HomeMy WebLinkAboutResolution_39-10_11/04/2010 RESOLUTION NO. 39 -10 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AMENDING RESOLUTION NO. 27 -10 AND AWARDING A CONTRACT TO WILLIAM H. MURPHY G. C. FOR THE INSTALLATION OF 2000 L. F. OF NEW SIDEWALK ON NORTH CYPRESS DRIVE IN THE AMOUNT OF $56,250.00 AND APPROPRIATING FUND BALANCE FROM THE CAPITAL PROJECTS FUND #303 IN THE AMOUNT OF $56,250.00 TO FUND THIS PROJECT AND AUTHORIZING THE VILLAGE MANAGER TO PROCEED ON BEHALF OF THE VILLAGE PROVIDING FOR SEVERABILITY; PROVIDING AN EFFECTIVE DATE; AND FOR OTHER PURPOSES. WHEREAS, Residents of the Village of Tequesta petitioned the Village to install a sidewalk on North Cypress Drive (see attached petition); WHEREAS, The original contractor awarded the bid is unable to complete the project in a timely manner; WHEREAS, the bid submitted by William H. Murphy G. C. was the next lowest of three bids submitted (see attachment); WHEREAS, This project was not budgeted it is necessary to Appropriate Fund Balance in the amount of $56,250.00 and increase the expenditure account Pathway and Sidewalk Improvements #303 - 321 - 663.652 respectively; NOW, THEREFORE, BE IT ORDAINED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS: Section 1 The Village Council hereby adopts Resolution #39 -10 amending Resolution # 27 -10 awarding a contract to William H. Murphy G. C. for the installation of a sidewalk on North Cypress Drive and appropriating Fund Balance in the Capital Projects Fund 303 to fund the project. The foregoing Resolution was offered by Council Member Humpage who moved its adoption. The motion was seconded by Vice -Mayor Paterno and upon being put to a vote, the vote was as follows: For Adoption Against Adoption Mayor Pat Watkins X Vice -Mayor Tom Paterno X Council Member Vince Arena X Council Member Jim Humpage X Council Member Calvin Turnquest X The Mayor thereupon declared the Resolution duly passed and adopted this 4 day of November 2010. MAYOR OF TEQUESTA Pat Watkins ATTEST: `` " F T � 6`e q Q�'', •''' ?OR` Fs ;y Lori McWilliams, MMC Village Clerk tNCORPORAT� .' € P '00 SH ELT ftA I N R �. �N �+�sT Cam, P.O. BOX 336, INDIANTOWN, FLORIDA 34956 PHONE 772 - 597 -3180 FAX 772 -597 -4213 JULY 19, 2010 VILLAGE OF TEQUESTA -INSTALL 2000 LF X 5 FT. WIDE NEW SIDEWALK f DESCRIPTION I QTY I UNIT JUNIT PRICO TOTAL OrTl yi`' i MOBILIZE, SURVEY, INSTALL 6" BASEROCK, 1 112" ASPHALT, 2,000 LF $26.58 $53,160.00 & A STRIP OF SOD ON BOTH SIDES OF 5' WIDE SIDEWALK OPTION 2 MOBILIZE, SURVEY, INSTALL SUBGRADE, 4" CONCRETE, 2,000 LF $27.40 $54,800.00 & A STRIP OF SOD ON BOTH SIDES OF 5' WIDE SIDEWALK TOTAL: WILLIAM H. MURPHY G.C. 8840 SE ROBWYN ST HOBE SOUND, FL 33455 TEL/ FAX 772 - 546 -9940 561 747 -7793 QUOTATION VILLAGE OF TEQUESTA JUNE 25, 2010 346 TEQUESTA DR TEQUESTA, FL 33469 ATTN: RUSSEL WHITE NORTH CYPRESS DR. SiDE'vVALKS: Approximately 5' X 2000' X 4" • Excavate, Form, Pour and finish a 2000' sidewalk on the East side of N. Cypress Dr. • Concrete to be 3000# regular with joints every 5' All surplus fill and debris will p be removed from the site as work progresses • As concrete cures, Forms will be stripped and sidewalk backfilled on a daily basis • Labor and material---------------------------- - - - - -- $ 56,250.00 ------------------------------- Thank you for the opportunity to bid your project. i i urphy WYNN & SONS ENVIRONMENTAL CONSTRUCTION CO. INC c, „z 7268 BELVEDERE RD. WEST PALM BEACH, FL. 33411 561 -686 -6077 6/29/10 The Village of Tequesta Tequesta , Florida Mr. Russell White Wynn & Sons Inc. is pleased to provide you with a quote for the