HomeMy WebLinkAboutDocumentation_Regular_Tab 07_06/08/2006 VII.I,AGE OF TE�?iJES'TA
MEE'TING AGE1�illA I�OIT'�I1�dG SII�ET'
1l�1EET�TG D,A,TE: June 8, 2006
REQUESTED ACTION: Change Order to Cone & Graham bridge repairs.
12ESOL,UTION OR OR.DINANCE NUMBER: ��;� ;°� E. , �,� �; j. � �' `, �f.:��°
ORIGINATING DEPAIZTMENT: Public Works De�artment
,,% _ l�� �`�'
DEPARTMENT HEAD APPROVAL '� � G r=- - �r � /< "%` �-`'" �
FtTNDII�G SC�URCEe 2005/2006. L��7DGET
ACCOITNT NYJ1dIBEit: 301-337-653.605
CiJRRENT BUDGETED AMOUI�T AVAILABLE: f �� ?
AI�IOUNT OF THIS I'I'�M: $56,669000
BUDGETED: No
BUD�E'I' TRANS�'ER REQiJIRED: Yes
APPROI'RIATE FIJNI) BALANCE: Yes
SUMMARY: see memorandum
, Piggy�ack CUntract Name anc� numbei°:
O�•
C�rnpetitive Bid foi° anythulg ovei° $10,000-Attacli 3 B�ds
Al'PRO�1�I,S: ' � ; _ --
� ---
F�NAIVCE DIRECTOR�, �_ ��-
VILLAGE MANAGER � - � sy`�
W
VILI,AU�; AT'I'ORl�EY (if Needed) 1'es I�Io
� _ < :�
( ..
!
--_______
' INTB1tOFFZCE MEMORANDUM
T4: VII.I,AGE MA1riAGER `.
FROM: R GARLO, ASSTSTANT MANAGER "
5UBJECT: TEQUES'TA DRPVE BRIDGE
DATE: 5/31/06 �
j CC: VII I,AGE MAYOR AND COUNCIL �
�'�T (�orida Depart�nent of Transportarion) completed a Post Rehabilitation Inspection
: Report dated March 8, 2006, following the recent repairs to the Tequesta Drive Br�dge. This report
has beeii attached for your review. Page twentp-one (21) of FDOT"s report lists their recommended .
repairs following the post rehabilitation inspecticm.
Both the Village Manager ar�ci I met with FpOT officials on several occasions to discuss the
report anci the esisring conditicm of the bridge. As pou know, the completed slab replacements
; addressed the immediate deficiencies in the bricige. At this poin� FDOT officials and KCA
; eng�ieers rec�uested that the Village immediately address two areas of concem
;
i 1• The removal of al1 deiaminated (unsound} cancrete from the entire underside of the
� bridge. 'This is pximarily for marine and boating safery.
2• To address all exposed cables and reinforcing steel bp removing e�is�g rust and
corrosiveness, and coating the areas with some reta.rding/protective compaund. This
will retard further darnage and insure the £tve�qear tirr�e period requested.
Based on the FDOT inspection report and the information provided in subsequent meetings,
Cone & G Inc. has provided a proposal to complete the �equested repairs. This proposal, at a
cost of �4 , 9.00, has been attached Note that Cone & Gzahatn, Inc. erformed the re'
bz�dge repatrs and slab replacemesrts. Subsequendy, this proposal is to serve as a change order to �
their exisrita,g contract with the Village_
Both the FDOT inspcction report and the proposal from Cone St Graharn �,ve,t.e t�ransmitted to
Br�an Rheaul� P.E. of $ridge Design Associates, Inc. Mr. Rheault engineered the repairs aZreacly
affected to the bridge: Mr. Rheault was asked to review the FDOT inspection repart and the
proposed scope of work from Gone & Graham. In an attached correspondence, Mr. Rheault
recommended that the repa.irs include the removal of all loose and delaminated concrete, and not be
limited to just span #2 and #4. This was relayed to Cone & Graham, Inc. and their proposed scope
of work was revised to include the xecommendation by Bridge Design Associates.
S� � (��c'��
ti
RESOLUTION NO -OS/06 0 , .
A RESOLUTION OF THE VILLAGE COUNCIL OF THE
VILLAGE OF TEQUESTA, PALM BEACH COUN'T'Y, FLOR.IDA,
AWARDI1�iG A CHANGE ORDER TO CONE & GRAHAM INC•�
OF WEST �PALM BEACH, FL�RIDA, IN THE AMOU�T OF
$56,669.Q4, FOR THE ADDITIaNAL REPALRS TO THE
TEQUESmA DRI�IE BRIDGE, AND APPROPRIATING
ADDITIONAL FUND BALEINCE QF $56,669.00 FROM THE
GENERAL FLIN� #001, AND AUTHORIZ�NG THE TRANSFER
Q� THESE FUNDS TO THE CAPITAL iMP TO �N�T F�
#3U1, ACCOLINT # 301�33�'-653.605,
ADDITIONAL COST OF THE TEQiJESTt� DRIVE BRIDGE
REPAIRS AND AUTHORIZII�TE CHANGE ORDER ON
EXECUTE THE APPLICAB
OF THE VI�,LAGE.
WHEEREAS, the FDOT (Florida Department of Transportation} conducted a
Post Rehabilitation Inspection of the Tequ�sta Drive Bridge;
WHEREAS, the FDOT has requested certain immediate, additional rep�irs to
the bridge based on that inspecti<m; '
. yJHEREAS, Cone & Graham, Tnc• 1�ave reviewed the report and proposed to
complete the necessarY repairs as a change order to their original repairs in the amount of
$56,669.00;
WHEREAS, the Village's bridge engineets have reviewed the FDOT' report and the
proposed scope of repairs ant� approve of same;
NOW, THEREFORE, be it resolved by the Village Council of the Village of Tequesta,
palm geach County, FIorida, as follows:
Section 1. Consideration to award a change order to Cane &�Graham, Inc•, o� W�t
palm Beach, Florida, in the amount af $56,669.00, for the additional repairs to the
Tequesta Drive $ridge, attached he�'eto as Exhibit "A", and incorporated by
reference as a part of this resolution is heret�y approved and th� Village Manager of
the Village of Tequesta is authorized to execute the same on behalf of the Village.
Section 2: 'fhe appropriation of additional fund balance of $ d#001 o th� Cap tal I p o v #
and authorizing th� transfer of such amount from General �un
Fund #301, account # 301-337-�i53.605, to fiind the additional cost af the Tequesta Drive Bridge
Repairs is hereby approved.
THE FOREGOING RESOLUTION was offered by Councilmembe�'
, who moved its adoption. The Resolution was seconded by Cauncilmernber . , and
upon being put ta a vote, the vote was as follows:
� FOR ADO�'TION AGAINST AD�3PTION
The Mayor theceupon declared the Resolution duly passed and adopted this " day of � �
�
A.D., 2006.
Mayor Jim Humpage '
ATTEST:
Village Clerk Gwen Carlisle
- - �� N
CONE 15� GRAHANM� fNC.
� H�►v�r Corvs�uc�noN
P. 0. BOX 310167 �� EAST COAST DIVISION 5201 CONE ROAQ
TAMPA, FLORIDA 33680 1767 HILL AVENUE TAMPA, FLORID/k 33610
t813} 623-2856 WEST PALM $EACH, FL. 33401 FAX ($13j 620-1642
561-842-3196 (PHONE) ��
561-842-3197 (FAX)
RC/rc
PRQPOSAL SUBMITTED TO PxorrE nATE
VILkA�EOFTEQUESTA (561} 575-6201 t�ay 3�, 2006
Attn Bob Garlo F �'
t561 575-6245
STREET JOB NAME .
TEQUESTA DRIVk; EMERGENCY $RIDGE REPAIR TEQUESTA COUNTRY CLUB $RIDGE
CITY, STATE AIdD ZIP CODE JOB LOCATIdN
VILLAGE OF TEQUESTA, Fl. 33469 TEQUESTA '
ARCHITECT/ENGINEER DRAWING NO,/NAME DATE OF PLANS
BRIDGE DESZGN ASSOCIATE N �A
Cone & Graham, Inc. (C&G) propose� the fo7.lowing:
1. In spans 2 and 4 remove all loose concrete from the underside of the deck
units. Clean all rust from rebar and strand. Paint an epoxy material over
All spalled areas.
2. On tihe east end bent remove the spalled concrete from the 5outheast corner of
the bridge, clean aIl zebar and paint an epoxy materia� over the spall�d
areas. �
3. Make a11 othe� repairs referenced in Bridge design associates letter dated
May 8, 2006 to the Villaqe of Tequesta.
Exclusions:
Notes: Fiftv SS.x Thousand Six Hundred S�.xtv Nine ---- 00/100 aoliars {556, 669.00) .
Aecep�Ced by: .
By: CONE & GRAHI�M, INC.
(Firm Name)
SIGNATURE SIGNATURE .
RandV Cropp, East Coast Division By:
Note: Tn;s�,�n�
��wn���na�a Tit1e :
wiWin - 30 - days.
Date:
ACCEPTANCE OF PROP�SAL _x,,e�,���d�»d�„8�,�f�ry��h���. You��,��do�,���.
71�e abowe quotetion iv subjax to ell tums and conditiona oFboth sides hcw� end becomes a conbaet when acceptunce is signed by an authoriud agent of each party. Payment wilt be made as outivwd in t1u
Tams and Conditions of Contract on the revase side of this propossl. ..
- over -
,. -- , 10:08:52 a.m. 05-OB-2006 d t H
501 086 3664 BRIOGE DESIGN ASSO
BRfDGE DESIGN ASS�C�ATES, iNG. -
^'CONSULTING ENGtINE�RS '
�
_�: .__.. . , .
_�
. BWAN C- RHEAUL� Y.B.
ptrsident
May 8, 2006 . �
Village of Tequesta
. 357 Tequesta Drive
Teque�ta, FL 33469
� ATTENTiON: Mr. Bab Garlow
REGARD{NG: Bridge Repair - Tequesta Country Club
PROJECT NO.: Ofi-517 — Bridge Design Associates, Inc.
Qear Bob: r
� We have reviewed both the Florida Department of Transportation rec4mmended
repairs dated March 8, 2006 and the Propasal irorn Cane & Graham.
Cone 8� Graham's Proposal only inclUdes spans #2 and #�4 and the east end
bent.
Far safety of boaters, we recommend that all loose and delaminated concrete ae
removed from al{ of the spans and pile bents.
!� you have any questions, please give me call.
Respectfuily, •
BRIDGE DESIGN ASSOCIATES, IPIC. . _
8rian C. Rheault, P.E., 38797
BGR:pmh�S:12006-Jobs!0 Tequesta Drive 8ridgelCorrespondencelLat 06-517 5-8-06 Vilfage of Tequa�ta.doc
2035 V'ista Pazkway, Suite 200 •'West Palm Beacl�; Florida 33�1�
(561) 686-3660 • Fax: (561) 686-3664
MAY-08 09�09AM FAX:561 686 3664
ID: PACaE�001 R=93�
STAI'E �OF FLORID�► DEPARTNiENY OF TR,�►�lSPORTATIOIV
BRI�CiE �E�ol���
I _ _ -- ----- — - -
I
i
i
� � � .� �.� __.:p `:. l ; ,`:
` :�•�-- �-�— --�' — � � � .-- _ —_— —c'� - �''�.i �
;..� _ _. . ..` v.._ ,L,��':. :.�a. ,-, '� ' .�i������_ . �..:..'� �'t _L��j �V;x�"��`'•Y� �.r.• ~ . �i3."c.�'�u^ ` �-
..'_ _.'....m
.._ . _� . _ .. _ ,_ ° - ._
.. �. . � ._. _ . ..- _-r_ �:.:� . - _ -
__' - - _... .
.- . . -.��t!�,e'�.�' • _ _ �w�� -^G� ... _ _
: :.-, _� --- -
.. . .-. .�..--.' ' .y _ _
.. _ � :.� ,� . . 'r-^"`+_.' � . _.
... ._:..-. 'w �'.'."^ : . -x. _ ',...e.. _._2� . ...r:^' ,� .. .... _. -.�w,. .' , .�, _....
>. "' ""_ n."�' -, _+c..._.T`^an•r-1 ior " .
�'� �sc; . � . . _
. _ ,..,� . . . . �"'
. � . �' �__ -r T ,. . . ��- _
�_
- _:S -�..», � ._ . - . '
- . . . . . .,�- .�. � � �'�� '� �.
BRIDGE NUMBER: 930227
BRIDGE NAME: TequeSta Drive over North Fork of Loxahatchee River
BRIDGE RECORD CONTEIVTS
I. Inspection Reporis - This section contains periodic bridge inspection reports, bridge repair work orders and
accident reports.
II. Inventory - Contair�ed in this section is the following bridge information: Photographs, location map, detailed
data, history, load carrying capacity, inspection preparation, and drawings.
III. Communications - Correspondence such as letters, memorandums and notices directly related to this bridge are
contained in this section.
.
SECTION I
BRIDGE tNSPECTION REPORT
,
I. INSPECTION REPORTS
BRIDGE NUMBER: 930227
BRIDGE NAME: Teauesta Drive over North Fork of Loxahatchee River
DOCUMENT LOG
TYPE OF INSPECTION REPORT OR DOCUMENT Date Date
!ns ected Published
Post Rehabilitation Inspection Report 3/8/2006
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Inspection/CID Report
(INTERIM INSPECTION REPORT)
.�DGE ID: 930227 PAGE: 1 OF 18
DISTRICT: 04 Fort Lauderdate INSPECTION DAT 3/8/2006 QTRO
BY: KCA BRIDGE NAME: Not Recorded
OWNER: City/Municipal Hwy Agenc YEAR BUILT: 1962
MAINTAINED BY: City/Municipal Hwy Agenc SECTION NO.: 0093000114
STRUCTURE TYPE: 5 Prestressed Concrete 01 Slab MP: 0.325
LOCATION: 1.2M1 W OF US-1 ROUTE: 00000
SERVICE TYPE ON: 5 Highway-pedestrian FACILITY CARRIED: TEQUESTA DRIVE
SERV TYPE UND: 5 Waterway FEATURE INTERSECTED: NO FORK LOXAHATCHEE RlV
❑ THIS BRIDGE CONTAINS FRACTURE CR171CAL COMPONENTS
❑ THIS BRIDGE IS SCOUR CRITICAL
❑ THIS REPORT IDENTIFIES DEFICIENCIES WHICH REQUIRE PROMPT CORRECTIVE ACTION
❑ FUNCTIONALLY OBSOLETE � STRUCTURALLY DEFICIENT
TYPE OF INSPECTION: Interim
DATE FIELD INSPECTION WAS COMPLETED: ABOVE WATER: 3/8/2006 UNDERWATER:01/31/2006
SMART FLAGS: OVERALL NBI RATINGS:
359 Soffit Smart Flag: Soffit cracked DECK: 4 Poor
SUPERSTRUCTURE: 4 Poor
SUBSTRUCTURE: 6 Satisfactory
CHANNEL: 7 Minor Damage
CULVERT: N N/A (NBI)
SUFFICIENCY RATING: 32.1
FIELD PERSONNEL / TITLE / NUMBER INI S
Maslyn, Rick - Bridge Inspector (CBI#00271) (lead)
Yeley, Larry - BI Tech
REVIEWING BRIDGE INSPECTION SUPERVISOR:
O'Grady, Patrick - Bridge Inspection Supervisor (CBI#00274)
CONFIRMING REGISTERED PROFESSIONAL ENGINEER:
LoCicero, Thomas - PE #31136 _
Kisinger Campo 8� Associates �
9270 Bay Plaza Blvd., Suite 605
Certificate ofi Authorization #2317 �
Tampa, FL 33619 •
'GNATURE: �����'`� �` � �
DATE: �. � � � ��
REPORT ID: INSP005 (condensed) PR{NTED: 43/31I2006
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Inspection/CID Report
(INTERIM INSPECTION REPORT)
__.iDGE ID: 930227 PAGE: 2 OF 18
DISTRICT: 04 Fort Lauderdale INSPECTION DATE: 3/8/2006 QTRO
All Elements
UN1T: 0 DECKS
ELEMENT/ENV:99/4 PS Conc Slab 7607 sf. ELEM CATEGORY: Decks/Slabs
CONDITION
STATE (5) DESCRIPTION QUANTITY
3 Repaired areas and/or potholes or impending potholes 7607sf.
and/or raveling or rutting exist. Their combined area is
more than 2% but less than 10% of the total deck area.
ELEMENT INSPECTION NOTES:
Note: Roadway slab units in Spans 1, 2, 4 and 5 are numbered 3 through 9.
Sidewalk slab units in Spans 1, 2, 4 and 5 are numbered 1, 2, 10 and 11.
Roadway slab units in Span 3 are numbered 3 through 7.
Sidewalk slab units in Span 3 are numbered 1, 2, 8 and 9. Sidewalk slab units 8 and 9 had
previously been identified as 10 and 11.
Due to the amount of text noted under this element, all comments can be found in the Element Notes
section of the addendum. The following is a brief summary of conditions:
Underside of fifteen (15) prestressed concrete roadway slab units have significant cracking,
delaminations (unsound concrete), or spalling as a result of corroding reinforcing steel. In addition,
Slab Unit 2-4 also has five exposed and corroded prestressed cables with an estimated 30% section
loss. Refer to photos 1, 2, 3 and 4.
Underside of eight (8) prestressed concrete sidewalk slab units exhibit cracking, delaminations, or
spalting as result of corroding reinforcing steel. Refer to photo 5.
Underside of the cast-in-place curb section in Spans 1, 2, 4 and 5 has significant cracking,
delaminations (unsound concrete), or spalling as a result of corroding reinforcing steel. Refer to
photos 6 and 7.
ELEMENT/ENV:301/4 Pourable Joint Seal 84 If. ELEM CATEGORY:Joints
CONDITION
STATE (3) DESCRIPTION QUANTITY
3 Major adhesion and/or cohesion failures may be present. 841f.
Signs or observance of leakage along the joint may be
present. Joint may be heavily impacted with debris and/or
stones. Major spalls may be present in the deck and/or
header adjacent to the joint.
ELEMENT INSPECTION NOTES:
Note: Total quantity represents the visible portion of the joints in the curb and sidewalk areas.
Roadway portions are no longer visible due to the new asphalt overlay.
Sealant within the sidewalk portion of the joints is completely deteriorated and in some areas they are
packed with dirt and debris. Refer to photo 10.
The sidewalk joints show no significant change from the previous report.
REPORT ID: INSP005 (condensed) PRINTED: 03/31/2006
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Inspection/CID Report
(iNTERIM 1NSPECTION REPORT)
....IDGE ID: 930227 PAGE: 3 OF 18
DiSTRiCT: 04 Fort Lauderdale INSPECTION DA7E: 3!8/2006 QTRO
All Elements
UNtT: 0 SUPERSTRUC7URE
ELEMENT/ENV:331/4 Conc Bridge Railing 364 If. ELEM CATEGORY: Railing
CONDITiON
STATE (4) DESCRIPTION QUANTITY
� The element shows little or no deterioration. There may be 2441f.
discoloration, efflorescence, and/or supe�cial cracking,
but without effect on strength and/or serviceability.
3 Some delaminations and/or spalls may be present, and 1201f.
some reinforcing may be exposed. Corrosion of rebar may
be present, but loss of section is incidental and does not
significantly affect the strength and/or serviceability of
either the efement or the bridge
ELEMENT INSPECTION NOTES:
CS3= Most of the posts have delaminations up to full height x 8" throughout.
In addition, the following posts have spalls with exposed reinforcing steel:
Left side: Posts 1-4, 2-1, 2-4, 2-5, 3-1, 3-2, 3-3, 3-4, 3-5, 4-1, 4-2, 4-3, 4-4, 4-5, 5-1 and 5-4.
Right side: Posts 1-2, 1-6, 2-1, 2-3, 3-2, 4-3, 4-4, 4-5, 5-2 and 5-5.
Refer to photo 11 for typical view.
The bridge railings show no significant change from the previous report.
The approach guardrails were considered incidental to this element:
The steel approach guardrail panels typically have minor dents and the timber posts have some
splintered edges.
Northwest guardrail Post 13 is missing the nut for the anchor bolt.
Southwest guardrail is missing the anchor bolt nuts at Posts 1, 2, 4 and 6. Refer to photo 12.
The approach guardrails show no significant change from the previous report.
ELEMENT/ENV:204/4 P/S Conc Column 36 ea. ELEM CATEGORY:Substructure
CONDITION
STATE (4) DESCRIPTION QUANTITY
� The element shows little or no deterioration. There may be 21 ea.
discoloration, efflorescence, and/or supe�cial cracking
but without effect on strength and/or serviceability.
2 Minor cracks, spalls, and scaling may be presenf and 5 ea.
there may be exposed reinforcing with no evidence of
corrosion. There is no exposure of the prestress system.
REPORT ID: INSP005 (condensed) PRINTED: 03l31(2006
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
tnspection/CID Report
(INTERIM INSPECTION REPORT)
�.<IDGE ID: 930227 PAGE: 4 OF 18
DlSTRICT: 04 Fort Lauderdale INSPECTION DATE: 3/8/2006 QTRO
All Elements
UNIT: 0 SUBSTRUCTURE
ELEMENT/ENV:204/4 P/S Conc Column 36 ea. ELEM CATEGORY: Substructure
CONDITION
STATE (4) DESCRIPTION QUANTITY
3 Moderate cracks, spalls, scaling and some delaminations 10 ea.
may be present. There may be minor exposure but no
deterioration of the prestress system. Corrosion of
non-prestressed reinforcement may be present but loss of
section is incidental and does not sign
ELEMENT INSPECTION NOTES:
Note: Only the outside faces of the piling in Abutments 1 and 6 are visible due to concrete added
between the piles (backwalls were jacketed). Refer to Element 475 R/Conc Walls for any related
comments regarding the two (2) support piles at each retaining wall.
Due to the amount of text noted under this element, all comments can be found in the Element Notes
section of the addendum. The following is a brief summary:
Several piles have cracking, mostly as a result of corroding reinforcing steel. Refer to photo 13.
ELEMENT/EIVV:215/4 R/Conc Abutment 98 If. ELEM CATEGORY: Substructure
CONDITION
STATE (4) DESGRIPTION QUANTITY
� The element shows little or no deterioration. There may be 591f.
discoloration, efflorescence, and/or superficial cracking
but without effect on strength and/or serviceability.
2 Minor cracks and spalls may be present, but there is no 251f.
exposed reinforcing or surtace evidence of rebar
corrosion.
REPORT ID: INSP005 (condensed) PRINTED: 03/31/2006
FLORIDA DEPARTMENT OF TRANSPORTATfON
BRIDGE MANAGEMENT SYSTEM
Inspection/CID Report
(INTERIM INSPECTION REPORT)
�..IDGE ID: 930227 PAGE: 5 OF 18
DISTRICT: 04 Fort Lauderdale INSPE DATE: 3/8/2006 QTRO
All Elements
UNIT: 0 SUBSTRUCTURE
ELEMENT/ENV:215/4 R/Conc Abutment 98 If. ELEM CATEGORY:Substructure
CONDITION
STATE (4) DESCRIPTION QUANTITY
3 Some delaminations and/or spaiis may be present and 141f.
some reinforcing may be exposed. Corrosion of rebar may
be present, but loss of section is incidental and does not
significantly affect the strength and/or serviceability of
either the element or the bri
ELEMENT INSPECTION NOTES:
CS1= The east face of Abutment 1 cap has less than 1/64" wide cracking that outlines a repair area
from Pile 1-1 to Pile 1-3 and between Piles 1-5 and 1-6.
CS2= Abutment 1 cap and Abutment 6 cap have intermittent horizontal cracking up to 1/64" wide
developing within 8" of the bottom edge.
Abutment caps have vertical cracks up to 30" long x 1/32" wide.
CS3= Abutments have other more significant cracking and delaminations as follows:
Abutment 1 cap: Delaminated repairs up to 24" long x 30" wide in the east face at the haunched
areas adjacent to Slab Units 1-3 and 1-9.
Abutment 1 cap: Horizontal crack 4' long x 1/64" wide in the lower east face between Piles 1-4 and
1-5, which is beginning to delaminate.
Abutment 6 cap: Horizontal and vertical crack 4' long x 1/8" wide that starts above Pile 6-5.
Abutment 6 cap: Spall with exposed reinforcing steel 40" x 10" x 4" bottom west edge between Piles
6-7 and 6-8. Refer to photo 14.
Abutment 6 cap: Delaminated patch 1' long x 6" wide in the top west edge under Slab Unit 5-10.
Refer to photo 14.
The abutment caps show no significant change from the previous report.
ELEMENT/ENV:234/4 R/Conc Cap 174 If. ELEM CATEGORY:Substructure
CONDITION
STATE (4) DESCRIPTION QUANTITY
� The element shows little or no deterioration. There may be 1091f.
discoloration, efflorescence, and/or superficial cracking
but without effect on strength and/or serviceability.
2 Minor cracks and spalls may be present, but there is no 251f.
exposed reinforcing or surFace evidence of rebar
corrosion.
REPORT ID: INSP005 (condensed) PRINTED: 03/31/2006
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Inspection/CID Report
(INTERIM INSPECTION REPORT)
�.:IDGE ID: 930227 PAGE: 6 OF 18
DISTRICT: 04 Fort Lauderdale INSPECTION DATE: 3/ 8 / 2006 QTRO
A(I Elements
UNIT: 0 SUBSTRUCTURE
ELEMENT/ENV:234/4 R/Conc Cap 174 If. ELEM CATEGORY:Substructure
CONDITION
STATE (4} DESCRIPTION QUANTITY
3 Some delaminations and/or spalls may be present and 401f.
some reinforcing may be exposed. Corrosion of rebar may
6e present, but loss of section is incidental and does not
significantly affect the strength and/or serviceability of
either the element or the bridge.
ELEMENT INSPECTION NOTES:
CS2= Bent caps have random cracking up to 1/32" wide.
CS3= The following is a list of delaminated areas, most of which are previous repair areas:
Bent 2: West face, under Slab Unit 1-2, 18" long x 12" wide
Bent 2: West face, south end, (two) 6" x 5"
Bent 3: Bottom northeast corner, 18" long x 12" wide
Bent 3: Bottom face near the southwest corner of Pile 3-1, 18" long x 18" wide
Bent 3: East face, under Slab Unit 3-8, 18" long x 12" wide (at haunch)
Bent 3: East face, lower edge from Pile 3-2 to north end, 16' long x 3" wide
Bent 4: West face, lower edge between Piles 4-4 & 4-5, 6' long x 3" wide
Bent 5: Bottom west face between Piles 5-1 and 5-2, 4' long x 18" wide. Refer to photo 15.
Bent 5: Bottom west face between Piles 5-4 and 5-5, 6' long x 10" wide
The following was considered incidental to this element:
Some of the intermediate bent caps have heavy rooted vegetation growing on the ends. Refer to
photo 16.
The bent caps show no significant change from the previous report.
REPORT ID: INSP005 (condensed) PRINTED: 03/31/2006
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Inspection/CID Report
(INTERIM INSPECTION REPORT}
�..�DGE ID: 930227 PAGE: 7 OF 18
DISTRICT: 04 Fort Lauderdale INSPECTION DATE: 3/8/ Q' TRO
Ail Elements
UNIT: 0 SUBSTRUCTURE
ELEMENT/ENV:396/4 OtherAbut Slope Pro 2400 sf. ELEM CATEGORY:Substructure
CONDITION
STATE (4) DESCRIPTION QUANTITY
� There is little or no deterioration. Surface defects only are 2400sf.
in evidence. Random open joints may exist.
ELEMENT INSPECTION NOTES:
Note: This element represents the concrefe filled fabric mat slope protection.
CORRECTIVE ACTION TAKEN:
All four approach slopes have been covered with concrete filled fabric mats.
Grouted over rip rap bags at the northwest and northeast corners of bridge were removed.
ELEMENT/ENV:359/4 Soffit Smart Flag 1 ea. ELEM CATEGORY:Smart Flags
CONDITION
STATE (5) DESCRIPTION QUANTITY
3 Cracking and efflorescence on the undersurface is 1 ea.
moderate. The distressed area is 10% or less of the
underside area.
ELEMENT INSPECTION NOTES:
Underside of the slab units have extensive spalling with exposed and corroded rebar and prestressed
cables. Refer to Efement 99 PS Conc Slab for details.
REPORT ID: INSP005 (condensed) PRINTED: 03/31/2006
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
tnspection/CID Report
(INTERIM INSPECTION REPORT)
b..iDGE ID: 930227 PAGE: 8 OF 18
DISTRICT: 04 Fort Lauderdale INSPECTION DATE: 3/8/2006 QTRO
All Elements
UNIT: 0 MISCELLANEOUS
ELEMENT/ENV:321/4 R/Conc Approach Slab 2 ea. ELEM CATEGORY:Other Elements
CONDITION
STATE (4) DESCRIPTION QUANTITY
� The slab has not settled and shows no sign of 2 ea.
deterioration other than superficial surface cracks.
ELEMENT INSPECTION NOTES:
Note: The approach slabs are not visible due to an asphalt overlay.
Both approach slabs are outlined with cracks up to 3/8" wide. Refer to photo 17.
West approach slab surfacing has a longitudinal crack, 8' long x 1/8" wide in the westbound lane.
Southwest approach sidewalk has a diagonal crack 3' long x 1/8" wide, adjacent to Abutment 1.
The approach slabs show no significant change from the previous report.
Note: The approach sidewalk and approach slopes were considered incidental to this element.
Southeast approach sidewalk has a fractured area with exposed steel, 5' long x 3" wide x 3" deep, on
the outside edge at the end post. Refer to photo 18.
Northeast approach sidewalk (new section) is exposed the outside edge, 17' long x 6" high. Refer to
photo 19.
Some construction debris has been left on the approach shoulders. Refer to photo 20.
CORRECTIVE ACTION TAKEN:
Undermining at the southwest and southeast approach sidewalk has been repaired.
Fractured area at the southeast approach sidewalk has been repaired.
Some of the vegetation along the approach slopes has been cut down.
ELEMENT/ENV:475/4 R/Conc Walls 256 If. ELEM CATEGORY:Other Elements
CONDITION
STATE (4) DESCRIPTION QUANTITY
2 Minor cracks and spalls may be present but there is no 1931f.
exposed reinforcing or surface evidence of rebar
corrosion. Open joints may be prevalent.
REPORT ID: INSP005 (condensed) PRINTED: 03/31/2006
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Inspection/CID Report
(INTERIM INSPECTION REPORT)
�.�IDGE ID: 930227 PAGE: 9 OF 18
DlSTRICT: 04 Fort Lauderdale INSPECTION DATE: 3/8/2006 QTRO
All Elements
UNIT: 0 MISCELLANEOUS
ELEMENT/ENV:475/4 R/Conc Walls 256 If. ELEM CATEGORY:Other Elements
CONDITION
STATE (4) DESCRIPTION QUANTITY
3 Some delaminations and/or spalfs and/or minor settlement 631f.
may be present and some reinforcing may be exposed.
Corrosion of rebar may be present but loss of section is
incidental and does not significantly affect the strength
and/or serviceability of either
ELEMENT INSPECTION NOTES:
Note: Total quantity includes both abutment backwalls and all four wingwalls, including the the two
support piles at each corner of the bridge. Backwalls were jacketed in the past.
CS2 & CS3:
The retaining wall caps have cracking up to 1/32" wide, some with efflorescence and/or corrosion
bleedout.
