Training Fees Apply at 1% of Building Fee Total
•
PLUMBING PERMIT FEES: BASE
FEES
• Minimum Base Permit Fee: $75.00
Each Fixture roughed in and set: per each
Residential $25.00
Commercial $35.00
Sewer /drainage - building interior lines and connection: per each
Residential $70.00
Commercial $80.00
Outside sanitary and storm lines (site work) for
each $1,000 of cost or fractional part thereof. for each $1,000
Residential $75+ $70.00
Commercial $75+ $90.00
Manholes (each): per each
Residential $70.00
Commercial $70.00
Floor or Roof drain (each): per each
Residential $10.00
Commercial $10.00
Water Piping:
Connection to supply system (each): per each
Residential $35.00
Commercial $55.00
Connection to any appliance or fixture not covered
by fixture roughed in and set: per each
Residential $35.00
Commercial $45.00
Irrigation systems
Residential Reference Zoning Code
Commercial Reference Zoning Code
Water main, distribution line, backflow system for
each $1, 000 of cost or a fractional part thereof. for each $1,000
Residential $75+ $30.00
Commercial $75+ $40.00
Swimming pools, spas, hot tubs: per each
Residential FLAT $75.00
Commercial FLAT $200.00
Solar water heater new complete installation: per each
Residential FLAT $75.00
Commercial FLAT $85.00
Jobsite Temporary Toilet (valid for length of job) per each
Residential FLAT $75.00
Commercial FLAT $85.00
Miscellaneous plumbing not covered or included
herein, for each $1,000 of the estimated cost or
fractional part thereof: for each $1,000
Residential $75+ $30.00
Commercial $75+ $45.00
•
ELECTRICAL PERMIT FEES: BASE
• FEES
Minimum Base Permit Fee: $75.00
Site work: residential and commercial, for each
$1,000.00 of the estimated cost of construction or a
fractional part thereof for each $1,000
Residential $75+ $50.00
Commercial $75+ $60.00
Outlets -- general, receptacles, switches, lighting,
telephones, computer, TV, etc: for each 100 square
feet or fractional part thereof.- for each 100 square feet
Residential $75+ $11.00
Commercial $75+ $12.00
Each appliance outlet including ceiling fans: per each
Residential $11.00
Commercial $12.00
Each exterior light -- Exclusive of sign lighting: per each
Residential $10.00
Commercial $15.00
Temporary electrical service: per each
Residential $100.00
Commercial $200.00
Single phase service, 0 -300 amps: per each
Residential $80.00
Commercial $100.00
• Single phase service, over 300 amps to 400 amps: per each
Residential $95.00
Commercial $110.00
Single phase service, over 400 amps to 600 amps: per each
Residential $120.00
Commercial $135.00
Single phase service, over 600 amps: per each
Residential $300.00
Commercial $400.00
Three phase service, 0 to 300 amps: per each
Residential $95.00
Commercial $150.00
Three phase service, over 300 amps to 400 amps: per each
Residential $110.00
Commercial $135.00
Three phase service, over 400 amps to 600 amps: per each
Residential $160.00
Commercial $195.00
Three phase service, over 600 amps: per each
Residential $250.00
Commercial $350.00
"Note: Sub -feeds to be charged by amps at the
same rate as services
•
BASE
ELECTRICAL PERMIT FEES: FEES
• Each motor throughout the project: 0 to 10 hp: per each
Residential $60.00
Commercial $75.00
Each motor over 10 to 25 hp: per each
Residential $125.00
Commercial $145.00
Each motor over 25 hp: per each
Residential $165.00
Commercial $180.00
Generators, transformers and transfer switches
(each) 0 to 25 KW: per each
Residential $60.00
Commercial $75.00
Generators, transformers and transfer switches
(each) over 25 KW to 50 KW: per each
Residential $120.00
Commercial $180.00
Generators, transformers and transfer switches
(each) over 50 KW: per each
Residential $160.00
Commercial $180.00
X -ray machines (each): per each
Flat Fee FLAT $500.00
Welding machines (each): per each
Flat Fee FLAT $300.00
Air conditioner (each), window or wall unit if
new service is needed: per each
Residential $70.00
Commercial $95.00
Central systems, up to 20 tons: per each
Residential $75.00
Commercial $85.00
Central systems, over 20 tons: per each
Residential $85.00
Commercial $120.00
Refrigeration system, up to 20 tons: per each
Residential $95.00
Commercial $95.00
Refrigeration system, over 20 tons: per each
Residential $5.00 per ton
Commercial $5.00 per ton
Heat pump, Heat Strips per each
Flat Fee FLAT $75.00
Elevators per each
Flat Fee FLAT $200.00
•
ELECTRICAL PERMIT FEES: BASE
• FEES
Dumbwaiters, chairlifts:
Flat Fee FLAT $200.00
Signage first connection
Flat Fee FLAT $75.00
Signage each additional sign connection
Flat Fee FLAT $30.00
Plug mold and track lighting for each 100 lineal
feet or fractional part thereof. for each 100 lineal feet
Residential $75+ $60.00
Commercial $75+ $85.00
Low voltage alarm system:
Residential FLAT $100.00
Commercial $75+ $35.00 (per $1,000.00 of estimated cost)
or fractional part thereof
Electrical repairs /remodeling same as new work:
Minimum Fee $75.00
Swimming pools, spas and hot tubs (lights, pump,
bonding, grounding and timer):
Residential FLAT $200.00
Commercial FLAT $300.00
Miscellaneous electrical work not included herein,
for each $1,000.00 of cost or a fractional part thereof
(per $1,000.00 of estimated cost)
Residential $75+ $30.00
Commercial $75+ $45.00
"Commercial vent hoods: price per motors
•
MECHANICAL PERMIT FEES:
• Minimum Base Permit Fee: $75.00
Air conditioning systems (excluding window
units) and refrigeration:
TABLE INSET:
(a) 0 -2 ton $55.00
(b) 2 -5 ton $70.00
5 -10 ton
(c) $85.00
10 -25
(d) ton $100.00
25 -50
(e) ton $130.00
50 -100
(fl ton $210.00
Over 100
(g) ton $320.00
Duct work per drop (including return air plenums): BASE
FEES per each drop
Residential $10.00
Commercial $12.00
Vent hoods (each): per each
Residential $50.00
Commercial $100.00
Heat pump (per unit): per each
Residential $50.00
Commercial $70.00
Miscellaneous mechanical work not included
herein, for each $1,000.00 of cost or a fractional part
thereof. for each $1,000.00 of cost
Residential $75+ $35.00
Commercial $75+ $70.00
Gas equipment and piping (per fixture unit inclusive
of all required piping): per each
Residential FLAT $45.00
Commercial FLAT $60.00
Mechanical elevators (up to two floors),
dumbwaiters, moving sidewalks, escalators: per each
Flat Fee FLAT $150.00
Mechanical elevators (over two floors): per each
Additional $75.00 per floor
•
ADDITIONAL SERVICE FEES:
After the Fact Permit: Four (4) times permit fee
Review without applying for a permit:
First Review $250.00 plus $20.00 per page
Second Review and all thereafter to
be charged upon each re- submittal $100.00 plus $10.00 per page
Specialty Plan Review - shall apply for after -hour
plan reviews on: weekends, holidays and other times,
which are not considered to be within the typical
business day:
a) $75.00 per hour rounded up to the next hour
b) $150.00 minimum
Resubmittal Fee - one resubmittal review at no
charge:
Second Resubmittal Review $50.00
Third resubmittal and all thereafter to Four (4) times plan review fee
be charged upon each re- submittal (calculated by 113 of the primary permit fee)
Revision - per revision to either Residential or $75.00 base Plus $15.00 additional per plan
Commercial plans sheet or attachment after each.
