HomeMy WebLinkAboutResolution_06-98/99_11/12/1998 RESOLUTION NO. 6 -98/99 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AWARDING A BID TO YOUNGQUIST BROTHERS, INC. OF FORT MYERS, FLORIDA, IN THE AMOUNT OF $496,692.00 FOR R.O. WELL NO. 2 CONSTRUCTION AND R.O. WELL NO. 1 DEVELOPMENT/ TESTING, AND AUTHORIZING THE VILLAGE MANAGER TO EXECUTE THE CONTRACT ON BEHALF OF THE VILLAGE. OW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS: , Section 1. The Bid for R.O. Well No. 2 Construction and R.O. Well No. 1 Development /Testing from Youngquist Brothers, Inc. H of Fort Myers, Florida in the Amount of $496,692.00, Attached Hereto as Exhibit "A" and Incorporated by Reference as Part of this Resolution are Hereby Approved and the Village Manager of the Village of Tequesta is Authorized to Execute the Contract on Behalf of the Village. HE FOREGOING RESOLUTION WAS OFFERED by Councilmember Hansen , who moved its adoption. The motion was seconded by Councilmember Cameron and upon being put to a vote, the vote was as follows: FOR ADOPTION AGAINST ADOPTION Alexander W. Camer Joseph N. Capretta Carl C. Hansen Ron T. Mackail Elizabeth A. Schaue The Mayor thereupon declared the Resolution duly passed and adopted this 12th day of November, A.D., 1998. i R F EST 4v Elizabeth fk. Schauer I TtFSI oann Mangani llo • Village Clerk i WP80 \MyFiles \Resolutions \6 -9899 EXHIBIT "A" • BID PROPOSAL TO: VILLAGE OF TEQUESTA P.O. BOX 3273 357 TEQUESTA DRIVE TEQUESTA, FLORIDA 33469 FROM: 1Z OT14 -ER S . S 4�o S �I ►J E 1 Q P Od F+. M er5 F L 339 D g (Hereinafter referred to as Bidder) Gentlemen: The undersigned, as Bidder, proposes to furnish all labor, materials, equipment, services, and incidentals necessary to perform all work in accordance with the Contract Documents entitled: Village of Tequesta, Floridan (R.O.) Well No. 2 Construction and R.O. Well No. 1 Development/Testing. Bidder has also received addenda numbers / // O d l ihrough , and have included their provisions in this proposal. Bidder now • submits the following and hereby agrees: 1. The only person(s) interested in this bid, or Agreement, as principal are named herein; that the bid is made without connection with any other person, company, or parties making a bid; and that it is in all respects fair and in good faith without collusion or fraud, or other illegal practices. 2. To hold Bid open until an Agreement has been executed between the Village and the accepted Bidder, or until one hundred twenty (120) calendar days after the bid opening date, whichever is shorter. 3. To enter into and execute an Agreement on the basis of this Bid, within fifteen (15) calendar days after the award of the Contract. To furnish the 100% Performance Bond and 100% Payment Bond in accordance with the Contract Documents. Failure to execute the Contract and furnished said Bonds within fifteen (15) days shall cause bid security to be forfeited, not as penalty, but as fixed and liquidated damages for costs and expenses incurred, payable into the funds of the Village. 4. To start work within ten (10) calendar days of the Date of Commencement as established in the Notice to Proceed. Work • shall be completed within the number of calendar days specified in Article 3 of the Construction Agreement. 96 -141 P -1 5. In the event of multiplication, addition, or clerical errors on the Bid Forms, the Village may correct these errors to clarify the Bids. The information which results in the lowest cost to the Village will be considered correct, and therefore utilized. • 96 -141 P -2 • BASE PROPOSAL FORM THE VILLAGE OF TEQUESTA Floridan (R.O.) Well No. 2 and R.O. Well No. 1 Development /Testing LUMP SUM, UNIT PER -FOOT OR ITE DESCRIPTION PER HOUR PRICE MOBILIZATION /DEMOBILIZATION (FOR ENTIRE PROJECT - PHASE I A II) 1.0 For complete Mobilization (60 %) and Demobilization (40$) including all manpower, drill rig, tanks, tools and accessories required to construct, develop and test one Floridan Well (R.O. Well No. 2) and the complete development and testing of R.O. Well No. 1 as described herein. 