Northwest retaining wall cap has a delaminated patch, 6' long x 10" wide, located at the angle break.
Northwest and northeast retaining wall support piles have up to 1/16" wide vertical cracking with
corrosion stains. Refer to photo 21.
Northeast retaining wall support piles are delaminated up to 3' long x 3" deep with corrosion stains
extending up from the marine growth.
At Abutments 1 and 6, there is concrete between the piling that extends down to within 8" of the
groundline. Below this concrete, a ruler can be probed back to the original wall.
The retaining walls show no significant change from the previous report.
ELEMENT/ENV:290/4 Channel 1 ea. ELEM CATEGORY:Channel
CONDITION
STATE (4) DESCRIPTION QUANTITY
� The channel is in good condition, channel banks are 1 ea.
protected or well vegetated, river control devices and
embankment protection are not required or are in good
condition.
ELEMENT INSPECTION NOTES:
CORRECTIVE ACTION TAKEN:
Lateral erosion at the southeast and northeast channel slopes was repaired during installation of the
concrete mat slope protection. Erosion at the ends of the northwest and southwest retaining walls
was also repaired during installation of this slope protection.
REPORT ID: INSP005 (condensed) PRINTED: 03/31/2006
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Inspection/CID Report
(INTERIM INSPECTION REPORT)
��cIDGE ID: 930227 PAGE: 10 OF 18
DISTRICT: 04 Fort Lauderdale INSPECTION DATE: 3/8/2006 QTRO
Smart Flag Summary
UNIT: 0 SMART FLAG
ELEMENT/ENV:359/4 Soffit Smart Flag 1 ea. ELEM CATEGORY:Smart Flags
CONDITION
STATE (5) DESCRIPTION QUANTITY
3 Cracking and efflorescence on the undersurface is moderate. The 1
distressed area is 10°/a or less of the underside area.
ELEMENT INSPECTION NOTES:
Underside of the slab units have extensive spalling with exposed and corroded rebar and prestressed
cables. Refer to E{ement 99 PS Conc Slab for details.
Structure Notes
BRIDGE OWNER: VILLAGE OF TEQUESTA
Bridge inventoried from west to east.
a: This structure is on a 12 month inspection frequency due to SIA Item 58 (Deck), 59 (Superstructure) and
70 (Posting) all being rated 4.
INSPECTION NOTES: TRO 3/8/2006
Sufficiency Rating Calculation Accepted by kn538p1-P at 2006-03-29 16:26:23
REPORT ID: INSP005 (condensed) PRfNTED: 03/31/2006
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Inspection/CID Report
REPORT ID: INVT001A COMPREHENSIVE Page 11 of 18
S+��ic ID: 930227 DATE PRINTED: 03/31/2006
� �escription
Structure Unit Identification
Bridge/Unit Key: g30227 0
Structure Name:
Description: SPAN 1 THROUGH 5
Type: M Main
Roadwav Identification: Roadwav Traffic and Accidents
NBI Structure No (8) 930227 Lanes (28) 2 Medians 0 Speed 15 mph
Position/Prefix (5) Route On Structure ADT Class ADT Ciass 4
Kind Hwy (Rte Prefix) 5 City Street Recent ADT (29) 13486 Year (30) 2004
Design Level of Service 1 Mainline Future ADT (114) 23398 Year (115) 2024
Route NumbedSuffix 00000/ 0 N/A (NBI) Truck % ADT (109) 2
Feature Intersect (6) NO FORK LOXAHATCHEE RIV Detour Length (19) 3 mi
Critical Facility Not Defense-crit Detour Speed 15 mph
Facility Carried (7) TEQUESTA DRIVE Accident Count -1 Rate -1
Mile Point (11) 0.325
Latitude (16) 026d57'30" Long (17) 080d06'12"
Roadwav Classification Roadwav Clearances
Nat. Hwy Sys (104) 0 Not on NHS Vertical (10) 99.99 ft Appr. Road (32) 24.6 ft
National base Net (12) Not on Base Network Horiz. (47) 38.7 ft Roadway (51) 27.8ft
LRS Inventory Rte (13a) 93 000 114 Sub Rte (13b) 00 Truck Network (110) 0 Not part of natl netwo
=unctional Class (26) 17 Urban Collector Toll Facility (20) 3 On free road
..n Federa� Aid System Y Fed. Lands Hwy (105) 0 N/A (NBI)
Defense Hwy (10d) 0 Not a STRAHNET hwy School Bus Route �✓
Direction of Traffic (102) 2 2-way traffic Transit Route ❑
Emergency❑
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Inspection/CID Report
REPORT ID: INVT001A COMPREHENSIVE page 12 of 18
S+r� cture ID: 930227 DATE PRINTED: 03/31/2006
Structure Identification Geometrics
Admin Area Palm Beach County Spans in Main Unit (45) 5
District (2) D4 - Ft. Lauderdale Approach Spans (46) 0
County (3) (93)Paim Beach Length of Max Span (48) 36.4 ft
Piace Code (4) Tequesta Structure Length (49) 181.1 ft
Location (9) 1.2M1 W OF US-1 Deck Area 7607 sqft
Border Br St/Reg (98) Not Applicable (P) Share 0% Structure Flared (35) 0 No flare
Border Struct No (99) Aqe and Service
FIPS State/Region (1) 12 Florida Region 4-Atlanta Year Built (27) 1962
NBIS Bridge Len (112) Meets NBI Length Year Reconstructed (106) 2006
Parallel Structure {101) No {� bridge exists Type of Service On (42a} 5 Highway-pedestrian
Temp. Structure (103) Not Applicable (P) Under (42b) 5 Waterway
Maint. Resp. (21) City/Municipal Hwy Agenc Fracture Critical Details Not Applicable
Owner (22) City/Municipal Hwy Agenc
Historic Signif. (37) 5 Not eligible for NRHP
Structure Tvpe and Material Deck Tvpe and Material
Curb/Sidewalk (50): Left 5.2 ft Right 5.9 ft Deck Width (52): 42 �
Bridge Median (33): 0 No median Skew (34): 0 deg
Main Span Material (43A): 5 Prestressed Concrete Deck Type (107): 2 Concrete Precast Panel
Appr Span Material (44A): Not Applicable Surface (108): 6 Bituminous
Main Span Design (43B): 01 Slab Membrane: 0 None
Appr Span Design (44B): Not Applicable Deck Protection: None
�ppraisal
Structure Appraisai Naviqation Data
OpenlPosted/Closed (41) P Posted for load Navigation Control (38) Permit Not Required
Deck Geometry (68) 2 Intolerable - Replace Nav Vertical Cir (39) 0 ft
Underclearances (69) N Not applicable (NBI) Nav Horizontal Clr (40) 0 ft
Approach Alignment (72) 8-No Speed Red thru Curv Min Vert Lift Cir (116) 0 ft
Bridge Railings (36a) 0 Substandard Pier Protection (111) Not Applicable (P)
Transitions (36b) 0 Substandard NBI Condition Ratinq
Approach Guardrail (36c) 0 Substandard Sufficiency Rating 32.1
Approach Guardrail ends (36d) 0 Substandard Structural Eval (67) 4 Minimum Tolerable
Scour Critical (113) U Unknown Scour Deficiency Structurally Deficient
Minimum Vertical Clearance Minimum Lateral Underclearance
Over Structure (53) 99.99 ft Reference (55a) N Feature not hwy or RR
Under (reference) (54a) N Feature not hwy or RR Right Side (55b) 0 ft
Under (54b) 0 ft Left Side (56) 0 ft
Load Ratinp
�esign Load (31) 4 M 18 (H 20) Operating Type (63) 1 LF Load Factor
Rating Date 3/28/2006 Initials JLL Operating rating (64) 42.6 tons Alternate -1
Posting (70) 4 0.1-9.9%below Inventory Type (65)1 LF Load Factor
Inventory Rating (66) 25.5 tons Alternate -1
Alt Meth -1
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Inspection/CID Report
REPORT ID: INVT001A COMPREHENSIVE Page 13 of 18
Stru cture ID:930227 DATE PRINTED: 03/31/2006
fi Schedule
Current Inspection Next Inspection Date Scheduled
Inspection Date: 03/08/2006 NBi: 1/28/2008
Inspector: KN538MR-P - Rick Masiyn Element: 01/28/2007
Bridge Group: N/A Fracture Critical:
Primary Type: Interim Underwater: 01/28/2008 .
Review Required:0✓ Other/Special: 01/28/2007
IIlSp2Ct1011 TVpeS
Performed NBI❑ Element �✓ Fracture Critical ❑ Underwater ❑ Other Special �✓
Inspection fntervais Required (92) Frequency (92) Last Date (93) Inspection Resources
Fracture Critical ❑ mos Crew Hours 4
Underwater � 24 mos 01/31/2006 Flagger Hours 0
Other Special 0✓ 10 mos 03/08/2006 Helper Hours 0
NBI 24 mos (91) 01/28/2006 (90) Snooper Hours 0
Special Crew Hours 3
� CUStOtll Special Equip Hours 0
General Bridqe Information
Parallel Bridge Seq Bridge Rail 1 Concrete post & beam
Chan�el Depth 7.9 ft Bridge Rail 2 Not applicable-No rail
Radio Frequency -1 Electrical Devices No electric service
Phone Number (000) 000-0000 Culvert Type Not applicable
Exception Date Maintenance Yard 0
Exception Type Unknown FIHS ON / OFF No Routes on FIHS
Accepted By Maint 01/01/1962 Previous Structure
Warranty Expiration 00/00/0000
Bridqe Load Ratinq Information
HS20 Govr. Span Length 34.4 ft Singie Unit Truck 2 Axles 31.8 tons
L-Rating Origination Design Plans Single Unit Truck 3 Axles 33 tons
Load Rating Date 03/28/2006 Single Unit Truck 4 Axles 32.5 tons
Method Calculation AASHTO formula Combination Unit Truck 3 Axles 48.3 tons
Load Dist. Factor 0.68 Combination Unit Truck 4 Axles 44.1 tons
Impact Factor 30 Combination Unit Truck 5 Axles 48 tons
Design Method Load Factor Truck Trailer 5 Axles 50 tons
Design Measure English Posting Weight 5 tons
Recommend SU Posting 32 tons Actuai SU Posting 99 tons
Recommend C Posting 99 tons Actual C Posting 99 tons
Recommend T Posting 99 tons Actual T Posting 99 tons
Gov FB Span 0 ft FB SU4 Rating 0 tons
Gov FB Spacing 0 ft FB Present N
FB HS20 Rafing 0 tons
Bridqe Scour and Storm Information
Pile Driving Record Unknown Scour Recommended 1 Stop scour evaluations
Foundation Type Unknown Scour Recommended II No recommendation
Mode of Flow Tidal Scour Recommended III No recommendation
Rating Scour Eval Scour Susceptible - Low Scour Elevation -1
Highest Scour Eval Phase I completed Action Elevation -1
1 Condition Storm Frequency -1
NBI Ratinq
Channel (61) 7 Minor Damage Culvert (62)N N/A (NBI)
Deck (58) 4 Poor Waterway (71) 7 Above Minimum
Superstructure (59) 4 Poor Unrepaired Spalls -1 sq.ft.
Substructure (60) 6 Satisfactory Review Required �✓
FLORIDA DEPARTMEN7 OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Inspection/CID Report
REPORT ID: fNVT001A COMPREHENSIVE Page 14 of 18
Stru cture ID: 930227 DA7E PRINTED: 03/31/2006
�ents
Inspection Date: 1/28/2006QTR0
pan Id lem/E escription Qty1 %1 Qty2 °/a2 Qty3 %3 Qty4 °/a4 Qty5 %5 T Qty
0 99/4 S Conc Slab � 0�� 7607 100. ���� 7607 sf.
Notes Note: Roadway slab units in Spans 1, 2, 4 and 5 are numbered 3 through 9.
Sidewalk slab units in Spans 1, 2, 4 and 5 are numbered 1, 2, 10 and 11.
Roadway slab units in Span 3 are numbered 3 through 7.
Sidewalk slab units in Span 3 are numbered 1, 2, 8 and 9. Sidewalk siab units 8 and 9 had previously been identified as 10
and 11.
Due to the amount of text noted under this element, all comments can be found in the Element Notes section of the addendum. The
foilowing is a brief summary of conditions:
Underside of fifteen (15) prestressed concrete roadway slab units have significant cracking, delaminations (unsound concrete), or spalling
as a result of corroding reinforcing steel. In addition, Slab Unit 2-4 also has five exposed and corroded prestressed cables with an
estimated 30°!o section loss. Refer to photos 1, 2, 3 and 4.
Underside of eight (8) prestressed concrete sidewalk slab units exhibit cracking, delaminations, or spalling as result of corroding
reinforcing steel. Refer to photo 5.
Underside of the cast-in-place curb section in Spans 1, 2, 4 and 5 has significant cracking, delaminations (unsound concrete), or spalling
as a result of corroding reinforcing steei. Refer to photos 6 and 7.
0 301/4 ourable Joint Seal ��� 84 100. ���� 84 If.
Notes Note: Total quantity represents the visible portion of the joints in the curb and sidewalk areas. Roadway portions are no longer visible
due to the new asphalt overlay.
Sealant within the sidewalk portion of the joints is completely deteriorated and in some areas they are packed with dirt and debris. Refer
to photo 10.
The sidewalk joints show no significant change from the previous report.
0 331/4 onc Bridge Railing 244 7.05 �0 � 120 2.95 �0 � 0�� 364 If.
Notes CS3= Most of the posts have delaminations up to full height x 8" throughout.
In addition, the following posts have spalls with exposed reinforcing steel:
Left side: Posts 1-4, 2-1, 2-4, 2-5, 3-1, 3-2, 3-3, 3-4, 3-5, 4-1, 4-2, 4-3, 4-4, 4-5, 5-1 and 5-4.
Right side: Posts 1-2, 1-6, 2-1, 2-3, 3-2, 4-3, 4-4, 4-5, 5-2 and 5-5.
Refer to photo 11 for typical view.
The bridge railings show no significant change from the previous report.
The approach guardrails were considered incidental to this element:
The steel approach guardrail panels typically have minor dents and the timber posts have some splintered edges.
Northwest guardrail Post 13 is missing the nut for the anchor bolt.
Southwest guardrail is missing the anchor bolt nuts ak Posts 1, 2, 4 and 6. Refer to photo 12.
The approach guardrails show no significant change from the previous report.
0 204/4 /S Conc Column 21 8.33 �5 13.89 10 7.78 �0 ��� 36 ea.
Notes Note: Only the outside faces of the piling in Abutments 1 and 6 are visible due to concrete added between the piles (backwalls were
jacketed). Refer to Element 475 R/Conc Walis for any related comments regarding the two (2) support piles at each retaining wal1.
Due to the amount of text noted under this element, all comments can be found in the Element Notes section of the addendum. The
foliowing is a brief summary:
Several piles have cracking, mostly as a result of corroding reinforcing steel. Refer to photo 13.
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM �
Inspection/CID Report
REPORT ID: INVT001A COMPREHENSIVE Page 15 of 18
Stru cture ID: 930227 DATE PRINTED: 03/31/2006
�ents
inspection Date: 1/28/2006QT
pan Id Iem/E escription Qty1 %1 Qty2 °/,2 Qty3 %3 Qty4 %4 Qty5 %5 T Qty
0 215/4 Conc Abutment 59 0.38 25 5.4 14 14.22 0���� 98 If.
Notes CS1= The east face of Abutment 1 cap has Vess than 1i64" wide cracking that outlines a repair area from Pile 1-1 to Pile 1-3 and between
Piles 1-5 and 1-6.
CS2= Abutment 1 cap and Abutment 6 cap have intermittent horizontal cracking up to 1/64" wide developing within 8" of the bottom edge.
Abutment caps have vertical cracks up to 30" long x 1/32" wide.
CS3= Abutments have other more significant cracking and delaminations as follows:
Abutment 1 cap: Delaminated repairs up to 24" long x 30" wide in the east face at the haunched areas adjacent to Slab Units 1-3 and 1-9.
Abutment 1 cap: Horizontai crack 4' long x 1/64" wide in the lower east face between Piles 1-4 and 1-5, which is beginning to delaminate.
Abutment 6 cap: Horizontal and vertical crack 4' long x 1/8" wide that starts above Pile 6-5.
Abutment 6 cap: Spall with exposed reinforcing steel 40" x 10" x 4" bottom west edge between Piles 6-7 and 6-8. Refer to photo 14.
Abutment 6 cap: Delaminated patch 1' long x 6" wide in the top west edge under Slab Unit 5-10. Refer to photo 14.
The abutment caps show no significant change from the previous report.
0 234/4 Conc Cap 109 2.62 25 14.38 40 3.����� 174 If.
; CS2= Bent caps have random cracking up to 1/32" wide.
CS3= The foliowing is a list of delaminated areas, most of which are previous repair areas:
Bent 2: West face, under Siab Unit 1-2, 18" long x 12" wide
Bent 2: West face, south end, (two) 6" x 5"
Sent 3: Sottom northeast corner, 18" long x 12" wide
Bent 3: Bottom face near the southwest comer of Pile 3-1, 18" long x 18" wide
Bent 3: East face, under Slab Unit 3-8, 18" long x 12" wide (at haunch)
Bent 3: East face, lower edge from Pile 3-2 to north end, 16' long x 3" wide
Bent 4: West face, lower edge between Piles 4-4 & 4-5, 6' long x 3" wide
Bent 5: Bottom west face between Piles 5-1 and 5-2, 4' long x 18" wide. Refer to photo 15.
Bent 5: Bottom west face between Piles 5-4 and 5-5, 6' long x 10" wide
The following was considered incidental to this element:
Some of the intermediate bent caps have heavy rooted vegetation growing on the ends. Refer to photo 16.
The bent caps show no significant change from the previous report.
0 396/4 ther Abut Slope Pro 2400 100. �0 ������� 2400 sf.
Notes Note: This element represents the concrete filled fabric mat slope protection.
CORRECTIVE ACTION TAKEN:
All four approach slopes have been covered with concrete filled fabric mats.
Grouted over rip rap bags at the northwest and northeast comers of bridge were removed.
0 290/4 hannel 1 100. �������� 1 ea.
Notes CORRECTIVE ACTION TAKEN:
Lateral erosion at the southeast and northeast channel slopes was repaired during installation of the concrete mat slope protection.
Erosion at the ends of the northwest and southwest retaining walls was also repaired during installation of this slope protection.
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Inspection/CID Report
REPORT ID: INVT001A COMPREHENSIVE Page 16 of 18
Stru cture ID: 930227 DATE PRINTED: 03/31/2006
�ents
Inspection Date: 1/28/2006QTR0
pan Id Elem/E escription Qty1 %1 Qty2 %2 Qty3 %3 Qty4 %4 Qty5 %5 T Qty
0 359/4 o�t Smart Flag �0�. �0 � 1� 100. �0 � 0�� 1 ea.
Notes Underside of the slab units have extensive spalling with exposed and corroded rebar and prestressed cables. Refer to Element 99 PS
Conc Slab for detaiis.
0 321/4 ConcApproach Slab 2 100. 0�� 0���0 � 0�� 2 ea.
Notes Note: The approach slabs are not visible due to an asphalt overlay.
Both approach slabs are outlined with cracks up to 3/8" wide. Refer to photo 17.
West approach slab surtacing has a longitudinal crack, 8' long x 1/8" wide in the westbound lane.
Southwest approach sidewalk has a diagonal crack 3' long x 1/8" wide, adjacent to Abutment 1.
The approach slabs show no significant change from the previous report.
Note: The approach sidewalk and approach slopes were considered incidental to this element.
Southeast approach sidewalk has a fractured area with exposed steel, 5' long x 3" wide x 3" deep, on the outside edge at the end post.
Refer to photo 18.
Northeast approach sidewalk (new section) is exposed the outside edge, 17' long x 6" high. Refer to photo 19.
Some construction debris has been left on the approach shoulders. Refer to photo 20.
CORRECTIVE ACTION TAKEN:
Undermining at the southwest and southeast approach sidewalk has been repaired.
Fractured area at the southeast approach sidewalk has been repaired.
Some of the vegetation along the approach slopes has been cut down.
475/4 Conc Walls � 193 5.39 63 4.61 �000 256 If.
tv�.es Note: Total quantity includes both abutment backwalls and all four wingwalls, including the the two support piles at each corner of the
bridge. Backwalis were jacketed in the past.
CS2 & CS3:
The retaining wall caps have cracking up to 1/32" wide, some with effiorescence and/or corrosion bleedout.
Northwest retaining wall cap has a delaminated patch, 6' long x 10" wide, located at the angle break.
Northwest and northeast retaining wall support piles have up to 1/16" wide vertical cracking with coROSion stains. Refer to photo 21.
Northeast retaining wall support piles are delaminated up to 3' long x 3" deep with corrosion stains extending up from the marine growth.
At Abutments 1 and 6, there is concrete between the piling that extends down to within 8" of the groundline. Below this concrete, a ruler
can be probed back to the original wall.
The retaining walls show no significant change from the previous report.
Total Number of Elements: 11
Inspection Information
Inspection Date: 03.08.2006 Type: Interim
Inspector: KN538MR-P - Rick Maslyn
Inspection Notes: Sufficiency Rating Calculation Accepted by kn538p1-P at 2006-03-29 16:26:23
Inspection Date: 01.28.2006 Type: Interim
Inspector: KNKCAST-P - Timothy Sweeney
�ction Notes: Su�ciency Rating Calculation Accepted by KNKCAES-P at 2006-02-24 15:29:08
Note: This structure is closed until further notice, due to the 100% corroded prestressed strands and permanent
fracture in Slab Unit 3-7 at mid-span. Due to the failed state of these strands and the numerous exposed and severely
corroded strands in other slab units at Span 3 underside, the NBI rating for Deck and Superstructure has been
lowered from a 5(Fair) to a 2(Critical) during this inspection.
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Inspection/CID Report
REPORT ID: INVT001A COMPREHENSIVE Page 17 of 18
Stru cture ID: 930227 DATE PRINTED: 03/31/2006
ection Information
Inspection Date: 10.26.2005 Type: Special-Nat Disaster Dmg
Inspector: KNKCAPO-P - Patrick O'Grady
Inspection Notes: NOTE: Storm damage assessment completed on 10/26/2005 following Hurricane Wilma. No storm related damage
was found in the structure as a result of the hurricane.
Inspection Date: 08.26.2005 Type: Special-Nat Disaster Dmg
Inspector: KN853KR-P - Ken Reinhold
Inspection Notes: NOTE: Storm damage assessment completed on 08/26/2005 following Hurricane Katrina. No storm related damage
was found in the structure as a result of the hurricane.
Inspection Date: 03.15.2005 Type: Interim
Inspector: 840
Inspection Notes: Sufficiency Rating Calculation Accepted by KNKCAES-P at 2005-04-12 11:03:56
Inspection Date: 02.24.2004 Type: Regular NBI
Inspector: KN738AB-P - Anthony Bibelhauser
Inspection Notes: Sufficiency Rating Calculation Accepted by kn738vb-P at 2004-03-18 16:58:09
KN738A6-P inspection comments -
Structure 930227 -
Date 2004-02-24 -
ection Date: 02.18.2003 Type: Interim
Inspector: KN738WW-P - Wade Wolfe
Inspection Notes: Sufficiency Rating Calculation Accepted by kn738vb-P at 2003-03-04 16:36:23
KN738WW-P inspection comments -
Structure 930227 -
Date 2003-02-18 -
This is an interim inspection, only elements 99 P/S Conc Slab and 359 Soffit Smart flag are included.
Inspection Date: 02.28.2002 Type: Regular NBI
Inspector: KN738SH-P - Scott Hughes
Inspection Notes: Sufficiency Rating Calculation Accepted by kn738ma at 3/7/02 11:45:19
KN738SH inspection comments - Routine inspection.
Structure 930227 -
Date 2/28/02 -
Inspection Date: 04.11.2001 Type: Interim
Inspector: KN738R0-P - Rick O'Connor
Inspectlon Notes: Sufficiency Rating Calculation Accepted by kn738vb at 5/15/01 17:34:36
KN738R0 inspection commenfs -
Structure 930227 -
Date 4/11/01 -
This is an interim inspection conducted based on SIA item 70 Bridge Posting being rated 4 or less. Only Element
99/4 PS Conc Slab and 359/4 Soffit Smart Flag are in this report. For a comprehensive list of all other deficiencies
and recommended repairs, see the previous report dated 02/09/00.
The following deficiencies noted are not covered by elements in the PONTIS program.
Repair recommendations for these elements can be found in the recommended repair section of the attached
addendum.
Signs- signs are posted at each approach for a 33 ton weight limit. The sign configuration does not conform with
FDOT Standard Index 17357 guidelines. Tequesta Drive is posted at several points prior to reaching the bridge for "No
Thru Trucks Over 50001bs. Net Wt".
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
InspectionlClD Report
REPORT ID: INVT001A COMPREHENSIVE Page 18 of 18
Stru cture ID: 930227 DATE PRINTED: 03/31/2006
, ection Information
Inspection Date: 02.09.2000 Type: Regular NBI
Inspector: KN738DC-P - David Crissey
Inspection Notes: Sufficiency Rating Calculation Accepted by kn738dc at 3/1/00 11:45:20
KN738DC inspection comments -
Structure 930227 -
Date 2/9/00 -
Refer to the attached addendum for ali non-Pontis and additional element deficiencies and recommendations.
Inspection Date: 02.24.1999 Type: Interim
Inspector: KN738DC-P - David Crissey
Inspection Notes: Sufficiency Rating Calculation Accepted by kn7381p at 3/24/99 13:33:04
Sufficiency Rating Calculation Accepted by kn7381p at 3/24/99 11:42:14
KN738DC inspection comments -
This interim inspection is being conducted based on SIA Item 70 Bridge Posting being rated 4 or less. Structural
deficiencies affecting the load carrying capacity were reviewed and will be included in this report. For a
comprehensive list of all other deficiencies and recommended repairs, see the previous report dated 1/20/98.
Stnacture 930227 -
Date 2/24/99 -The following deficiencies noted are not covered by elements in the PONTIS program.
Repair recommendations for these elements can be found in the recommended repair section of the
attached addendum.
Signs-Signs are posted at each approach for a 33 ton weight limit. The signing configuration
does not conform with FDOT Standard Index 17357 guidelines. Tequesta Drive is posted at several
points prior to reaching the bridge for "No Thru Trucks Over 5000 Ibs. Net Wt".
Previous comments > (none)
�'" •+cture Notes
3E OWNER: VILLAGE OF TEQUESTA
Bndge inventoried from west to east.
This structure is on a 12 month inspection frequency due to SIA item 58 (Deck), 59 (Superstructure) and 70 (Posting) being rated 4 or
less.
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE INSPECTION REPORT
ADDENDUM
• ..
.
- .
_ ;
.
CONTENTS OF ADDENDUM
Location Map Photo Section & Sketches
Weight Limit Sign Photos * Fracture Critical Data
Load Rating Analysis Summary Recommended Repairs
Element Notes Scour Evaluation
* This section is not included in this re ort.
BRIDGE OWNER: VILLAGE OF TEQUESTA
BY: KISINGER CAMPO & ASSOCIATES CORP.
REPORT IDENTIFICATION
Bridge Number: 930227 Post-Rehabilitation Inspection Date: 3/8/06
Bridge Name: Tequesta Drive over North Fork of Loxahatchee River
Road Name/Number: Tequesta Drive
Feature Intersected: North Fork of Loxahatchee River
Critical Deficiency Statement: None
Traffic Restrictions: According to the current load rating analysis dated 3/28/06, this structure should be
posted at or below the Operating Rating for the SU type vehicles as follows: SU-32 tons. This structure
is currentl posted at 5 tons. Refer to photos on pa e 3.
Page 1 of 25
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
BRIDGE INSPECTION REPORT
Bridge No: 930227
inspection Date: 3/8/06
LOCATION MAP
- ---
----�- - ------
.
�����-�4 ; ,�; _
- ��� _ << -.
- _ . . . : ,
� . --, - � . _
� �.
:` � � �: . .; s ' „_ - _. _ . _ .. ... . , _ ;�. .. ...
. - �§a..��vr; -.,. . . .. , �._ _
j
i_s+.��"; � 'cN ��LY. - � � .�'.6"`�'� _
�_' - --# �� ? _ �..� r - - -_ . ..
. ' _ - " :' £. .
_ �- _ - "s � �. '���
: , - _�-_ ..:.- _ .. _. :.� ._ '_ , -_. _,_ _ ' �-'"_
_ _..
- ': . _._ . ':___: .�` -� , -'... , :':�. , . :'. ..�.- ' _.'" .-� _ -- ' ' �-s�,�=1_
� <„�,r-.`-�-�.="°x'�'°^_aa_ ti _ +�,s.wa�.�--�- r'' �- � , �e.�,_. 4> � _ � v.Ei-._
� � +
� - -....� �'� :, �' '� _ ...+� `."_ . —m"` `_°°^� __ _ _
�--~-` -ryi�s..� � .� - . � !�-�S +s. � - _ � : _ y`'- � : � - -
.= � �' Y ,�, . "'_ — . .. �a� �"�;a.___"� —�.r_ c.� .� - �� --s-- ` __
�„�_.ne� --- "Lei N .Y.� " � __l �°--._._ �-'='- _ _ - __' -- �`- o ...,� -� '` g_
, _ - _ _ - ---- ��a-� --- � - --�^��'.�_� - � -, �°�-��._ —°
--��-•�- �-- ^ _''.�°_' ' _ _ ° _ ---°��- � '-° ° --��. -=,`_'°'--_$' --•�`=:
_ :..., _ 4- `'�"'_"_-�----- _ � - _
_ _ _ _ ��� � �--�____m-,,�.._.>�__�-z__._.Q_�.._. �"- _
- - °�.^-+v-5.....-°-°---�......'"_'".� � _ -- -
-- - - _ ' _
� , - - � - -
_ _ �_ ._ -- -�'�_-ac.c���
— — -_-°�"°°"`°.-. -
South Elevation
_ ��
_. -... BG �,� o 70RaFtRO Cn �Mx��: v9 � PL
lE��� ��'!k Q��� < CYPRES3CIR V5�'� � �'�
�Rpl � v0 � z v.wuai tt i Q m GS
� Cdj r ^' Nidne&D�h .,.; �j � �
STARBOARD MViY „ p -� OAl( A1DGE LN ��� �, � a
� o � m
A .�
GOLf PL ,� ;� ��n� �n .� ��. N r w�uow Ro ��.. � sr�unE � � .
p _ �n�rr�ce �
�2 �� ,.,,
� �
� '� E �pWP'� � GULFCT cY �H'ES7lV00DAVE � p7p1FpGR � �
qcy �� PN�' �- W 4. ! U y " .._ l 0AKIAND CT
%' - �� 44�41. $ �q� �` .. CAMELVtCIR
°a `' .� � 930227 � HOLLI'qR OAKLEAFCT
m .
� p1NDriARDAVE � �> '"iaQuatavnayao� �`
°� -- - � �i Ta .. _. �rcoe.en�orumen� �'* SpDP
d o� �porceo.c, ���k _
o Y1 xi2 . .. F --G IIery.G�ille RM�u ant �.
.. _ - . TeQUesla m`� o .. ,- .. . un �
c
.. N BAW�ElYTER a . . . � a CHURCHRD a � s?, BRIDGERp �
� O J p �j N Z N
�� BAWIE�'CT �$ RNERTER .� � FRANRLINRD_ � a TFiO
RNER DR_ �� �$> p . . .. � � p . _ .
