Loading...
HomeMy WebLinkAboutHandouts_Regular_Tab 07 and 08_03/10/2011_Community DevelopmentVILLAGE OF TEQUESTA Village Council Public Hearing JP MORGAN CHASE BANK APPLICATION March 10, 2011 Village Council Public Hearing APPLICANT: JP MORGAN CHASE BANK AGENT: BOHLER ENGINEERING REQUEST: BUILD A 4,312 Sq. Ft. CHASE BANK FACILITY –Outparcel 4 Expansion from 9,446 Sq. Ft. to 31, 258 Sq. Ft. Ft, 4 Subject Property located at County Line Plaza 3 Shopping Center –US Publix Highway 1 & Village Boulevard 2 Existing Conditions: Publix, in line retail and 3 developed outparcels : 1 1.Seacoast Bank 2.Lobster House 3.Wendy’s Village Council Public Hearing Site Plan Modification-Shopping Center Application Outparcel Site Plan Review-Bank Facility Includes Staff Review for Development Review Compliance Village’s Code Committee (DRC) Setbacks  November 15, 2010 Height  Min. Site Area  Community Development Lot Coverage  Law Enforcement/ Open Space  Public Works/Fire Safety Parking  Signage  Planning and Zoning Advisory Landscaping  Board - February 3, 2011 - Fences  Recommended Approval (3-0) Level of Services (LOS)  Village Council Public Hearing Shopping Plaza Site Area: 894,946 SF Building : 166,891 SF Open Space: 21.14% (1994 variance 18.3%) Parking: 856 Spaces Lot Coverage: 19.23% Outparcel Expansion ) Site: 31,258 SF Building :4,312 SF Open Space: 27.72% Subject Property Parking: 22 Spaces Lot Coverage: 16.66% Village Council Public Hearing EXISTING LAND FUTURE LAND ZONING USEUSE SUBJECT PROPERTYCommercialCommercialC-2 Community Commercial Use North Property - CommercialCommercialC-2 Community Commercial Use South Property- CommercialCommercialC-2 Community Commercial Use Village Council Public Hearing LEVEL OF SERVICE ANALYSIS Section 78-331 (h) all new development and/or redevelopment must provide necessary infrastructure to meet the Village’s level of service standards: TRAFFIC : Traffic Impact DRAINAGE: 95 percent of all Reviewed by Village’s Traffic stormwaterrunoff must be maintained Engineer found sufficient / on site. Permit from South Florida Water Management District in process- Palm Beach County issued Applicant needs to provide it by building approval letter –Traffic permit phase. Performance Standards (TPS). POTABLE WATER : Average day water SANITARY SEWER: Loxahatchee consumption rate(proposed: 900 River Environmental Control gallons/day) –Code: 1,455 gallons/day District approved proposed Maximum day water consumption rate development with a condition. (proposed: 1,350 gallons/day) –Code: Applicant addressed condition. 2,182 gallons/day EXISTING CONDITIONS OUTPARCEL EXISTING ENTRY WALLS Proposed Monument Sign EXISTING CONDITIONS Village Council Public Hearing APPLICANT PRESENTATION