00 LUMP - SUM PRICE $ 18 1��05 Adjustments 1.1 For more than one remobilization and demobilization to the site as approved by the Engineer in writing. ob LUMP -SUM PRICE OF $ WELL DEVELOPMENT /TESTING (R.O. WELL NO. 1_) - PHASE I 2.0 For providing all equipment, material, tankage, treatment and labor necessary to develop and test Floridan Aquifer Production Well No. 1 in accordance with these specifications. The unit price called for in this bid includes two videos (pre and post test), development time of 60 hours; a 8 -hour constant rate pumping test, a 4 -hour step -rate pump test 172 hours total); provide 8 hours of stand -by time; provide temporary tankage, pumps and treatment /monitoring prior to discharge of development /pump test water; perform geophysical logging; provide 500 IF of 12 -inch restrained temporary piping and connect to reject main; modify reject main • diffuser in accordance with these specifications. 06 UNIT PRICE PER WELL OF $ J CpZ� 96 -141 P -3 LUMP SUM, UNIT PER -FOOT OR ITEM DESCRIPTION PER HOUR PRICE Adjustments 2.1 For developing the well (R.O. No. 1) for more or less than 60- hours, conducting a constant rate test for 8 -hours and a 4 -hour step -rate test (72 hours total). Pumping time to include furnishing and installing temporary pump, dischar a piping, meter, tankage, treatment /monitoring and all accessories and appurtenances required to pump /develop more or less than the hours specified. 66 PER HOUR PRICE OF $ 15 � Ll 2.2 For providing more or less than 500 LF of 12 -inch restrained temporary piping. 00 PER FOOT PRICE OF $ �. 2.3 For performing more or less than one Lo suite of geophysical logs as described within Special Requirements, Sequence of Work, Phase I. Item 8. 5 OOC) • 0^ ' PER HOUR PRICE OF $ �. 2.4 For standby time more or less than 8 hours as ordered bx the Engineer in writing for activities not covered by these specifications. 00 PER HOUR PRICE OF $ ACID TREATMENT (R.O. WELL NO. 1) 3.0 One acid treatment of well including acid, pumps, equipment and all tools, accessories and aVpurtenances including 24 -hours of acid residence and 8 -hours of pump out. PER UNIT PRICE OF $ 14 000• °°r r 96 -141 P -4 LUMP SUM, UNIT PER -FOOT OR ITE DESCRIPTION PER HOUR PRICE ' Adjustments 3.1 For more or less than one acid treatment (per well) ordered by the Engineer. ao PER TREATMENT PRICE OF $ ce FLORIDAN (R.O.) WELL NO. 2 CONSTRUCTION - PHASE II WELL CONSTRUCTION (R.O. WELL NO. 2) 4.0 For providing all equipment, material, tankage, treatment and labor necessary to construct, develop, and test one Floridan Aquifer Production Well No. 2 including construction of the well, development and testing and. furnishing and installing well head facilities and fittings according to the specifications. The unit price called for in this bid includes, drilling a nominal 32 -inch .diameter hole to 325 feet and setting /grouting a 26 -inch diameter steel surface casing to 325 feet, drilling of a pilot hole to 1200 feet, with formation sampling and geophysical logging; ream 26 -inch- diameter hole. to 1200 feet; center, set, and cement 975 feet of 20- inch diameter, 0.375 -inch wall thickness steel casing; drill 500 feet of 20 -inch diameter hole to 1700 feet while collecting flow test data; install temporary wellhead and perform geophysical loggingg; remove temporary wellhead and backfill hole with clean pea size stone to approx. 