Transfer Building Permit - same owner new location $100.00
Change of Contractor- from same location from one
contractor or "To be announced" to another:
Master permit $100.00
• Sub - contractors (only when attached plus $50.00 per sub - contractor
to a Master Permit) when applicable (only if attached to master permit)
Replacement Cost:
Permit Card $35.00
Additional CO $35.00
Permitted Plans $35.00 plus printing cost
Radon FEES:
Radon One -half a cent per square ft. under roof
Maintenance Fee One -half a cent per square ft. under roof
Certification of hurricane protection for insurance
purposes: $30.00
•
ADDITIONAL SERVICE FEES:
• Re- Inspections - for all trades, if the violation
requires an additional inspection or the job is not
ready for inspection:
1st Re- Inspection $50.00
2nd Re- Inspection (Same type) $50.00 + $50.00 Penalty Fee
3rd Re- inspection (Same type) $50.00 + $100.00 Penalty Fee
4th Re- Inspection (Same type and all thereafter) $50.00 + $200.00 Penalty Fee
After hours, weekends or holiday inspections -
upon 3 days in written advanced & payment of fees
upon request. Time includes 1 hour travel time for
inspector:
Weekdays $75.00 per hour with a two hour minimum
Weekends $75.00 per hour with a four hour minimum
Holidays $75.00 per hour with a four hour minimum
Renewal or Extension of Permit:
Master permit $75.00
Sub - permits
(only when attached to a master) $50.00
Administrative Appeal: $250.00
Partial and /or Conditional Certificate of Occupancy:
First 30 days $500.00
30 days extension $500.00
30 day additional extension $500.00
Certificate of Occupancy:
24 hour notice NO FEE
• Less than 24 hour notice $200.00
Return Check Charge: $25.00 or 5% of the amount of the check,
whichever is greater. (Maximum $40.00)
Contractor Registration Fee:
Non -State Certified Contractors $2.00
State Certified Contractors $0.00
Refunds - only calculated upon the base permit fee 20% over $100.00 of the base permit fee
for work that has not started Specialty fees incurred
on permits such as: re- submittal fees, revision fees,
change of contractor, over -time reviews, ect. Are NOT
REFUNDABLE:
•
THE VILLAGE OF NORTH PALM BEACH
• *� i COMMUNITY DEVELOPMENT DEPARTMENT
501 U.S. HIGHWAY 1 • NORTH PALM BEACH, FLORIDA 33408
PHONE (561) 841 -3365 * FAX (561) 841 -8242 • WWW.VILLAGE- NPB.ORG
BUILDING PERMIT FEE SCHEDULE
Permit fees are based on the total value of the proposed construction.
They are not refundable or transferable.
Minimum Permit Fee $40.00
Water heater replacement, front door change -out (door leaf
only), fence replacement or repair, and minor structural
repairs with a value of less than $1,000.00.
Percentage of Valuation Unit Value:
4.05% Up to the first $10,000.00 plus,
2.03% The next $10,000.01 to $100,000.00 plus,
1.05% The next $100,000.01 to $500,000.00 plus,
0.35% The next $500,000.01 to $1,000,000.00 plus,
0.174% $1,000,000.01 and up or fraction thereof
Moving Buildin $290.00
Building Demolition $290.00
Construction Trailers $46.00
• Re- Inspection Fee $40.00 second re- inspection and four (4) times the permit
(ss 553.80(2)(c) — Enforcement) fee for each subsequent re- inspection for an uncorrected
violation.
Unscheduled Inspection by Special Request $40.00 per inspector or inspection
Sub to avaiLabili
Penalty for commencing work without first securing a Two (2) times the permit fee based on valuation plus
p ermit or written a royal $100.00 Administration Fee
Change of Contractor — Same Location $40.00
Residential Revision Fee After plans are approved and the permit issued: One- and
Two-family dwellings $40.00.
Commercial Revsion Fee After plans are approved and the permit issued: Includes
multi - family dwellings, each plan page $10.00 or 2% of the
revision value whichever is gLqater
Plan Review Correction Submitttal Third resection of plans for the same comment shall incur a
(ss 553.80(2)(c) — Enforcement fee of four (4) times the plan review portion of the permit
fee
Fire Department Plan Review if apklicablej $2.25 12er 1,000 of Valuation. Minimum fee: $50.00
Permit Extension Fee Maximum of three 3
First Extension 90 Da s $40.00
Second Extension 90 Da s $80.00
Third Extension (90 Days) $120.00
•
BLD2008 -04.2 Rev 02 03 10
Village of North Palm Beach
• Building Permit Fee Schedule
Page 2
Permit Application Extension Fee (Maximum of three 131)
First Extension $40.00
Second Extension $80.00
Third Extension $120.00
Tem ora Signs or TemporM Tents Each $40.00
TemporM Certificate of Occu anc Fee $100.00
TemporM Certificate of Completion Fee $100.00
Early Power Release Commercial Projects Onl $100.00
Document Research Determined by Department Supervisor
Time & Materials Fees after 15 minutes
Palm Beach County Impact Fees Palm Beach County Impact Fees are collected by the
Village of North Palm Beach. Impact fee credit approval is
required at the time of permit application submittal
•
•
BLD2008 -04.2 Rev 02 03 10
Permit Center Home Page Page I of I
UA
Department of Planning,, Zoning, and Building Home I Site Map I Search
2300 N Jog Road, West Palm Beach, FL 33411-2741
Planning I Zoning I Building I Contractors Certification I Code Enforcement I Administration
When is a Permit
Required?
Building Permit General
Information
Awiw
Permit Types and
Checklists of Minimum
Submittal Requirements
for Application
Building Division Office
Locations
......... ... ..
Building Division Permit
and Inspection Fees
1-11111-11-1,
Forms - Frequently Used Rebecca Caldwell, Building Official
Building Division Forms Adopted Building and
Technical Codes Monday - Thursday 8:00 am - 5:00 pm
. .. .... .... ............. . .. . Closed on Fridays
Other Regulatory Agency
Contact Information
The Permit Center is intended to be a full service facility for
• Flood Damage Prevention permitting building construction in the unincorporated area
Acron of Palm Beach County. The regulatory programs of the
individual agencies that comprise the Center are limited
only to those affecting the issuance of building permits.
Individual agencies may have additional regulatory
responsibilities. This information is available by directly
contacting the particular agency (See the individual Chapter
on the specific agency and programs).
