Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 23b_04/13/2006 VILLAGE OF TEQUE5TA MEETING AGENDA ROUTING SHEET MEETING DATE: 4/13/2006 REQUESTED ACTION/SUMMARY The Community Development Department seeks adoption of a revised Appendix `C' for permit fees, to replace our existing fees adopted in 1975 and to provide for actual operating expenses. See attached Appendix "C" Permit Fees. RESOLUTION OR ORDINANCE NUIVIBER: Res # 67-OS-06 Ord # ORIGINATING DEPARTMENT: Community Development FUNDING SOURCE: 2005/2006 BUDGET ACCOUNT NUMBER: CURItENT BUDGETED AMOUNT AVAILABLE: $ AMOUNT OF THIS ITEM: $ AMOUNT REMAINING AFTER THIS ITEM: $ BUDGET TRANSFER REQUIRED: ❑ Yes X No APPROPRIATE FUND BALANCE: ❑ Yes X No Piggyback Contract Name and #: Or Competitive Bid # APPROVALS: ---1 ; � DEPARTMENT HE FINANCE DIRECTOR: VILLAGE MANAGER: �-�'" � VILLAGE MANAGE� RECOMMENDA ON: APPROVE ITEM: d DENY ITEM: ❑ VILLAGE ATTORNEY: APPROVED FOR LEGAL SUFFICIENCY ❑ Yes ❑ No X Not Applicable (n/a) RESOLUTION NO. 67-05/06 � A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGEU�OC��R 14, PALM BEACH COUNTY, FLORIDA, REVISING APPENDIX C, ARTiCLE VI, PERMIT FEES, SEC.14-152, O B�UILDIN�LY � B��HI APPENDIX C, PERMIT FEES IS HEREBY RESOLUTION. � yVHEREAS, the current fee schedule adopted in 1975 is obsolete; and WHEREAS, the new fee schedule will provide for actual operating costs, and � WHEREAS, the new fee schedule Appendix C, Permit Fees of the Village of Tequesta is hereby . officially adopted. NOW, THEREFORE, BE IT RESOL�ED BY THE � FOLLOW;S�'.TC� OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, A SECTION 1— The Village Council of the Village of Teque� 5 ding Permitsr and s Appendix C, Permit Fees, as referenced in Chapter 14, Section , officially adopted by this resolution. , who moved its TI� FOREGOING RESOLUTION WAS OFFERED bY � and upon being put to a vote, the adoption. The motian was seconded by vote was as follows: FOR ADOPTION AGAINST ADOPTION T"he Mayor thereupon declazed the Resolution duly passed and adopted this 13th day of April, A.D, 2006. �yOR OF TEQUESTA Jim HumpaSe ATTEST: Gwen Cazlisle, Viliage Clerk � APPENDIX C � , PERMIT FEES APPENDIX C ._ PERMIT FEES . , ,, �:: (A) BUIILDING PERMIT FE�S: 1. Minimum Fee: $75. . - 2. Building permit applicants for new or replacement commercial buildings, new or replacement multi-family buildings and new or replacement duplexes shall pay a non-refundable $3,000 fee at the time of filing for a building permit. Building permit � - applicants for a new or replacement conventionat single=family residences shall pay a non-refundable $1,500 fee at the time of filing for a building permit: Building permit applicants for a new or replacement modular homes shall pay a non-refundable $750 fee at the time of filing for a building permit. Building permit applicants for a new or replacement mobile home are exempt from paying an application fee at the time of filing. Upon approval and permitting the application fee shall be deducted from ariy other amount which may be due and owing under the other terms of this subsection. 3. Buildings including balconies, additions, garages, enclosures and accessory structures, for each 100 square feet of enclosed area or a fraction thereof: , residential $30; commercial $35. 4. Structures other than buildings and miscellaneous construction (unless specified herein) for each $1,000 of cost or a fraction thereof: residential $35; commercial $40. 5. Seal coat parking lot; re-striping, for each $1,000 of cost or a fractional part thereof: residential $30; commercial $40. (. State approved modular units (building only, electrical, plumbing, meehanical require separate permits): r.esidential $650; commercial $300. ` � �. Foundations for modular units (slabs, auger/pilings, columns or tie beam): residential $200; commercial $300. g. Flatwork and decks on grade (concrete, wood, etc.), for each 1000 square feet or a fractional part thereof: residential $35; commercial $45. 