'v(� {q - Fon Orlqin
q -a kl� -._ EVAkbSOkRp. YJi .
_ ''y wa�r?� � `;
qP . . . � -- EYEBIVLL
80 ,� NOlyyppp RO � m- .� � 1 _
'� �O � � Q p= oie o��n. C,�., t
FRAZIER RD
� � _
g �. "� A � m � 50t
o � �� � a
� m
. y . . � 1 (,.,� 70T —
m � f^
° ��/
s > �� �$
' � nfl
POINTLN E p
. .� .���% _ �
.. •' y �
Dateusesu6Jedtolicrose. � 0 � I � i �
0 2001 DaLame. 5lreet Allas USA� 2005. �
www.debrme.com ANV (5.8' WJ Dete Zaom 136
Tequesta Drive over North Fork of Loxahatchee River 1.2 Mi. W/O US-1
Page 2 of 25
FLORIDP► DEPARTN1EN�' OF 1'FiA9V�PORTAT9GP�
BRIDGE MANA�Ei1AENT SYSTE�II
SRIDGE INSPECTIC�N REPORT
�iridge No: 93022.7
Inspection Date: 3/8/06
POSTING PHOTOS
s
-,. . .
�� ' �.�� �� , ,t.
.,� �'
, �. , ,.
ti ..
-.'r BRI[� GE r �� r, �' x ��1�: �
RESTRICTION ' �,��; ,'� `. Y f''
(� ' ` 'c.:_.: � r . h . .
_ WEIGHT "
` �Y � , �'� I�� LIMIT ti ,,,, .
� ,, t� .:,� 5 '
'', r . � � � ;—�
��; TONS
-f ; i ,
� � ,�
,.. . ,5
..h - �``y. . , . �Itlh
-�''`����' _ BRIbGE
- �,
. _ -_ - ...:A� OPEN
""'�� ° y"` �'�'"'�a THANK YOU FOfl
YOUfl PATIENCE
. . VILLACE h1AY0H At10 -
� COLL4CIL - ,
� . . __ -- � ��a
_ � � - -.�, y ���:•
-
�� '�' (� ,� � .
, � �,�+ �
� ��� i }
r
� '"� se�;, �
West Weight Limit Sign
- _ - --- _
---
��;-- �/
�-- - BRI�GE /
�" �ESTRICTION
i
WEIGHT �'�'
� � �. .`/,,:-
LIMIT
5 '�; ,; ,
TONS H �� + �� _ ,,
,.
� ;:
-. �'� '*�� M 1 �.j'
+,ra�.� �. �5.1r.. ,. .
..,�__- °�-- ��:�~ �RIDG�
,_ _ . __ _� - OPEN �� ti:�:,t_
� ' THANK YOU FOR
� ;c'` _ �.;: ,«�;;A, . - YOUR PATIEN
I ,r•.. _
�� `'" VILLAGE PAAYOR AtlD
I � ,��,q' '''� � COU!ICIL
i y , z, f'` �. k. ��. a r. w . �
I i 1
-�, �rf.?r ��4w�� Y�• a ,� ir�u��: r''e>
_"�. 1 . a.� �.r q �. t ��
:. r � � 4L�� ;d Y _ �. S'.� f �cr,�'tr � ♦
�,}� �. � � F{µ"t ��.,� 'Y f -;+�` ., ; "• `+ ?rv � ` t
�!'r �,'¢s��.0 r..� _ � r v }_ _ ..ti� ,� .,3:'�w . ��'
. � r
. ..� . , ;.. -, �,
s - .,r� '.�EN2„ � *�, .,
East Weight Limit Sign
Page 3 of 25
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
BRIDGE INSPECTION REPORT
Bridge No: 930227
Inspection Date: 3/8/06
LOAD RATING ANALYSIS SUMMARY
STATE OF FLORIDA DEPARTMENT OF TRANSPoRTATION
D: LOAD CAPACITY INFORMATIOIY
1. BRIDGE DATA
Bridge Number 9J0227 Uate 3/28/2006 ___
STR Type Main [B[D Item BI(43)] SOl STR'Cype APR [BID Item B2(44)� 000
2. POSTINC DATA:
Posted YES Ifya, Existing Posting Needed YES Ifyes. Proposed
Reshictions SC Restrictions SU-3YC
BID Item H8(4l) P BID [tem HI l(70) 4 ____
— BID Item H7(31) _ 4 _
3. AIVALYSIS AATA:
A. Methoc7 of Malvsis: C. Anatvsis Based On: D. Data Stored:
X Coad Factor X Design Drawings X District Of6ce
Working Stress As-Built Record Plans Central Office
B. Malvsis System: Shop Drawings Microfilm
X BARS X Field Measureme�u Bridge Owner
SALOD Catalogs Materials Test (.ab
BRUFEM SampleTesting �X _Other KDrive
C.oad Test Otha Other
Other
E. Controlline Mcmber Malvzal:
Material: Function: SubsWCture:
Stcel X Siab Bent Constructioa
X Concrete Stringer P����B
_....._. . _.—
Cast in Place Flooc Beam Cap
X Precast G'vder PierConsWC[ion
X Presh'essed Culvert Piling
Post Tensioned Truss F��B
Timber � Column
Other Cap
Soan: Sha°e:
X Simple Rolled �
Continuous Built-up Welded [moact Factor: 0.300
Frame Builbup Riveted
Slab: Box Shape
X Non-Composite AASHTO Girders -
Composite X Other Voided Slab
4. Load Ratine Summarv Table:
LOAD RATING SUMMARY FOR OPERATING RATING
GROSS TONS
VEHICLE OPR OPR SPAN CONTR
,�,� PE TONS RpT�NC FAC"fOR SPAN No. LENGTH MEDiBER M or V LLDF
SU2 17 31.8 1.87 2 34'-5" G01 M 0.680
SU3 33 33.0 I.00 2 34'-5" GOl M 0.680
SU4 35 32.5 0.93 2 34'-5" G01 M 0.680
C3 28 48.3 1.73 2 34'-5" GOI M 0.680
CA 36.6 44.I 12l 2 34'-S" GOt M 0.680 �
CS 40.0 48.0 I.20 2 34'-5" G01 M 0.680
STS 40.0 50.0 f.25 2 34'-5" GOl M 0.680
HS 20 36 42.6 I.AS 2 34'-5" G01 M 0.680
HS20 Invrntory Rating 25.5 Rating Factor 0.71
5. Commeuts
Member G01 is a prestressed concrete voided slab with a span length oE34.416 ft __
Member GOl has a large spall and exposed tendons. Reductions for material strengths and section loss have been taken. _
6. Comoutations:
Paformed By Jason L. LaBarbera, P.E. Date 3f28/2006
Checked By Patrick Mulheam Date 3/28/2006
Reviewed By David B. Thompson, P.E. Date 3R8/2006
'7. Resoonsible Enefneer: Jason L. LaBarbera, P.E.
P.E. # 64004 /� --
Date 3292006 � /
���yooy =
3 �29 /Olo
Page 4 of 25
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
BRIDGE INSPECTION REPORT
Bridge No: 930227
Inspection Date: 3/8/06
ELEMENT NOTES
Element 99 PS Concrete Slab
Note: Roadway slab units in Spans 1, 2, 4 and 5 are numbered 3 through 9.
Roadway slab units in Span 3 are numbered 3 through 7.
Sidewalk slab units in Spans 1, 2, 4 and 5 are numbered 1, 2, 10 and 11.
Sidewalk slab units in Span 3 are numbered 1, 2, 8 and 9. Sidewalk slab units
8 and 9 had previously been identified as 10 and 11.
Underside of fifteen (15) prestressed concrete roadway slab units have significant
cracking, delaminations (unsound concrete), or spalling as a result of corroding
reinforcing steel. In addition, Slab Unit 2-4 also has five exposed and corroded
prestressed cables with an estimated 30o section loss. Refer to the following list
and photos 1, 2, 3 and 4.
Deficiencies listed below are located at or near mid-span, unless otherwise noted:
1-8: 6' x 4" delamination south edge
1-9: 3' long x 1/16" wide longitudinal crack adjacent to Bent 2 near the center
2-3: 1` x 3" delamination near the center
2-4: 8' x 3.5' x 3" spall/delamination with exposed rebar (4) and exposed
prestressed cables (5) with up to 30% section loss
2-7: 3' x 3' x 1" spall/delamination (no exposed steel)
2-8: 5' x 3.5' x 2" spall/delamination with exposed rebar (2)
2-8: 13' x 6" delamination south edge from midspan toward Bent 3
4-3: 18' x 4' x 2" spall/delamination with exposed rebar (2)
4-4: 5' x 3' x 2" spall/delamination with exposed rebar (2)
4-5: 5' x 3' x 2" spall/delamination with exposed rebar (3)
4-6: 5' x 2.5' delamination and 7" x 5" x 1/2" spall with exposed rebar
4-7: 4' x 3.5' x 2" spall/delamination with exposed rebar (2)
4-8: 6' x 4' x 2" spall/delamination with exposed rebar (1)
4-9: 8' x 6" delamination south edge
5-3: 3' x 1' delamination south edge
5-4: Intermittent span length x 8" delamination north edge
5-4: 8' x 1' delamination south edge
(continued on next page)
Page 5 of 25
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
BRIDGE INSPECTION REPORT
Bridge No: 930227
Inspection Date: 3/8/06
ELEMENT NOTES
Element 99 PS Concrete Slab (Continued)
Underside of eight (8) prestressed concrete sidewalk slab units exhibit cracking,
delaminations, or spalling as result of corroding reinforcing steel. Refer to the
following list and photo 5:
3-1: 3' x 12" wide delamination with corrosion stains at midspan
3-2: 6' x 2' delamination south edge at midspan
3-8 (previously 3-10): 4' x 3' x 2" spall on north edge at midspan
3-9 (previously 3-11): 12' long x 2' wide cracked and delaminated south edge at
midspan
4-1: 3' x 1' delamination at Bent 5
4-1: Two delaminations up to 4' x 15" on north edge near midspan
4-2: 4' x 15" delamination on south edge near midspan
4-10: Two delaminations up to 3' x 1' at midspan and 3/4 point of span
Underside of the 1' wide cast-in-place curb section in Spans 1, 2, 4 and 5 typically
has significant cracking, delaminations (unsound concrete), or spalling as a result
of corroding reinforcing steel. In some cases the delaminations or spalling extends
3/4 of the span length. Refer to photos 6 and 7.
The metal utility pipes attached to the north overhang are heavily corroded with
several areas that have completely rusted through, exposing the plastic coated cables
within. Refer to photo 8.
It is also noted that there is concern for boater/marine vessel safety due to the
potential for falling objects (unsound concrete or pieces of inetal conduit that could
break f ree).
(continued on next page)
Page 6 of 25
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
BRIDGE INSPECTION REPORT
Bridge No: 930227
Inspection Date: 3/8/06
ELEMENT NOTES
Element 99 PS Concrete Slab (Continued)
Traffic face of the curbs in Spans 1, 2, 4 and 5 have longitudinal (horizontal)
cracks up to 1/16" wide and several delaminations with and without corrosion staining
in areas throughout.
Top of the sidewalks have numerous shallow spalls and delaminations with and
without exposed reinforcing steel. 12efer to the following chart and photo 9.
Span 1: North sidewalk adjacent to Abutment 1 has a delaminated repair 6' x 4'
Span 1: North sidewalk adjacent to Bent 2 has a Delaminated repair 18` x 3'
Span 1: North sidewalk under utility pipe at midspan (two) spalls with exposed
steel 18" x 4" x 3/4"
Span 1: South sidewalk adjacent to Bent 2(four) delaminations and spalls with
exposed steel up to 5" x 3' x 3/4"
Span 2: North sidewalk adjacent to curb at Bent 2 delamination 17' x 4"
Span 2: North sidewalk under utility at span 3/4 point spall with exposed steel 5"
x 4' x 1"
Span 2: South sidewalk adjacent to curb intermittent delamination and spall with
exposed with exposed steel 25' x 5" x 1/2"
Span 3: South sidewalk adjacent to curb, 8' & 16' from Bent 3 two delaminations with
exposed steel 7" x 3" x 1/2" (popoutsj. Other minor spalls with no exposed steel
along new curb also.
Span 3: South sidewalk longitudinal cracks up to 1/32" wide and minor spalls with no
exposed steel along new curb.
Span 4: South sidewalk longitudinal cracks up to 1/32" wide
Span 4: South sidewalk adjacent to curb spalled and delaminated with exposed steel
and corrosion stains 25' x 6" x 1/2"
Span 5: South sidewalk longitudinal cracks up to 1/32" wide
Span 5: North sidewalk, 4' from Bent 5 spalled and delaminated with exposed steel and
corrosion stains 16" x 4" x 1/2"
Deficiencies in the top and underside of the spans show no significant change from
the previous report.
CORRECTIVE ACTION TAKEN:
Span 3 roadway slab units have been replaced. Curbs in Span 3 were replaced. Deck top
in the travel way of Spans 1 through 5 has been resurfaced. No cracks or other
obvious defects were observed. Refer to Topic G in the Inventory Section for view of
the plans marked As-Built.
Page 7 of 25
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
BRIDGE INSPECTION REPORT
Bridge No: 930227
Inspection Date: 3/8/06
ELEMENT NOTES
Element 204 P/S Conc Column
Note: Only the outside faces of the piling in Abutments 1 and 6 are visible due to
concrete added between the piles (backwalls were jacketed). Refer to Element 475
R/Conc walls for any comments regarding the two (2) support piles at each retaining
wall.
CS1= Most of the piling in Bents 2 through 5 have unpatched pickup points up to 18"
below the top of the marine growth.
CS2 & CS3= Several piles have cracking, mostly as a result of corroding reinforcing
steel. Refer to photo 13 and the following charts for a list deficiencies noted
above the waterline:
Piles in CS2:
Pile 1-1: SE corner 18" below cap, vertical crack, 3' long x 1/64" wide
Pile 1-5: NE corner, vertical crack 3' below cap, 1' long x 1/64" wide
Pile 2-1: SE corner, vertical crack at cap, 1' long x 1/64" wide (outlines
delaminated area)
Pile 6-2: NW corner, 4' below cap, vertical crack, 2' long x 1/64" wide
Pile 6-3: NW corner, vertical crack 3' below cap, 3' long x 1/64" wide
Piles in CS3:
Pile 1-2: SE corner, vertical crack, 7' long x 1/16" wide
Pile 1-3: SE corner, corrosion staining at waterline, vertical crack, 6' long x 1/64"
wide
Pile 1-4: NE corner, vertical crack with corrosion stains, 7' long x 1/32" wide
Pile 1-6: NE corner, corrosion stains in grout patch
Pile 1-7: SE corner, 4' below cap, vertical crack with corrosion stains 2' long x
1/16" wide
Pile 2-3: W face near N corner, 5' below cap, vertical crack 3' long x 1/8" wide
Pile 4-2: NE corner, 4' below cap, delamination up to 4' long x 10" wide
Pile 6-1: NW corner, 4' below cap, vertical crack/delamination with corrosion stains,
4' long x 1/32" wide
Pile 6-4: NW corner, 18" below cap, vertical crack that extends up through grout
patch, 5' long x 1/32" wide
Pile 6-6: NW corner, 2' below cap, vertical crack with corrosion stains 4' long x
1/32" wide
(continued on next page)
Page 8 of 25
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
BRIDGE INSPECTION REPORT
Bridge No: 930227
Inspection Date: 3/8/06
ELEMENT NOTES
Element 204 P/S Conc Column (Continued)
The following was noted by the underwater inspectors during the 1/28/06 routine
inspection:
Piles in CS3:
Pile 2-3: West face, up to 30" long x 1/16" wide vertical cracks extending 7" into
the marine growth with no corrosion bleed out. These are continuations of the cracks
noted above water.
Piles 1-2, 1-4, 4-2, 6-1, and 6-4: There are 1/32" wide cracks that extend a maximum
of 12" into the marine growth with corrosion bleed out above water.
The piles show no significant change from the previous report.
Page 9 of 25
FLOFiIDA DEPARTiL1ENT OF TRAfVSPORTATIOh�
�RIDGE MAIV�►GEMEfVT SYSTE6Vi
BRIDGE INSPE�TIOIV REPORT
E3sidge No: 93022.7
lnspection Date: 3/8/06
PHOTO SECTION
.
. ..- w �'"i��� l "7
.. � .7��' _ +r ���.
. .. } .
y�rp� .,, ....... � .MRY... _...ev.�.r ' � Y . - . . .... . _.. .
� �'
rr _ '" _ ,�,., . ___��. . . �. �V'Ss . TT�s _ . � .
� i,,, !
�, d
' ���� Yyil L.�• , ,� r � y .� i. .� ` . .
y�.: "'«. ,,� �� � i +�: .
~ ` � r ` .'" � � � -
�
`!:� �__ �_ -
_-°--•.*..�_..
�
Photo #1 Element 99 - Span 2 showing exposed and corroded rebar and prestressed
cables at Slab Unit 2-4
• *r.
, •. � ' , •
�` `�+�" " � �'" '-� ' .
� - - --- � � -�--
�i ,,;. _ . ,
� � .t , � .'� .-
�
_ �' �
. �._-__ , �„ .
.. -g►.. .•� ,
-; - ` ' - ; �"`"'c
w �i Y�. . ' - •r - '-
�, _ -. j � �i - ..
�. �' — �
• ..r : .
. • N . ✓� � . .�..<` .
.t� � � �: - w �w.., ,
_ ' � _..�7 A .
. ai.� . ..
MIe � � ' �• N . ���_ " ,
., � I �_� .�� - - '�
'�. T
. � ��
��J.r'iL. � , .
y �y�` , -��y� rF . .
. _�"!!f�-'4ip�T.� �'"�" 7 ��u� y i��� . + y , "'f4'�
. t. . . �� ' ��'�'.lt . . "�.'i��.� � � .. .
�: ¢.. � .
S , �
!•
�� �,
Photo #2 Element 99 - Slab Unit 2-4 showing close up view of exposed and corroded
rebar and prestressed cables
Page 10 of 25
FLOI�ID�4 DEP,,4RTiViEiVT' OF TRANSPQFiTATION
SRlDGE Ni�►�VAGE6ViEPVl' SVSTENB
BRIf�GE INSPECTION REPORT
Bridge No: 930227
Inspectior� Date: 3/8/06
PHOTO SECTiOIV
�, .
r�
�
:� �
.�. _
:�
....,.,e.—P - �-��:--� ,� --�°� _ �
. _.. ,.� —
..-�------ .--- — "�."a - "
... - - - ._..�.__._
- _.. . I �'�.._ . ` .
. yi_;�c- � .' I
� t. �:�� .�� •��,� - .
5 {,� d
y � � ! . �M�.' _ ., F y
. . . � � � � �;.;:�r _ ..�' r -
�s =-�_. � - - ' .�^'
� � ',t ,
Photo #3 Element 99 - Span 4 showing spalls with exposed rebar in Slab Units
3 , 4 and S
9
'N, �,,I, ,�,� ,t � "�+a+i"�S„s,n..,-.
� ; ��t �
," .
7 :. . t �:. . ... . ` ' � .�� � .,t' ^t
} . . � + . . "'�.
a�� � . . � �1►+�.� V ,r+�:': G �+.c�''s4�����.:v�� .
,� �' , , s''`�'� � ` _ ' �: '� ; ��,
�. s , `�="'~--
� . _ . • i � . . � � f y�� e � y � p � .
� . - -� ."� �� �` :
� � � �, '� � ' - �' �
� \ . 'B'i' • ��_ - � - l- - . -- c - � . ( - • ' �_�+ _� �'
'. "„ ' `�• 1\ , l� -- r ,,,•- 4,,r��5:.�
r. �
` , ipC,;. �� � �.�1.� �;. - . � _ _
� . �
- L - �
�"-- . 5 -... � ��
� . f -._ i '
�• �-•_ _
i
_/ - _ �
... . , - �� �:.�
� ...
. � . K , � ����,' � .
Photo #4 Element 99 - Span 4 showing spalls with exposed rebar in Slab Units 7
and 8
Page 11 of 25
FLORIDA DEPARI'Ni�NT OF TRANSPORTATI()iV
BRIDGE MANAGEMENT SYSTEIVi
BRIDCE IPVSPECT90�4 REPORT'
Bridge No: 930227
Inspectic�n Date: 3/8/06
PHOTO SECTION
�,� �� � : �
/ _
��
-� �
�
, /
�i' - � ` _
: ` �
, R :� � -
. s . �,s�"`� _ ,: .. .
` � ;', K .. �,�'��„<,;; . �.
; ��
'. S +� '..��� t'. � � . - .
�i. �'�{ � t ����:�l�i 'Y ",JFv �y .� v y _ .. , '
� �
t s� 1 � ��'✓i,����ii?;r '
�; - , �.t' { . ° t` . , : F.:
��
, � �,i;i�'. . . .. . ' . . .. � �
. ':Y;L_ a`: _ ' . . 1 .
. —.:�/ ' . . . � ., .
Photo #5 Element 99 - Underside of a prestressed sidewallc slab units showing
spalled and delaminated areas (unsound concrete)
Page 12 of 25
FLORIDA DEPARTNiENT OF TRA�JSPUR�AT�QN
BRlDGE NiAIVAGEIVIEI�T SYSTEM
BRIDGE Ii�SIPECTION REPOR�"
Sridge f�a; 93022?
inspectior� Date: 3/8/06
►'HOTO SECTION
� ..I��� - �' �i 4 'I����� L=' . . . �� �
_��
; K.v�:�� � 4
� " . �'.� . � ' i'C.. . �_
' _ . . � .. - . . ,
=r. `: '
•'..�� .t� . -- .- _. �
��,.r— ���.�
. � ' °��' � at- ��°Y�'��a�i, '{
�� , �� � � :�
�� � 1
. ,
�� - �� � . . � . .
�� ��� � U/i
� . �
� " -' � -'�aoL� � .. .
- . . . �' � "�rlii�. , ,. .
�� _
� " - � . _'. _ �_ . � • .a�L.t { k)
-'��` .
-. .. _ _'r�..'°� , . - - � .
--� - _� - - _ ..
. � . _ '
,.. _.. "-'.a.i'- -_� `�'-�----:,,..- _„_
..�� . .
i '��.. ..�.. ; - =�-�i
, f �
�"".-.:v�+e ,,..w,,,.`__"�'"^� �.;'�f.t �"' ,r�'[ .. - ,- c -- _- - . _
. _ ' . . ., i � -�"':ru;�{?y .� �: -- . . .. .
� . _ '� �iar�?[��� ,� ;ay - 't..� .
.. -.. �:� y,-_..- . . .
Photo #6 Element 99 - Underside of cast-in-place curb section showing spalled
concrete with exposed rebar
� �t.� � � .�.� ., �e�, .: . � �,� � ' . ' �t}f; ..�.i
'� !*. •
}� c�. r+ '�``^ ' ,� � 't w t � �-�
. �i �'hh' . _ � 4 ,,.d ., ' � . . .
��i k � . „k �"' k " y � . . K .
� �' , ,�u ._. � 7 - .., f i ! / , , .
� r . .
... . ' % . . ' �'
j � � �
� /� . �• � . , ' ' _ ..
» � �
s- ^ �
�.
� � ���_
� /'�
� '�'¢+�
r ,,,,t�� '_. ''gs'a►�"�!��-
y�^� '��'' . >:i 'L' r`�
-r..� �e
-�� �.w �,� `�4 T'��' .. _l�.13"�� -''':.�
':�� � �'�� . � " .. . . � _
i , - . ,' . _ ..
t¢ :.
1 Y �.' -: �3ei'w!!f!�"'y� �"., _ , ' , � .Tv� . . . '_
� r ..._ f F _' � _ _. "1
��. � ._ __ -- -_ . i .�e�� .. ..-�.` � �,.. _ ,
Photo #7 Element 99 - Underside o£ cast-in-place curb section showing delaminated
concrete
Page 13 of 25
FLORIDA DEPARTMEN7 OF TRANSPORTATION
BRIDGE MAiVAGEME�lT SYSTEM
BRIDGE INSPECTION RE�OR�
Bridg� No: 93U227
Insp�ction Dat�: 3/8/06
PHOTO SECTION
;
' ;�„_
-�_.
_ ...�, ''� r
� ' • ����� � � ,
: �` i � ,�.,. ��,.
�I�j1�,�-- _ ,"'¢� � _ _ t
, �� � � .'+�'�-. � �� � Y � - .;
F. . �r
� ' � . ' a ' "`��-8+_LY
. c . - . � � 1�. . . . . _ ! ,w
+_ • � �
_ ... . . � �
,�,. � ���_ �'r1 i° � :� . �r :F _ - .=�' .
_ �. ' _ }MY:9� NF+� � �' ' �,j _ % . _
' ,�s _ . �' � �
.`� .. , . �.
. .. ...�.:. .._s.. 3 _ � � ,� � � j -, ��
��.+.y , �� Y �
p�' T#
i I t, } �,. �"'�.
, � :I �,4' __--- ' } ,•
_ "' .`.i`"" '*� t �Ef' i ��.�,
+"�-;� .� _ __��— , . . ` , i �i. . ..�, r,� '�Y• y .e11
%' �� _ n � �� {r(I ` `{
� �
- . t.�c,� � i -
� . �, .., ,� - :+� -- ::.> , _ "� _
Photo #8 Elemenr gg - Typical view of heavily corroded utility conduits on
north side of bridge
�
I �
..�.-�- ;
� � � 1'a .��.� fh �« , ' Y
r; � i �S4.� e ' . '�� -`' ..yvf. ' � � i;ti€ i,► i ;. � � . �y�s . �i..' � _ � ,� z �.. �:.e:l
� .:1� , ;i-. � 4� �..., c.� .
� - ` t� � � � � �:. v � � �i 7:�
r �p � �•. ..,,�, .S �.--ti �1 . M• .� , � : .
� ...-:f�7ti�s�i7e� , • � . . �
�� xp�.�'���- � f'
� � Y;'':.,R�'vt �, f�
"r'.:r �. ., . .
a: �
, . . _. --, � � . . _ . .� � _ . .
4 £ � '> _ . �,,.� `u',- . .l 3yS:� , �hry
,,,f„y.�'aar 'r��� ; �.�b_ � �ri�( r���rty�1K'� y . � � � �� •� y �' ..
. �� �d ��� ' r ` ,. �� , .. . , . .
� - .. � _. � � . . .
; ' . ..._ . _ -���.
i ,$.;
' Photo #k9 Element 99 - North sidewalk in Span 1 showing spalls with exposed
reinforcing steel below utility
Page 14 of 25
FLORIDA DEPARTIInE�➢T OF TR,ANSPQRTA�Ii I�f�!
BRlDGE MAf�AGEMEfVT SYSTEM
BRIDGE INSPECTION REPORT
Bridge No: 930227
Inspectior� D�te: 3/8/06
PHOTO SECTION
,,. : ,,
� ;�
,
,
/�
,;= .
.. -_,#-7
�, � . .
� '� �:.
. . , , . � �c:.�.� . . � .
� - . '�`�2,. ,.,_, � � .
� . ��� . - - � . - . .. �- - � . ' _- ..:a�ti�'c+'.�Nc3t''.rs:i? c,i,req.�
.1 f -. ,TN 4 J� � J . , ' . .�"" � " . . _ . ' ; " ,
.��._�z�3.�' � � � '� . . , . - . � a: nei�,.-�
' �'. �i ���4 L ��-}.., . — _ f'�7 r t"-:_ �:.d
> 's�'i
�. , ;.• �,^ _ c .f .. i
Photo #10 Element 301 - Typical view of open sidewalk joint
� l ,�" f' `V� �,
,,�
��ae��� �
a.;��x;�.€
, 1 .-�, _ , `�
� '
'1-'
.u. .. . . , � '
— — - -- --- —��
. ..�°- .. .. . `
. „ •fik� .�!.��., r' . � _ 8}r .
� � ,Y
'` �
Photo #11 Element 331 - View of spall with exposed steel in bridge rail post
Page 15 of 25
FLOFiInA DEPARTMENT OF TRARISP��iT,AI"ION
BRIDGE MA�AGEMENT SYSTE611i
�RIDGE INSPECTIOfV i�EPORi
Bridge MQ: 93�J227
Inspectior� Date: 3/8/06
PHOTO SECTION
- ,_
. t � _.
���;�: _ -- - - _
�� .; -
�i � � . � 1 ��`;� �� � � -`� � _ . .- --� -- —
\: ' _ f:_ -;�� _�-- _
� � °j , A ���
. - � �, . 1 . ' �Yf , �R � . _.
P �
� ���� a: � � � � j
�
,s, �
. `�, , � i
' , �.
_-_ .� � � '` -
� � /- ,, '. t l � �_ �� ; �� � i�
�. � ,�-, ` ,r , ,
� �: +�� '� ''', . , ,,� ' '� ^ ., � �" , . , �
_ ;:� � , � � . ,� � r
. . . ' t i
-:q JS� ^ '� _ ,
�'
Photo #12 Element 331 - Southwest guardrail showing missing anchor bolt nuts
.. - ...,�----- . _ - �
;ai-- --
4.:-`-,.�."'�.4- �_,,
�,.",, ' - . - ;_..:
::..�-.,..��"����
��� � �... _ � -
; , � ' —
�~ .1 � r I � �. .. . . � . � _. .
.;7 ' . , ' ; . ---�._.. � .. _
n " " _ . ` --. . . , .
. r . . . , � � J —._... _ . - ,.,. .... _ _. .
. . �. , , cf ' . `_ : ' ,-
� • • � ' . � �`�- `� vti� -
. � " -�->'-� `_�
. , � . �' • . � . ����� ���.>�� �.
✓ . . � . '. � � `� ��
� � ,. � . '-- � _ C
� � , ' , � "�� . >
� � , ! ,. s �� o
�� � . . . .. . �'� .�.`
t �;: ., � • � ' � • - \��
\ ��� . ' / ' '�
{ � '' I�� • . � _ ' �
` ` ' . ,�
� . '. � �- , . .•� -G -
r `�� ,+ .�,I�RF� � �
rr ' t e �` � � - ' : `, � � t'U �4� ' :��JS�� � � �
t
� ; , / .h �}�.j _ �. . � 3 '/'� � `/R� :� '
i .. Y y .y� . . � +} i'�k� ..o � ... �' � '..t> ..
. . ,I .`�a, a.t �.��'i..r ,- x.L.. .
.,,; ,��� �P.�� ¢. ��
�' II � ���';�.�'?�`•F'•�c .t '. �
Photo #13 Element 204 - View of vertical cracking on piles
Page 16 of 25
FLORIDA p�PARTfViENT OF TRANSPORI"ATION
BRIDGE MAlVAGEMENT SYSTEiU9
BRlC�GE IN�PECTIaN R�PO�tl'
Bridge No: 930227
Inspection Date: 3/8/06
PHOTO SECTION
,
�� ' f ' . . . ` _` /
, ��,ti::.._..___- ----�� _ _._ . �;,
� _ /; ...,_.� __ _
,
►7�'I i
.�� 4 .
,t ��.,. . �+
�
1 t , v '
�' "�'
.. �tl ' � .
� , � � �' .
�; t4�
T " y
� d 7� y:.
.'�� `r= . I . • .
y �' �.` +
, 4 � s;� r�°.
- � - ti, = � :f � ls'���� ��'' , .