1450 BLS; center set and grout 1215 feet of 14 -inch PVC pipe and 235 feet of 16 -inch PVC pipe, perform temperature tog on first 3 stages of grouting; develop/test well for 60 hours; conduct 4 -hour step -rate pumping test and 12 -hour constant -rate pumping test (76 hours total); provide 12 hours of standby time; furnish and install permanent well head assembly; provide temporary . tankage with pumps, treatment /monitoring prior to discharge of development /test water; provide 1500 IF of 12 -inch restrained temporary piping and connect to existing reject main; modify reject main diffuser; video of completed well; all in accordance with these specifications. UNIT PRICE PER WELL OF $ 3Ga OOC3 �� LUMP SUM, UNIT 96 -141 P -5 PER -FOOT OR TE DESCRIPTION PER HOUR PRICE • Ad justments 4.1 For reaming more or less than 325 -feet of 32 -inch diameter hole. PER FOOT FRICE OF $ �W 4.2 For furnishing and installing more or less than 325 -feet of 26 -inch I.D. steel casing including cementing and installation. o PER FOOT PRICE OF $ LOO 4.3 For drilling more or less than 1200 feet of pilot hole. 00 PER FOOT PRICE OF $ 30.E 4.4 For reaming more or less than 1200 feet of 26- inch - diameter hole. 00 PER FOOT PRICE OF $ z- 5 �i 4.5 For furnishing and installing more or less than 975 feet of 20 -inch I.D., 0.375 -inch wall, steel casing including centralizers and cementing. 00 PER FOOT PRICE OF $ ZS' 4.6 For drilling more or less than 500 feet of nominal 20- inch - diameter open hole. PER FOOT PRICE OF 4.7 For furnishing and installing more or less than 1215 feet of 14 -inch PVC Certa- Lok SDR 17 well casing including centralizers, cementing and temperature log. PER FOOT PRICE OF $ 4.8 For furnishing and installing more or less than 235 feet of 16 -inch PVC Certa- Lok SDR 17 well casing including centralizers and cementing. o0 PER FOOT PRICE OF $ • I 96 -141 P -6 LUMP SUM, UNIT PER -FOOT OR • jTE DESCRIPTION PER HOUR PRICE 4.9 For furnishing and installing more or ' less than 1200 cubic feet of clean pea size stone (1200 to 1700 feet). PER FOOT PRICE OF $ 4.10 For developing the well (R.O. Well No. 2) for more or less than 60 hours, conducting a step -rate test for 4 hours and conducting a constant -rate test for 12 hours (76 hours total). Pumping time to include furnishing and installing pump, temporary discharge piping, meter, tankage with pumps,, treatment /monitoring and all accessories and appurtenances required to pump /develop more or less than the hours specified. PER HOUR PRICE OF $ 50 4.11 For providing more or less than 1500 LF of 12 -inch restrained temporary piping. 00 PER FOOT PRICE OF $ 5 • 4.12 For performing more or less than one suite of geophysical logs as described within Special Requirements, Sequence of Work, Phase II, Item 11. ao PER HOUR PRICE OF $ 10 ow 4.13 For stand -by time more or less than 12 hours as orderd by the Engieer in writing for activities not covered by these specifications. 00 PER HOUR PRICE OF $ to ACID TREATMENT (R.O. WELL NO. 2) 5.0 One acid treatment of well including acid, pumps, equipment and all tools, accessories and appurtenances including 24 -hours of acid residence and 8 -hours of pump -out time. ors UNIT PRICE OF $ ` • r r ' 96 -141 P -7 Adjustments 5.1 For more or less than one acid treatment (per well) as ordered by the Engineer. 00 PER TREATMENT PRICE OF $ QW SUMMARY OF BID ITEMS ITEM 1.0 MOBILIZATION /DEMOBILIZATION $ (Entire Project, Phase I & II) ITEM 2.0 BASE BID WELL DEVELOPMENT /TESTING (R.O. WELL NO. 1) Phase I co ITEM 3.0 ACID TREATMENT $ 1 000 (R.O. WELL NO. 1) �/� 00 ITEM 4.0 BASE BID - WELL CONSTRUCTION $ lJIJIJ 3 ao (R.O. WELL NO. 2) Phase II /ny� 00 ITEM 5.0 ACID TREATMENT $ X0 .000 (R.O. WELL NO. 2) TOTAL BASE BID (ITEMS 1.0 - 5.0) $ qq( 0 , , L0 C , 1?- 00 — ADD /DEDUCT ITEMS (R.O. WELL NO. 2 ONLY) 1.0 Adjustment to Base Bid - Well Construction Item No. 4, for supplying 1215 Ft. of 14 -inch FRP well casing (0.50 inch wall thickness) in place of PVC well casing. 