Most of our forms and diagrams require
the free Acrobat Reader plugin.
fret almt-'
oe
Directions/ Locations I Jobs I Links I FAQs I Contact Us I Email-Public Records
Web Mail I Phone List I Calendar I Disclaimer
Copyright @ 2009 Palm Beach County Board of County Commissioners.
http://www.co.palm-beach.fl.us/pzb/permit/Default.htm 5/12/2010
1 EXHIBIT "A"
2
• 3 CONSTRUCTION PERMIT FEE SCHEDULE
4
5 I. PRIMARY PERMITTING FEES:
6
7 A. Base Permit Fees: (Includes No -Fee Sub Permits)
8
9 VALUATION RANGE FEE
10 1. To $ 2, 000 ................................... ............................... $75
11 2. Next $ 8, 000 ......... ............................... ...........................plus 2.50%
12 3. Next $ 90, 000 ......... ............................... ...........................plus 1.75%
13 4. Next $ 200, 000 ........ ............................... ...........................plus 1.00%
14 5. All Remainder .............. ............................... ...........................plus .75%
15
16
17 "Valuation" per Section 108.3 FBC as amended, with attached
18 Exhibit B, and as amended, as Valuation method required on single -
19 family dwelling and attached Exhibit C, and as amended, as
20 Valuation for use on other occupancies.
21 Valuation shall not be used if Fixed Fee is set below.
22 Valuation of total improvement (excluding only land) shall be used
if no fixed fee is set in Section II below.
23 B. Plan Review Related Fees:
24
25 1. On new submittals included in fee schedule ........................... ............................Per I.A
26
27 2. Additional Fees on Excess Submittals:
28 a. Application Sufficiency Re- review ........ ............................... ...........................$100
29 (When content fails to meet Sufficiency Check List)
30 b. Same Critique Items On 2 nd Review, per plan sheet .......... ..............................$ 50
31 c. F.S. 553.80 requires a fee FOUR TIMES the plan review fee
32 each time after the third review said plan review fee being 1/3 of the
33 Primary Permitting Fees.
34
35 3. Site Plan Review after plat recording, if necessary, per permit . ...........................$150
36 (including conversion of "Dry Models ").
37
38 4. Revision Review —Field or Office Submittal- base ................ ..............................$ 75
39 5. Plus, additional per plan sheet or attachment ............. ..............................$ 20
40
41 6. Pre - Application Design Review, base ...................... ...........................$100
42 7. Plus, additional per plan sheet or attachment ......... ............................... $ 20
43
44 8. Alternate Method and Material Processing $150
45
46 9. Plan Review During Off -Duty Hours:
47 Each hour or part (including drive time, or "portal to portal"): ....................... $100
48 (Min. 2 hours on Building Division workdays, and 4 Hours on days when the
49 Division is closed- Must be arranged by noon of previous work day — Subject
50 to the Availability of Staff)
51
• 52
53
54
1
Proposed Permit Fee Adjustments Revised 08 -04 -09
1 C. State Radon & Certification Maintenance: (Per square foot under roof)
2 1. Radon ....................................................... ............................... ...........................half cent
• 3 2. Certification Maintenance ........................ ............................... ...........................half cent
4 (No refund on state mandated fees)
5
6 D. Retroactive Permitting After Construction Start ........................... 4 Times Fees
7
8 E. State Required Construction Lien Law Notification ..............................$ 5
9
10 II. FIXED PERMIT FEES:
11
12 A. A/C Change -Outs:
13 1. Residential (Or Random per II.E.2.a or Prepay per II.E.2.b, when hard- wiring is
14 required) ................................................................................ ...............................
100
15 2. Commercial, per 10 units ........................... ............................... ...........................$150
16
17 B. Accessory Buildings:
18 1. Prefabricated:
19 a. To 36 sq. ft. floor area (no inspections) ............................ ..............................$ 50
20 b. Larger, per 400 sq. ft. area, or portion .. ............................... ...........................$100
21 2. Site Built:
22 a. To 36 sq. ft. floor area (no inspections) ............................ ..............................$ 50
23 b. Above 36 to 400 sq. ft. area .................. ............................... ...........................$200
24 c. Larger than 400 sq. ft. area ............ ............................... On Valuation, Not Fixed
25
26 C. Agricultural Exemption Processing: ................................................................ $ 200
27
• 28 D. Airport Overlay Special Review: per permit ...................... ..............................$ 50
29
30 E. Annual Permit Programs:
31 1. File Creation & Monitoring, annually ...... ............................... ...........................$250
32 2. Registration Documents: (With Master Plan or no plan review)
33 a. Random Inspections, each decal ....................................... ..............................$ 25
34 (To begin with 2010 Annual Program — January 1, 2010)
35 b. Prepaid, required inspections, each as .......... ..........................Priced in Section II
36
37 F. Awnings /Canopies/Tents/Membrane Structures: ........................................... $100
38 (Per 2,000 sq. ft., or portion thereof, excludes Electric)
39
40 G. Concrete Slabs, Hard Surfacing, Paving or Repaving:
41 1. Per 20,000 sq. ft., or portion thereof, (if scope of work
42 is not in a Primary Permit), but without inspections ....... ..............................$ 50
43 2. Same as G1 above, but With Inspections ........................... ...........................$100
44
45 H. Demolition Permits: (For signs see II.S.5)
46 1. SFD ............................................................ ............................... ...........................$250
47 2. Accessory Buildings and Vacant Lot Landscaping .................. ...........................$150
48 3. Commercial: Per 50,000 sq. ft. area, or increment ................... ...........................$250
49 4. Interior Demolition, Non - Structural .......... ............................... ...........................$150
50
51 I. Door and Window Replacements:
52 1. Windows and/or Entry Doors, per 20 openings or increment (Does not include shutters)
53 (Or Random for 1 & 2 Family Dwelling, per Section II.E.2.a when shutters are
• 54 not required) ............................................... ............................... ...........................$100
55 2. Windows and/or Entry Doors with Shutters, per 20 openings or increment ....3200
56
2
Proposed Permit Fee Adjustments Revised 08 -04 -09
1 3. Shutters, per 20 openings or increment ...... ............................... ...........................$150
2 4. Garage Doors, per 3 openings or increment ............................. ...........................$100
• 3 J. Electric:
4 1. Temporary Poles (No plan review; or Prepay per II.E.2.b) ...... ...........................$100
5 2. Service Change: (includes service disconnect and/or meter can and/or panel)
6 a.1 & 2 Family or Mobile Homes (With plan review & one inspection) ............$100
7 b. Commercial, per 400 amps or part (With plan review & one inspection) .......$100
8 3. Low Voltage:
9 a. Dwelling unit, each (Or Random per II. E.2.a) ................ ..............................$ 75
10 a. Commercial Systems ..................... .............................On Valuation, Not Fixed
11 c. Fire Alarms:
12 i. Sub- permit ........................................................ ..............................$ 75
13 ii. Primary ......................... ............................... On Valuation, Not Fixed
14 4. Phone /CATV Service (Or Prepay per II.E.2.b, if Master Plan) ...........................$ 75
15 5. Repairs, & other work:
16 a. to $2,500 value (Or Prepay per II. E. 2. b) ........................... ..............................$ 75
17 b. over $2,500 ..................................... .............................On Valuation, Not Fixed
18 6. Site Lights, per 5 poles or part ................... ............................... ...........................$100
19 7. Standby Generators:
20 a. Generator Electric Only, 1 & 2 Family Dwelling ................ ...........................$150
21 b. Generator and/or Tank and/or Lines, 1 & 2 Family Dwelling ........................$250
22 c. Other than 1 & 2 Family Dwellings ............................. On Valuation, Not Fixed
23
24 K. Excavation with 1 & 2 Family Dwelling:(w /Inspections) ..... ...........................$150
25
26 L. Fences, Barriers, Railings, & Site Walls:
27 1. Residential Fence (No inspection) ......................................... ..............................$ 75
28 2. Residential Fence w/ Inspection Required . ............................... ...........................$125