� re � , , fY1 n:� , �j�•-" .. .__ .. � . .,.�..—_ <:-e-.+�'^- :*`
_. , . "t+ti .-�t'c' - _ . . - _, � - . ,. . . . � .... . ., � _
� ; � Y ,�.��� ,
� I
Photo #14 Element 215 - Abutment 6 cap showing spall with exposed rebar on
bottom edge and delaminated area on top west edge below Slab Unit
5-10
rs • �. ' .'.:�� , �� �
.� } •l�'p� � :'`�i ��b � ��. .
_- �#` 6 •7� {�+:
�ws.
�� � � �' ' ��.�y ... �
j�p ��
., i� �, � ��'/`"7 ' q �J ��.. � .
. . � � '�x: �' �# , . i E -. .
� � f� "� � � � _ T � �.'� �
'S :` `- :`� ' "p ' �j'
� i � `'� � ^:���.� .'7� r. ��_fy'•• . .
�'� �� �.: � q� ' f �,� ...
�:<�� � �•. Y''� a f ` � . � �� `. ��je,S . .
_ r,� �, � ` � �� + zas[a' . ' ���� �' - .
.w, f � -. t -_-..� N � •rf!( M � 'W7 l�.j G � . � .�
.(i� _ , �.'�� _ . � .F,✓i� r: . . .• .
��
`,�'4�i"�� . / •�:•. ' � g� - 3 , �
/� f
s � S i
rY � �Rv ` ,F` = l.
� . - '-. . : . > . �z'`t.9 ..
_ . ._._ _. .._ _. ' � � ' �s.' �L�.,-.:�.. ',.
'_. "" F��Y<T.y'�.-� ' . .. �n+-�" , . j� ,
� . ..� "_. . _l1�., �� ��
__ .._.. _ .�,_- �- � � �� •�. - �
.._ _ - , .� .+�<.i}'p' .
���_ _ . . w r � > . ,.
� j /
� � �_ � • . f / . �'
'� ��_.. _ __ � '�� ..
•-1'� .' �;,i.. . y "�
� `_ ���.., .
;+��1 _ �
�� . . . 1 ..� "' _. ....
Photo #15 Element 234 - Delaminated repair in bottom of Bent 5 cap
Page 17 of 25
FLORiDA DE�AI�TNIENT UF TRANSPOR�'�lTION
B�iIDGE i1�iANAGEiVi�NT SY�TENB
�RiDG� INSPECTION REPOFc°I"
Bridge No: 93d227
Inspection Date: 3/8/06
PHOTO SECTION
°,..
! ,, �
<�
_ �`
, �
- �s, �; t � � :,� � f :�
.�[z��.y��,'•�'\ �::��?�� a_
':' '. � .,:�� '�'_
r "
I� - � 5 w ��— 4
.�-
� �' � ?� 5�.;�a
`
�� `;�. . 3 � ' � t ��� f t �� � � ' –
-- • ....�.-.,...�;�,.��.. +,�. , � ���,- �.;
- �. ----� :+'.`,y,- *a
,
— : .,
,..,,
--.�--. .__.._ . _. ,.� . . . ----.. :.�. __: ��� c�e�.i;sa ��<..i, �'�:a�:'_�ie,�o ,�hs,.,,zs,�
' -, . . -
`� �'", ��r " � ,� i� t': Y ` i- '� - - , �
'� �..; .-.� . .,`
b �
I �,
-
, . ,
,
.
-. . _�. . . ... � r �i
�- ,
� `.,
. .
� �� ^ ^� _ �:"._..
^, �T'�M•�g�[•� . '�.qft' � ` `° �r.�.. �A¢��aas� � ���� ��M r . . . �.. -J. '��
.. ....�,....— , - .
... � —
�,�
�
c.!w� . , �t� � �'�. �._.��
- � � .+-..... .. � � . . . -
's�- -.�� - . .-. _ -�� �,r - . . .
. .___ , . ... . _. .�__. �_....� -..-._q�, "i
Photo #16 Element 234 - View of rooted vegetation at north end of cap
'I
_. � - �,... �ii �a n,� l I � � �;,� :� . ,
! T, k ,
L4 h t��. �� µ Y .. '. . r` �
, . , � �.���.. �: � ` _ ?'�— ' r
. . ~ i� 1 -. S x .
�.a� r�,. ���.. . - . ..ti�nt+ _
� : . '�' I '�+ - � _ Mp � _ � .
��, _� 1 � t - _.s..,..«1 `y '�� � Lp � � � y� _ _ �!: - i i
L ••.��
� . � � ��� _��•i .. _� � .,.� . _ t N � � ��
- `- " ' T ' , r _'-�y�y ' i
� � :'..
_- s;''!. : , . � . � �..: � .
y4 '�_ � - `'�: ,
.\' 4 �
� �� �
• , �'�
... . �, . � � `
�_,
.�'� � , -. . j � �
'f- . . . . . � n -: ' Z� � �
- �� ..' i -�' .. , ,
��
�.� . . �� - . . � �` „ � � t �e _ . i . � '! ��t .. ir.��c�� '4�
. .. . . .q �� . �. _ , _:
Photo #17 Element 321 - West approach showing longitudinal cracicing izi
approach roadway and transverse cracking along approach slab
transition
Page 18 of 25
FLOF8IDA DEP'ARTi1/iEN7 OF TRANSPORTATIO�
BIRIDGE i1�AIVAGEfVEE�1T SYSTEiVi
BRID�� I�ISPECTION R�PORTi
Bricige Nv: 930227
Inspecfic�n Date: 3/8/06
PHOTO SECTION
- . ���: y � - _
i , �, °,,'� � �
� � ���ik� ,
, ;1',' , ` `�-,-_
�. , , `
, ii� '' { ,
; - � .=.ti , . � , :"�'�—"`
�� � ie
�-.c? ; +5. � ; - �1 � ' � ' �
' h?; �
•,� 3 ,� r ;
, , y,
', � �
,� �. . t , ;.� � "-
� �_�
. _.. . : -
. i
. k , . .�... .��. .-
i' ,,. , ;� . i , ,
, 5 �,�.a� '.:
.� ,
u�, ,�
. . � _ . �. �
.. `�' E
a�. .. � . :�+ ` r . t .., _
.� _ ' . �l l !' _x.
� , �:
, � ' �^—�' � `
�� �> � s , � . - :
l
tt '�'Y /' .. '�.
r l� f '.'� � � : f lr
. .:�! "'y . ' , . . . f � � ' r .�
� �� r ; . � ' .. . J�. ' ,� ti
,� �.' �, . '
�. . � -
. , r � . � � �'C, . � - . . ,_ : �'i . . �
Photo #18 Element 321 - Southeast approach sidewalk showing spall with
exposed steel on outside edge. Arrows mark limits of spall
,kY►y�i�, .'}3Yif�",.- f -�� -�r. � — ��_... - a �� y .. �.u.J •` - :wcw#�M�tr � ,
� �,� '� J
s , + �' t �.w�ar--- i .�:�� �--=� y�. �,r�ail.n`r� .y+ �.� �.:� �1.�,�:.i �'.�.L' d,�ii , , t.r �
�' �������
.—,.-
A,_ _ . .
,
�..
._;�
,� .
- - �
_ ;: ;
_ '
- I.�,.
v � ' �
_ _ ,� � �,'� � ``
J v� `r
as:. ��— �Y ,��� 1`
`t ;�
� �
` o- � .. �.� � �.a. .�'�
,•�.. "'� ` �-�' � � "�
� , �' �
� , . �� '�
,
-e°�,�, �� � , - ,,�,. �i' � ; �
r w �
�c; �,�� _ � ; � '� "�
;. : �� F 1 - . , �: , � • '�i" �
;,•�. � � � � !. - ,'. V �. . " - � �. _ , . �-�; �
�:� �� ' , V: .�}.
. .
�-
V � . •
',. . . � . .. .. . . .. .:...... .... � .
Photo #19 Flement 321 - Northeast approach sidewalk showing exposed
outside edge
Page 19 of 25
FLOFi9DA DEPA►R1'fVdE�T' �F TRANSP(�R7A�'9Q�
BRIDGE f1�ANAGEMENT SYSTEfi�
BRIDGE INSPECTIO� REPORT
Bridye No: 930227
Inspection Date: 3/8/06
PHOTO SECTION
- ,, I
i _.
�_. . : . ,
_ , ,x`' - �
�, _ ; < _
� j ,;�;, ., �
. � �t ;� a .'�, I -•
.t� , ..:A . .
�"" ":a�.� ` ' �r ! ' .
4 �} .. = - C 1 ' ' I
� .. . ,
• �
' • �': r '`�-� � . /,_ �c:' ., . �:..� , .:; � �� � .
, :+' :t Y . r • i �;��� R j ,r `,
, ' ;�� . • ,�,; � y �, , � • .
.
� .
. a" " 1 � ; �..� a �' ` ?.- s :: ' ?� `'. ti ;
�
r�-., - t ��.+ '' �
� t . 3. �-. � � a R � � � : ,.��
� � ^' 7 ;� �`'i" i �
.. n , . . ,• 1 , .. } � . ti {�. • , �.. �
' �� •'� . y. ` .i � . /Y' -� r 1 �'r *. i. 15 �� -'r
ti ' . :' -t., � �. +�, f �'(k , .. r;, � < , ` - �t ,''
w � ' • ' ♦ "}' " .
'`; *` • � r.a� � � h � ~ f ° a ' � ` ,
, ,: �� - • , ?i• ,�� . �, � n , ``'j�.. ; � �, ,
k .1 , �P'�' r'
���:v , �T . �1, ` � t • • ; � � 4 � ,�
,: �.._ �:.. -�; '''y� �
�"� ,� ' �:'1 , `
Photo #20 Element 321 - Construction debris on approach shoulder �
� �
.�, � � � � < �,.��,, � � �,"�.
� ,iy ��� r .f:' rf��'- . . :�i� „�:_
' .. aP .,��='�,� � e. � . . -. - � . . . . . .
��v' �.. . • - . � .
* . . � , . - . ! . i ' � y
,. � '��� ,� ` : � i � I ' ''�.�� �.' p ~�� � r .=� ^ ' • �`�,�
.
t. : �'.� ' � � '`f; � •� 1 ,vy, ,, r w,T �� � `.
� �''��K„ T'l- ��� �`�;�, { � H. ''�` ��' :
�
� ;
1
;�
-.�
�j'4. ' . r c ;
+.z �y
_ -t�� ;*�.��:. " t �i � :
`��--„r�„ s ia� 51' : f � ; i
� S
�p +v , �.,
3` 1- . •.� K �,� , i ' '� } �i� �� ` F_ � ,� � . .,,, .� f ,.
. _ - .� � • . -• _ . . . , . . " ��. : .£ - ,'K�M\
r� "" } t � . . ' �r ��.r:
Photo #21 Element 475 - Northeast wingwall showing cracking with corrosion
stains on support piles
Page 20 of 25
FLOR{DA DEPARTMENT OF TRANSP�RTATION
BRIDGE MANAGEMENT SYSTEM
BRIDGE INSPECTION REPORT
Bridge No: 930227
Inspection Date: 3/8/06
RECOMMENDED REPAIRS
Element Category:
99 PS Conc Slab
359 Soffit Smart Flag
Remove all delaminated (unsound) concrete throughout the underside of bridge.
Repair the exposed prestressed cables in the underside of Sl.ab Unit 2-4.
Repair the exposed reinforcing steel in the underside of the slab units.
Repair a11 cracked, spalled and delaminated areas in the underside of the slab units
in Spans 1, 2, 3, 4 and 5(roadway and sidewalk units).
Repair all cracked, spalled and delaminated areas in the underside of the cast-in-
place curb sections in Spans 1, 2, 4 and 5.
Repair all cracked, spalled and delaminated areas in the top surface of the curbs and
sidewalks.
Repair or replace the utility conduits along the north overhang.
301 Pourable Joint Seal
Clean out and seal all sidewalk joints.
331 Conc Bridge Railing
Repair all bridge railing posts that are cracked, spalled or delaminated.
Replace all missing anchor bolt nuts at the northwest and southwest approach
guardrail posts.
204 P/S Conc Column
Repair all piles that are cracked or delaminated.
215 RfConc Abutment
Repair a11 cracked, spalled or delaminated areas in Abutment 1 cap and Abutment 6 cap.
234 R/Conc Cap
Repair all cracked or delaminated areas in Bent 2, 3, 4 and 5 caps.
Remove vegetation from the ends of the bent caps.
321 R/Conc Approach Slab
Repair cracks in approach roadways and along the approach slab surfacing.
Repair the fractured area on the outside edge of the southeast approach sidewalk.
Repair the exposed area along the outside edge of the northeast approach sidewalk.
Remove all remaining construction debris from the approach shoulders.
475 R/Conc Walls
Repair all cracked or delaminated areas in the retaining wall caps and plies.
Page 21 of 25
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
BRIDGE INSPECTION REPORT
Bridge No: 930227
Inspection Date: 3/8/06
SCOUR EVALUATION
LEFT SIDE LEFT OFFSETS 100ft.
10/01/89 10/26/05 01/28/06 03/08/06 Chan e 01/01/96 02/24/04 01/28/06 03/08/06 Chan e
Abutment 1 18.0 18.8 18.3 18.3 0.0 20.7 21.0 20.7 20.7 0.0
Bent 2 21.3 21.4 21.6 21.4 0.2 20,7 21.0 20.7 20.7 0.0
Bent 3 23.3 24.3 24.3 24.0 0.3 21.7 21.9 22.0 22.0 0.0
Bent 4 23.6 24.6 24.6 24.5 0.1 22.0 21.7 22.0 22.0 0.0
Bent 5 21.0 22.4 22.5 22.4 0.1 23.0 22.4 22.7 22.7 0.0
Abutment 6 16.7 18.1 18.0 17.8 0.2 23.0 23.3 23.0 23.0 0.0
Waterline at Bent 3 16.6 15.0 16.0
RIGHT SIDE RIGHT OFFSETS 100ft.
10/01/89 10/26/05 01/28/06 03/08/06 Chan e 01/01/96 02/24/04 01/28/06 03/08/06 Chan e
Abutment 1 18.0 17.8 17.6 17.6 0.0 23.0 23.0 23.0 23.0 0.0
Bent 2 21.3 21.3 22.0 2i.8 0.2 23.6 23.6 23.4 23.4 0.0
Bent 3 23.3 22.7 23.6 23.0 0.6 24.0 24.8 24.5 24.5 0.0
Bent 4 23.6 23.8 24.1 23.9 0.2 24.0 24.9 25.Q 25.Q 0.0
Bent 5 21.3 22.0 21.8 21.5 0.3 23.6 24.4 24.0 24.0 0.0
Abutment 6 16.7 17.5 17.7 17.4 0.3 22.6 23.7 23.3 23.3 0.0
Waterline at Bent 3 16.6 15.0 16.0
NOTE: -= An increase in degradation.
Blank box = No previous measurement available.
Relative Channel Pbts Are Not To Scale.
Any Vertical Curvature Of Datum Point Is Not Reflective In Pbt.
The wate�line and mudline measurements, in reference to the top of the bridge rail,
are provided for future comparison. All measurements are in feet.
Page 22 of 25
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
BRIDGE INSPECTION REPORT
Bridge No: 930227
Inspection Date: 3/8/06
SCOUR EVALUATION
Left Side Profile
-+-�oro�res -�-�ortsioa --+-o�rze�os -+-oaroeios
E E
¢ m m m m ° a
0.0
5.0
10.0
" 15.0
0
> 20.0
25.0
30.0
Relative Channel Plota IUe Not To Scale.
My Verticel Curvature Of Datum Point Is Not Reflec6ve in Plot
Left Offset Profile
--.-ovot�ss -&-ozi2aioa -+-oineros -+-oarosros
E E
a m m m m 6
0.0
5.0
10.0
15.0
0
r
� �.�
25,0
30.0
Relative Channel Plots Are Not To Scale.
My Vertical Curvature Of Datum Point Is Not ReBective In Plot
Page 23 of 25
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
BRIDGE INSPECTfON REPORT
Bridge No: 930227
Inspection Date: 3/8/06
SCOUR EVALUATION
Right Side Profile
-+-iaoiias -� �ores�o5+ovzaros �-osroe�os
E E
° a m m m ° a
0.0
5.Q
10.0
x
0
15.0
c
z
0
> 20.0
25.0
30.0
Relapve Channel Plots Are Not To Scale.
My Verticai Curvature Of Datum Point Is Not ReNective In Plok
Right Offset ProBle
-�-otrotrss -.-oztzaroa -+-otrzeros -+--o�toe�os
�
E E
¢ m m m m 4
0.0
5.0
10.0
�
m
A
n 15.0
0
m
" 20.0
25.0
30.0
Relative Channet Plots Are Not To Scale.
Any Vertical Curvature Of Datum Point Is Not Reflective In Plot.
Page 24 of 25
FLORIDA DERARTIIAENT OF TRANSPORTATION
BRIDGE tl�2;�NAGEMENT SYSTEM
BRIDGE INSPECTION REPOR"T
Bridge No: 930227
Inspection Date: 3/8/06
SCOUR EVALUATION
� _ _
,
�,�__ � _ , _
, -.��.�: � .. _. .. � �y
,rt-
i
I
_ - _ - :.,.... - .
. _ y�,.c.-�; . :_ �_ ... . .
^ :.w.. ..� �'��-.:� -'��,,,�: ,�,�,,4s - �'v.-::- .
-.�.- ..� � .� .. �.�.,,� , • - . . . .
-..����.�. '�-�r` J .;"'� � � -+�-'�� ` .a�+ ,y"���i� . .
�r - "'�,�w �°"'•�,_ ^.�"�u,� ''�p`s,,c "+e�, .
. ��[_i',. ���'-.a�,
� � '_�,-+t� .. ��'� ��T-_�.a. , .. . . „ � .
°-"�� o
I � : � .. .. . . . . . . _ ,. . . .. . .
� � . _ . . . - . - . � .
� � .
, . . -' . �' .. _. . ` . . . � � �
' I__. � _ . ... � _ ._ ._._. .- _. . ..-_ . _�_t. ___-__' .. _ . . _ . __ . . __ i
..._ _.__'-.' _-.. _.
North channel (Left side)
I
.�
' ',� ?'s� ,r
i �ti��_ --.. _, _ . _ . ..,.. _���.T2tF�"-!",�"'?�f1�L. -.� �. - -
� _ � .,, `� _.� v w �� _
i°' �. ,
�
� � . - : �.::.x. � :: � -:
. , . . ,. -• � -:
- . ._ . y i..:cc.,,"�pt,"� x 4.
_ . . .. , _ -�^�b� : �
. - .>. ��.' �rn =. .� -
. . _ .?l. �; � � • .
µ��� .. _ , ^�_ '�_ f � y " X'
�:.�..�_ ...r3M-�^'_":. _•.�ly��
:
"-=�.r... .. .. '. �." ... _ .:�'r` � .�1� .'y'4.
_
�
. . . . .�. ::�. ,,._�. -3 , _ . �_ . . _.. __._' �. - _
. . F•. �«. " � . ' '� �,� _ � _�� � �� �� _
.. .. . r( _�..:.v ��i�.,C� 'a� .�'r��
� «-z =.:�'�`w..'.` _
� ��;, = '._`:."�."`. - -- -
I '-�Y y � ... - �
. - .� !, � il��i0. :,� {„J`,..._-f t � �.:o'
' _ - Y '� � .� - f �.�r!i'' - '
. - _.�;�, x ��.�� �:r..'.i�
�. - t - _ ,- � r ,''�' .y ..
- x � "� ' �.
South channel (Right side)
Page 25 of 25
SECTION II .
INVENTORY
II. INVENTORY
INVENTORY TOPICS
A. Photo Inventory
6. Location Map
** C. Data File and Reports (CIDR)
D. Load Capacity Information
E. Bridge History
F. Field Preparation
1. Tools and Equipment
2. Services
3. Scheduling
4. Site Conditions
G. Bridge Description and Drawings
* H. Identification of Fracture Critical Components
I. Channel and Scour Information
* * 1. Channel Profile
* 2. Scour Screening and In-Depth Scour Evaluation
* Not appticable to this bridge report.
** Included in the 3/8/2006 inspection report (Section I— Inspection Reports)
� TOPIC A
PHOTOGRAPHIC INVENTORY
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYST�MI
Bridge No: 930227 Photo Date: 3/8/2006
PHOTOGRAPHIC INVENTORY
- __ 1
I
�
�.
�
--•— - - - - .�i.+±*_� : �er�'�
_ - . - - - --°- - �°� � �,
I - I
.�..
�-'.. __T � � -.:� ���_'
. - �-_ _ -�„�._ -�- - -. -
. _ _ - —" -- -z�.---�.:_ _ _""�`—_ _ _ -
� -•_ _ .. .s.. - �„ �,r � : �_,� _ ""�7! ,� �- ,4 +�►
I � - ,-•-, ...-+ � T— _ ��'a� :�`,�^-�.
� r �ca�y : �. ^ z�c`' y •� ���., , a,+������e.y,,__�_��'�_ y.
' ''-'" - ..n;;,,,,x ,.. 4�"r„��''��•s�t . �;-� '� R +�' .. .�*� �--..w
...�, � ' y . ��� .. �" , ��`_9 ° �� ��' ,�_A�"�x �� .
4�
:� �i' _ � r r .,,,� 3rT' , , ; y ., u r:•� , --.�- -
, � �^ .tr�a""' ..--- �`' -
�North elevation
�- — --_
_ __ _ _
- -- - -
_,�x;,� f -c_r,��....._ .. :_•: _ : .:..._ ..- -- � $
�--�-TT.��..T-� ti �
� - ,,, s_r - - - - - � , ,w-:���
_.. _ J .. _� i! ��;} �j _--� `�_i ;
..,y� .
- - -
� — � -..±.�.- :c _ o m �,'-' � . ' �'�'�. `- "'�'�..."' .�-=:.._.,�._� . ..- - _ .. _ _
`
_.. . . ..; . -- `� � � -
._ -�.�_ .�....�:w...ro-.: . - _ .. .:.. .� � � _
�
, , _
— ,'
-.,....-`�-�r:' - r.�+....._.-�-_ . y�- ` ... __ _.... _� ��....7�:�.:-e'� _ -_
� �` �ty�� . �_..� _ _. _ �. . - . .'='�'.ae?` � ",A...z,,.,�,..�`_____-.e.�"' . � .. ' .
'- � '^��-e'"' !''` } . " _` � � '`'��``�..--�"
-�."�-�.�.+ � . -_ , . _ . ,. -a. � . � � �... . - : � ". - . � �x� �t
. �.r+ ;.'-�,..` `�^-- --- .. - '�'7:`�'°°w^ , . . '' ��rs
�.� �N , �i' � ,� ;.'..+�wbiMB..�;� _,�,-� ..� .e .- ._- rc„"!A` � 'a°�%'" .. ' `�` _
.'.a� �' �r. M_ _ Y . � ... _ +." " ' ' "F
I - �/�':.� �_�'M.� � x � ..,.' - . ' . � «_ -- _ _ . ' -t . _
��l� _ M� ."a!� ,' _ _��_' . . �_;,N .�.L.
I � . . _--____2--__... _ _,.. S�'�d�'..__-_ �.:�'.'k
South elevation
PAGE A1 OF A11
FLORIDA DEPARTMENT (�F TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Bridge No: 930227 Photo Date: 3/�/2006
PHOTOGRAPHIC INVENTORY
��
_'\\
\
l x �" �
A � , „ „ ,�-� �; � �,
., �
,; , q - � �"r � � ,_.. � �;�: Y�,r:
, v�_ T . (�t�� �� �
� � �� -' ,� - - - '-= :tltt:�.kE:t �
-• ��� j�.��,: _ � �. �E���,�
.r'= _ �-�.�- _ -�"�,� _ _
� � _
.� � _ �
_ :� -_
�;. � �
� � � . � ;� - -
, �
, -��4 . \���=` .
' 1 � �
y_
�d � �:-. . � . ;. t , .
u 7 � ` y ��`•
I � r .� l t .' . . , . . • � � :1. � �� _ .
i vr dx i � � . � � ; :
,� '� }; _ ' `�,f�.
+ _ _ � _ � , . � � - . -. ti.� .. � ' .�44�.�j. �.....�+ '
' � . .
i � '- ,.. - . . -
i = � � . _ . ��' . �', � :.
West approach looking east
{ � W:'� . �I� �. N ='�$ _ . -- � -- � --
q � ni
•� V
+
. .. Ji.a }P'Fd'� I
I � �
i ,.
�* y�' �- -` '� _3�3
. :, rrr �11 '� n
, . . � k�"_ '�� -:_. . �
, ... �3��• -._ �
l ' _._ 4•,\�• ..
. ' l..7F � <vJ 14 ±� �
I _ . �R:�� .. �
I : , . - . �� ;�
I ���� � � �r .. -- � f5 f . �, t = yR � . '„ `,
rl� ut" � � } ��� i
/} l
--r' fi :�}< :3^�, �,
e � � � - � . � � ' � {�" ` lyl6
i . , : '�;d� . � � i y�.
i � � F �,� y :
� ; , ,y „
� ,;�: ;: • ?
c a A � :
�� ): ` ;� ' i F
! � � �; �t--'st r . . : �. F ,� .O�r ,� }:�'..
�� y�, �, f f� �. � f�£�1�', �'M�s �./' -- .2� � _ .i ��
; �� ��nt , j'� �.�Y. �� �3� ��... fr " � ��� jf.� . '�`x � :
�� Y ` . � � `�n'. : , f+ { �- ' �'I �i /• �4k<Y . �. . � , 1 �f.-r � r'r�
. 1 {� r-0 � , �� �-- �
� West approach looking west
I
j PAGE A2 OF A11
�
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Bridge No: 930227 Photo Date: 3/8/2006
PHOTOGRAPHIC INVENTORY
� � _ �' . . . ... - y' ,� � �`�`: ; �d' w, , y. ,.
. ° . ,.. 4
�� . � � �_ `I,- . . . ..... ��fi�. 'r � ��' -- -- -
�-?... . yr ��i r"r : ,,..y..;�'"�.: - :�� � � -..a ��.,.w..<.,
n� _ . ' C-." _ _ �_ . ,. __ ' .,. . � � � \ ., � ��� .. �y Mr.
.. -, _w W ��_.... �..�
-" _wv . � �" r "��.-....::.....
- - s -- ' � ' '�
� _ 4 • �
... ... .,�.."_'''t'•v. .. "'.'.�,.—..
v_
_ '.{
/ ;. ..
. .' i '• . . ' . '
� ��" . . � .. . '
. . . ' . . . T '_ . .
. . . �:
. , . ' � � ` ' �1 • � � - .
East approach looking west
- ----- 1
` � �" ,�C ,r �`' ��. �' . a .�,z
1F�..�.�,,! �' �t r�, n'� y �;' -l-, ��'�'
�. � ' ,y�
� �+ � ,�7'. I �'''��'.� � �"�`.. •jw
., ' �; t w� '� . r � _ Y
` .I_ �t���`. �� ,r. Y i �+, s'a� �
�./' � - _ __„'-,--� �''� , x ��
.� t _�� I � *'s, $ � _ y ✓�
'�'' ' t `"�` _
' - ;-,�.,.
" =�"".":�=�
�r�= _ - - � " �� -
�- -� ���"" t"'
_�� � _� _
; .. y_r :,.�
_ »rE` _� ° ."7�,�v..w. ;
,� . 3•,.
- r .;,
.: � i� r',
� � § �- � -
1- r � ~`�` �����'.�
' _ "'alt ! �'�� 1 •�4 _
I
in east
East approach look g
PAGE A3 OF A11
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Bridge No: 930227 Photo Date: 3/8/2006
PHOTOGRAPHIC INVENTORY
� �- "�`; `�A �
- w�. - .3 ,�,�. . II �. .�..,. ��'� Mr'{ r � - ' � �.�� K
y ��'. ��� �L1•cl!'� I ��������� , ��� 000 �� ? .
Y ..5 �� a'raf 8�/�• .. — ��.. - j 7 . ���K
��', ��� �� - _ � _ � _
� •�• ` . . .. ��� ,_ y � � � � � .�� .��
.�''= � '!}"`"1s,. �� � � �? .�
._ ,.1 ,- '�y
� .
-:l�
� - ' ��• !�q�,��
_ _ •:�y,.:. - � ;. aR° _`��'
i � L� -
i �` r` �} {
j s ,� y a�i
��'� _ _ .' ' F` _ . ., . �
� ! �� ..�,` � .
� ��:k�.z��� � � t . , . \\•
"- Y '; � .is' �� - _ \
T� � ,"&r
.{i d r � � � � �`\
�. _- _ y.: : �:a-.. `� \�.\
'-�,'
""�r ..
,--
��:.
� � �
� �.+
'�` �r S'�.A'Y'+y l;, ': r ..... F .-�. �. � � ,� :� :1;,r i, S s � r . ... . . - _ .
'"�� r-c . ' ' f I 1 ���;�,� rs F �. ,{C,. kr�. I; , � ar"
`� � a::�,+it,.. d�s3.ts.t'.�-°�".��� d��
' "���. �� _ .
� ' f , � 1 ' M a ' C .
i �'t�� i �� � �� �� 4� ti . . : . . . �
� �� = �.� ��� _ .�E"� t`F� i '�Cie-�� . _
. �'`� \. r
�.��k`�e .� � �' `.�wy�� Y. ,
�,t r �{
, .'f�d T.fu'i, v . .^� .� . �`.-{�,° f `' r4f..':� �
Overall view of bridge deck looking west to east
_� . . . `^' � . ` .J . . _ T+��^ ��ey.
� ���-,� ����j----'.�.► _��� `, -� � �---=--=�;���`� � 4 ��`'� ',� ,
'` , : J � � '��� ���� .`' ,
e� �
� �' �.� � ��'� ' �� �. � �..
I �� � . r.,� ' �' �� ��....�
�.
� . ��
�.�: �, -_
, �
� �:
_ �-�.�. . «��;- �� '�
�
,;� ;
.�,, r.� � ,:;
3 .�C� `' .,tFa ;�s-- .
Y , T�
:
,r� a
View of Span 3 deck top looking west to east
PAGE A4 OF A11
�
FLOEiIDA DEPARTMENT OF TRANSPORTATlON
BRIDGE MANAGEMENT SYSTEM
Bridge No: 930227 Photo Date: 3/8/2006
PHOTOGRAPHIC INVENTORY
�� �.. �:, •�.' -_ .. • . \ ', /��- . �`t� I' � � , '7�� 'Q .
I���� �E���" �, 1 ��� y L T� r � , ~,� a7 t �� T' � T � ��y .
r •T r '� '
I l�, ` � ����� , � �j�i � 1� ?ycC n :� ��PS. �,/�� ` � .
,, t f �r < � • s. t .r � � � , -, �r
.. �� r ` �% �`: ' �. ''' �;1.�j .� ' ,r4; ` 5i• ' �' ��' ��r� � �` � I.' r�'Y.�'"' `�f) ..
�.�.7 � �' la, ti+ � . �� , ��! �:, '� .,a:t .�#t � �, yy � �j�� � .. ! .. • ��.
,.� i,,�, ;�'��+ '�'• - ;�ttt�, .f+' "'�f �''�.� r� ° t., _.�'�. -
�� .° . � l rf � �r '.�~ � /v�h 4�.. �'y tf�' t t Y� . y �..� ..�.