9. Fences and walls (all types), for each 1001ineal feet or a fra�tional part , thereof: residential $35; commercial $45. . 10. Tile and metal roofing (including repairs and new roofs), for each roofing square or a fractional part thereof: residential $7; commercial $8. � 11. Modified, built-up, shingle roofing (including repairs and new roofs), for each roofing square or a fractional part thereof: residential $�; commercial $7. - 12. Air conditioner stands on roofed areas and waterproofing for roofed areas: residentia� $35; commercial $45. � p . 13. Swimming pools including 3ft. wide deck surround (plumbing and electrical excluded): residential $500; commercial $800. , 14. Spa and hot tubs (up to 12ft. diameter) (decks plumbing and electrical excluded): residential $100; commercial $200. 15. Cisterns (non-potable): residential $Z50; commercial $350. 16. Mobile home installation, tie downs, blocking, setbacks and stairs: residential $300; commercial $500. 17. Temporary construction/sales trailer annual fee, remo�al required before certificate of occupancy will be issued: residential $200; commercial $250.. 1 g. Tents (temporary only-3 day maximum):. residential $50; commercial $100. 19: Tanks (all types)—for each 1,000 gallons of capacity or fractional part thereof: residential $9.00; commercial $10. 20, Moving building: residential $350; commercial $600. �l. Demolition of interior or exterior of an� structure, for each 1,000 sguare - feet or fractional part thereof: residential $80; commercial $90. ` 22. Gutter, downspouts, french drains: for each 1001ineal feet or fractional part thereof: residential $35; commercial $45. 23, Awnings or canopies, for each 100 square feet or a fractional part thereof: " residential $35; commercial $55. � 24, Hurricane shutters, retrofit or new: residential c�r commercial $50. 25. Certification of hurricane protection for insurance purposes $30. 26. Commercial flood proofing panels for FEMA compliance: $200 flat fee. • 27. Wood lattice/screening including framing and material—no roofing " allowed, for each 100 square feet or a fractional part thereof: residential $25; commercial. - � $35. , 28. Window removal and replacement: $20 per window. 29. Commercial vent hoods, for each $1,000 of the estimated cost or a fractional part thereo£ 30. Signage: � (a) New signs, for each 40 square feet of signage or a fractional part thereof: residential N/A; commercial $35. � . .-- (b) 1Vlodify, repair, repaint existing signs, for each 40 square feet or a fractional part thereof: residential N/A; commercial $30. (c) Political signs: $50 unlimited signs. Note: The permits and associated fees listed below may also require additional biological inspection fees. � 31. Seawalls per SO lineal feet or fractional part thereof: residential $35; commercial $50. 32. Docks for each lQ square feet or a fractional part thereof: residential $35; . commercial $50. 33. Dock piling (wood piling and concrete), each: residential $25; commercial 35. � 34. Boat davit, (each): residential $45; commercial $60. � 35. Boat lift: residential $100; commercial $Z00. 36. Retaining and rip rap walls per 1 OO lineal feet or a fractional part thereof: residential $60; commercial $80. � 37. Land filing, per each 100 cubic yards: residential $35; commercial $60. , 38. Land clearing (invasive exotics): no fee. 39. Land clearing for construction,purposes for each lot: residential $75; commercial $95. 40. Non-refundable plan review fee to be added with the total permit fee: residential $3 per $1,000 of estimated cost; commercial $4 per $1,000 o�estimated cost. • 41. Archived plan retrieval fee $25 per request,.copies priced per Section 119.07(1)(a), Florida Statutes. ' . 