• 29 3. Pool Barrier (with plan review and inspection)
30 a. On Deck, new ........................................ ............................... ...........................$100
31 b. In Yard, new ......................................... ............................... ...........................$150
32 c. Existing Wall or Fence as " Barrier" .................................. ..............................$ 75
33 4. Commercial Fences, with inspection, per 500L.F. or portion ... ...........................$100
34 5. Railings on Balconies ............................................................ ..............................$ 75
35 (With inspection, or Prepay per II.E.2.b, if Master Plan)
36 6. Site Walls, per 500L.F. or increment ......... ............................... ...........................$150
37
38 M. Fire Protection Systems ....................................................... ..............................$ 75
39
40 N. Gas or Fuel Tank and Lines:
41 1. Below 501 gal, per new tank, and/or lines only and/or remove ...........................$100
42 2. Larger capacities, per tank ......................... ............................... ...........................$150
43 3. Replacements (Or Prepay per II. E. 2. b) ...... ............................... ...........................$100
44
45 O. Hood, Commercial: (Excludes Suppression System), each .... ...........................$100
46
47 P. Mobile Homes:
48 1. Tie -Down, steps & landing ........................ ............................... ...........................$200
49 2. Repair or Trade permits, each ................................................ ..............................$ 50
50 3. Additions per FBC :............................ ............................... On Valuation, not Fixed
51
52 Q. Roofing:
53 1. New roofs: ........................................................................ On Valuation, not Fixed
• 54 2. 1 & 2 Family Residential -
55 Pre - Approved Flat Roofs (less than 4 squares and under Prepay per II.E.2.b) .... $150
56
57
3
Proposed Permit Fee Adjustments Revised 08 -04 -09
1 3. Penetrations, Vents, Skylights
2 a. With Individual Plan Review ................. ............................... ...........................$100
• 3 b. Under Approved Master Plan or Product Approval ........... ..............................$ 75
4 (Or Prepay per II.E.2.b)
5 4. Repairs (or Prepay per II. E. 2. b) ............................................. ..............................$ 75
6 (Under 2 squares and less than $2500 value)
7
8 R. Screen/Aluminum Construction:
9 1. Carport or Porch (Open Wall or Screened) ............................... ...........................$150
10 2. Pool enclosures .......................................... ............................... ...........................$200
11 3. Wall screen, Doors or Flexible Plastic Inserts (Non - structural)
12 a. With Individual Plan Review ................ ............................... ...........................$100
13 b. With Master Plan or Product Approval ............................. ..............................$ 50
14 (Or Prepay per II.E.2.b)
15 4. Repairs to Existing Construction .......................... ..............................$ 75
16
17 S. Signs:
18 1. Painted onto or wall supported, each ......... ............................... ...........................$100
19 2. Freestanding, non - billboard, each .............. ............................... ...........................$150
20 3. Billboards (new or replacement) ................ ............................... ...........................$500
21 4. Face panel change, maintenance, or repair ............................... ...........................$100
22 5. Demolition (with pre & post inspections) .. ............................... ...........................$100
23
24 T. Swimming Pool & Spa Heaters:
25 1. New, w /supply lines (w/ Plan Review & Inspections) .............. ...........................$150
26 (See W1 below for replacements.)
27
28 U. Utility Connections:
• 29 1. Water or Sewer line, house & main connection ..................... ..............................$ 75
30 (No plan review; may Prepay per II.E.2.b)
31 2. Water meters: (if not set by utility)
32 a. Each 1 or 2 Family Dwellings ...................................... ..............................$ 75
33 b. Others .......................................... ............................... On Valuation, not Fixed
34
35 V. Walls Infill:(under existing roof, including electric) ............ ...........................$150
36 (See II.P.3 for flexible inserts)
37
38 W. Water or Pool Heater Replacements:
39 1. 1 & 2 Family Dwellings (Or Random per II.E.2.a,
40 Or Prepay per II.E.2.b, when hard -wiring is required) ............. ...........................$100
41 2. Other, each ................................................. ............................... ...........................$150
42
43 X. Landscape Irrigation Systems:
44 1. 1 &2 Family Dwellings, (if scope of work
45 Is not in a Primary Permit) ..... ............................... ...........................$100
46 2. Other than 1 & 2 Family Dwellings ............................On Valuation, Not Fixed
47
48 III. ADMINISTRATIVE SERVICE FEES:
49
50 A. Fax Program: (Annual, for no -fee sub permits) ...................... ...........................$200
51
52 B. Local Product Approval or Master Plans: (due at submittal, nonrefundable)
53 1. Master Plans Review:
54 a. Model SFD each ................................................................ ..............................$ 500
55 b. Accessory Structures ......................................................... ..............................$ 200
56 c. Minor Structures ............................................................... ..............................$ 100
4
Proposed Permit Fee Adjustments Revised 08 -04 -09
1
2 2. Local Product Approvals per Rule 913-7: (Without Statewide Approval)
• 3 a. Simple Product ................................................................... ..............................$ 500
4 b. Complex Products .................................. ............................... ..........................$1000
5 c. Revision under same FBC .................................................. ..............................$ 200
6 d. Re- verify under new FBC or revised Standard .................. ..............................$ 100
7
8 C. Replacement /Additional Document:
9 1. Permit Duplicate ..................................................................... ..............................$ 20
10 2. C/O or C/C (After initial free copy) ........................................ ..............................$ 20
11 3. Plan Re -stamp or Additional Set, base .................. ............................... $ 50
12 Plus, additional per plan sheet or attachment ............ ..............................$ 5
13
14 D. Renew or Extend Permit or Application: (May require additional Impact, Building, or
15 other Fees, if Increases have Occurred since Original Application ) ..........
16 1. Within 180 Days of Inactive Status ........................ ..............................$ 75
17 2. After 180 Days of Inactive Status .................30% of Original Permit ..(Min. $75)
18
19 E. Revision of Record:
20 1. Contractor change or "To Be Determined" ............................. ..............................$ 75
21 2. Owner change ......................................................................... ..............................$ 50
22 3. Lot change (Within plat, after Tech review of original plan) . ..............................$ 300
23 (Lot change outside plat involves refund & new application)
24
25 F. Special Processing of Permits: Extra Fee
26 (Affidavit process with Building Official approval, Special Foundation Permits, and
27 approved RUSH tracking)
28 1. Simple Projects ............................................. ............................... $150
• 29 2. Complex Projects or New Construction ..................... ...........................$300
30 3. Construction Start Prior to Permit Per Building Code ...... ...........................$100
31
32 G. Verification on LOMR or Mitigation Affidavits:
33 1. FEMA Community Acknowledgement on LOMR — per Building/Lot........... $100
34 2. Mitigation Affidavit, per System, Each Building ....... ..............................$ 75
35
36 H. Construction Board of Adjustment and Appeals Filing Fee .........................$250
37
38 IV. INSPECTIONS SPECIAL FEES:
39
40 A. Annual Permits: .................................................................................. Per Sec. II.E
41
42 B. Completion Agreements: ................................................................. $100
43
44 C. Extra Inspection Fees:
45 1. Any unproductive inspector trip ............................................. ..............................$ 75
46 (Work not ready, locked out, plans absent, etc.)