„� �. `ri� �I ' *��1 M� � � , •�l � `4+'Y � 'A •� _ � . �.= O
�' - r.} `-. 3' � . Zi�' �
�a� a c� Z .S� � � j � �i�i�� J+ V����1/� �' F�
�° "'.+► '+ � i'L�Is` . � 1 l�� � 7P'�x .;�� �, t<� }� . -��� ��
r y 3, P � J . �, � �). ��7 ," �� � y � . � ^ � �. �� t
� : . . b: ' � t '� ��t L' � t i �• ( � //t` � �f � � ��4U. S<': '� 'v�t��/ , , ��n�Cxi t'� 6 f, ,
•.�� ` „�y ✓��� Y �J.'�C. a � S���h� . ��*t�� } t � .t } '��^ ,,-( ,i
, fj r �� „� ���.��� 4�.. :1:"'
3� �}i� a � *3 • 4q`u�, r� t�,�( �"�� ...A�
�Y� r , Zf �
� : .'Y�.• J. /' l.
Y ..¢ . .... : t �
..�f . �. :. t; � � ,��
'���•� r � _`� � S J't, l`l:�' ~.�.
ei ,, � �/
� � rl �) � I � �(���.
''i '; � "S4t
- • �
� ,� �1�� L' . . . .
. . � y+
r � � i ..��,. ..
' ✓ ..
: _�` � .
-^� ��� �
Southwest corner (oncoming)
'� ' , ` T ti "- r � � -'�
:4 r4 '
�r.�i1L a � �sr�:.- . •:�..�- ��'. w•
,a , ,c
fi � ~�� � � `�' ,
a. e -
_. � _ - : �� f ..-` � ;.� t
�' �:
� , � � . - . �� ,.f . �
- . � ' . .,�� � ,'Fr �` � ^ _
_ .�y�� �
. - I -�'i;;� /� � _ .
,,,. �- ,��x� ;
- � . °•��" �,�. � �.k �.-_ �
a�sr,� ;.
� �
. , �-�y��:� .,,�' y
, . � -��.►�► ,: --
,, ; _ � �� '�. _
;" .
t '• ' :�, . . r = '
x_ � �
t i: :.�' � r .
i �. s: �,,- - � . :
f � . . . - �,:.
, , .,..
,� .��
� � w �.:
. ._': � � -.
, _ �� ,;
:.�*�
°---�e. � �
< <-�
_ , _ "� ° rs:.
Northeast corner (oncoming)
PAGE A5 OF A11
FLORIDA DEPARTMENT OF 7RANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Bridge No: 930227 Photo Date: 3/8/2006
PHOTOGRAPHIC INVENTORY
.'.r �r�a- � � `_( ..�. � .'�' � =:i� ,� �- �� . _ - , "t
'tl I�I"' t.� �� " � ,�
"�"~� . �!�' � l �:..�� ...i
t�
�;,. - = .�'_ . � �,� , �.
� L°�� � . � �' 4 ' Mf � �'. .. _.a � � •
� �� ' � 4 ji. . . ... + : �_ . .. . ..� 1.
� , � .. I r{2�. h ff. - � �. � _ �
\ ~ �
'�: \�` � '�1. Y ' . — - t
_ �� � :�� ._� _ _-- _
N�� K � _� � �� ' 1 , f � . `; � -
� ^� }i C- � �, i �.
. � _ I $ -
. ; ^'�
� . � < � 1,. ; �. � ,
_ ,,�;'>°` � . , �.. �
.� ; (I .
— + ,!
_ �,�`,;?
' ` " . - e __ . ;.�,
' �„�.��.. _.-
- _ _, �:.�
i _. "'r''_ -
' - r� 4 �.; ., . ' �` `_
� � �...
..;�Z' . _'� :� 1',.•. . . � .
��.r. _ i
, ry
;; �: �. �:.,
_'�:� ��'°-�.�M,; — — - — - -
Southeast corner (off-going)
_ a! � �-,
. . � T-s' ,�:
. .. �� J`t -;, T 5 ����'t.Yi*���� / ��. . ,�' ��, � � !�'� i �' , /
.a�. ^ � �. � , `�. ; �� t`� �� �' �e� � :�.
� ; , � � ..,,.� � � s�����'* ,� x{� �� ���� � ,
4 •� �'7 j4;' y �+� •'. . � r C �� . r� A+ t � ` .��-'..
I�7' .�,� � 1 G f ,{f � .� � � �� � � � r�
�' 11 Ll :�� , 5 �.f�.. �i �Y
�/' .•� �1�. ..t ', l�M� Ya ��1�� �•� _ ���
'� . T �V�� .t:� V, _'�
t�
���� ; . , 'H .�- �"
� , . . - ;� �, �"}'
('.. . � , . 4 �� , '+��� �•�� t.ji�+41 � - � vr
i� ��t�
..�;: _�.,��_.-.�." -. ��'�V. ' .�4 �'.A1 'tG'+,}
t 1 - w J L'"
..,�. . � � .:.,t� �:� ,_' ' `
` ��i
- 1 ." .
� � .�: � �
:��s � � �,� ��
� . •"i � � '. �. . `
' tifi� .; .
.j
��''� !�� .. _ . iwF.�i
I '�. t <�r�, '. �. ' .. �
-- .Ry' o �ti � _. ..
{,
.�y.; .��u, .
� =;- � � ; r� � ----
�_��r,.:., _ _�..:
. ,� .
� --- -___ — - ----- --
Northwest corner (off-going)
PAGE A6 OF A11
FLOR'DA DEPARTMENT OF TRANSPORTATION
' BRIDGE MANAGEMENT SYSTEIV!
Bridge No: 930227 Photo Date: 3/8/2006
PHOTOGRAPHIC INVENTORY
_ --. -------- � ----- -� -- - —.r— --
' �'. �+ � .�� - '� �
.� � � .�; --- `;��
� §
,
,� �., - . �
. ��'� ��'� ,� � - ..
. �
_ _
� y����
� � +� _,; ; �� ,r
i ..� 7 ��, ��,,a �� f+y �`$ - ?'." t
�.` if ::�,�s� �` .
j ,
�, ��. �
, ,.
' ----- — . _ _ .:
Bridge number
��� �,
,
�s ^ C,: �' , ,. r
� b !.: Il� 4 � . �`��" t � , � � � � }rq;: � �� �'.I I :. ' �
t . _ .0 �
*' - f • � �'-��— - _ ' , i, - . '
� ��y .� _ — ' I �- � - .-iR19�ri�+r^� . ��-.�� �
� IdrJs
�� ,., �� �
' J ���
� - _
_ . .�
- - �; �,
�� � _ i'�; << ,
�� t .
, �i ;
��
II I . -�. �•, � _
. . . �; . 1 `1 �,. �
��'
• . "�:� � - �
: ' — ..} . �R�? .. , ���
r
� �
I r "�f I � ��
I ��
� Bridge railing - Typical of both sides
PAGE A7 OF A11
i
S
� FLORIDA DEPARTMENT O� TRANSPORTATION
i
BRIDGE MANAGEMENT SYSTEM
Bridge No: 930227 Photo Date: 3/8/2006
PHOTOGRAPHIC 11VVENTORY
� 1 � -- � �r
I /' � -
` -= ���� �: . �
� �_ - ' '�:+�� .. . ,
,�' - -�` -�
. . '. � � . ,•` `�1��,
_ � �l '
,
�` .._ ., . '. � - � � . . ._ ... - .
I � ... . _ �t • � _' .'.. � . ` e5 � �
� ��
� n KT:
_ ��,..- ' . .� _ _ _ x:
. +-� - a.��".' ^ - -� �_� . _ .!t -
�..r' _
� _ �
. . ,
� ,�o'C�b� . _ _ . . �����;: � -� .
'.�`-.�._ , . _ ..� " � I
' �.i:' - � ;�.' . j � �� .. ,
♦' ~ !. � t -�` '� ��.
'. j , � S . : `.
..' � y� ��� �.� . . . � . � " "
, . �:iN7L�� � r�'��1�►jl ' i.!R�!`:� �w�� 4 ' � l. �
, �. . ti , M ,� �� �, � i �:i {�
. _, � ..._. ��'s. .�t�l�l .j �l � ��,ti .��_;� i
, _ ......�_...._ ._ _ +. f �., i � � . �.
i
� � �' � -
a ' _
Typical view of substructure and original superstructure (Spans l, 2, 4& 5)
\� .,� r ��;,. f �. �� "�� � t . — �
� ' � �
�_ ' ::.�: ,i�.°, . . '. .
'', — T .a „�. _ =
� . . ��` - � ,
I . . .--. . ...-a � _
� � fl ` µ�y, ti �,�
� . ,� � ; 3.y;
.. '
, ` � Y . �'� '� � _ � � t''
. .. �G.•� �I , � � '�1 �� , �, d � �. �
. __ _ _ - .i'Y. . '..;.
f '
�.. q ,,
�' '. � . �� : ". . . .
I �� .. � r � � -� �'�ti ���.'. .. � ����� �,��� ��� 'E .
� I • ' ��� �. .. ,��a �� -u. .__ ' .+'�r�'i �r" . �- f. . , .._ ..
�� —_ �` __ ., _, •� ' - ."fYG; I �' � T
. �ert� , . .�r .
�.
r; .
�4i.:�« . - '_�•� �'� _-
.,� �.' '_ - - _ � - - -_ ,
.. ., �' � - �.. _ .. � � _ _'_ ' _ _
���.. __ _ _ --_ � . _' �_i. _ _ _. _
.. �_ _ '_ =_ ' �\. - _
� � �_. _ -: �_ = 1 c _ _ _ — - _
� . � �.` � _ . �� ���� _ _
�T. ... _ i— �.��
.^d_ , ,'�� -- ����.f `� _�- _ -
. : �,__=.� - - i' . " r_ T _� �a — _
View of substructure and new Span 3 superstructure
PAGE A8 OF A11
1
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
' Bridge No: 930227 Photo Date: 3/8/2006
PHOTOGRAPHIC INVENTORY
;�,.�.s._--'�'� „�".,s,. � ;�.-__ 1, -
' i _ � � ��� �,�
` I+y ` a . � _ _ _ � � . _ _
. " �� �m .. M1 . .. . _ ' " �I
4 • . Ir./,���r� ; . ; ,: ..: �. , z , ,,, ,�; . -
.. y J tk�rr.�,�."� s� � � ,�..�_ � - > > i
.s., •,��_. •-�;; � ., ��s�f " . 4 r ���Av� � � Y a iD�,'''�
-- ` .,t�, j diir_� �rr � ���♦ � .�.,'.�k�• �
a '�/�r,�,� �,�`. � -I � '�'y y p _ ,,,,, ': '� ,'`•.
f� �"7c .��. �'y
- . . � ���. ^ .._ . - +'1 .
r
� � �'i14 �'W�r+ � � �' �
'�/r�� a4 � '" ,
• ' � y �, , �t y ��i/ ( � iy . �f � ���,�� '"� � � �'�'��M�,a s� ; �,�` � .
'��
� . � ~� r � . �'�I � � �� " .t . . r . :. . � �,a'.+ I K+ j � .
.? 1 Y i� �� .��. � � ��� �� , � .
�, 'I �•, ., ,. ��,� ,�_v,�,-•�r�
7 „ Yl(C r. .t � .. Y _ w�iel
�� ' `x' �` � .i '�. ,:.."�t �'�;,`�'"'•R � :
t� " _ � � �s'a�@r µ .� �'„Z p,7 �I�'i(� � �r rf �- �1 � �'.
I �= .�� ..�+ � �� j•,-,y�,'J�. ��5����, . `� - a"✓ � " �
'� ,.�� e° A y � � '� `.'�^ 7 �
� • ' �"' � � �A "��� •..�i�FriS��� :r�4 .�y��..'. �y�� ��� �`�' � ��'
ti
� r : . 1.,,�,. ,. - . + � a rrr��k. 'F : -,� r .,� jy -.
t t �"� �a�� �� �� �� �Ih �� . �
� � .,(. 'h`' . � "Vr.� �'�; �M'�'r e..
. � f.+.Y�.�. yY ..! �..•C.k ` 11` , ..1n;�."t �' t�� ..
•t- .
. ,. . K
. , . . .. . . , �
. . . . �. r-'�
f i1 � , �1� r"�y � � .k..1 ' � I :�! .
. �� � }, � h 1 k a ���' � �� 1 .
I �.`t� / �_ F "' ._} �E t S y� y� � k1�R2 � I���i}�4�.�..rr�\ �,�'
J �^
' ----- --- �f-.�'�w �c�lr�.�. rniF!'.�nn�+���_l��_ 44. _ � �l� . �.��"..Y:$t.�..
Northwest slope protection
- rw�� .
j , r-�r,
��
.
�,
-. . � .
�. � . - - i- �
, � �
�i
I ' _^`� .. . . ` ` 1 ! `
� ,� r +�c,� � - , . . . . . . ` . . - : .✓ ` R : -�.
i - � ._ � ` ,��. ; r , �.
.
± ;, '" �` �:. •,
+ .�- �. : , ' , _ . � . � ' �` ; �o� ; y r -
I � ti' ., y �� v `� �" _ `` - , � s -
i `N �'va� . _ - y ,` �� , r� J '� '�
I v ... ' ' �— ' �, ♦ \ ` � .', � :..' : �
u . , : _- 1 \ - ,
r � �'t��'
, _ ' • , �• 4 V , . \
. _� .. ` . . \ .� .
t _,��,� ��p RMw , ,L . � '
, . ��i ~ � •
�^�
.. � .�
�, �� � " � + ' J.Y C. .
7 r ,•• ..
�� � gti;+ � v' w 5t: �_ A'' �
� � � '.� �„ ; s w ` � '' k �;: • ��� � .
„'f.. �� f f�J. �� r r.i, +• � rx` � � _ f-- •�6 � ° �t
� . � F ...� �,. ... ,'. �,�,'aF . Ij... _ !2 7 � �Jw.\�'�1
- - � °q. � .+ ��.
. ( *- �-,lCY.L , ,�.'. �� � , _ y � k 4 .. *. h� R . ��
,,�� S
: L'i�t �Fi?:A � _. . _ .��'oJCc� 6,-. �,� . _ _ .'_ .
Southwest slope protection
PAGE A9 OF A11
1
�LORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
t3ridge No: 93022 Photo Date: 3/8/2006
PHOTOGRAPHIC INVENTURY
- --- ----- -- ---- - ------- -- --- --- -- _ - __ -- _ �
,
� I
� I / �� .
�����;. ., � ` - , _ .��� 1 � .,'_�_, ,� ,
, ' w`,_�.`,��-.`.
� � � ? ; .�
'r
� . . ..+...,.... ..
� �. �1! � i � ` w .+.;.:
k ' ,`� •..� a` , ` � .:,,.-.�.w� " ``. ..
F� � V�..
! g � � �_ V��F�fV
i , ! + �' i n..? � �41 \� ` 4�`. ..
� �� k- ,�? � �`} k " • � \_ ��.atr`r�' �� ` �
=a '- � a . v�"��
. ' .:^ w , ... f Z'R3 ' . \ �`.,��� ��v"� ' � _
Y y� ' j � � •� � � ��]�� y � , .
� ) ' jc - � J b � ' . ♦ r , P "` �YYtY 2•
� � } . � 4't}. ' .[ �
r�+��` i a,_,, y T x����r, i i ` v r,. ,. .
}��'�,^ � � y 4 �'�"`� A�� t `' . .:tb �' +1Y� � _- .
1 � ,��,�� t ���� ��' r '�, — -
. T'� � Y p ~ J �� ' � p� r� �
i � �' S< y �� X � J'n � � ; �f
C 1'� ���, �� �,`�`�'tl .Sr ° l,.a �5''` �:l 4 r �.: � '� � ' .
rs � t��
�� 'l ��� � �• ��� ��!� � � � � . .
x ^�� �r .k� �� y ,f�2����...f �- �.
} � - : ' «�, .. n � . ��;.
':�' �;. _ __ '.
. r � ..' � .
Northeast slope protection
-�=— —
- 1
�__
--
�
� ��.�. ���� . r . - �_ ;� �' =�3.
f N �1--�' .
, i` , �' � '"'�'� .- ,
;'��YY�,(y,�y''`-`,'�A � ,:}fifi'
� r a . � r ,yj �''
� 4 �" I � { ,�{," + �y�� . � � �
---.. f � � �
, 4d y,. - i .� '� �.�,Il$ �:A
� Y, atV,,�i..e , +.,� �
`cy�' �<.. ��' ,2r� . �, � ,�,��� ✓,;;�
� _ .:F�S
`.� y �1 . � �(i' .
_ r' . �y �
/� ;�� ��a� ;�'•� :.,
s.
,.,�..�" L ' ; y c �.;`. ' i�`:
� i�'"� '+ '� . ���, �.
'�` - _ _ ' �4 hr.� ��1lk' x {.. ` � , ;1 : �. ."�
I va.. " ✓'1 �.; d ' . .A
�:.:.. »�.Y�� ' ,.. .
w } � `�•
'i� dq' a�;��,.�. �t+�� � �
. . . �c � � ,� �• i,`'[" `f '� �^' �
. iF "�.'+�� �"W" ^ "� ��! .' � ��'.�a'el,: ..
. :. . ,�: �.I� �F'�. ' : + �: ` �
T J� �C �p� .. � l�k:,y �«l,�}1 �I•` �
.p� �.t r � �- l�t.� � t+�a, �
� r .� R r. .:� f �r t � {1t ��!F � . �.
!,. �e. � � �KU�!i�4t :�.� ,�',aAy* �� C - ^ c 1 -�:
+.� �. j . �w�..?�' y` • � �, 5 y �
t��z _ _ ��y.� i �.� . � �f�ii�� 1 ) �. � I
r" q ".;' � rr+�:..rh � : � . k ���5 j;' y� y �.
� i , ti �' v� � ''� +��
v "''�� � � _ 't�` - a - �' .,: .+ ' � � �• F� � 'k�s
y �. ;�� ... _.� {� �•fyY� � f ) I `7
~ � { � > ��� �� - �J F � C ' 1� '.a ; . e - � p� h . ( ' " P'�'!� � ti�F b � , IY .
'�' � +A�'fr`r� �"� � `'!-` .�`� �;�r 4s A''/1��� z .�,� . ,4.
� ,� t Y..� � . ay, -.w ...�I� � ° � N _ . _ f ��ha- 8 ,�y�� F I � �_`
I .� t � � �l � .�, ��,i„���2�, . .� ..'. i .. + ' S
1 •: .. SS � � -.1t'+' ;� f y1rdfl.�'f'9: �.�- �R�,� � ,� . l {I `" ♦ N .
� � �„ ,� f r* r � e • : '�4�- � �'.� � � .,.,, �3
� - +��� y S"_ �1`ti-'�'� �.�. 3`�' �'b,��-: -'���- -.1.
i Southeast slope protection
I PAGE A10 OF A11
�
�
FLORIDA DEPARTMENT OF TRANSPOHTATION
� BRIDGE MANAGEMENT SYSTEM
Bridge No: 930227 Photo Date: 3/8/2006
PHOTOGRAPHIC INVENTORY
I
;.-,_ -
� � �. ,;;;.�: "�' �-=�: - ,� __ I �.�.
�� �
- , . .
_ .. - - . � s
- �. _ � :.
-� ,,,, .
_ _ �. "' /y ,,, . -_ `:-- y i _ _ �-, . : "��.- � ., + � . .. _
�� / .;r . � ��..� -!�,� �...i�'� � �^ _". �+.'�' r '"�. Z A . •. ti . , . � ,
� �'- � - -,� n "� '�.rw . `"?� ""-'. - . �;�.+r .i;_ o :: -aR,... � ,yy. �. �. - .
�..�%��,•���,.�^:r -�= _.rf'>i'�cy,=i'�`�� ' 'c1�� �"�:.. tz ,1. . .
I " i:i.
(
1
� North channel (Left side)
- I
I
I �.
� wKwrc�zs.�c�"_t.;..r,«-�t�'_����dY�'�°"'•�t,� -
?����'���..` _ -
� '��,.� ; ,,,�-A-r.=,
I �
I �
�� _
i . . _ _ F . � .. �. :�Y_ _ ._ �"_ =� "rs�a-� � �i�'y 4 �
.. : ..- _ . . � � � .'.-� �' _ Y � __ - '
� � Y'
� } � �� j• �
r ���.
� �: , � fi� ��.
: ,...,.- � �
I i< �� p;i:?. r c r z"�:�. _
� � ` � r.
. , , l _ "' .Y�Y.:F'.=.C-�= �'1 �. .
South channel (Right side)
PAGE A11 OF A11
FLORlDA DEPARTM�NT OF TRANSPORTATION
BRiDGE MANAGEMENT SYSTEMI
Bridge No: 930227 Date: 3i8/2006
LOCATION MAP
COUNTY
-- — ----
' Palm Beach (Village of Tequesta) � " ,,, „
' ���
� Te D A RRIED �---- �--- -- ---._ -
� ,�
q ' _`
, ,
930227 �
' -L.MC•:4s � 11
FEATUREINTERSECTED � ���
, i ,e4���e��� I�l�
North Fork of Loxahatchee River -- - - - - - �
I � ��,
I
LOCATION �� �� ,�, ., .„ �,, .,,
1.2 Miles West of US-1 �` ,�
�� LlmestoneCreek - I
1f � \ \�I(B • .. _ _ _ S� �� �.P�
(�
1 P
. � 1�1�� ��� � ��
e�u � �\
� ���il� O � � ��\ Q
� 'q�IN � � .•i�.4v�
. �l �\
oa�e,w�7i�a�cn.,sus.uiws — -- � � ---- �
o r x
nvm Jclw*a?m fe� AN (5 6' WJ D!s 2acm I].0
i TRADEUUINDS CIR x
� e ,� � POPLAFt RD � ��,p1P
, G ��'YLJp,_ Q�t��� A CYPRESS CIR p �ti,yp,G��'JO ��
�'� LESWFElO C1R � .�.:
� �SN�AP�- c� v �C � � 47 �L 't,4`I
I STARBOARD WAY S � o Y 0-�H �'IDGE LN � � a
m
U'JILLOb^JRD y ST�Ub ,
�' GOLF PL 9 91MINI Rp � :,� � �� � p�
�' �' �� !" � PINETREE CIR �
'� � ` _ .Y`' S
� x Q y �
� �� ? � OULFCT �� , � WESTWOODAVE qzqLEqCIR . � s
4�` r` ,� '- . � Or�Y.IAND CT �
, � F4�� g �N ro � �, HOLLY �R .. "��.KLEAF!.f
� � a l 2 m Ig.��227 z zw
m
� WINDWARDAVE � i ° sq m 9 .�ppR
d � � o � 'CEQ
x� S� = o �
f � �
O ���� TP.l�IlBS�� my o �� . -
� a Q m �; �- BRIDGERD
� BAWIEWTER CHUftCHRD �� ��
� o � ¢ o � � ''i\ . �
� BAYVIEW CT $ � � fRANKLIN RD D � 9 �
RIVER TER
N � � � �,; ,
RIVERDR � ���i� � � �' � I �J
�r 4 fl I
V�'�� e � � ��Ck� p E WINDSOR Rb
� WBEVERLI'AO �a ��
� � � m EYEBALL
.p� NORWOOD ft� x m '�s �
Q � � � m N 1
i^:QIERRD � �, A = ...
j y D m 501
R��� ° o � o �'q�y�'S' "� m
s Tq� � � � , {
„ � ` �
POINT W E o
� a����9i;1�_ � (_
DMa use subjed to license. — —
(� 2004 DeLorme. St�eet Alles USA� 2005. D 600 loaD
www delorme.com MN (5.8' IM1� Deta Zoom 13-6
I
I
B1
TOPIC B
LOGATION MAP
- roP�c �
LOAD CAPAC ITY `
INFORMATION
STATE OF FLORIDA DEPARTMENI' OF'CRANSPORTATION
D: LOAD CAPACITY INFORMATION
:��.
Ob9] P�E t Of
1. BRIDGE DATA
Bridge Number 930227 Date 3/28/2006
STR TyQe Main [BID Ifem B1(43)) SOl STR Type APR [BID Item BZ(44)] 000
2. POSTING DATA:
Posted YES If yes, ExisNng Posting Needed YES [f yes, Proposed
Resh ST Restrictions SU-32T
BID Item H8(41) P BID Item H11(70) 4
BID Item H7(31)
3. ANA�.YSIS DATA:
A. Method of Ana(vsis: C. Analvsis Based On: D. Data Stored:
X Load Factor X Design Drawings X District Office
Working Stress As-Built Record Plans Central Office
B. Analysis Svstem: Shop Drawings Microfilm
X BARS X Field Measurement Bridge Owner
SALOD Catalogs Materials Test Lab
BRUFEM Sample Testing X Other K Drive
Load Test Other Other
Other
E. Conh�olling Member Analvzed:
Material: Function: Substructure:
Steel X Slab Bent Construction
X Concrete Stringer Piling
Cast in Place Ftoor Beam Cap
X Precast Girder Pier Const�ucrion
X Prestressed Culvert Pilitig
Post Tensioned Truss Footing
Tunber Column
Other Cap
Soan: Shaoe:
X Simple Rolled •
Conrinuous Built-up Weided I�act Eactor: __ 0300
Frame Built-up Riveted
Slab: Box Shape
X Non-Composite AASHTO Girders
Composite X Other Voided Slab
4. Load RatinE Summarv Table:
LOAD RATING SUMMARY FOR OPERATING RATING
GROSS TONS
VEHICLE OPR OPR SPAN CONCR
�jyp�i �� RATIl�'G FACTOR SPAN No. LENGTH MEMBER M or V LLDF
SU2 17 31.8 1.57 2 34'-5" GOl M 0.680
SU3 33 33.0 1.00 2 34'-5" G01 M 0.680
SU4 35 32.5 0.93 2 34'-5" GO1 M 0.680
C3 28 483 t.73 2 34'-5" GO1 M 0.680
C4 36.6 44.1 1.21 2 34'-S" GO1 M 0.680 �
CS 40.0 48.0 1.20 2 34'-5" GO1 M 0.68Q
STS 40.0 50.0 1.25 2 34'-5" GOl M 0.680
HS 20 36 42.6 1.18 2 34'-5" GOl M 0.680
HS20 Inventory Rating 25.5 Rating Factor 0.71
5. Comments
Member GO1 is a prestressed concrete voided slab with a span length of 34.416 ft.
Member GO 1 has a large spall and exposed tendons. Reductions for material strengths and section loss have been taken. _
6. Computations:
Performed By Jason L. LaBarbera, P.E. Date 3/28/2006
Checked By Patrick Mulhearn Date 3/28/2006
Reviewed By David B. Thompson, P.E. Date 3/28/2006
7. Resaonsible En2ineer: Jason L. LaBarbera, P.E.
P.E. # 64004
Date 3/29lZ006
foyooy
�izR /a�
KIS(NGER CAMPO & ASSOCIATES
ENGWEERING • INSPECTION • PLANNING
JOB_ �EQI�ES � A- V'Rxflc..t ovGq �oxA��ATc-µ� COMPUTEDBY �L-L- DATE 3�a-8�0(v
DESCRIPTION �--o��J R A SsJ V CHECKED BY PD(�1 DATE _��
���� �� ��—� SHEET y OF 3 METRIC
y$" P S U :
4� 'i „
a-T���, � s.R, '�'' 3„
szRt�Nas �-1( `iZ
Q � �� r� �5.�
aa-'/��' � s.x. g
5^�RhND s �;,��
r4 � $ �� �
�}D,CA vfi PR�s'�R�.ssZnYC� S``EE�- :
' ASSVn�� ?,o�ro {�RFR- l..oSS a9v S C�p tTUM 1T ���j1S
� flssumt 30°� Dsp, �oss � 5O i SE�ssoe-+ �os<
AR�ac ' O Io�sq -�„ZCt�� + o.�a$.tizN�(o.5a`}� 51
�a�a �ao-c� _ �L. 1 a 3 -xN'`
/�R� C-��A`� ` ��} � , t 045`1 �N
�R�� LTOP� " O . `�, T � -s.�
�yo�y
3/zq fo�,
KISINGER CAMPO & ASSOCIATES
ENGINEER(NG • INSPECTION • PLANNING
�Qg �EQUES - 6F�S.C�� Ov�.R � 5�- DATE 3I �`� l��
DESCRIPTION LoAI� RA� - su c3 CHECKED BY P�M DATE 3 I2 a'I0�
SHEET 2 OF � METRIC
mA ERZl�L Q {�oP�R � '•
' RF �UG-E `_: �RE�C��' N �Y f Q°j�, �O (�CCOUN � FOf� UNFoFiSE�F-ti1 ��3�� W,
��c. = ��UOPSZ � �st. � �C = yS�O PsZ
F's = 'dy� K�s � Us� F's - 'aa3KS�
CA�c��A-��. t� FA��oR : � �' "�.�`3.`j�
Ass��.c we, �a*,� or.� ��{ .
�J = ! �'
L = 3y,y'
K = o.$
� L \
G = K� = o,� � �y' }
� = o.a�
N� � 1
p= C s.�rs - 0.5 N + o.� N� (�- o.ac�
4=� S.�S - b.s (. ��� + o.� C t� � � - a• a(o .ag�1 2
D= 5.$�
LL DF = S ' - y
p - s,g�
L L i> t= = O. C g
KISINGER CAMPO & ASSOCIATES
ENGINEERING • INSPEC7iON • PLANNING
JOB TEC��s�s COMPUTEDBY 5�--�-- DATE 3/ag(b�
DESCRIPTION L�Af� Ra iT..NC.� CHECKEDBY QpM DATE 3�
SHEEf � OF � METRIC
CAL.Lc��.R SuPCR �MPoSEC� DL :
3� rtSPN(�L"�' LoNG,.R�"�� CaV�-k�-.A`� : USF �`E`a -g /FT�� �o (nAT�t+ KL.10�{ MoQ�L LCo�Js�
Wnsr���. = l �� - �\ / C li-ly � j= l�Iy .o �
jl.
CLOS�RC PouP� :
(/ " `l �\ �-6 1 1 \\ / L
W CLOi� ` \ 'IZ / C I J C ► 5 � /F'C� / (3 GSP�FZS J = l� �. � �iFT
C�R[� ;
Cis°' + ��.s" ( ��.s` �� �
W�a� � � a \ � � � l S � �F ; �� � 3 GiR9�RS = ! 6 s , �3 ` z
I,J-so-�A� = 1 y y . � ` � (o a .5 `a/F T + ! � S . 8 `'��fi ,
W -roz�� = 3�a .3 IrC3/FT
LIST OF ROADWAY SLAB DEFICIENCIES
(SLAB UNIT 2-4 APPEARS TO BE WORSE CASE)
Pontis Element 99 PS Concrete Slab
Note: Roadway slab units in Spans 1, 2, 4 and 5 are numbered 3 through 9.
Sidewalk slab units in Spans 1, 2, 4 and 5 are numbered 1, 2, 10 and 11.
Roadway slab units in Span 3 are numbered 3 through 7.
Sidewalk slab units in Span 3 are numbered 1, 2, 8 and 9. Sidewalk slab units
8 and 9 had previously been identified as 10 and 11.