00 Lump Sum Price adjustment $ (circle appropriate Add /Deduct Add or Deduct item and initial) 1.1 Adjustment for furnishing and installing -� more or less than 1215 Ft. of 14 -inch FRP well casing (0.50 inch wall thickness) including centralizers and cementing. c� 00 PER FOOT PRICE OF $ 58 2.0 Adjustment to Base Bid - Well Construction Item No. 4, for supplying 235 Ft. of 16 -inch FRP well casing (0.50 inch wall thickness) in place of PVC well casing. Lump Sum Price adjustment $ 35 (circle appropriate Add /Deduct Add or Deduct item and initial) 2.1 Adjustment for furnishing and installing more or less than 235 Ft. of 16 -inch FRP well casing (0.50 inch wall thickness) including centralizers and cementing. • PER FOOT PRICE OF 96 -141 P -8 The following is a complete list of the subcontractors to be used if the undersigned is awarded the Contract for this project. The subcontractors • performing more than $10,000 work (equipment and labor) on the project shall be listed below. Subcontractors named below may not be changed by the Contractor. The Owner may request a change under the terms of applicable sections of the General Conditions. (7:61mf pe of Work Name and Address of Subcontractor n��� U eA 1 NU NC. ►s4tos l K) IE pxaQe 2cl rs L 33q Lo Gc. r N C!, C21A caornki �-, FT MsA e rs FL 339D@ Dated this day of Novem�e r , 19 Contractor: 1&66QLvS f' 't le 9RQ. Corporate Address: )s4 to S P) K)z R J e Seal. F . FL 33 906 r By: Q n -I C �C'i�2r MR Title T l rn YO(A N GCP L41 sT • r 96 -141 P -9 DAvISBALDWIN Inc • 4600 W Cypress St Tampa El 33607 (813) 287 -1936 Bid Bond KNOW ALL MEN BY THESE PRESENTS, that we Youngquist Brothers, Inc. as Principal, hereinafter called Principal, and United States Fidelity and Guaranty Company a corporation_ duly organized under the laws of the State of Maryland as Surety, hereinafter called the Surety, are held and firmly bound unto Village of Tequesta as Obligee, hereinafter called the Obligee, in the sum of Five percent of the total amount bid in Dollars 05% amt bid), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators-, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, Principal has submitted a bid for Floridan (R.O.) Well #2 Construction and R.O. Well #1 Development / Testing THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter a Contract with the Obligee in accordance with the terms of such bid, and give such bond or ds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the_ prosecution_ thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 3rd day of November, 1998. . Youngquist Brothers, Inc. lijus (Principa (Seal) { (witness Titl Tirr� �OUNGQurST United States Fidelity and Guaranty Company 813- 282 -4271 (Surety) (Seal) C (Witness) U ArhR. ne Fact / F ensed Resident Agent Jo i This document conforms to AIA Document A310 RT BOND_ FEBRUARY 1970 ED. THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N Y AVE NW, WASHINGTON, DC 20006 ' 1613481 United States Fidelity and Guaranty Company % V S F Power of Attorney No. 110209 Know all men by these presents That United States Fidelity and Guaranty Company, a corporation organized and existing under the laws of the State of j Maryland and having its principal office at the City of Baltimore, in the State of Maryland, does hereby constitute and appoint John R. Neu, Charles M. Davis, Jr., L. Lowry Baldwin and Kelly Jones ; 1 i of the City of Tampa State of Florida its true and lawful Attomeyls) -in -Fact, each in their separate capacity if more than one is named above. to sign its name as surety to, and to execute, seal and acknowledge any and all bonds• undertakings, contracts and other written instruments in the { nature thereof on behalf of the Company in its business of guaranteeing the fidelity of persons: guaranteeing the performance of contracts; and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. i In Witness Whereof, the said United States Fidelity and Guaranty Company, has caused this instrument to be sealed with its corporate seal, duly attested by ? the signatures of its Vice President and