47 2. Re- inspection:
48 a. 1 s1 Re- inspection ............................................................ ..............................$ 50
49 b. 2 Re- inspection without "Correction" done ...................... ...........................$100
50 c. 3` and Subsequent = Re-inspection without "Correction" done .......................$300
51 (Charged per 553.80 Florida Statute)
52
53 D. Final Inspections by Affidavit (per PBO- 078) .............. ...........................$100
• 54
55
56
57
5
Proposed Permit Fee Adjustments Revised 08 -04 -09
1 E. General or Special Inspections:
2 1. Advisory, First onsite hour or part .......................................... ............................... $100
• 3 Plus, Each Additional Hour or Part ........................ ............................... $75
4
5 2. Electrical waiver power release inspection (1 meter) ................. ...........................$150
6 Plus, Each Additional Meter (same trip) ................. ............................... $20
7
8 F. Inspections During Off -Duty Hours:
9 Each hour or part (including drive time, or "portal to portal ") :.. ...........................$100
10 (Min. 2 hours on Building Division workdays, and 4 Hours on days when the
11 Division is closed- Must be arranged by noon of previous work day — Subject
12 to the Availability of Staff)
13
14 G. Temporary or Partial C/O or C/C Inspections:
15 1. Temporary C/O or C /C, Each for a 30 Day Period
16 a. On residential dwelling units, each unit and each condition ........................$150
17 b. On commercial work, each building and each condition ........ ...........................$500
18 2. Partial C/O or C/C
19 a. On residential dwelling units, each .......... ............................... ...........................$300
20 b. On commercial work, each building ......... ............................... ..........................$1000
21
22 H. Sectioning Building for Incremental/Partial Inspections, per Section...,,,,....$250
23
24 I. Stocking Permit .................................. ............................... .... .....$200
25
26 V. CALCULATION OF FEES FOR OTHER REQUESTED WORK AND UNIQUE PERMITS:
27
28 Customer requests for files investigation or research; or for unique permits not listed in Sections I
• 29 or II above, shall be estimated (for customer acceptance before service) and charged at these fully
30 loaded hourly costs:
31
32 Non - Supervisory Supervisory
33 Administrative Staff ......................... $ 50/ Hr ................................................ $ 75/Hr
34 Licensed per 468FS ................................... $80 /Hr ............................................... $100 /Hr
35
36 VI. SUBMITTAL FEES:
37
38 A. Detached Single Family Home Applications:
39 Unit Floor Area Due With Application
40 (Heated/Cooled or Enclosed Living Area) (Credited Toward Permit Fees)
41 (Forfeited if not permitted)
42 0 -800 ................ Sq. Ft ................................................................................. ......... $ 500
43
44 801- 1399 .......... " .................................................................. ..............................$ 750
45
46 1400 -1999 ......." ........................................ ............................... ..........................$1000
47
48 2000 - 3599........ " ....................................... ............................... ..........................$1500
49
50 3600 &Larger.... " ....................................... ............................... ..........................$2500
51
52 B. Applications for all other types of construction:
53 Half of the "Primary ", or of the initial incremental "Fixed" Permit Fees
• 54 listed in Section I and/or II of this Exhibit "A ", shall be due with the
55 application, with fifty ($50.00) dollars minimum.
6
Proposed Permit Fee Adjustments Revised 08 -04 -09
• • •
EXHIBIT "B"
NCO OFFICE USE ONLY
PALM BEACH COUNTY VALUATION CHART Dev:
Date (SINGLE FAMILY DWELLING DETACHED, TYPE V, "UNPROTECTED"
APPLICANT: Check those characteristics most closely reflecting your proposed
PR #: construction. Lot: Blk:
OR19
TYPICAL PBC ICC ICC PBC PBC
FEATURES "AFFORDABLE" "AVERAGE' "GOOD" "LUXURY" "CUSTOM LUXURY"
FOOTPRINT ❑ RECTANGULAR ❑ L OR T SHAPE W/ PORCH ❑ L, T. OR H SHAPE W/ PORCH o L, T, OR H FOOTPRINT ❑ COMPLEX FOOTPRINT WITH MANY CORNERS
❑ BALCONY ❑ THEATER/ MEDIA ROOM
❑ COURTYARD ❑ MAID'S QUARTERS
❑ GUEST HOUSE ❑ ELEVATORS
❑ METAL WORK TRIM ❑ DOUBLE KITCHENS
o GATE ❑ HIS /HERS SITTING ROOMS
❑ LOGGIAS OR PORTICOS
❑ ELECT. SECURITY GATES
ROOF PLAN ❑ SIMPLE, LOW SLOPE ❑ L OR T, SLOPE TO 5:12 ❑ SLOPE TO 7:12 o COMPLICATED DESIGN ❑ UNIQUE, HIGHLY COMPLICATED DESIGN
❑ ASPHALT OR FIBERGLASS SHINGLE ❑ BETTER ASPHALT OR ❑ DORMERS ❑ MULTIPLE HIPS ❑ SLATE, BARREL TILE, OR EQUIVALENT
FIBERGLASS SHINGLE
❑ FLAT CONCRETE TILE ❑ HIGH GRADE OR MULTI -CUT ❑ CLAY "S" TILE OR
SHINGLE EQUIVALENT
❑ LOWER END "S" PROFILE
TILE
CEILINGS ❑ FLAT, F HEIGHT ❑ FLAT, 8' HEIGHT ❑ VAULT IN LIVING OR DINING ❑ 9 -15' HEIGHT ❑ 1530' HEIGHT
ROOM
❑ POPCORN/ SWIRL PATTERN ❑ MULTIPLE VAULTS ❑ DOMES OR VAULTS
❑ MULTIPLE TREYS ❑ STEPPED OR INVERTED TREYS
❑ COFFERS
WINDOWS ❑ MILL FINISH, PLAIN ❑ COLORED FRAME ❑ BOWTOPS, TRANSOMS ❑ STOREFRONT ❑ LEADED, ARTCARVED, OR STAINED
❑IMPACT ❑IMPACT
• MULTISHAPE ❑ EXTREME HEIGHT /SHAPE
• POWDERCOAT, HIGH ❑ HIGHEST GRADE VINYL CLAD WOOD
MASONRY ❑ STUCCO ❑ STUCCO ❑ STUCCO W ITH BANDS OR ❑ STUCCO WITH EXTENSIVE ❑ STUCCO, BRICK, STONE WITH ELABORATE