The following is a list of spalls and/or delaminations noted in the underside of the
roadway slab units. All conditions noted are at or near mid-span unless otherwise
noted:
1-8: 6' x 4" delamination south edge
1-9: 3' long x 1/16" wide longitudinal crack adjacent to Bent 2 near the center
2-3: 1' x 3" delamination near the center
2-4: 8' x 3.5' x 3" spall/delamination with exposed rebar (4) and exposed prestrassed
cables (5) with up to 30o section loss
2-7: 3' x 3' x 1" spall/delamination (no exposed steel)
2-8: 5' x 3.5' x 2" spall/delamination with exposed rebar (2)
2-8: 13' x 6" delamination south edge from midspan toward Bent 3
4-3: 18' x 4' x 2" spall/delamination with exposed rebar (2)
4-4: 5' x 3' x 2" spall/delamination with exposed rebar (2)
4-5: 5' x 3' x 2" spall/delamination with exposed rebar (3)
4-6: 5' x 2.5' delamination and 7" x 5" x 1/2" spall with exposed rebar
4-7: 4' x 3.5' x 2" spall/delamination with exposed rebar (2)
4-8: 6' x 4' x 2" spall/delamination with exposed rebar (1)
4-9: 8' x 6" delamination south edge
5-3: 3' x 1' delamination south edge
5-4: Intermittent span length x 8" delamination north edge
5-4: 8' x 1' delamination south edge
K:\Structures\Bridge_Inspecti ,IST4\930227\Tequesta Span 2
* AASHTO * AASHTO * AASHTO * AASHTO * AASHTO * AASHTO * AASHTO * AASHTO * AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*
A A
A A
S S
x H
T T
O �
r. *
A A
A AMERICAN AS50CIATION OF STATE HIGHWAY A
S AND TRANSPORTATION OFFICIALS g
H H
T A PROPRIETARY COMPUTER SOFTWARE PRODUCT T
T T
0 p
* �
A A
A p,
S g
H H
T T
O 0
* *
A A
A AASHTOWAREtm BBBBBBBBBBBB AAAAAAA RRRRRRRRRRR SSSSSSSSSSSSS A
S BBBBBBBBBBBBB AAAAAAAAA RRRRRRRRRRRR SSSSSSSSSSSSSSS S
H BBB BBB AA AA RRR RRR SSSS SSSS H
T BBB BBB AAA AAA RRR RRR SSS T
O BBB BBB AAA AAA RRR RRR SSSS O
* BBBBBBBBBBBB AAA AAA RRRRRRRRRRRR SSSSSSSSSSSSSS *
A BBBBBBBBBBBBB AP,A AAA R.Ft12RRR22RRR SSSSSSSSSSSSSS A
A BBB BBB RRR RRR SSSS A
S BBB BBB RRR RRR SSS S
H BBB BBB AAA AAA RRR RRR SSSS SSSS H
T BBBBBBBBBBBBB AAA AAA RRR RRR SSSSSSSSSSSSSSS T
O BBBBBBBBBBBB AAA AAA RRR RRR SSSSSSSSSSSS5 O
* *
A A
A A
S S
g H
T T
0 0
. ,r
A A
A BRIDGE ANALYSIS AND RATING SYSTEM A
S S
H (C) COPYF2IGHT 1996 BY THE AMERICAN ASSOCIATI.ON OF STATE H
T HIGFiWAY AND TRANSPORTATION OFFICIALS, INC. T
O 444 NORTH CAPITOL STREET, N.W., SUITE 249 �
* WASHINGTON, D.C. 20001'U.S.A. *
A (202) 624-5800 �r--
A / � D � u A
g RELEASE 5.5 - MOD 3.2 t 1 S
H
3IzR 10� H
T JAN[JARY 15 , 19 9 6
p 0
*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO
Page 1 of 2
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
' BARS-PC R5.5-MOD 3.0 '
RECORD REC.NO.
O1 032406J.LABARBERA AA *LF* POST 100
02930227J. LABARBERA PSC62 60 180 0 28 0 5 100
05930227 930227 4 200
069302271 TEQUESTA DR OVER NORTH PRONG OF' THE LOXAHATCHEE RIVER 300
069302272 PALM BEACH COUNTY, FL 400
069302273 CONTROLLING MEMBER W/ 5 EXPOSED STRANDS AND 30$ SECTION LOSS 500
069302275 P/S BOX BEAM W/ 3- 8" VOTDS 6�0
08930227G01 1 X 344 PSC 223 45000.68 700
10930227G01 1 W312.3 X 344 800
11930227G01 1 1X 344 1 900
15930227G01 1 8.0 7.5 15 472 3 465 8 48 1 2.123 2.00 1000
15930227G01 1 8.0 7.5 2A 807 12.00 1100
15930227G01 1 8.0 7.5 1200
THE FOLLOWING STRUCTURES WERE SELECTED
930227
Sjl C
�` �.
�)
<a �
n
Page 1 of 1
K:\Structures\Bridge_Inspection\DIST4�930227\Tequesta Span 2
Page 1 of 2
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
DETAIL DATA FOR FLEXURAL MEMBER
DATE 03/24/06 D/P STRUCTURE I.D. 930-227
MEMBER I.D.--GO1
NO. SPANS = 1 MATERIAL--PSC
NOT SYi�1ETRICAL LL DIST. FACT. _ .680
VAR SUPERIMPOSED DISTRIBUTED DL(5) SUPERIMPOSED CONCENTRATED DL(S)
CODE DL DUE TO LENGTH DISTRIBUTED*************** DIST. FROM LT SUPPORT****
S MEM. WEIGHT DIST. FROM LT SUPPORT*** * *
SPAN LENGTA RNG. LENGTH SEC.NO. T T W(LT) W(RT) SPAN W(LT) W(RT} * * STIFF SPAN P *
N0. FT. NO. FT. LT RT P B LBS/FT LBS/FT NO. LBS/FT LBS/FT FT. FT. TRANS. LONG. NO. KIPS FT.
1 34.400 1 34.400 01 01 584.2 584.2 1 312.3 312.3 .000 34.400
CHECK POINTS RATED--
SPAN DIS FRM FUNC SPAN DIS FRM FUNC
N0. LT SPRT M VL T7R N0. LT SPRT M VL VR
FT. FT.
1 .000 X
1 17.200 X
1 34.400 X
Page 2 of 2
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
DETAIL DATA AT MOMENT CHECK POINT FOR BARS RELEASE 5.5
PRESTRESSED CONCRETE FLEXURAL MEMBER
DATE 03/24/06 D/P STRUCTURE I.D. 930-227
MEMBER I.D.--G01
C.P. LOCATION 1.50
***** SECTION PROPERTIES IN RANGE 1 OF SPAN 1
-----------SECTION MODULUS-----------
IX IX C TOP TOP BOTTOM BOTTOM
H AREA AS CT DA ECC FI + BEND - BEND (BOT) + BEND - BEND + BEND - BEND
IN. SQ.IN. 5Q.IN. IN. IN. IN KIPS IN**4 IN**4 IN. TN**3 IN**3 TN**3 IN**3
15.00 560.80 2.99 7.64 2.00 2.45 467.4 12891.7 12891.7 7.36 1686.5 .0 1752.5 10.1
LOSS = 35839.2
FF = 360.1
NON-COMP: D= 10.09 KD = 2.55 JD = 9.24
***** INFLUENCE LINE (SIMPLE SPAN) ***** ULTIM. STRENGTH ***** MOMENT CAPACITY
PRESTRESS CONC TOP TOP BOTTOM BOTTOM
X-DIST (FT.) .000 17.200 34.400 POS AREA = 147.9 STEEL + BEND - BEND + BEND - BEND
Y-ORDINATE .000 8.600 .000 PSI PSI FT-KIPS FT-KIPS FT-KIPS FT-KIPS
INVENTORY 223000.0 4500.0 185.9 .0 185.9 .Q
***** ORDINATES OF AND AREAS UNDER INFLUENCE LINE (CONPINUOUS SPAN) OPERATING 223000.0 4500.0 309.8 .0 309.8 .0
SPAN SPAN SPAN SPAN SPAN SPAN POST VEH1 223000.0 4500.0 309.8 .0 309.8 .0
T 0 POST VEH2 223000.0 4500.0 309.8 .0 309.8 .0
E 1 POST VEH3 223000.0 4500.0 309.8 .0 309.8 .0
N z POST SPEC .0 .0 .0 .0 .0 .0
T 3
H 4 ***** TOTAL DL ***** AVATL.CAPAC.FOR LL+IMPACT
5 MOMENT EFFECT TOP TOP BOT BOT
P 6 +BEND -$END +BEND -BEND
Q 7 FT-KIPS F-KPS F-KPS F-KPS F-KPS
I g 132.6 INVENTORY 106.3 .0 106.3 .0
N 9 OPERATING 177.2 .0 17`I.2 .0
T 0 AREA *** ULTIMATE VEH. 1 177.2 .0 177.2 .0
TOTALS MOMENT CAPAC. VEH. 2 177.2 .0 177.2 .0
POS AREA .0 .0 .0 .0 .0 .0 .0 FT-KIPS VEH. 3 177.2 .0 177.2 .0
NEG AREA .0 .0 .0 .0 .0 .0 .0 402.7 SPECIAL .0 .0 .0 .0
***** LIVE LOAD AND RATING CALCULATIONS (IMPACT FACTOR =.300 FOR +BEND AND =.300 FOR -BEND)
------ -TRUCK LOAD--------------- ------LANE LOAD-------
LIVE LL+IMP LL LOC.NO. DIR' AXLE LL+IMP LL LOC.COI3C LOC.COT3C RATII�SG SAFE LOAD RATII3G
LOAD 1 WHEEL SPACE LOAD LOAD 2 FACT. CAPACITY VALUE
FT-KIPS FT-KIPS FT. FT. FT-KIPS FT-KIPS FT. FT. TONS
INV HS20 +BEND 149.9 115.3 3.200 L .0 110.3 84.8 17.200 .709 25.5 HS 14.2
-BEND .0 .0 .000 L .0 .0 .0 .000 .000
OPE12 H520 +BEND 149.9 115.3 3.200 L .0 110.3 84.8 17.200 1.182 42.5 HS 23.6
-BEND .0 .0 .000 L .0 .0 .0 .000 .000
POST SU2 +BEND 94.8 72.9 4.200 L 1.870 31.8
-BEND .0 .0 .000 L
Page 1 Of 3
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
POST SU4 +BEND 190.7 146.7 3.867 L .929 32.5
-BEND .0 .0 .000 L
POST C4 +BEND 147.0 113.1 -14.633 L 1.205 44.2
-BEND .0 .0 .000 L
POST SPEC +BEND .0 .0 .000 .000 .0
-BEND .0 .0 .000
Page 2 of 3
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
SUMMARY OF SHEAR ANALYSIS
DATE 03/24/06 D/P 5TRUCTURE I.D. 930-22'I
---INVENTORY--- ---OPERATING--- --VEH. 1 -- --VEH. 2 -- --VEH. 3 -- --SPECIAL--
MEMB. SPAN DIS FRM L DL SDL LL+I T LL+I T LL+I T LL+I T LL+I LL+I LL+I LL+I LL+I LL+I LL+I LL+I
ID MATL NO. LT SPRT R SHEAR SHEAR MAX.V L MIN.V L MAX.V L MIN.V L MAX.V MIN.V MAX.V MIN.V MAX.V MIN.V MAX.V MIN.V
FT. KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS
G01 PSC 1 .000 L 10.0 5.4 23.2 T .0 T 23.2 T .0 T 13.0 .0 24.8 .0 20.6 .0
1 17.200 L .D .0 8.4 T 8.4 T 8.4 T 8.4 T 5.5 5.5 9.4 9.4 8.5 8.5
1 34.400 L 10.0 5.4 .0 T 23.2 T .0 T 23.2 T .0 13.0 .0 24.8 .0 20.6
Page 3 of 3
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
LIVE LOAD DATA AT MOMENT CHECK POINT FOR
PRESTRESSED CONCRETE FLEXURAL MEMBER - LOAD FACTOR RATING
DATE 3/24/ 6 D/P STRUCTURE I.D. = 930-227
MEMBER I.D. -- G 1
C.P. LOCATION -- 1.50
PAGE 1
***** LIVE LOAD CALCULATIONS (IMPACT FACTOR =.300 FOR +BEND AND =.300 FOR -BEND)
-- LIVE LOAD --
-------------TRUCK MOMENT------------ -------------LANE MOMENT------------ -----FIXED----- -----5HEAR-----
LIVE REDIS LL+IMP LL LOC.NO. DIR LL+IMP LL LOC.CONC. LOC.CONC. SHEAR
LOAD LL+I 1 WHEEL LOAD #1 LOAD #2 +V -V LEFT RIGHT
FT-KIPS FT-KIP5 FT-KIPS FT. FT-KIPS FT-KIPS FT. FT. KIPS KIPS KIPS KIPS
INV. HS20 +BEND .00 149.9 115.3 3.200 L 110.3 84.8 17.200 .000 .00 .00 8.39 8.39
-BEND .00 .0 .0 .000 L .0 .0 .000 .000 .00 .00
OPER HS20 +BEND .00 149,9 115.3 3.200 L 110.3 84.8 17.200 .000 .00 .00 8.39 8.39
-BEND .00 .0 .0 .000 L .0 .0 .000 .000 .00 .00
OPER 2 ST5 +BEND .00 141.6 108.9 -13.800 .0 .0 .000 ..000 .00 .00 5.45 5.45
-BEND .00 .0 .0 .000 .0 .0 .000 .000 .00 .00
POST 1 SU2 +BEND .00 94.8 72.9 4.200 L .00 .00 5.51 5.51
-BEND .00 .0 .0 .000 L .00 .00
POST 4 SU3 +BEND .00 177.1 136.3 6.200 .00 .00 9.12 9.12
-BEND .00 .0 .0 .000 .00 .00
POST 2 SU4 +BEND .00 190.7 146.7 3.867 L .00 .00 9.39 9.39
-BEND .00 .0 .O .000 L .00 .00
POST 5 C3 +BEND .00 102.7 79.0 7.200 .00 .00 -4.91 -4.91
-BEND .00 .0 .0 .000 .00 .00
POST 3 C4 +BEND .00 147.0 113.1 -14.633 L .00 .00 8.55 8.55
-BEND .00 .0 .0 .000 L .00 .00
POST 6 C5 +BEND .00 147.6 113.5 -14.633 .00 .00 8.55 8.55
-BEND .00 .0 .0 .000 .00 .00
Page 1 of 2
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
LIVE LOAD DATA AT MOMENT CHECK POINT FOR
PRESTRESSED CONCRETE FLEXURAL MEMBER - LOAD FACTOR RATING
DATE 3/24/ 6 D/P STRUCTURE I.D. = 930-227
MEMBER I.D. -- G 1
C.P. LOCATION -- 1.50
PAGE 2
***** RATING FACTOR *****
-- RATING FACTOR FOR -- -- RATING FACTOR FOR --
MOMENT SHEAR RATING SAFE
TOP BOTT LEFT RIGHT VALUE LOAD
+BEND -BEND +BEND -BEND CAP.(TONS)
INV. HS20 .709 .000 .709 .000 .000 .000 HS 14.2 25.5
OPER HS20 1.182 .000 1.182 .000 .000 .000 HS 23.6 42.5
OPER 2 ST5 1.251 .000 1.251 .000 .000 .000 .0 50.0
POST 1 SU2 1.870 .000 1.870 .000 .000 .000 31.8
POST 4 SU3 1.00Q .000 1.000 .Q00 .000 .000 33.0
POST 2 SU4 .929 .000 .929 .000 .000 .000 32.5
POST 5 C3 1.725 .000 1.725 .000 .000 .000 48.3
POST 3 C4 1.205 .000 1.205 .000 .000 .000 44.2
POST 6 C5 1.200 .000 1.200 .000 .000 .000 48.0
Page 2 of 2
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
BARS-PC R5.5 - MOD 3
STRUCTURE I.D. = 930-227
*****+**+*�*********.********,r*****************+*+**,r*************�*****x*********�:r****:r****+**:r*+**x********+��***�**+***:r**,r**
* STRUCTURE HEADER AND DESCRIPTION *
*:t,t***:t:r:r*,r*,r,r*:r*:t:r*:t*****x*,t�**:t,t�,t*t,r*,t,t****:t**:t,t:t**xt:r*,r:r,t*,tx*,r*,t,r�*++*,t**,r*t,t**�******a:t:r*:t:t:t*,t,r*,t**t*�*,ttt****,t:t*++x:t�**:t*�+
100-- 2 J. LABARBERA EA/I/O/P = FILE REQUESTS AND OUTPUT DATA EXCEPTIONS 0���
TYPE = PSC62 YEAR = 60 LEN = 180.00 FT. WIDTH = 28.00 FT. 5 SPANS SP.LOAD =
INV.LL.TRK.= OP.LL.TRK.=
******�***+************:r**,r**+****+****:r�*,r+,r*+**,r******+***�*************,r*:r*:r**x*****;r*,r,r,r,r*,r*:r,e*+:.:r+*:r;r:r��**x**�+**+,r**,r��,*��
* STRUCTURE LOCATION AND PERMANENT IDENTIFICATION FACTORS *
. �*******,r*:r*:r********:r*+:r:r+++:r*:r:t*:rx:r**:rx*:r*:r,ra**,t*,t**�:r**�**:r***���**�*******:r***�***+.**,r+++:r:r***�:r*****x:t****,r:r:r�**�r,r**,r*x**.
200-- 5 BRIDGE= 930227 DIST./CO.= 4 CONST. ROUTE = CONST. SECT.= CONST. STA.= 0+ .
MICROFILM REEL NO. DESIGN PLANS= COMPUTATIONS= CORRESPONDENCE=
ROUTE I.A.= MARKED ROUTE _
:r*,t,t*:t:t*:t,tt,t,t****;r+;t**,t***x****,t,r,r***xt**,t,r,t*x,t,t****,�:t:t*:t**x*
* COMMENTS *
:t*:t**x**,t+:tirt*x,rtx*:r:rx,t,t*****,tt,t,r,t*,t�,r**,r,t,r**t*,t**:r**�,r***,tx**
300-- 6 1 TEQUESTA DR OVER NORTH PRONG OF THE LOXAHATCHEE RIVER
400-- 6 2 PALM BEACH COUNTY, FL
500-- 6 3 CONTROLLING MEMBER W/ 5 EXPOSED STRANDS AND 30� SECTION LOSS
600-- 6 5 P/S BOX BEAM W/ 3- 8" VOIDS
,t**x*
* MEMBER SPECIFICATIONS AND REQUIRED ANALYSIS-GIRDER,STRINGER AND FLOOR BEAM *
,t**
MEMBER SPANS STIFF. SPAN 1 SPAN 2 SPAN 3 MATL ALLOWABLE STRESS LL DIST. END THRU MAX IMPACT FACTOR
ID SYMM CODE (SPAN 4) (SPAN 5) (SPAN 6) CODE FY FB FC* FC** FACTOR FL.BM DECK INV OP. POST SPEC
700-- 8 G 1 � 1 34.400 .000 .000 PSC 223.00 4500.00 .680 .00 .00 .00 .00 ��
� �
N �
� �
�
Q'`
Page 1 of 11
K:\StrucCUres\Bridge_Inspection\DIST4\930227\Tequesta Span 2
*****+******�**************x**+**************+**********+*********************�********�+*******.**�***��+x***+*�****�+
* SUPERIMPOSED DEAD LOADS-GIRDERS,STRINGERS AND FLOOR BEAMS *
+****x*�**�+****�+***�****r****+*****t***+.*******+�***�**+xx*a*********xx****x*x*:*a***x*****************a*********+**�*********�
MEMBER SYMNI. SPAN DISTANCE FR. LOAD LOAD LENGTH
ID NO. LEFT SUPP. TYPE P OR W(L) W(R)
800--10 G 1 1 .00OFT. W 312.3 .0 34.400FT.
***+***���**+*+********:r:r*+;r+*,r***:r*****,r,r***;r***************,r***�**********,:****:r*�*«*****************+****x***�**********�*****
* SECTION RANGE SPECIFICATIONS *
*�:r;r:t**x**:ra************;r,r*,r,r,r,r+*,r**+***,r,r************:r*,t*****,r*s**+*:r:r:r+*�**,r***x,r**x*,r*,t:r*,t***,r*****��**x****,t*
MEMBER SYMM. SPAN R�TGE RANGE SECTION NO. SEC. VAR. HINGE HINGE 1 HINGE 2 HYBRID GIRDER
ID NO. N0. LENGTH LEFT RIGHT CODE DIST. DIST. CODE FY CODE FY
900--11 G 1 1 1 34.400FT. 1 0 .00OFT. .00OFT. 0. 0.
�***********+***�**t**;r**,:**,:*********:r**:r:r**,r**************.**;r*,r******:r*;r:r*************,r*,r*****�********x,r********+*******,r*�*+
* SECTION PROPERTIES (PRESTRESSED CONCRETE) - GIRDERS,STRINGER5,FLOOR BEAMS *
,t:r:t,t**x:t:t**,r*****:t:r*:t*,r*xaa**,tt**,t***,r****t****x,t*****:tx,r**,r*,r*t*:t:tt**,t,t�,t,t,ttr**,t**x,t**x:r*:t****,tx*,t,t,r*,t�*,r,r,t***:tx*,r*****,t+
MEMBER SAME ** VOIDS DESCRIPTION ** *************** BEAM DESCRIPTION ***************** ****** STRANDS ******
ID. SECT ADR DEPTH WIDTH DIST. CODE DEPTH TFLW TFLT TFIT WEBT BFIT BFLT BFLW I ASI DI
1200--15 G 1 1 0 8.0 .00 7.5 .00 .0 .0 .00 .00 .00 .0 .0 0 .00 .00
1000--15 G 1 1 0 8.0 .00 7.5 15.00 47.2 3.0 .00 46.50 .00 8.0 48.0 1 2.12 2.00
1100--15 G 1 1 0 8.0 .00 7.5 .00 .0 .0 .00 .00 .00 .0 .0 2 A 807.00 12.00
W G
' G
� '
O
CT
Page 2 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
Page 3 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
SUMMARY OF RATING CALCULATIONS------STRUCTURE MEMBER G 1 BARS-PC RELEASE 5.5
INVENTORY AND/OR OPERATING ANALYSIS
INPUT CODING -- STRUCTURE 930227 D/P STR. I.D.-- 930-227
DATE 3/241 6 INVENTORY OPERATING
BY J. LABARBERA LIVE LOAD RATING LIVE LOAD RATING
HS20 HS 14.18 HS20 HS 23.64
STRUCTURE DESCRIPTION -- LOCATION -- MICROFILM REEL NUMBERS --
IDENTIFICATION 930227 DISTRICT 4 DESIGN PLANS
TYPE PSC62 COUNTY COMPUTATIONS
YEAR OF CONSTR. 1960 CONSTR. RTE. CORRESPONDENCE
LENGTH 180.00 FEET CONSTR. SEC.
ROADWAY WIDTH 28.00 FEET CONSTR. STA. 0+ .
NUMBER OF SPANS 5 KEY RTE.
MARKED RTE.
ANALYST REMARKS --
TEQUESTA DR OVER NORTH PRONG OF THE LOXAHATCHEE RIVER
PALM BEACH COUIVTY, FL
CONTROLLING MEMBER W/ 5 EXPOSED STRANDS AND 30� SECTION LOSS
P/S BOX BEAM W/ 3- 8" VOIDS
INVENTORY RATING SU2�IARY -- OPERATING RATING SUNIIKARY --
MEMBER ID. G 1 MEMBER ID. G 1
SPAN 1 SPAN 1
CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. DIST. 17.2 FEET
LIVE LOAD DESIGNATION HS20 LIVE LOAD DESIGNATION HS20
MOMENT MOMENT
(FT. KIPS) (FT. KIPS)
MEMBER CAPACITY 238.9 MEMBER CAPACITY 309.8
DL EFFECT 132.6 DL EFFECT 132.6
CAPACITY FOR (LL+I) 106.3 CAPACITY FOR (LL+I) 177.2
• Page 4 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
ACTUAL (LL+I) 149.9 ACTUAL (LL+2) 149.9
INVENTORY RATING HS 14.18 OPERATING RATING HS 23.64
Page 5 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
SUMMARY OF RATING CALCULATIONS------STRUCTURE MEMBER G 1 BARS-PC RELEASE 5.5
POSTING ANALYSSS
INPUT CODING -- STRUCTURE 930227 D/P STR. I.D.-- 930-227
DATE 3/24/ 6 INVENTORY OPERATING POSTING
BY J. LABARBERA LIVE LOAD RATING LIVE LOAD RATING TRUCK TYPE GROSS TONS
HS20 HS 14.18 HS20 HS 23.64 VEH. SU2 31.78
VEH. SU4 32.52
VEH. C4 44.18
STRUCTURE DESCRIPTION -- LOCATION -- MICROFILM REEL NUMBERS --
IDENTIFICATION 930227 DISTRICT 4 DESIGN PLANS
TYPE PSC62 COUNTY COMPUTATIONS
YEAR OF CONSTR. 1960 CONSTR. RTE. CORRESPONDENCE
LENGTH 180.00 FEET CONSTR. SEC.
ROADWAY WIDTH 28.00 FEET CONSTR. STA. 0+ .
NUMBER OF SPANS 5 KEY RTE.
MARKED RTE.
ANALYST REMARKS --
TEQUESTA DR OVER NORTH PRONG OF THE LOXAHATCHEE RIVER
PALM BEACH COUNTY, FL
CONTROLLING MEMBER W/ 5 EXPOSED STRANDS AND 30$ SECTION LOSS
P/S BOX BEAM W/ 3- 8" VOIDS
TRUCK TYPE VEH. SU2 TRUCK TYPE VEH. SU4 TRUCK TYPE VEH. C4
MEMBER ID. G 1 MEMBER ID. G 1 MEMBER ID. G 1
SPAN 1 SPAN 1 SPAN 1
CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. DIST. 17.2 FEET
MOMENT MOMENP MOMENT
(FT. KIPS) (FT. KTPS) (FT. KIPS)
MEMBER CAPACITY 309.8 MEMBER CAPACITY 309.8 MEMBEF2 CAPACITY 309.8
DL EFFECT 132.6 DL EFFECT 132.6 DL EFPECT 132.6
Page 6 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
CAPACITY FOR (LL+I) 177.2 CAPACITY FQR (LL+I} 177.2 CAPACITY BOR {LL+=) 177.2
ACTUAL (LL+I) 94.8 ACTUAL (LL+I) 190.7 ACTUAL (LL+I) 147.0
POSTING GROSS TONNAGE 31.8 POSTING GROSS TONNAGE 32.5 POSTING GROSS TONNAGE 44.2
Page 7 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
*** FINAL SUMMARY OF RATING RESULTS FOR --- 5TRIICTURE ID. 930-227 BARS-PC RELEASE 5.5
INVENTORY AND/OR OPERATING ANALYSIS
STRUCTURE 930227 D/P STR. ID-- 930-227
INPUT CODING--
IN\IENTORY OPERATING
DATE 3/24/ 6 LIVE LOAD RATING LIVE LOAD RATING
HS20 HS 14.2 HS20 HS 23.6
BY J. LABARBERA
STRUCTURE DESCRIPTION-- LOCATION-- MICROFILM REEL NUMBERS--
IDENTIFICATSON 930227 DISTFtZCT 4 DESIGN PLANS
TYPE PSC62 COUNTY COMPUTATIONS
YEAR OF CONSTR. 1960 CONSTR. RTE. CORRESPONDENCE
LENGTH 180.00 FEET CONSTR. SEC.
ROADWAY WIDTH 28.00 FEET CONSTR. STA. 0+ .
NUMBER OF SPANS 5 KEY RTE.
MARKED RTE.
ANALYST REMARICS--
TEQUESTA DR OVER NORTH PRONG OF THE LOXAHATCHEE RI�IER
PALM BEACH COUNTY, FL
CONTROLLING MEMBER W/ 5 EXPOSED STRANDS AND 30� SECTION LOSS
P/S BOX BEAM W/ 3- 8" VOIDS
IN�IENTORY RATING SUMNIARY OPERATING RATING SUMMARY
MEMBER I.D. G 1 MEMBER I.D. G 1
SPAN 1 SPAN 1
CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. DIST. 17.2 FEET
LIVE LOAD DESIGNATION FiS20 LIVE LOAD DESIGNATION HS20
MOMENT MOMENT
(FOOT-KIPS} (FOOT-KIPS)
MEMBER CAPACITY 238.9 MEMBER CAPACITY 309.8
DL EFFECT 132.6 DL EFFECT 132.6
CAPACITY FOR (LL+I) 106.3 CAPACITY FOR (LL+I) 177.2
ACTUAL (LL+I) 149.9 ACTUAL (LL+I) 149.9
Page 8 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta Span 2
INVENTORY RATING HS 14.18 OPERATING RATING HS 23.64
Page 9 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta 5pan 2
*** FINAL Si7MMARY OF RATING RESULTS FOR --- STRUCTLTRE ID. 930-227 BARS-PC RELEASE 5.5
POSTING ANALYSIS
STRUCTURE 930227 D/P STR. ID-- 930-227
INPUT CODING--
IN�IENTORY OPERATING POSTING
DATE 3/24/ 6 LIVE LOAD RATING LIVE LOAD RATING TRUCK TYPE GROSS TONS
BY J. LABARBERA
HS20 HS 14.18 HS20 HS 23.64 VEH. SU2 31.8
VEH. SU4 32.5
VEH. C4 44.2
STRUCTURE DESCRIPTION-- LOCATION-- MICROFILM REEL NUMBERS--
IDENTIFICATION 930227 DISTRICT 4 DESIGN PLANS
TYPE PSC62 COUNPY COMPUTATIONS
YEAR OF CONSTR. 1960 CONSTR. RTE. CORRESPONDENCE
LENGTH 180.00 FEET CONSTR. SEC.
ROADWAY WIDTH 28.00 FEET CONSTR. STA. 0+ .
NUMBER OF SPANS 5 KEY RTE.
MARKED RTE.
ANALYST REMARKS--
TEQUESTA DR OVER NORTH PRONG OF THE LOXAHATCHEE RIVER
PALM BEACH COUNTY, FL
CONTROLLING MEMBER W/ 5 EXPOSED STRANDS AND 30$ SECTION LOSS
P/S BOX BEAM W/ 3- 8" VOIDS
POSTING RATING SUMMARY
TRUCK TYPE VEH. SU2 TRUCK TYPE VEH. SU4 TRUCK TYPE VEH. C4
MEMBER I.D. G 1 MEMBER I.D. G 1 MEMBER I.D. G 1
SPAN 1 SPAN 1 SPAN 1
CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. DIST. 17.2 F$ET CRITICAL C.P. DIST. 17.2 FEET
MOMENP MOMENT MOMENT
(FOOT-KIPS) (FO�T-KIPS) (FOOT-KIPS)
MEMBER CAPACITY 309.8 MEMBER CAPACITY 309.8 MEMBER CAPACITY 309.8
DL EFFECT 132.6 DL EFFECT 132.6 DL EFFECT 132.6
CAPACITY FOR (LL+I) 177.2 CAPACITY FOR (LL+I) 177.2 CAPACITY FOR (LL+I) . 177.2
ACTUAL (LL+I) 94.8 ACTUAL (LL+I) 190.7 ACTLTAL (LL+I) 147.0
Page 10 of 11
K:\Structures\Bridge_Inspection\DIST4\93Q227\Tequesta Span 2
POSTING GROSS TONNAGE 31.8 POSTING GROSS TONNAGE 32.5 POSTTNG GROSS TONNAGE 44.2
Page 11 of 11
K(SINGER CAMPO & ASSOCIATES
ENGINEERING • INSPECTION • PLANNING
,}pg TF_C�u�s - tt�zt�c,E o11E4� LoxA NA'rC.µEE COMPUTED BY S��- DATE �a$ �C)�o
DESCRIPTION LoaD RA"'�''s-U� CHECKEDBY P�� DATE 3�z�/p�
SHEET , OF �' METRIC
CA�c.u�A�E Dis FA�-�mA : ( � 3.a3-�
ASSu�r_ Et� �c'R.AFFz...� SE� �E6 $ WR�
w= ag
� = 3y,y �
K = 6.�7
\ Z S`
C = � O.�t 1 � • - �ti .y �
C = �. 5(oq �
NL = a
D= � 5, - O.S NL� * O,`I N� � l- 0 a�� �.
p:[ s.�s - o,s<a�� + o . - t(a�( i- o.a(a ,s�a�>> Z
D= S,�y� ,
.bai �'� (s -s �z t �'iti
L�.D F= 5. B ti°�
L��� = l.oa�
�yoo �(
3/a��o�
KfSiNGER CAMPO & ASSOCIATES
ENGINEERING • INSPECTION • PLANMNG
JOB TEQUES� Pr COMPUTED BY S L.L DATE 31 as t o�
DESCRIPTION L�A� RA�c�.-NC� CHECKEDBY pdM DATE _�IZ"'�vb
SHEEf �' OF � MEfRIC
CA�cu��k SuPFR �.mPds�..i� D �-- :
3`� ASPNR�� � Lor.t c.�=t��'� a�EA� hK :
�1a5P,. = ` � � , 02t� 1 l � J O ��FY \} = a � S . 2� ' � Co�s s �
CLc7suRE $ou(`-` '.