installation of concrete sidewalk on N. Cypress dr., 5' wide & 2000 If in length, 4" thick, and as an alternate we will also provide you with a proposal for construction in asphalt. Please see below the line Items that will address your needs as per The Town of Jupiter annual contract for miscellaneous roadway improvements EPW- 2008 -19. Concrete - Item # 522 -4 4" concrete sidewalk new 1112 sy @ $51.00 = $56,712.00 (This item includes clearing & grubbing, excavation & embankment.) Item # 160 -2 Compacted sub grade 1112sy @ $3.00 = $3,336.00 Total proposed total for concrete sidewalk $60,048.00 Asphalt Pathway Item 339 -4 Install misc. asphalt pavement (1 " 5 -111 asphalt, 6" base rock & 12" compacted sub - grade) 1112sy @ $48.00 = $53,376.00 Item 120 -2 Excavation 250cy @ $6.15 = $1537.50 Total proposal for asphalt pathway $54,913.50 Please note that although the proposal for asphalt pathway is more economical, we highly suggest the installation of concrete for longevity, speed of installation and future value to the Village. Respectfully, Daniel P. Wynn president North Cypress Drive, Tequesta 33469 Sidewalk Petition We, the undersigned, residents in the neighborhoods of North Cypress Drive, Tequesta Fl 33469, petition the Village of Tequesta to install a sidewalk on North Cypress Drive beginning North of Tequesta Drive to the existing sidewalk of the Cypress Ridge neighborhood. Without a side walk the residents do not have: e a safe route for children to walk to the school bus stops e a safe area for mothers to walk babies in strollers or small children e a safe route for pet owners to walk their dogs e a safe area for children to play on riding toys e a safe route for residents exercising and it causes an addition safety hazard for drivers because residents are forced to walk in the street We would like the Village of Tequesta Planning and Zoning committee to add our sidewalk to the 2009 Village building plans. Thank you 4 M Business Solutions Inc Servic Complete Per mitting ' e Siaecia ag in Cow, W Projects • On Site Permit Project Managernent JAMS �crA • Cornsa Ling on pin p 561 -2 22 -9284 ' Expedite Building & Zoning Pits • Permit Acquis dons Licensed and insured No Project Too Big o,. SnrQ[[ lameshackett ®conx-.ast.oet ... .• _,. ,� a r ... .. . , « I .. . 1 . 1 I m I . I I _G . .' R. . v , . . . , OWNS jaw WAW _ . 1- • ► f AM Sri. WT �!'' : G am /!- '' fff .�"a�' • 1 • . • r. • r, , =71 • . 1 • • • �• - -. .• • • r • k I • - l J r . • • 1 - • - • +c • WIT • r• 11, 11 1 d 9 7A f IF •'• r .T TrJM fl . All IffrnW-WI .-Tr*7r,�!�"MA AW ITOYM . 7 C N.T.11 . -. . , , t +w • r n o / 1 W'T "In 'q " l i !! ` WO 1��� � - .. • 1 . ; • Non► CbPress Dire, Tequesb 33469 Sidewalk Request Petition+ We, the undersigned, residents in the neighborhoods of North Cypress Drive, Tequesta Fl 33469, petition the Village of Tequesta to install a sidewalk on North Cypress Drive beginning north of Tequesta Drive to the adsiting sidewa9c of the Cypress Ridge neighborghood. With out a side walk the residents do not have: a safe route for children to walk to the school bus stops a safe area for mothers to walk babies in strollers or small children a safe route for pet owners to walk their dogs a safe area for children to play on riding toys a safe route for residents exercising and it causes an addition safety hazard for drivers because residents are forced to walk in the street We would like the Village of Tequesta Planning and Zoning committee to add our sidewalk to the 2009 Village building plans. fiidlri1 Nan& Raidemses Address Phone G n N ss Ole St"i I&<- tA-- - wwn