QUOINS TRIM PIECES AND /OR INTRICATE DETAILING
❑ CAST STONE OR ❑ COPPER TRIM
STYROFOAM OUTLOOKERS
MILLWORKrrRIM ❑ NARROW, MINIMAL ❑ STOCK TRIMS ❑ CROWN MOLDING ❑ 2+ PROFILE MOLDINGS o 3+ PROFILE MOLDINGS OF PLASTERANOOD
❑ METAL BI -FOLDS ❑ STANDARD FINISH ❑ CHAIR RAIL ❑ ARCHES , COLUMNS, ❑ 8' HIGH INTERIOR DOORS WITH DETAILING
ARCHITECTURAL ELEMENTS
❑ METAL BI -FOLDS ❑ REGULAR TRIM -OUT ❑ BRASS HARDWARE, HIGH ❑ SPECIALTY DESIGNER HARDWARE OF PEWTER,
GRADE BRASS, OR PLATINUM
❑ WOOD BIFOLDS ❑ RAISED PANEL DOORS ❑ $25,000+ ENTRY DOORS
CABINETS /COUNTERTOPS ❑ MOST ECONOMICAL FORMICA ❑ BETTER GRADE FORMICA ❑ FORMICA OR PRODUCTION ❑ $25,000 TO $60,000 IN ❑ $65,000+ IN EUROPEAN WOOD COUNTERS &
WOOD DESIGNER SERIES CABINETS
❑ CORIAN TOP ❑ INCLUDING GRANITE, MID- ❑ INCLUDING EXOTIC MARBLES, STONE, OR HAND
RANGE MARBLE, HIGH END DONE TILES
TILE COUNTERTOPS
REVISED OCTOBER 01, 2009 CONTINUED ON BACK
10/1/09 Revision Page 1 of 2
• • •
EXHIBIT "B"
TYPICAL PBC ICC ICC PBC PBC
FEATURES "AFFORDABLE" "AVERAGE' "GOOD" "LUXURY" "CUSTOM LUXURY"
WALL FINISH ❑ ORANGE PEEL ❑ ORANGE PEEL ❑ SMOOTH COAT ❑ SMOOTH COAT OR ❑ SMOOTH COAT OR KNOCKDOWN
KNOCKDOWN
❑ ONE COAT SPRAYED FLAT PAINT ❑ PRIMER ❑ PRIMER W/2 COATS PAINT ❑ PRIMER W/2 COATS HIGH ❑ PRIMER W/ 3 COATS OF HIGHEST GRADE PAINT
GRADE PAINT
❑ ONE COAT SPRAYED PAINT ❑ LATEX ENAMEL TRIM ❑ PAINT EFFECTS / FAUX ❑ HIGH GLOSS PAINT
FINISH
❑ LATEX ENAMEL TRIM ❑ FRESCOES / MURALS
❑ LATEX OR OIL BASED ENAMEL TRIM
BATH FIXTURES ❑ MOST ECONOMICAL ❑ IMPROVED MASTERBATH ❑ 2+ BATHS ❑ 3-6 BATHS ❑ 6 BATHS AND UP
❑ QUALITY BUILDERS ❑ HIGH QUALITY FIXTURES ❑ HIGHEST QUALITY FIXTURES
FIXTURES
❑ HIGH QUALITY BATH ❑ CHINA, PRECIOUS METAL, STONE OR PAINTED
ACCESSORY HARDWARE FIXTURES
❑ HIGHEST QUALITY BATH ACCESSORY HARDWARE
HEATING /COOLING ❑ MINIMUM SYSTEM ❑ BETTER SYSTEM ❑ BEST SEER ❑ BEST SEER ❑ HIGHEST SEER
❑ 2 -3 ZONES ❑ 4+ ZONES
❑ DIGITAL THERMOSTAT ❑ AIR PURIFICATION SYSTEM
❑ HUMIDISTATS
❑ COMPUTER CONTROLS
FLOORING ❑ MINIMUM CARPET ❑ BETTER CARPET ❑ MODERATE GRADE CARPET ❑ HIGH GRADE CARPET ❑ HIGHEST GRADE CARPET
❑ VINYL ❑ VINYL ❑ WOOD / TILE ❑ WOOD / TILE / MARBLE ❑ EXOTIC TILES, WOODS, MARBLES
❑ FLOORING LAID IN ❑ MOSAICS /INLAYS
PATTERNS
$ PER S.F. HOUSE AREA PLUS $55 $86 $102 $137 $165
PER S.F. GARAGE AND PORCH $40 $46 $52 $66 $84
AREAS
VALUATION SUMMARY CALCULATION FOR PROPOSED SINGLE FAMIL DWELLING
(Adjusted to February 2009 International Code Council Square Foot Construction Costs)
INTERPOLATE $ /S.F. BETWEEN CATEGORIES BASED UPON CHARACTERISTICS INDICATED: $ /S.F. HOUSE $ /S.F. GAR. / PORCH
TOTAL S.F. "HOUSE" (HABITABLE SPACE) X INTERPOLATED $ PER S.F. _
TOTAL S.F. "GARAGE / PORCH AREAS" X INTERPOLATED $ PER S.F.
VALUATION OF LANDSCAPE IRRIGATION SYSTEM, AS APPLIES ........................................................................ ............................... =
TOTAL VALUATION FOR SINGLE FAMILY DWELLING =
APPLICANT SIGNATURE: DATE: CONTRACTOR LICENSE NUMBER:
1011109 Revision Page 2 of 2
Building Valuation Data
The International Code Council is pleased to provide the follow- group and type of construction. The average costs include foun-
ing Building Valuation Data (BVD) for its members. The BVD will dation work, structural and nonstructural building components,
be updated and printed at six -month intervals, with the next electrical, plumbing, mechanical and interior finish material. The
update in August 2009. ICC strongly recommends that all juris- data is a national average and does not take into account any
dictions and other interested parties actively evaluate and regional cost differences. To this end, the table containing the re-
assess the impact of this BVD table before utilizing it in their gional cost modifiers was last printed in the October 2003 issue
current code enforcement related activities. and has been discontinued.
The BVD table provides the "average" construction costs per
square foot, which can be used in determining permit fees for a PERMIT FEE MULTIPLIER
jurisdiction. Permit fee schedules are addressed in Section Determine the Permit Fee Multiplier:
108.2 of the 2006 International Building Code (IBC) whereas 1. Based on historical records, determine the total annual con -
Section 108.3 addresses building permit valuations. The permit struction value which has occurred within the jurisdiction for
fees can be established by using the BVD table and a Permit the past year.
Fee Multiplier, which is based on the total construction value 2. Determine the percentage ( %) of the building department
within the jurisdiction for the past year. The Square Foot Con- budget expected to be provided by building permit revenue.
struction Cost table presents factors that reflect relative value of Permit Fee Multiplier = Bldg. Dept. Budget x ( %)
one construction classification /occupancy group to another so Total Annual Construction Value
that more expensive construction is assessed greater permit Example
fees than less expensive construction. The building department operates on a $300,000 budget, and it
ICC has developed this data to aid jurisdictions in determin- expects to cover 75 percent of that from building permit fees.
ing permit fees. It is important to note that while this BVD table The total annual construction value which occurred within the
• does determine an estimated value of a building (i.e., Gross jurisdiction in the previous year is $30,000,000.