W«osoa� ` � � � 1�-�`` ��Z-�l,�s����FT - $o.a ���FT
GuRa°_
WcuRu '�` t` t J� � Iz 150`�/�-r3 (SA3U� SI.S L6 �F"L
W - aoZ. L6 �F't � g�.a i S�. `3 �F'T
"foiA�-
�.Jso-ra.� = 357. S �e�%-s
� . - ;s'=» >/2" . - -
,•'
_ ,3" _ 5 "-5 1 � 2 N . 3'"
. . 2 - 1/2 0 270K af 15.0"
- . . LO-LAX STRANDS
1"-3" 3�-5 1/2" �'-p" PULLED TO 31,000� EACH
¢" 1'-7 1/2'" 1'-6 1 f2'� 1'-7 1/2' 4 4 BARS V
_� � �--- BARS S
- ---.... . , , . � � � ,„ � �
i�
- - . h� N � � I
\ 3"' MIN. . =--1---
^�-� � ------ ---- --- `
,' � -____- _-__=�__�_- �
^ =
�-
� z • BARS G ;.,,
4"�� 1 1/2' 1 1/?` �"
�, 24 - 1/2'N 270K af 3.0 °
LO-L4X STRAN�S
7" 1 ° 4" 4 9 1/1' 4 4 1 7" PULLED TO 31,OOOJ� EACH
8 SP. 2, 2. 8 SP.
"�'- lYPE A at 2" o.c. at 2"o.c ot 2`o.e at 2" o_c.
TYPlCAL. SECTION
,s'- � > >/2
5'-8 1/�" 3�
2- 1/2"v� 270K at 15.0'"
, LO-LAX STRANOS
1"-1 3-9 1 f2" »" PULLED TO 31,000# EACH
., 7'" 1-8" 1'-5 1�2 ° 1"-�" 4 4 BARS V
2 1/2" 6 »
&1R5' X al 1'-0"ac BARS D
8" x 11 " x 5 BLOCKDUT BARS Sl
�
(ANCHOR PtATE 7" x 7'� x 1� ;� \ Z � H
N �
\ 3" M/N. , � r-----
e `"� '� _— _----- ---- . :,
� :; � -- ------ ------ Q, .,
� ^ J -+.�.�.s.+ '
� �'
m <r- 8.4R.$ C�i . i,.�
� 4" N� 1 1/2� 1 l/2'" 1„ 24 - 1/2�� 270K at 3.0
� NOTE.• LO-LtLY STRANDS �
� MAINTAIN PROPER S17RRUP 7 � �� 4 �� 4 �� 9 �� Z �'� N 4�� 1"-4 " 7" PULLED TO 31, 000�` EQCN
� PLqCEMENr lN END UNITS. 8 SP. 1 S. 2. 8 SP. �
� ot 2" o.c. ol1"a.c. Qf 2`o.c. at 2" o.c.
� Tl'PE B �
.�
� TYPICAL SECTiON
�
E
' " V�RIFY SCALE N0. REVISION DAT
$ ��••�
.� � 6 ��
� . . 0f11C11Y�L Of7AM�NGS.
II1Jl.Gf SQVES
. � FS NECFSS/�RY.
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
*AASHTO*AASH T O*A ASHTO * AASHTO * AASHTO * AASHTO * AASHTO * AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*
A A
A A
S S
H H
T T
0 �
*
+
A A
A P,MERICAN ASSOCIATION OF STATE HIGHWAY A
S AND TRANSPORTATION OFFICIALS g
H H
T A PROPRIETARY COMPUTER SOFTWARE PRODUCT T
T T
O p
* *
A p
A p,
S g
H H
T Z+
O p
* *
A A
A AASHTOWAREtm BBBBBBBBBBBB AAAAAAA RRRRRRRRRRR SSSSSSSSSSSSS A
S BBBBBBBBBBBBB AAAAAAAAA RRRRRRRRRRRR SSSSSSSSSSSSSSS S
H BBB BBB AA AA RRR RRR SSSS SSSS H
T BBB BBB AAA AAA RRR RRR SSS T
0 BBB BBB AAA AAA RRR RRR SSSS O
* BBBBBBBBBBBB AAA AAA RRRRRRRRRRRR SSSSSSSSSSSSSS *
A BBBBBBBBBBBBB AAA AAA RRRRRRRRRR SSSSSSSSSSSSSS A
A BBB BBB RRR RRR SSSS A
S BBB BBB RRR RRR SSS S
H BBB BBB AAA AAA RRR RRR SSSS SSSS H
T BBBBBBBBBBBBB AAA AAA RRR RRR SSSSSSSSSSSSSS5 T
O BBBBBBBBBBBB AAA AAA RRR RRR SSSSSSSSSSSSS 0
* �
A A
A A
S S
H H
T T
O 0
. *
A A
A BRIDGE ANALYSIS AND RATING SYSTEM A
g � S
H (C) COPYRIGHT 1996 BY THE AMERICAN ASSOCIATION OF STATE . H
T HIGHWAY AND `1'RANSPORTATION OFFICIALS, INC. T
0 444 NORTH CAPITOL STREET, N.W., SUITE 249 �
* WASHINGTON, D.C. 20001 U.S.A. *
A (202) 624-5800 A
. ro G( 0O t-(
Page 1 0£ 2 3 � a � /o�
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
A A
S RELEASE 5.5 - MOD 3.2 S
H
H
T JAN[JARY 15 , 19 9 6
O �
*AASHTO*AASHTO*A ASH T O * AASATO * AASHTO * AASHTO * AASHTO * AASHTO * AASHTO * AASHTO * AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*AASHTO*
Page 2 of 2
x:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
BARS-PC R5.5-MOD 3.0
RECORD REC.NO.
01 032406J.LABARBERA AA *LF* POST 100
02930227J. LABARBERA PSC62 60 180 0 28 0 5 100
05930227 930227 A 200
069302271 TEQUESTA DR OVER NORTH PRONG OF THE LOXAHATCHEE RIVER 300
069302272 PALM BEACH COUNTY, FL 400
069302273 NEW SPAN 3 LOAD RATING 500
069302275 NEW 71.5" PSU - NON-VOIDED 600
08930227G02 1 X 344 PSC 270 55001.029 700
10930227G02 1 W357.5 X 344 800
11930227G02 1 1X 344 1 900
15930227G02 1 15 655 55 635 4 715 1L 2408 3.00 1000
15930227G02 1 2L 208 12.00 1100
TkIE FOLLOWING STRITCTURES WERE SELECTED
930227
�
-e
b
�
�.�
�
,�
_r
C
�
Page 1 of 1
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
Page 1 of 2
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
DETAIL DATA FOR FLEXUF�;L MEMBER
DATE 03/24/06 DiP STRUCTURE I.D. 930-227
MEMBER I.D.--G02
NO. SPANS = 1 MATERIAL--PSC
NOT SYN�IETRICAL LL DIST. FACT. = 1.029
VAR SUPERIMPOSED DISTRIBUTED DL(S) SUPERIMPOSED CONCENTRATED DL{S)
CODE DL DUE TO LENGTH DISTRIBt7TED*************** DIST. FROM LT SUPPORT****
S MEM. WEIGHT DIST. FROM LT SUPPORT*** * *
SPAN LENGTH RNG. LENGTH SEC.NO. T T W(LT) W(RT) SPAN W(LT) W(RT) * * STIFF SPAN P *
N0. FT. N0. FT. LT RT P B LBS/FT LBS/FT N0. LBS/FT LBS/FT FT. FT. TRANS. LONG. NO. KIPS FT.
1 34.400 1 34.400 01 O1 1037.0 1037.0 1 357.5 357.5 .000 34.400
CHECK POINTS RATED--
SPAN DIS FRM FUNC SPAN DIS FRM FUNC
NO. LT SPRT M VL VR NO. LT SPRT M VL �IR
FT. FT.
1 .000 X
1 17.200 X
1 34.400 X
Page 2 of 2
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
DETAIL DATA AT MOMENT CHECK POINT �OR BARS RELEASE 5.5
PRESTRESSED CONCRETE FLEXURAL MEMBER
DATE 03j24/06 D/P STRUCTURE I.D. 930-227
MEMBER I.D.--G02
C.P. LOCATION 1.50
***** SECTION PROPERTIES IN RANGE 1 OF SPAN 1
-----------SECTION MOAULUS-----------
IX , IX C TOP TOP BOTTOM BOTTOM
H AREA AS CT DA ECC FI + BEND - BEND (BOT) + BEND - gEND + BEND - BEND
IN. SQ.IN. SQ.IN. IN. IN. IN KIPS IN**4 IN**4 IN. IN**3 IN**3 IN**3 IN**3
15.00 995.50 3.98 7.70 3.00 3.61 805.5 19395.1 19395.1 7.30 2520.0 .0 2655.6 11.3
LOSS = 26968.7
FF = 698.3
NON-COMP: D= 11.31 KD = 2.22 JD = 10.57
***** INFLUENCE LINE (SIMPLE SPAN) ***** ULTIM. STRENGTH ***** MOMENT CAPACITY
PRESTRESS CONC TOP TOP BOTTOM BOTTOM
X-DIST (FT.) .000 17.200 34.400 POS AREA = 147.9 STEEL + B� - g� + BEND - BEND
Y-ORDINATE .000 8.600 .000 PSI PSI FT-KIPS F'T-KIPS FT-KIPS FT-KIPS
INVENTORY 270000.0 5500.0 363.1 .0 363.1 .0
***** ORDINATES OF AND AREAS UNDER INFLUENCE LINE (CONTINUOUS SPAN) OPERATING 270000.0 5500.0 6Q5.2 .Q 605.2 .0
SPAN SPAN SPAN SPAN SPAN SPAN POST VEH1 270000.0 5500.0 605.2 .0 605.2 .0
T 0 POST VEH2 270000.0 5500.0 605.2 .0 605.2 .0
E 1 POST VEH3 270000.0 5500.0 605.2 .0 605.2 .0
N 2 POST SPEC .0 .0 .0 .0 .0 .0
T 3
H 4 ***** TOTAL DL ***** AVAIL.CAPAC.FOR LL+IMPACT
5 MOMENT EFFECT TOP TOP BOT BOT
P 6 +BEND -BEND +BEND -BEND
�� FT-KIPS F-KPS F-KPS F-KPS F-KPS
I$ 206.3 INVENTORY 239.4 .0 239.4 .0
N 9 OPERATING 398.9 .0 398.9 .0
T 0 AREA *** ULTIMATE VEH. 1 398.9 .0 398.9 .0
TOTALS MOMENT CAPAC. VEH. 2 398.9 .0 398.9 .0
POS AREA .0 .0 .0 .0 :0 .0 .0 FT-KIPS VEA. 3 398.9 .0 398.9 .0
NEG AREA .0 .0 .0 .0 .0 .0 .0 786.8 SPECIAL .0 .0 .0 .0
***** LIVE LOAD AND RATING CALCULATIONS (IMPACT FACTOR =_300 FOR +BEND AND =.300 FOR -BEND)
---------TRUCK LOAD---------------- -------LANE LOAD-------
LIVE LL+IMP LL LOC.NO. DIR AXLE LL+IMP LL LOC.CONC LOC.CONC RATING SAFE LOAD RATING
LOAD 1 WHEEL SPACE LOAD LOAD 2 FACT. CAPACITY VALUE
FT-KIPS FT-KIPS FT. FT. FT-KIPS FT-KIPS FT. FT. TONS
INV HS20 +BEND 226.9 174.5 3.200 L .0 166.9 128.4 17.200 1.055 38.0 HS 21.1
-BEND .0 .0 .000 L .0 .0 .0 .000 .000
OPER I3S20 +BEND 226.9 174:5 3.200 L .0 166.9 128.4 17.200 1.758 63.3 HS 35.2
-BEND .0 .0 .000 L .0 .0 .0 .000 .000
POST SU2 +BENA 143.4 110.3 4.200 L 2.782 47.3
-BEND .0 .0 .000 L
Page 1 of 3
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
POST SU4 +BEND 288.6 222.0 3.867 L 1.383 48.4
-BEND .0 .0 .000 L
POST C4 +BEND 222.4 171.1 49.033 R 1.793 65.7
-BEND .0 .0 .000 L
POST SPEC +BEND .0 .0 .000 .000 .0
-BEND .0 .0 .000
Page 2 of 3
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
DETAIL DATA AT MOMENT CHECK POINT FOR BARS RELEASE 5.5
PRESTRESSED CONCRETE FLEXURAL MEMBER
DATE 03/24/06 D/P STRUCTURE I.D. 930-227
MEMBER I.D.--G02
C.P. LOCATION 1.50
*x*** SECTION PROPERTIES IN RANGE 1 OF SPAN 1
-----------SECTION MODULUS-----------
IX , IX C TOP TOP BOTTOM BOTTOM
H AREA AS CT DA ECC FI + BEND - BEND (BOTJ + BEND - gEND + BEND - BEND
IN. SQ.IN. SQ.IN. IN. IN. IN KIPS IN**4 IN**4 IN. IN**3 IN**3 IN**3 IN**3
15.00 995.50 3.98 7.70 3.00 3.61 $05.5 19395.1 19395:1 7.30 2520.0 .0 2655.6 11.3
LOSS = 26968.7
FF = 698.3
NON-COMP: D= 11.31 KD = 2.22 JD = 10.57
***** INFLUENCE LINE (SIMPLE SPAN) ***** ULTIM. 5TRENGTH ***** MOMENT CAPACITY
PRESTRESS CONC TOP TOP BOTTOM BOTTOM
X-DIST (FT.) .000 17.200 34.400 POS AREA = 147.9 STEEL + BEND - gEND + BEND - BEND
Y-ORDINATE .000 8.600 .000 PSI PSI FT-KIPS FT-KIPS FT-KIPS FT-KIPS
INVENTORY 270000.0 5500.0 363.1 .0 363.1 .0
***** ORDINATES OF AND AREAS UNDER INFLUENCE LINE (CONTINUOUS SPAN) OPERATING 270000.0 5500.0 605.2 .� 605.2 .0
SPAN SPAN SPAN SPAN SPAN SPAN POST VEH1 270000.0 5500.0 605.2 .0 605.2 .0
T 0 POST VEH2 270000.0 5500.0 605.2 .0 605.2 .0
E 1 POST VEH3 270000.0 5500.0 605.2 .0 605.2 .0
N 2 POST SPEC .0 .0 .0 .0 .0 .0
T 3
H 4 ***** TOTAL DL ***** AVAIL.CAPAC.FOR LL+IMPACT
5 MOMENT EFFECT TOP TOP BOT BOT
P 6 +BEND -BEND +BEND -BEND
� � FT-KIPS F-KPS F-XPS F-KPS F-KPS
I 8 206.3 INVENTORY 239.4 .0 239.4 .0
N 9 OPERATING 398.9 .0 398.9 .0
T 0 AREA *** ULTIMATE VEH. 1 398.9 .0 398.9 .0
TOTALS MOMENT CAPAC. VEH. 2 398.9 .0 398.9 .0
POS AREA .0 .0 .0 .0 :0 .0 .0 FT-ICIPS VEH. 3 398.9 .0 398.9 .0
NEG AREA .0 .0 .� .0 .0 .0 .0 ?86.8 SPECIAL .0 .0 .0 .0
***** LIVE LOAD AND RATING CALCULATIONS (IMPACT FACTOR =.300 FOR +BEND AND =.300 FOR -BEND)
---------TRUCK LOAD---------------- -------LANE LOAD-------
LIVE LL+IMP LL LOC.NO. DIR AXLE LL+IMP LL LOC.CONC LOC.CONC RATING SAFE LOAD RATING
LOAD 1 WHEEL SPACE LOAD LOAD 2 FACT. CAPACITY VALUE
FT-KIPS FT-KIPS FT. FT. FT-KIPS FT-KIPS FT. FT. TONS
TNV HS20 +BEND 226.9 174.5 3.200 L .0 166.9 128.4 17.2d0 1.055 38.0 HS 21.1
-BEND .0 .0 .000 L .0 .0 .0 .000 .000
OPER HS20 +BEND 226.9 174.:5 3.200 L .0 166.9 128.4 17.200 1.758 63.3 HS 35.2
-BEND .0 .0 .000 L .0 .0 .0 .000 .000
POST SU2 +BEND 143.4 110.3 4.200 L 2.782 47.3
-BEND .0 .0 .000 L
Page 1 of 3
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
POST SU4 +BEND 288.6 222.0 3.867 L 1.383 48.4
-BEND .0 .0 .000 L
POST C4 +BEND 222.4 171.1 49.033 R 1.793 65.�
-BEND .0 .0 .000 L
POST SPEC +BEND .0 .0 .000 .000 .0
-BEND .0 .0 .000 '
Page 2 of 3
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
SUNIMARY OF SHEAR ANALYSIS
DATE 03/24/06 D/P STI2UCTURE I.D. 930-227
---INVENTORY--- ---OPERATING--- --VEH. 1 -- --VEH. 2 -- --VEH. 3 -- --SPECIAL--
MEMB. SPAN DIS FRM L DL SDL LL+I T LL+I T LL+= T LL+I T LL+I LL+I LL+I LL+I LL+I LL+I LL+I LL+I
ID MATL N0. LT SPRT R SHEAR SHEAR MAX.V L MIN.V L MAX.V L MIN.V L MAX.V MIN.V MAX.V MIN.V MAX.V MIN.V MAX.V MIN.V
FT. KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS
G02 PSC 1 .000 L 17.8 6.1 35.1 T .0 T 35.1 T .0 T 19.7 .0 37.5 .0 31.2 .0
1 17.200 L .0 .0 12.7 T 12.7 T 12.7 T 12.7 T 8.3 8.3 14.2 14.2 12.9 12.9
1 34.400 L 17.8 6.1 .0 T 35.1 T .0 T 35.1 T .0 19.7 .0 37.5 .0 31.2
Page 3 of 3
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
LIVE LOAD DATA AT MOMENT CHECK POINT FOR
PRESTRESSED CONCRETE FLEXLTRAL MEMBER - LOAD FACTOR RATING
DATE 3/24/ 6 D/P STRUCTURE I,D. = 930-227
MEMBER I.D. -- G 2
C.P. LOCATION -- 1.50
PAGE 1
***** LIVE LOAD CALCULATIONS (IMPACT FACTOR =.300 FOR +BEND AND =.300 FOR -BEND)
-- LIVE LOAD --
-------------TRUCK MOMENT------------ -------------LANE MOMENT---�-------- -----FIXED----- -----SHEAR-----
LIVE REDIS LL+IMP LL LOC.NO. DIR LL+IMP LL LOC.CONC. LOC.CONC. SHEAR
LOAD LL+I 1 WHEEL LOAD #1 LOAD #2 +V -V LEFT RIGHT
FT-KIPS FT-KIPS FT-KIPS FT. FT-KIPS FT-KIPS FT. FT. KIPS KIPS KIPS KIPS
INV. HS20 +BEND .00 226.9 174.5 3.200 L 166.9 128.4 17.200 .000 .00 .00 12.69 12.69
-BEND .00 .0 .0 .000 L .0 .0 .000 .000 .00 .00
OPER HS20 +BEND .00 226.9 174.5 3.200 L 166.9 128.4 17.200 .000 .00 .00 12.69 12.69
-BEND .00 .0 .0 .000 L .0 .0 .000 .000 .00 .00
OPER 2 ST5 +BEND .00 214.3 164.8 -13.800 .0 .0 .000 .000 .00 .00 8.25 8.25
-BEND .00 .0 .0 .000 .0 .0 .000 .000 .00 .00
POST 1 SU2 +BEND .00 143.4 110.3 4.200 L .00 .00 8.34 8.34
-BEND .00 .0 .0 .000 L .00 .00
PO5T 4 SU3 +BEND .00 268.1 206.2 6.200 .00 .00 13.80 13.80
-BEND .00 .0 .0 .000 .00 .00
POST 2 SU4 +BEND .00 288.6 222.0 3.867 L .00 .00 14.22 14.22
-BEND .00 .0 .0 .000 L .00 .00
POST 5 C3 +BEND .00 155.4 119.6 7.200 .00 .00 -7.43 -7.43
-BEND .00 .0 .0 .000 .00 .00
POST 3 C4 +BEND .00 222.4 171.1 49.033 R .00 .00 12.93 12.93
-BEND .00 .0 .0 .000 L .00 .00
POST 6 C5 +BEND .00 223.4 171.8 -14.633 .00 .00 12.93 12.93
-BEND .00 .0 .0 .000 .00 .00
Page 1 of 2
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
LIVE LOAD DATA AT MOMEN'I' CHECK pOINT FOR
PRESTRESSED CONCRETE FLEXURAL MEMBER - LOAD FACTOR RATING
DATE 3/24/ 6 D/P STRUCTURE I.D. = 930-227
MEMBER I.D. -- G 2
C.P. LOCATION -- 1.50
PAGE 2
***** RATING FACTOR *****
-- RATING FACTOR FOR -- -- RATING FACTOR FOR --
MOMENT SHEAR RATING SAFE
TOP BOTT LEFT RIGHT VALUE LOAD
+BEND -BEND +BEND -BEND CAP.(TONS)
INV. HS20 1.055 .000 1.055 .000 .000 .000 HS 21.1 38.0
OPER HS20 1.758 .000 1.758 .000 .000 .000 HS 35.2 63.3
OPER 2 ST5 1.862 .000 1.862 .000 .000 .000 .0 74.5
POST 1 SU2 2.782 .000 2.782 .000 .000 .000 47.3
POST 4 SU3 1.488 .000 1.488 .000 .000 .000 49.1
POST 2 SU4 1.383 .000 1.383 .000 .000 .000 48.4
POST 5 C3 2.566 .000 2.566 .000 .000 .000 71.9
POST 3 C4 1.793 .000 1.793 .000 .000 .000 65.7
POST 6 C5 1.786 .000 1.786 .000 .000 .000 71.4
c
T
c
�
��
_`
n/
�'
fi
Page 2 of 2
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
BARS-PC R5.5 - MOD 3
STRUCTURE I.D. = 930-227
*,r**,r,r**;r***,r**, r :,r,r.* *+ , r*:r , r*:r**** , r , r***** , r***. , r*****�**x� , r , r**+***+:r*x*x* , r*� , r****�,r*,r,r**x*�;r,r***:r*****x�*,�*.* : �***,� : r***,r*** * , r . ** , r:rW** �
" STRUCTURE HEADER AND DESCRIPTION *
x,e************,r*,r � ** ************* , r:r*+++* , r , r , r* , r********** , r***� , r , r , r*:r**.*+.:r,r*.*,+.*....�*++***,r*��***.*�+:r*,r*.**..***+*.**� +* �, r**** � + .
100-- 2 J. LABARBERA EA/I/0/P = FILE REQUESTS AND OUTPUT DATA EXCEPTIONS Od❑0
TYPE = PSC62 YEAR = 60 LEN = 180.00 FT. WIDTH = 28.00 FT. 5 SPANS SP.LOAD =
INV.LL.TRK.= OP.LL.TRK.=
a*
* STRUCTURE LOCATION AND PERMANENT IDENTIFICATION FACTORS *
,t*x****, t , t+****x , tx , t* , t**�* , tfr , t*+t* , t**:t:t**+ic�• , t**t*** , tx , t******** , tx** , tx**:r+*a**:t:t , t.**,tx*+,r*,r*.,t,t,t,t***,t;t,t,t,r*:r*,r**,r:t+:r**,t ; t,t:r,r*,ta,r : r,r,r�**t,t
200-- 5 BRIDGE= 930227 DIST./CO.= 4 CONST. ROUTE = CONST. SECT.= CONST. STA.= 0+ .
MICROFILM REEL N0. DESIGN PLANS= COMPUTATIONS= CORRESPONDENCE=
ROUTE I.D.= MARKED ROUTE _
x*t:t**
* COMMENTS *
, t***.+ , r�*.. , rx* , r , rxx*******x. , r:r , r , e***.�x�**+ , r , rx*�*******��a�***** , r*****«+.+*+*+*****+..*x****,r****+x,r,r**,r*****,t*,r**,t**+:tx*+,r : r***+ : r ; r�*
300-- 6 1 TEQUESTA DR OVER NORTH PRONG OF THE LOXAHATCHEE RIVER
400-- 6 2 PALM BEACH COUNTY, FL
500-- 6 3 NEW SPAN 3 LQAD RATING
600-- 6 5 NEW 71.5" PSU - NON-VOIDED
*x.x���rt:r*:r*x
* MEMBER SPECIFICATIONS AND REQUIRED ANALYSIS-GTRDER,STRINGER F�ND FLOOR BEAM *
*.*******
t
MEMBER SPANS STIFF. SPAN 1 SPAN 2 SPAN 3 MATL ALLOWABLE STRESS LL DIST. END TIiRU MAX IMPACT FACTOR o
ID SYNA1 CODE (SPAN 4) (SPAN 5) (SPAN 6) CODE FY FB FC* FC** FACTOR FL.BM DECK INV OP. POST SPEC 3
700-- 8 G 2❑ 1 34.400 .000 .000 PSC 270.00 5500.00 1.029 .00 .00 .00 .00 �„�
`
�
s
�
c;
�
Page 1 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
* � ****+*** �� ****** � *********** **********��*******+**********.*****.*�.**+************.***�*w*.*******+**+* **** � ******* � ++** � *+***
* SUPERIMPOSED DEAD LOADS-GIRDERS,STRINGERS AND FLOOR BEAMS *
*##*
MEMBER SYI�III. SPAN DISTANCE FR. LOAD LOAD LENGTH
ID NO. LEFT SUPP. TYPE P OR W(L) W(R)
800--10 G 2 1 .00OFT. W 357.5 .0 34.400FT.
**..*** �� **..*+.,r+*.*** � *** � **«*** �* * *****.*�*�******+**�*******x� , �:r*******�*******:**�**+*+*:.*****,+*�**.**+*�*******+*** * + *******
* SECTION F2ANGE SPECIFICATIONS +
*:r,r*****:r*,r** � ,r,r*****,r+** � *,r,r � + * , r* , r* , r**+. , r* , r , r*******:r**�******** , r**+;r*:r***********;r*x***�*******,r:r,r:r*x*,r�****»,r� : r ; r***,r,r,+* *x , r:r , r*xx
MEMBER SYNII1. SPAN RANGE RANGE SECTION N0. SEC. VAR. HINGE HINGE 1 HINGE 2 HYBRID GIRDER
ID NO. NO. LENGTH LEFT RIGHT CODE DIST. DIST. CODE FY CODE FY
900--11 G 2 1 1 34.400FT. 1 0 .00OFT. .00OFT. 0. 0.
***.,r******, r**********:r;r*:r* , r*.<:r******. , r*�*****:� , r****�***�* , . , r**x** , ..**.. , r , r,.*.*�x**.*��*�*****�**+�*+*..*,r.*�*.***�*. * � x � ***** .�. +
* SECTION PROPERTIES (PRESTRESSED CONCRETE) - GIRDERS,STRINGERS,FLOOR BEAMS *
,e**,r:**x****x«:r* � e**x.x*+** +**��***** , r:r+**** , r***+ , r**+* , r*.•****x+*�*x*x**+ , r**x*x*�x**x�**x****:r**,r**,r*x+:r:t**,e***�*,r***i : ***x,r. : r*. : r ; r
MEMBER SAME ** VOIDS DESCRIPTION ** *************** BEAM DESCRIPTION ***************** ****** STRANDS ******
ID. SECT ADR DEPTH WIDTH DIST. CODE DEPTH TFLW TFLT TFIT WEBT BFIT BFLT BFLW I ASI DI
1000--15 G 2 1 0 .0 .00 .0 15.00 65.5 5.5 .00 63.50 .00 4.0 71.5 1 L 2408.00 3.00
1100--15 G 2 1 0 .0 .00 .0 .00 .0 .0 .00 .00 .00 .0 .0 2 L 208.00 12.00
C
�
O
3
W
�
�J
�
Page 2 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
Page 3 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
SUMMP.RY OF RATING CALCULATTONS------STRUCTURE MEMBER G 2 BARS-PC RELEASE 5.5
IN�IENTORY AND/OR OPERATING ANALYSIS
INPUT CODING -- STRUCTURE 93�227 D/P STR. I.D.-- 930-227
DATE 3/24/ 6 INVENT012Y OPERATING
BY J. LABARBERA LIVE LOAD RATING LIVE LOAD RATING
HS20 AS 21.10 HS20 HS 35.17
STRUCTURE DESCRIPTION -- LOCATION -- MICROFILM REEL NUMBERS --
IAENTIFICATION 930227 DISTRICT 4 DESIGN PLANS
TYPE PSC62 COUNTY COMPUTATIONS
YEAR OF CONSTR. 1960 CONSTR. RTE. CORRESPQNDENCE
LENGTH 180.00 FEET CONSTR. SEC.
ROADWAY WIDTH 28.00 FEET CONSTR. STA. 0+ .
NUMBER OF SPANS 5 KEY RTE.
MARKED RTE.
ANALYST REMARKS --
TEQUESTA DR OVER NORTFi PRONG OF THE LOXAHATCHEE RIVER
PALM BEACH COUNPY, FL
NEW SPAN 3 LOAD RATING
NEW 71.5" PSU - NON-VOIDED
INVENTORX RATING SUMMARY -- OPERATING RATING SUNIIVIARY --
MEMBER ID. G 2 MEMBER ID. G 2
SPAN 1 SPAN 1
CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. DI5T. 17.2 FEET
LIVE LOAD DESIGNATION H520 LIVE LOAD DESIGNATION HS20
MOMENT MOMENT
(FT. KIPS) (FT. KIPS)
MEMBER CAPACITY 445.6 MEMBER CAPACITY 605_2
DL EFFECT 206.3 DL EFFECT 206.3
Page 4 of 11
�
K:\Structures\Bridge_Inspection�DIST4�930227\Tequesta New Span 3
CAPACITY FOR (LL+I) 239.4 CAPACITY FOR (LL+I) 398.9
ACTUAL (LL+I) 226.9 ACTUAL (LL+I) 226.9
INVENTORY RATING HS 21.10 OPERATING RATING HS 35.17
Page 5 of 11
K:\5tructures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
. SUIvID7ARY OF RATING CALCULATION5------STRUCTURE MEMBER G 2 BARS-PC RELEASE 5.5
POSTING ANALYSIS
INPUT CODING -- STRUCSURE 930227 D/P STR. I.D.-- 930-227
DATE 3/2§/ 6 INVENTORY OPERATING POSTING
BY J. LABARBERA LIVE LOAD RATING LIVE LOAD RATING TRUCK TYPE GROSS TONS
HS20 HS 21.10 HS20 HS 35.17 VEH. SU2 47.29
VEH. SU4 48.39
VEH. C4 65.73
5TRUCTURE DESCRIPTION -- LOCATION -- MICROFILM REEL NUMBERS --
IDENPIFICATION 930227 DISTRICT 4 DESIGN PLANS
TYPE PSC62 COUNPY COMPLTTATIONS
YEAR OF CONSTR. 1960 CONSTR. RTE. CORRESPONDENCE
LENGTH 180.00 FEET CONSTR. SEC. .