42. Extension of a permit if no new codes are in effect: $50. - 43. Radon fee: 5% of additional living area. 44.. BCAIF fee: 5% of additional living area. . 45. Re-inspection fee due to rejection of work due to faulty construction, work s,. not ready, failure to call for inspection and work covered up, work not per plans and no access to jobsite: flat fee: $100. � 46. After the fact permit fees for work done without benefit of a permit. Price � for after the fact permits will be a,ssessed to each category, building, plumbing, electrical, mechanical and roofing at double the regular permit fee. 47, Plans revision fee (for substantially revised plans): flat fee $75. 48. plans revision fee (for minor revisions to plans): flat fee $45. 49. Contractor registration fee: initial fee $40; annual update fee $25. 50. Business license fee (annual): $200; home occupation license fee (annual) $100. 51. Lost permit card or lost plans fee: residential $20; commercial $40. 52, FEMA inspections: $150: ' (B) - PLUNIBING PERMIT FEES: . l, Minimum fee: $75. 2, Each fixture roughed in and set: residential $25; commercial $35. 3. Sewer/drainage-building interior lines and connection: residential $70; commercial $80. 4, Outside sanitary and storm lines (site work) for each $1,000 of cost of fractional part thereof: residential $70; commercial $90. � � 5. °-= Manholes (each): flat fee: $70. 6. Floor or roof drain (eaeh): flat fee $10. '7, Water pipirig: (a) Connection to supply system (each): residential $35; commercial $55. . (b) Connection to any appliance or fixture not covered by paragraph (b)2: residential $35; commercial $45. � " (c) Irrigation systems for each $1,000 of cost or fractional part thereof: residential $25; commercial $40. g, Water mains and distribution lines, for each $1.000 of cost or a fractional . part thereof: residential $30; commercial $40. � 9, Swimming pools, spas, hot tubs: residential $60; commercial $200. � 10. Solar water heater new complete installation: residential $50; commercial $85, 1 l. Jobsite temporary toilet (valid for the length of the project): residential $45; commercial $60. 12, Miscellaneous plumbing not covered or included herein, for each $1,000 of the estimated cost or fractional part thereof: residential $30; commercial $45. 13. Plumbing after the fact fees: refer to (a)46. (C) ELECTRICAL PERMIT FEES: 1, Minimum fee: $75. � 2, Site work: residential and commercial, for each $1,000 ofthe estimated : cost of construction or a fractional part thereof: residential $50; commercial $60. 3, Outlets---(gen�ral, receptacles, switches, lighting, telephones, computer, TV, etc: for each 100 square feet or fractional part thereof: residential $11; commerci�l $12. . 4, Each appliance outlet including ceiling fans: residential $11; commercial ;,� $12. 5, Each exterior light—exclusive of sign lighting: residential $10; commercial $15 . (. Temporary electrical service: residential $100; commercial $200. '7. Single phase service, 0-300 amps; residential $80; commercial $100.' g. Single phase service, over 300 amps to 400 amps: residential $95; commercial $110. � 9. Single phase service, over 400 amps to 600 amps: residential $120; � commercial $135. 10. Single phase service, over 600 amps: residential $300; commercial $400. � 11. Three phase service, 0 to 300 amps: residential $95; commercial $150. 12, Three phase service, over 300 amps to 400 amps: residential $110; commercial $135. . 13. Three phase service, over 400 amps to 600 amps: residential $160; commercial $195. 14. Three phase service, over 600 amps: residential $250; commercial $350. Note: Sub feeds to be charged by amps at the same rate as services. 