Area x Square Foot Construction Cost), this data is only in- Permit Fee Multiplier = $300.000 x 75 %x 75% = 0.0075
tended to assist jurisdictions in determining their permit fees. $30,000,000
This data table is not intended to be used as an estimating guide
because the data only reflects average costs and is not repre- PERMIT FEE
sentative of specific construction. The permit fee is determined using the building gross area, the
This degree of precision is sufficient for the intended Square Foot Construction Cost and the Permit Fee Multiplier.
purpose, which is to help establish permit fees so as to fund Permit Fee = Gross Area x Square Foot Construction Cost
code compliance activities. This BVD table provides jurisdictions x Permit Fee Multiplier
with a simplified way to determine the estimated value of a build-
ing that does not rely on the permit applicant to determine the Example
cost of construction. Therefore, the bidding process for a partic- Type of Construction: 1113 Area: 1st story = 8,000 sq. ft.
ular job and other associated factors do not affect the value of a Height: 2 stories 2nd story = 8,000 sq. ft.
building for determining the permit fee. Whether a specific Permit Fee Multiplier = 0.0075
project is bid at a cost above or below the computed value of Use Group: B
construction does not affect the permit fee because the cost of 1. Gross area:
related code enforcement activities is not directly affected by the Business = 2 stories x 8,000 sq. ft. = 16,000 sq. ft.
bid process and results. 2. Square Foot Construction Cost:
B /IIB = $143.24/sq. ft.
Building Valuation 3. Permit Fee:
The following building valuation data represents average valua- Business = 16,000 sq. ft. x $143.24/sq. ft x 0.0075 = $17,188
tions for most buildings. In conjunction with IBC Section 108.3, Important Points
this data is offered as an aid for the building official to determine In most cases the BVD does not apply to additions, alter-
if the permit valuation is underestimated. Again it should be ations or repairs to existing buildings. Because the scope of
noted that, when using this data, these are "average" costs alterations or repairs to an existing building varies so greatly,
based on typical construction methods for each occupancy the Square Foot Construction Costs table does not reflect
January- February2009 building safety journal 41
Building Valuation Data (co€ltinued)
accurate values for that purpose. However, the Square Foot (1 year) is the sum of each building's value (Gross Area x
Construction Costs table can be used to determine the cost Square Foot Construction Cost) for that time period (e.g., 1
of an addition that is basically a stand -alone building which year).
happens to be attached to an existing building. In the case of The Square Foot Construction Cost does not include the
such additions, the only alterations to the existing building price of the land on which the building is built. The Square
would involve the attachment of the addition to the existing Foot Construction Cost takes into account everything from
building and the openings between the addition and the ex- foundation work to the roof structure and coverings but does
isting building. not include the price of the land. The cost of the land does not
• For purposes of establishing the Permit Fee Multiplier, the es- affect the cost of related code enforcement activities and is
timated total annual construction value for a given time period not included in the Square Foot Construction Cost.
Square Foot Construction Costs °,
Group (2006 International Building Code) Type of Construction
IA IB IIA IS IIIA IIIB IV VA VB
A -1 Assembly, theaters, with stage 207.99 201.27 196.59 188.35 177.31 172.08 182.33 161.78 155.82
Assembly, theaters, without stage 188.37 181.65 176.97 168.72 157.73 152.50 162.70 142.19 136.23
A -2 Assembly, nightclubs 160.35 155.84 151.87 146.10 137.40 133.56 140.99 124.59 120.41
A -2 Assembly, restaurants, bars, banquet halls 159.35 154.84 149.87 145.10 135.40 132.56 139.99 122.59 119.41
A -3 Assembly, churches 191.73 185.01 180.33 172.08 161.06 155.82 166.06 145.52 139.56
A -3 Assembly, general, community halls, 162.11 155.39 149.71 142.46 129.82 126.20 136.44 114.89 109.93
libraries, museums
A -4 Assembly, arenas 187.37 180.65 174.97 167.72 155.73 151.50 161.70 140.19 135.23
B Business 161.10 155.30 150.33 143.24 130.34 125.39 137.63 114.22 109.47
E Educational 176.25 170.31 165.47 158.26 148.32 140.74 153.03 130.54 125.61
F -1 Factory and industrial, moderate hazard 97.68 93.20 87.88 84.96 7610 72.71 81.54 62.67 59.24
F -2 Factory and industrial, low hazard 96.68 9220 87.88 83.96 76.10 71.71 80.54 62.67 58.24
H -1 High Hazard, explosives 91.50 87.02 82.70 78.78 71.10 66.71 75.36 57.67 N. P.
H234 High Hazard 91.50 87.02 82.70 78.78 71.10 66.71 75.36 57.67 53.24
H -5 HPM 161.10 155.30 150.33 143.24 130.34 125.39 137.63 114.22 109.47
1 -1 Institutional, supervised environment 161.32 155.78 151.61 145.46 135.81 132.09 146.81 122.94 118.11
1 -2 Institutional, hospitals 271.13 265.33 260.35 253.27 239.63 N. P. 247.66 223.51 N. P.
1 -2 Institutional, nursing homes 189.55 183.75 178.78 171.69 159.17 N. P. 166.08 143.05 N. P.
1 -3 Institutional, restrained 185.16 179.37 174.39 167.30 155.66 149.72 161.69 139.55 132.80
1 -4 Institutional, day care facilities 161.32 155.78 151.61 145.46 135.81 132.09 146.81 122.94 118.11
M Mercantile 119.24 114.73 109.76 104.99 95.94 93.10 99.88 83.13 79.95
R -1 Residential, hotels 163.43 157.90 153.72 147.58 137.69 133.97 148.68 124.81 119.99
R -2 Residential, multiple family 136.97 131.44 127.26 121.11 111.35 107.63 122.34 98.47 93.65
R -3 Residential, one- and two - family 129.98 126.37 123.27 120.01 115.61 112.61 118.02 108.33 101.95
R -4 Residential, care /assisted living facilities 161.32 155.78 151.61 145.46 135.81 132.09 146.81 122.94 118.11
S -1 Storage, moderate hazard 90.50 86.02 80.70 77.78 69.10 65.71 74.36 55.67 52.24
S -2 Storage, low hazard 89.50 85.02 80.70 76.78 69.10 64.71 73.36 55.67 51.24
U Utility, miscellaneous 69.10 65.33 61.44 58.37 52.71 49.14 55.08 41.61 39.61
a. Private Garages use Utility, miscellaneous
b. Unfinished basements (all use group) = $15.00 per sq. ft.
c. For shell only buildings deduct 20 percent.
d. N.P. = not permitted
Electronic files of the latest Building Valuation Data can be downloaded from the Code Council website
at www.iccsafe.org /cs /techservices
42 building safety journal January- February2009
APPENDIX C PERMIT FEES*
(A) BWILDING COMMUNITY DEVELOPMENT PERMIT FEES:
1. A fee Application fee :... $75.00 The application fee is non - refundable and added to the
permit fee.
