HomeMy WebLinkAboutHandouts_Special Meeting__AOM_06/30/2010 Arena WYNN & SONS ENVIRONMENTAL CONSTRUCTION CO.
INC
r 4-
C
7268 BELVEDERE RD.
WEST PALM BEACH, FL. 33411
561 - 686 -6077
6/29/10
The Village of Tequesta
Tequesta , Florida
Mr. Russell White
Wynn & Sons Inc. is pleased to provide you with a quote for the installation of concrete sidewalk on N. Cypress dr., 5' wide &
2000 If in length, 4" thick, and as an alternate we will also provide you with a proposal for construction in asphalt. Please see
below the line Items that will address your needs as per The Town of Jupiter annual contract for miscellaneous roadway
improvements EPW- 2008 -19.
Concrete -
Item # 522 -4 4" concrete sidewalk new 1112 sy @ $51.00 = $56,712.00
(This item includes clearing & grubbing, excavation & embankment.)
Item # 160-2 Compacted sub grade 1112sy @ $3.00 = $3,336.00
Total proposed total for concrete sidewalk $60,048.00
Asphalt Pathway
Item 339-4 Install misc. asphalt pavement (1 " 5-111 asphalt, 6" base rock & 12" compacted sub - grade)
1112sy @ $48.00 = $53,376.00
Item 120 -2 Excavation 250cy @ $6.15 = $1537.50
Total proposal for asphalt pathway $54,913.50
Please note that although the proposal for asphalt pathway is more economical, we highly suggest the installation of concrete for
longevity, speed of installation and future value to the Village.
Respectfully,
Daniel P. Wynn president
CC cc