15. Each motor throughout the project: 0 to 10 hp: residential $60; , commercial $75. ' - �16. Each motor over 10 to 25 hp: residential $125; commercial $145. _ 17, Each motor over 25 hp: residential $165; commercial $180: � 1 g, Generators; transfarmers and transfer switches (each) 0 to 25 KW: residential $60; commercial $75. � 19. Generators, transformers and transfer switches (each) over 25 KW to 50 KW: residential $120; commercial $180. 20, Generators, transformers and transfer switches (each) over 50 KW: residential $160; commercial $180. � 21, X-ray machines (each): flat fee: $500. 22, Welding machines (each): flat fee: $300. 23. Air conditioner (each), window or wall unit if new service is needed: . residential $70; commercial $95. 24. Central systems, up to 20 tons: residential $60; commercial $85. 25. Central systems, over ZO tons: residential $85; commercial $120. : 2C. Refrigeration system, up to 20 tons: flat fee: $95. 27. Refrigeration system, over 20 tons: residential and commercial $5/per ton. 28: Heat pump, residential and commercial: minimum fee $60. 29. Elevators, residential and commercial: flat fee: $200. 30. Dumbwaiters, chairlifts: residential and commercial: flat fee: $200. 31. Signage first connection: $60. 32. Signage each additional sign connection: $30. 33. Plug mold and tra�k lighting for each 100 lineal feet or fractional part thereof: residential $60; commercial $85: 34. Low voltage alarm system: residential $100; commercial $35 per $1,000 of estimated cost. ' 35. Commercial vent hoods: price per motors, see paragraph (c)15-(c)17. 36. Electrical repairs/remodeling same as new work: minimum fee $75. 37, Swimming.pools; spas and hot tubs (lights, pump, bonding, grounding and timer): residential $200; commercial $300. 3 g. Miscellaneous electrical work not included herein, for each $1,000 of cost or a fractional part thereof: residential $30; com�nercial $45. 39. After the fact electrical work: refer to paragraph (a)46. (D) MECHANICAL PERMIT FEES: 1. IVlinimum fee: $75. � 2. Air conditioning systems (excluding window units) and refrigeration: (a) 0-2 ton $55 (b) 2-5 ton $70 (�) 5-10 ton $85 (d) 10-25 ton . $100 . (e) 25-50 ton $130 (� 50-100 ton $210 ' (g) over 100 ton $320 3, Duct work per drop (including return air plenums): residential $Y0; commercial $12. 4, Vent hoods (each): residential $50; commercial $100: . 5, Heat pump (per unit): residential $50; commercial $70. 6. 1Vliscellarieous mechanical wark not included herein, for each $1,000 of cost or a fractional part thereof: residential $35; commercial $70. � '7. � Gas equipment and piping (per fixture unit inclusive of all required piping): residential $45; commercial $60. 8. . Mechanical elevators (up to two floors), dumbwaiters, moving sidewalks, escalators: flat fee: $150. 9. Mechanical elevators (over two floors): additional $75 per floor. 10. After the fact mechanical and gas fees: refer to Section (a)46. (E) pLANNING AND DEVELOPMENT SERVICE FEES: 1. Consultant reports for approvals: fee subject to time expended. 2. Plan review (for all required landscape plans, i.e. buffer yards and mitigation): flat fee $75. � 3. Site visit inspection (for environmental compliance review or vegetation plan review): flat fee $100. 4. Land filling permits: residential $40; commercial $50. � 5. Dock/seawallhiprap applications: flat fee, canal $40; open water $80. (,, Planning or environmental inspection fee: flat fee $75. . �. Reinspection fee. (Inspection requested job not ready):, flat fee $40. g. Planning review fee: new residential $40; modification to existing residential $20; new commercial $50; modification to existing commercial $30. (G) OPERATIONS/PUBLIC WORKS FEES: � 1. Minimum fee: flat fee $_75. - - 2. Utility work in the right of way not performed by Village personnel: flat . fee $75. 3. Driveway connection approval to Village roadways: flat fee $50. , . THIS RESOLUTION SHALL BECOME EFFECTIVE IMMEDIATELY UPON ITS ADOPTION. 3/06 CH/mm