2. Building permit applicants for new or replacement commercial buildings, new or replacement
multi- family buildings and new or replacement duplexes shall pay a non - refundable $3,000.00 fee at the
time of filing for a building permit. Building permit applicants for a new or replacement conventional
single - family residences shall pay a non - refundable $1,500.00 fee at the time of filing for a building
permit. Building permit applicants for a new or replacement modular homes shall pay a non - refundable
$750.00 fee at the time of filing for a building permit. Building permit applicants for a new or
replacement mobile home are exempt from paying an application fee at the time of filing. Upon
approval and permitting the mien applicable non - refundable building permit fee shall be deducted
from any other amount which may be due and owing under the other terms of this subsection.
3. Permit fee shall be 2% of the valuation.
"Valuation" shall be considered the greater denomination of either the;
A. The notarized contract between the contractor and the owner of such property or building or;
B. The valuation method as determined by the International Building Code (IBC) Section 109.3.
4._ Permit fees based upon valuation shall be collected to construct, enlarge, alter, repair, move,
demolish, or change the occupancy of a building or structure, or to erect install enlarge, alter, repair,
remove, convert or replace any required impact - resistant coverings electrical gas mechanical or
Plumbing system, the installation of which is regulated by the Florida Building Code and Florida Fire
Prevention Code, or to cause any such work to be done, shall first make application to the building
official and obtain the necessary hermits.
Below are some examples work requiring such permit.
New Structures Seawalls Air conditioners
Renovation and Demolition Docks / Boat lifts / Davits Heat pumps
Additions Land filing Fire Protection Systems
Accessory structures Land clearing Refrigeration systems
Moving buildings ns, new or modified I Gas equipment and piping
Flatwork and decks on grade Repair of existing signs Gutter or downspouts
Seal coating of parking lot Landscaping French drains
Re- striping of parking lot Irrigation systems Awnings or canopies
Miscellaneous construction Plumbing installations Commercial vents & hoods
State approved modular units Plumbing repairs Solar water heaters
Foundations for modular units Sewer /drainage Electrical installations
Driveways and Side walks Storm drainage lines Electrical repairs
Fences and walls Water heaters Exterior lighting
Roofing (repairs and new roofs) Water mains Generators and transfer switches
Hurricane protection Swimming pools Transformers
Flood proofing panels Spa and hot tubs Low voltage alarm system
Retaining or rip rap walls Screen enclosures Elevators
Window removal & replacement Water features Dumbwaiters, chairlifts
Waterproofing of areas Tanks (all types) Utility work
Non - refundable plan review fee to be added with the total permit fee: $.00125 times valuation
Valuation system shall not be used if a fixed fee is set below.
Jobsite temporary toilet (valid for the length of the proiect): $50.00
Temporary electrical service: $125.00
Temporary construction trailer: $200.00
Temporary sales trailer $200.00 annual fee, removal required before certificate of occupancy will be
issued:
Tents (temporary only -- Three -day maximum): $50.00
Change of Contractor: $75.00
Plans revision fee (for substantially revised plans): Flat fee:... $75.00
Plans revision fee (for minor revisions to plans): Flat fee:... $45.00
Lost permit card or lost plans fee: $40.00
Extension of a permit if no new codes are in effect:... $75.00
Extension of a permit if new codes are in effect: 1% of valuation.
If a permit expires, renewal of the expired permit shall require the payment of the full permit fee in
effect at the time of renewal. Subiect to the approval of the building official, one or more, not to exceed
four, requests for permit extensions can be made prior to the expiration of a permit. However, in no
event shall extensions be granted by the building official on proiects which have received variances,
special exceptions, and site plan reviews which have otherwise lapsed pursuant to the chapter 78.
Re- inspection fee due to reiection of work due to faulty construction, work not ready, failure to call for
inspection and work covered up, work not per plans and no access to iobsite:
Flat fee:... $1On.nn
After the fact permit fees for work done without benefit of a permit. Price for after the fact permits will
be assessed to each category, building, plumbing, electrical, mechanical and roofing at double the
regular permit fee.
Archived plan retrieval fee $25 per request, copies priced per F.S. § 119.07(1)(a).
Requests for refunds of permit fees paid must be submitted to the department of community
development within 30 days of the date of issuance of the permit. There shall be no refunds of the plan
submittal and review fee paid at the time of application for permit.
Where equipment replacements and repairs must be performed in an emergency situation, the permit
application shall be submitted within the next working business day to the building official, without
double fee.
c c c
c c
0 C C c c Q Q c C)
c c r c c C i
c
U L I c c U
u L I Q ul L q r
()) C 1 r 4 n I r -qA-
JTL ul ul
r,� oi ri
ri
Q Q Q c
c c c ) - ( ) ( ) Q c c Q c C) c ?
c c Q > Q f Q c c c
c c Q
c c C Q
c i ul i I c 1 ) ci 11:1 i c
L I n j c: ) c ) d C i u L
L ) r i rl L I c L ui U Ui
ri c I t
r c I C r r i
i U 1, to c -u 0) t
JD 3 0
rl n)
u r I r I r J
i u i d C;
I ri C: ri I I I , I I
0 Q Q Q Q Q Q Q C
Q C Q
c
L V Ul Ul c C C C U L I
ol L L I L) L C I
c I
u I U I
(rl u
(0 n n I
c
C) c
c;
Q
ri
u I
I L J c
L j C
C5 di L ui
cb
c c L J c c c c I c C C c c c c c c
C:) C
c C c C c c
L c ; C L L U c i C L I
c r c c C C c C L L L c ( (� c ) U
r i c I r r, c C C r 4 C ) t L 1 01
d d 4.). 4. - u A 4 u 1.4
-U -U).
t D Ll
. t ---r
i t)
U oi
c
c
Q
c
U)
r, I I I I I I I
C) Q
0 Q Q Q c
Q Q q Q c c c c c8 C) Q c c > c
c Q c C) C Q c Q C) c Q
Q c C C: C d c c C i L C
c c u i c c c ( I c L d C L I
C r c c; c L I r q ri i C U) I L C
4 3 r i r4 ri 0) ri
A r ri i 's 4 r4 k
Ad r U)-
t JD 0
Ul
I
Lli b ; u ui
4 4 L�
4 1
u I
c
c c c c c
c c Q C) c c
C) Q Q G
c c C
C:l 0) 0) 0 L I ul ri A Q L
ui U� Q Q
r4 rJ C)
C) Q C. 0) A
C;
' ru -u I. r 1. -U). -U). 4
-u A I. L I c c
ri r 4
L
C) 7
UJ U)
r4
r 4 n) m ri n)
ri
c ri ri
L J
L J
L . .
L J
L J
c c c c
c c c c
ui . . .
c I C, Q I
C, M 1 �4 1 1
I ri A r i
c Q Q c Q
Q c Q Q c Q c C I c
Q c c c Q i c
; ri i C i C
i L u i C
c ri rl c r u r
c r C; c c Q
r j r 1 4j -u U I -U). I n) U)- c
-u -u')- Ul ui
j Ul c Q L ri
C ) r 4 L I r I J-
ri U) rl 0
Al
L I C
LUJ J u C) q ui r c 4 u I u I
06 a
4 , 4 ,
r� CE ri ni
ri B 0 1
c i
u I
0 c 0
c c c
Ul ui u i c
2
r rl. J � � u
-m - U). 4U -u
LJ
d
ui rH L4- rp i* r