Assistant Secretary, this 31s t day of January A.D. 19 9 7 . United States Fidel' and a a yµo Fidelity Guaranty Company By �" ........... .,. enosraaen, (Signed) B . .. ............. ��� � ...... ISM Vice President (Signed) By ......... .......... . v isCdnt Secretary State of Maryland i SS: Baltimore City On this 31s t day of January A.D. 19 97 . before me personally came Gary A. Wilson, Vice President of United States Fidelity and Guaranty Company, and Thomas E. Huibregtse, Assistant Secretary of said Company, with both of whom I am personally acquainted, who being by me severally duly sworn, said, that they, the said Gary A. Wilson and Thomas E. Huibregtse were respectively the Vice President and the Assistant Secretary of the said United States Fidelity and Guaranty Company, the corporation described in and which executed the foregoing Power of Attorney. that they each knew the sea(of said corporation; that the seal affixed to said Power of Attorney was such grate seal, that it was so affixed by order of the Board of Directors of said corporation, and that they signed their names thereto by like order as Vice President and Assistant Secretary• respectively, of the Company. My Commission expires the is t day of Augurs t A.D. 1998. '= s )Signed) By. CMARI .4 PUBUC - _ ryPubhc� 3 This Power of Attorney is granted under and by authority of the following Resolutions adopted by the Board of Directors of the United States Fidelity and Guaranty Company on September 24,1992: Resolved, that in connection with the fidelity and surety insurance business of the Company, all bonds, undertakings, contracts and other instruments relating to said business may be signed• executed, and acknowledged by persons or entities appointed as Attorney(sEin -Fact pursuant to a Power of Attorney issued in accordance with these resolutions. Said Powers) of Attorney for and an behalf of the Company may and shall be executed in the name and on behalf of the Company, either by the Chairman. or the President, or an Executive Vice President, or a Senior Vice President or a Vice President or an Assistant Vice President, jointly with the Secretary or an Assistant Secretary, under their respective designations. The signature of such officers may be engraved, printed or lithographed The signature of each of the foregoing officers and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Attomey(s)-in -Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and subject to any limitations set forth therein, any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Comparry and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is validly attached. Resolved. That Attomey(sHn -Fact shall have the power and authority, and. in any rase, subject to the terms and limitations of the Power of Attorney issued to them, to execute and deliver on behalf of the Company and to attach the seal of the Company to any and all bards and undertakings, and other writings obligatory in the nature thereof, and any such instrument executed by such Attomey(s) -in Fact shall be as binding upon the Company as if signed by an Executive Officer and sealed and attested to by the Secretary of the Company. 1, Thomas E. Huibregtse, an Assistant Secretary of the United States Fidelity and Guaranty Company, do hereby certify that the foregoing are true excerpts from the Resolutions of the said Company as adopted by its Board of Directors on September 24, 1992 and that these Resolution are in full force and effect 1, the undersigned Assistant Secretary of the United States Fidelity and Guaranty Company, do hereby certify that the foregoing Power of Attorney is in full force and effect and has not been revoked. In Testimony Whereof, I have hereunto set my hand and the seal of the United States Fidelity and Guaranty Company, onthis 3rd dayof November .19 98 j ✓ Assistant Secretary • � t896 FS 3(12/96)