ROADWAY WIDTH 28.00 FEET CONSTR. STA. 0+ .
NUMBER OF SPANS 5 KEY RTE.
MARKED RTE.
ANALYST REMARKS --
TEQUESTA DR OVER NORTH PRONG OF THE LOXAHATCHEE RIVER
PALM BEACH COUNPY, FL
NEW SPAN 3 LOAD RATING
NEW 71.5" PSU - NON-VOIDED
TRUCK TYPE VEH. SU2 TRUCK TYPE VEH. SU4 TRUCK TYPE VEH. C4
MEMBER ID. G 2 MEMBER ID. G 2 MEMBER ID. G 2
SPAN 1 SPAN 1 SPAN 1
CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. AIST. 17.2 FEET
MOMENT MOMENT MOMENT
(FT. KIPS) (FT. KIPS) (FT. KIPS)
MEMBER CAPACITY 605.2 MEMBER CAPACITY 605.2 MEMBER CAPAGITY 605.2
DL EFFECT 206.3 DL EFFECT 206.3 DL EFFECT 206.3
Page 6 ot 11
K:\Structures\Bridge_Tnspection\DIST4\930227\Tequesta New Span 3
CAPACITY FOR (LL+I) 398.9. CAPACITY FOR (LL+I) 398.9 CAPACITY FOR (LL+I) 398.9
ACTUAL (LL+I) 143.4 ACTUAL (LL+I) 288.6 ACTUAL (LL+I). 222.4
POSTING GR�SS TONNAGE 47.3 POSTING GROSS TONNAGE 48.4 POSTING GROSS TONNAGE 65.7
Page 7 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
*** FINAL SUMMARY OF RATING RESULTS FOR --- STRUCTURE ID. 930-227 BARS-PC RELEASE 5.5
INVENTORY AND/OR OPERATING ANALYSIS
STRUCTURE 930227 D/P STR. ID-- 930-227
INPUT CODING--
INVENTORY OPERATING
DATE 3/24/ 6 LIVE LOAD RATING LIVE LOAD RATING
HS20 HS 21.1 HS20 HS 35.2
BY J. LABARBERA
STRUCTURE DESCRIPTION-- LOCATION-- MICROFILM REEL NUMBERS--
IDENTIFICATION 930227 DISTRICT 4 DE5IGN PLANS
TYPE PSC62 COUNTY COMPUTATIONS
YEAR OF CONSTR. 1960 CONSTR. RTE. CORRESPONDENCE
LENGTH 180.00 FEET CONSTR. SEC.
ROADWAY WIDTH 28.00 FEET CONSTR. STA. 0+ .
NUMBER OF SPANS 5 KEY RTE.
MARKED.RTE.
ANALYST REMARKS--
TEQUESTA DR OVER NORTFi PRONG OF THE LOXAHATCHEE RIVER
PALM BEACH COUNTY, FL
NEW SPAN 3 LOAD RATING
NEW 71.5" PSU - NON-VOIDED
INVENTORY RATING SUMMARY OPERATING RATING Si)I�IARY
MEMBER I.D. G 2 MEMBER I.D. G 2
SPAN 1 SPAN 1
CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. DIST. 17.2 FEET
LIVE LOAD DESIGNATION HS20 LIVE LOAD DESIGNATION HS20
MOMENT MOMENT
(FOOT-KIPS) (FOOT-KIPS)
MEMBER CAPACITY 445.6 MEMBER CAPACITY 605.2
DL EFFECT 206.3 DL EFFECT 206.3
CAPACITY FOR (LL+I) 239.4 CAPACITY FOR (LL+I} 398.9
Page 8 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
ACTUAL (LL+I) 226.9 ACTUAL (LL+I) 226,9
INVENTORY RATING HS 21.10 OPERATING RATING HS 35.17
Page 9 of 11
K:\Structures\Bridge_InspecCion\DIST4\930227\Tequesta New Span 3
*** FINAL SUhID1ARY OF RATING RESULTS FOR --- STRUCTURE ID. 930-227 BARS-PC RELEASE 5.5
POSTING ANALYSIS
STRUCTURE 930227 D/P 5TR. ID-- 930-227
INPUT CODING--
INVENTORY OPERATING POSTING
DATE 3/24/ 6 LIVE LOAD RATING LIVE LOAD RATING TRUCK TYPE GROSS TONS
BY J. LABARBERA
HS2Q AS 21.10 HS20 HS 35.17 VEH. SU2 47.3
VEH. SU4 48.4
VEH. C4 65.7
STRUCTURE DESCRIPTION-- LOCATION-- MICROFILM REEL NUMBERS--
IDENTIFICATION 930227 DISTRTCT 4 DESIGN PLANS
TYPE PSC62 COUNTY COMPUTATIONS
YEAR OF CONSTR. 1960 CONSTR. RTE. CORRESPONDENCE
LENGTH 180.00 FEET CONSTR. SEC.
ROADWAY WIDTH 28.00 FEET CONSTR. STA. 0+ .
NUMBER OF SPANS 5 KEY RTE.
MARKED RTE.
ANALYS2 REMARKS--
TEQUESTA DR OVER NORTH PRONG OF THE LOXAEIATCHEE RIVER
PALM BEACH COUNTY, FL
NEW SPAN 3 LOAD RATING
NEW 71.5" PSU - NON-VOIDED
POSTING RATING SUMAIARY
TRUCK TYPE VEH. SU2 TRUCK TYPE VEH. SU4 TRUCK TYPE VEH. C4
MEMBER I.D. G 2 MEMBER I.D. G 2 MEMBER S.D. G 2
SPAN 1 SPAN 1 SPAN 1
CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. DIST. 17.2 FEET
MOMENT MOMENT MOMENT
(FOOT-KIPS) (FOOT-KIPS) (FOOT-KIPS)
MEMBER CAPACITY 605.2 MEMBER CAPACITY 605.2 MEMBER CAPACITY 605.2
DL EFFECT 206.3 DL EFFECT 206.3 DL EFFECT 206.3
CAPACITY FOR (LL+I) 398.9 CAPACITY FOkt (LL+I) 398.9 CAPACITY FOR (LL+I) 398.9
ACTUAL �LL+I) 143.4 ACTUAL (LL+I) 288.6 ACTUAL (LL+I) 222.4
Page 10 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
POSTING GROSS TONNAGE 47.3 POSTING GROSS TONNAGE 48.4 POSTING GROSS TONNAGE 65.7
Page 11 of 11
�
K:\Structures\Sridge_Inspection\DIST4\930227\Tequesta New Span 3
DETAIL DATA AT MOMENT CHECK POINT FOR SARS RELEASE 5.5
PRESTRESSED CONCRETE FLEXURAL MEMBER
DATE 03124/06 D/P STRUCTURE I.D. 930-227
MEMBER I.D.--G02
C.P. LOCATION 1.50
***** SECTION PROPERTIES IN RANGE 1 OF SPAN 1
-----------SECTION MODULUS-----------
IX , IX C TOP TOP BOTTOM BOTTOM
H AREA AS CT DA ECC FI + BEY3D - BENfJ (BOT} + BEND - BEND + BEND - BEND
IN. SQ.IN. SQ.IN. IN. IN. IN ICIPS IPI**4 IN**4 IN. IN**3 IN**3 IN**3 IN**3
15.00 995.50 3.98 7.70 3.00 3.61 805.5 19395.1 19395.1 7.30 2520.0 .0 2655.6 11.3
I,OSS = 26968.7
FF = 698.3
NON-COMP: D= 11.31 KA = 2.22 JD = 10.57
***** INFLUENCE LINE (SIMPLE SPAN) ***** ULTIM. STRENGTH ***** MOMENT CAPACITY
PRESTRESS CONC TOP TOP BOTTOM BOTTOM
X-DIST (FT.) .000 17.200 34.400 POS AREA = 147.9 STEEL + BEND - BEND + BEND - BEND
Y-ORDINATE .000 8.600 .Q00 PSI PSI FT-KIPS FT-KIPS FT-KIPS FT-KIPS
INVENPORY 270000.0 5500.0 363.1 .0 363.1 .0
***** ORDINATES OF AND AREAS UNDER INFLUENCE LINE (CONTINUOUS SPAN) OPERATING 270000.0 5500.0 605.2 .0 605.2 .0
SPAN SPAN SPAN SPAN SPAN SPAN POST VEH1 270000.0 5500.0 605.2 .0 605.2 .0
T 0 POST VEH2 270000.0 5500.0 605.2 .0 605.2 .0
E 1 POST VEH3 270000.0 5500.0 605.2 .0 605.2 .0
N 2 POST SPEC .0 .0 .0 .0 .0 .0
T 3
H 4 ***** TOTAL DL ***** AVAIL.CAPAC.FOR LL+IMPACT
5 MOMENT EFFECT TOP TOP BOT BOT
P 6 +BEND -BEND +SEND -BEND
O 7 FT-KIPS F-KPS F-KPS F-KPS F-KPS
I 8 206.3 INVENPORY 239.4 .0 239.4 .0
N 9 OPERATING 398.9 .0 398.9 .0
T 0 AREA *** ULTIMATE VEH. 1 398.9 .0 398.9 .0
TOTALS MOMENT CAPAC. VEH. 2 398.9 .0 398.9 .0
POS AREA .0 .0 .0 .0 :0 .0 .0 FT-KIPS VEH. 3 398.9 .0 398.9 .0
NEG AREA .0 .0 .O .O .0 .0 .0 786.8 SPECIAL .0 .0 .0 .0
'�**** LIVE LOAD AND RATING CALCULATIONS (IMPACT FACTOR =.300 FOR +BEND AND =.300 FOR -BEND)
---------TRUCK LOAD---------------- -------LANE LOAD-------
LIVE LL+IMP LL LOC.NO. DIR AXLE LL+IMP LL LOC.CONC LOC.CONC RATING SAFE LOAD RATING
LOAD 1 WfiEEL SPACE LOAD LOAD 2 FACT. CAPACITY VALUE
FT-KIPS FT-KIPS FT. FT. FT-KIPS FT-KIPS FT. FT. TONS
INV HS20 +BEND 226.9 174.5 3.200 L .0 166.9 128.4 17.200 1.055 38.0 HS 21.1
-BEI3D .0 .0 .000 L .0 .0 .0 .000 .000
OPER HS20 +BEND 226.9 174:5 3.260 L .0 166.9 128.4 17.200 1.758 63.3 HS 35.2
-BEND .0 .0 .000 L .0 .0 .0 .000 .000
POST SU2 +BEND 143.4 110.3 4.200 L 2.782 47.3
-SEND .O .0 .000 L
Page 1 of 3
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
P05T SU4 +BEND 288.6 222.0 3.867 L 1.383 48.4
-BEND .0 .0 .000 L
P05T C4 +BEND 222.4 171.1 49.033 R 1.793 65.7
-BEND .0 .0 .000 L
POST SPEC +BEND .� .0 .000 .000 .0
-BEND .0 .0 .000
Page 2 of 3
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
SUMMP.RY OF SHEAR ANALYSIS
DATE 03/24/06 D/P STRUCTURE I.D. 930-227
---INVENTORY--- ---OPERATING--- --VEH. 1 -- --VEH. 2 -- --VEH. 3 -- --SPECIAL--
MEMB. SPAN DIS FRM L DL SDL LL+I T LL+I T LL+I T LL+I T LL+I LL+I LL+I LL+I LL+I LL+I LL+I LL+I
TD MATL N0. LT SPRT R SHEAR SHEAR MAX.V L MIN.V L MAX.V L MIN.V L MAX.V MIN.V MAX.V MIN.V MAX.V MIN.V MAX.V MIN.V
FT. KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS KIPS
G02 PSC , 1 .000 L 17.8 6.1 35.1 T .0 T 35.1 T .0 T 19.7 .0 37.5 .0 31.2 .0
1 17.200 L .0 .0 12.7 T 12.7 T 12.7 T 12.7 T 8.3 8.3 14.2 14.2 12.9 12.9
1 34.400 L 17.8 6.1 .0 T 35.1 T .0 T 35.1 T .0 19.7 .0 37.5 .0 31.2
Page 3 of 3
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
LIVE LOAD DATA AT MOMENT CHECK POIN'I' FOR
PRESTRESSED CONCRETE FLEXURAL MEMBER - LQPS3 FACT�R RATING
DATE 3/24/ 6 D/P STRUCTURE I.D. = 930-227
MEMBER I.D. -- G 2
C.P. LOCATION -- 1.50
PAGE 1
***** LIVE LOAD CALCULATIONS (IMPACT FACTOR =.300 FOR +BENTJ AND =.300 FOR -BENA)
-- LIVE LOAD --
-------------TRUCK MOMENT------------ -------------LA1VE MOMENT------------ -----FIXED----- -----SHEAR-----
LIVE REDI5 LL+IMP LL LOC.NO. DIR LL+IMP LL LOC.CONC. LOC.CONC. SHEAR
LOAD LL+I 1 WHEEL LOAD #1 LOAD #2 +V -V LEFT RIGHT
FT-KIPS FT-KIPS FT-KIPS FT. FT-KIPS FT-KIPS FT. FT. KIPS KIPS KIPS KIPS
INV. HS20 +BEND .00 226.9 174.5 3.200 L 166.9 128.4 17.200 .000 .00 .00 12.69 12.69
-BEND .00 .0 .0 .000 L .0 .0 .000 .000 .00 .OQ
OPER HS20 +BEND .00 226.9 174.5 3.200 L 166.9 128.4 17.200 .000 .00 .00 12.69 12.69
-BEND .00 .0 .0 .000 L .0 .0 .000 .000 .00 .00
OPER 2 ST5 +BEND .00 214.3 164.8 -13.800 .0 .0 .000 .000 .00 .00 8.25 8.25
-BEND .00 .0 .0 .000 .0 .0 .000 .000 .00 .00
POST 1 SU2 +BENU .00 143.4 110.3 4.200 L .00 .00 8.34 8.34
-BEND .00 .0 .0 .000 L .00 .00
POST 4 SU3 +BEND .00 268.1 206.2 6.200 .00 .00 13.80 13.80
-BEND .00 .0 .0 .000 .00 .00
POST 2 StT4 +BEND .00 288.6 222.0 3.867 L .00 .00 14.22 14.22
-BEND .00 .0 .0 .000 L .00 .00
POST 5 C3 +BEND .00 155.4 119.6 7.200 .00 .00 -7.43 -7.43
-BEND .00 .0 .0 .000 .00 .00
POST 3 C4 +BEND .00 222.4 171.1 49.033 R .00 .00 12.93 12.93
-BEND .00 .0 .0 .000 L .00 .00
POST 6 C5 +BEND .00 223_4 171.8 -14.633 .00 .00 12.93 12.93
-BEND .00 .0 .0 .000 .00 .00
Page 1 of 2
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
LIVE LOAD DATA AT MOMENT CHECK POINT FOR
PRESTRESSED CONCRETE FLEXURAL MEMBER - LOAD FACTOR RATING
DATE 3/24/ 6 D/P STRUCTURE I.D. = 930-227
MEMBER I.D. -- G 2
C.P. LOCATION -- 1.50
PAGE 2
***** RATING FACTOR *****
-- RATING FACTOR FOR -- -- RATING FACTOR FOR --
MOMENT SHEAR RATING SAFE
TOP BOTT LEFT RIGHT VALUE LOAD
+BEND -BEND +BEND -BEND CAP.(TONS)
INV. HS20 1.055 .000 1.055 .000 .000 .000 H3 21.1 38.0
OPER HS20 1.758 .000 1.758 .000 .000 .000 HS 35.2 63.3
OPER 2 ST5 1.862 .000 1.862 .000 .OQO .000 .0 74.5
POST 1 SU2 2.782 .000 2.782 .000 .Q00 .000 47.3
POST 4 SU3 1.488 .000 1.488 .000 .000 .000 49.1
POST 2 SU4 1.383 .000 1.383 .000 .000 .000 48.4
POST 5 C3 2.566 .000 2.566 .000 .000 .000 71.9
POST 3 C4 1.793 .000 1.793 .000 .000 .000 65.7
POST 6 C5 1.786 .000 1.786 .000 .000 .000 71.4
<
T
G
�
I.�
'`
�J
�•
��
Page 2 of 2
K:\Structiures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
BARS-PC R5.5 - MOD 3
STRUCTURE I.D. = 930-227
+x*,t,r***:r,r:x,t,t,r**,r**+,t*,t** � t* ***** , t** , t*�*�****+**+t:r*�*�*t**�* , r* , t**** , r* , r*+*+*,+,r+*:rx++:r,t,r*,r*,r******** ; r** : r.****,t** :r:r *, r . :r**x . :ra**:r;rx*+ �
" STRUCTURE HEADER AND DESCRIPTION :r
**:r++ � *x*: �� ***a,t.tx++,r*,r+*,r,r**, r** , r�*t**** , t , r* , r , r , tt*x** , r* , r , tx**er , r , r*** , r+;r�a*x*x****�*****+**++,r**�+,rw,t**+**,r***,r*.*t* ; r,r* :r * *+* � * , r+:r � ***
100-- 2 J. LABARBERA EA/I/0/P = FILE REQUESTS AND OUTPUT DATA EXCEPTIONS pdpp
TYPE = PSC62 YEAR = 60 LEN = 180.00 FT. WIDTH = 28.00 FT. 5 SPANS SP.LOAD =
INV.LL.TRK.= OP.LL.TRK.=
x.* � **,r,r* � *,r**** �* .+.+'+ +*****+*.x**.*****�**� , r*****re�* , r** , r***** , r , r*:r**:r:r�:r*****:r*;r..•*,r***,r**,r�****�+*x*�***�..�x+«**�***.+*�� ****
* STRTTCTURE LOCATION 11ND PERMANENT IDENTIFICATION FACTORS *
*�*
200-- 5 BRIDGE= 930227 DIST./CO.= 4 CONST. ROUTE = CONST. SECT.= CONST. 5TA.= 0+ .
MICROFILM REEL N0. DESIGN PLANS= COMPUTATIONS= CORRESPONDENCE=
ROUTE I.D.= MARKED ROUTE _
***
* COMMENTS *
+***+.***
300-- 6 1 TEQUESTA DR OVER NORTH PRONG OF THE LOXAHATCHEE RIVER
400-- 6 2 PALM BEACH COUNTY, FL
500-- 6 3 NEW SPAN 3 LOAD RATING
600-- 6 5 NEW 71.5" PSU - NON-VOIDED
, rx*x+�x***:t*x , t****+**x**x*x***** , r*x*. , t+* , ra�**� , r*.t+*��*w+**««+*+�*r:+:+:**��*******xx�+*x*.****:t,t�,t�.+:t,tx*��,t**:r**,t*.***+w : r*,t*,t+,t**,r,t
* MEMBER SPECIFICATIONS AND REQUIRED ANALYSIS-GIRDER,STRINGER AND FLOOR BEAM *
aa
t
MEMBER SPANS STIFF. SPAN 1 SPAN 2 SPAN 3 MATL ALLOWABLE STRESS LL DIST. END THRU MAX IMPACT FACTOR o
ID SYNII�i CODE (SPAN 4) (SPAN 5) (SPAN 6) CODE FY FB FC* FC** FACTOR FL.BM DECK INV OP. POST SPEC 3
700-- 8 G 2 0 1 34.400 .000 .000 PSC 270.00 5500.00 1.029 .00 .00 .00 .00 W
`
�
s
C
G�
Page 1 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
*****************�*******�:**********�*�*�*****************.****++�*:*******��******�**.*�*�*.**********�+**�**�**++***+�+*�*�***
* SUPERIMPOSED DEAD LOADS-GIRDERS,STRINGERS AND FLOOR BEAMS *
**** �� ******+********xx*x � **+*** * x * +*+ *** x �*+*******�***x**x�*+*********+****+**xx**+*�*�********�******** ***+** � * . *+**+++****+*+
MEMBER SYMM. SPAN DISTANCE FR. LOAD LOAD LENGTH
ID NO. LEFT SUPP. TYPE P OR W(L) W('R)
800--10 G 2 1 .00OFT. W 357.5 .0 34.400FT.
**** � ******..++********* � ***** *****�* , +* , r*+***�******�**********�*.+****�*.**:r**:r***:r.***�**�*****�*,�*****.++**�*****+**,r * ., r . ***+*
* SECTION RANGE SPECIFICATIONS �
*x***.****,r***:r****+ � *.* � **** � + ** , r** *, r****************.*+**** , r+********** , r , r++;r*** , r**,r�********,r,r�***,r,r:r**:r***x*x�x* : r,r : r**, r .* ***++ , r
MEMBER SYI�fI1. SPAN RANGE RANGE SECTION N0. SEC. VAR. HSNGE HINGE 1 HINGE 2 HYBRID GIRDER
ID N0. NO. LENGTH LEFT RIGHT CODE DIST. DIST. CODE FY CODE FY
900--11 G 2 1 1 34.400FT. 1 0 .00OFT. .00OFT. 0. 0.
* � **** **:r:�** , r*.*** , r*** , r*:**************************�*******..�x**..*+*******�*��.*�..�*****����w�+**+**���** : .+�***�*�. x � * * *** � * «
' SECTION PROPERTIES (PRESTRESSED CONCRETE) - GIRDERS,STRINGERS,FLOOR BEAMS *
**,r+***x** *****+****xx+:+�:r. , r , r*+ , r , r*:+** , .*�*****:r+.**+*�.******�******�+* , r+* , r+ , r , r* , r*,r****,r*,r*�*,r****,r****+****,r**,r**,r*******x+,r,r****
MEM$ER SAME ** VOIDS DESCRIPTION ** *************** BEAM DESCRIPTION ***************** ****** STRANDS ******
ID. SECT ADR DEPTH WIDTH DIST. CODE DEPTH TFLW TFLT TFIT WEBT BFIT BFLT BFLW I ASI DI
1000--15 G 2 1 0 .0 .00 .0 15.00 65.5 5.5 .00 63.50 .00 4.0 71.5 1 L 2408.00 3.00
1100--15 G 2 1 0 .0 .00 .0 .00 .0 .0 .00 .00 .00 .0 .0 2 L 208.00 12.00
C
^o
O
�
��
�
r.�
f�
Page 2 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
Page 3 of 11
K:\Structures\Bridge_Inspection�DIST4\930227\Tequesta New Span 3
SUMMARY OF RATING CALCULATIONS MEMBER G 2 BARS-PC RELEASE 5.5
INVENTORY AND/OR OPERATING ANALYSIS
INPUT CODING -- STRUCTURE 930227 D/P STR. I.D.-- 930-227
DATE 3/24/ 6 INVENTORY OPERATING
BY J. LABARBERA LIVE LOAD RATING LIVE LOAD RATING
HS20 AS 21.10 HS20 HS 35.17
STRUCTURE DESCRIPTION -- LOCATION -- MICROFILM REEL NUMBERS --
IDENTIFICATION 930227 DTSTRICT 4 DESIGN PLANS
TYPE PSC62 COUNTY COMPUTATIONS
YEAR OF CONSTR. 1960 CONSTR. RTE. CORRESPONDENCE
LENGTH 180.00 FEET CONSTR. SEC.
ROADWAY WIDTH 28.00 FEET CONSTR. STA. O+ .
NUMBER OF SPANS 5 KEY RTE.
MARKED RTE.
ANALYST REMARKS --
TEQUESTA DR OVER NORTH PRONG OF THE LOXAHATCHEE RIVER
PALM BEACH COUNTY, FL
NEW SPAN 3 LOAD RATING
NEW 71.5" PSU - NON-VOTDED
INVENTORY RATING SUMMARY -- OPERATING RATING SUMMARY --
MEMBER ID. G 2 MEMBER ID. G 2
SPAN 1 SPAN 1
CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. DIST. 17.2 FEET
LIVE LOAD DESIGNATION HS20 LIVE LOAD DESIGNATION HS20
MOMENT MOMENP
(FT. KIPS) (FT. KIPS)
MEMBER CAPACITY 445.b MEMBER CAPACITY 605.2
DL EFFECT 206.3 DL EFFECT 206.3
Page 4 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
CAPACITY FOR (LL+I) 239.4 CAFACITY FOR (LL+I) 39$,g
ACTUAL {LL+I) 226.9 ACTUAL (LL+I) 226,g
INVENTORY RATING HS 21.10 OPERATING RATING HS 35.17
Page 5 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
SUhID1ARY OF RATING CALCULATIONS------STRUCTURE MEMBER G 2 BARS-PC RELEASE 5.5
POSTING ANALYSIS
TNPUT CODING -- STRUCTURE 930227 D/P STR. I.D.-- 930-227
AATE 3/24/ 6 INVEN'PORY OPERATING POSTING
BY J. LABARBERA LIVE LOAD RATING LIVE LOAD RATING TRUCK TYPE GROSS TONS
HS20 HS 21.10 HS20 HS 35.17 VEH. SU2 47.29
VEH. SU4 48.39
VEH. C4 65.73
STRUCTURE DESCRIPTION -- LOCATION -- MICROFILM REEL NUMBERS --
IDENPIFICATION 930227 AISTRICT 4 DESIGN PLANS
TYPE PSC62 COUNTY COMPU'T'ATIONS
YEAR OF CONSTR. 1960 CONSTR. RTE. CORRESPONDENCE
LENGTH 180.00 FEET CONSTR. SEC. .
ROADWAY WIDTH 28.00 FEET CONSTR. STA. 0+ .
NUMBER OF SPANS 5 SCEY RTE.
MARKED RTE.
ANALYST REMARKS --
TEQUESTA DR OVER NORTH PRONG OF THE LQXAHATCHEE RIVER
PALM BEACH COUNTY, FL
NEW SPAN 3 LOAD RATING
NEW 71.5" PSU - NON-VOIDED
TRUCK TYPE VEH. SU2 TRUCK TYPE VEH. 5U4 TRUCK TYPE VEH. C4
MEMBER ID. G 2 MEMBER ID. G 2 MEMBER ID. G 2
SPAN 1 SPAN 1 SPAN 1
CTtITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. DIST. 17.2 FEET
MOMENT MOMENT MOMENT
(FT. KIPS) (FT. KIPS) (FT. KIPS)
MEMBER CAPACITY 605.2 MEMBER CAPACITY 605.2 MEMBER CAPACITY 605.2
DL EFFECT 206.3 DL EFFECT 206.3 DL EFFECT 206.3
Page 6 of 11
K:\Structures\Bridge_Tnspection\DIST4\930227\Tequesta New Span 3
CAPACITY FOR (LL+I) 398.9. CAPACITY FOR (LL+I) 398.9 CAPACITY FOR (LL+I) 398.9
ACTUAL (LL+I) 143.4 ACTUAL (LL+I) 288.6 ACTUAL (LL+I). 222.4
POSTING GROSS TONNAGE 47.3 POSTING GROSS TONNAGE 48.4 POSTING GROSS TONNAGE 65.7
Page 7 of 11
�
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
*** FINAL SUMMARY OF RATING RESULTS FOR --- STRUCTURE ID. 930-227 BARS-PC RELEASE 5.5
INVENTORY AND/OR OPERATING ANALYSIS
STRUCTURE 930227 D/P STR. ID-- 930-227
INPUT CODING--
INVENTORY OPERATING
DATE 3/24J 6 LIVE LOAD RATING LIVE LOAD RATING
HS20 HS 21.1 HS20 HS 35.2
BY J. LABARBERA
STRUCTURE DESCRIPTION-- LOCATION-- MICl20FILM REEL NUMBERS--
IDENTIFICATION 930227 DISTRICT 4 DESIGN PLANS
TYPE PSC62 COUNTY COMPUTATIONS
YEAR OF CONSTR. 1960 CONSTR. RTE. CORRESPONDENCE
LENGTH 180.00 FEET CONSTR. SEC.
ROADWAY WIDTH 28.00 FEET CONSTR. STA. 0+ .
NUMBER OF SPANS 5 KEY RTE.
MARKED,RTE.
ANALYST REMARKS--
TEQUESTA DR OVER NORTH PRONG OF THE LOXAHATCHEE RIVER
PALM BEACH COUNTY, FL
NEW SPAN 3 LOAD RATING
NEW 71.5" PSU - NON-VOIDED
INVENTORY RATING SiJMMARY OPERATING RATING SiTMMARY
MEMBER I.D. G 2 MEMBER I.D. G 2
SPAN 1 SPAN 1
CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P_ DIST. 17.2 FEET
LIVE LOAD DESIGNATION HS20 LIVE LOAD DESIGNATION HS20
MOMENT MOMENT
(FOOT-KIPS) (FOOT-KIPS)
MEMBER CAPACITY 445.6 MEMBER CAPACITY 605.2
DL EFFECT 206.3 DL EFFECT 206.3
CAPACITY FOR (LL+I) 239.4 CAPACITY FOR (LL+I) 398.9
Page 8 of 11
K:\Structures\Bridge_Tnspection\DTST4\930227\Tequesta New Span 3
ACTUAL (LL+z) 226.9 ACTUAL (LL+I) 226.g
INVENTORY RATING HS 21.10 OPERATING RATING HS 35.17
Page 9 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
*** FINAL SUhQ1ARY OF RATING RESULTS FOR --- STRUCTURE ID. 930-227 BARS-PC RELEASE 5.5
POSTING ANALYSI5
STRUCTURE 930227 D/P 5TR. ID-- 930-227
INPUT CODYNG--
INVENTORY OPERATING POSTING
DATE 3/24/ 6 LIVE LOAD RATING LIVE LOAD RATING TRUCK TYPE GROSS TONS
BY J. LABARBERA
HS20 HS 21.10 HS20 HS 35.17 VEH. SU2 47.3
VEH. SU4 48.4
VEH. C4 65.7
STRUCTURE DESCRTPTION-- LOCATION-- MICROFILM REEL N[JMBERS--
IDENTIFICATION 930227 DISTRICT 4 DESIGN PLANS
TYPE PSC62 COUNTY COMPUTATION5
YEAR OF CONSTR. 1960 CONSTFt. RTE. CORRESPONDENCE
LENGTH 180.00 FEET CONSTR. SEC.
ROADWAY WIDTH 28.00 FEET CONSTR. STA. 0+ .
NUNIDER OF SPANS 5 KEY RTE.
MARKED RTE.
ANALYST REMARKS--
TEQUESTA DR OVER NORTH PRONG OF THE LOXAHATCHEE RIVER
PALM BEACH CQUNTY, FL
NEW SPAN 3 LOAD RATING
NEW 71.5" PSU - NON-VOIDED
POSTING RATING SUMMARY
TRUCK TYPE VEH. 5U2 TRUCK TYPE VEH. SU4 TRUCK TYPE VEH. C4
MEMBER I.D. G 2 MEMBER I.D. G 2 MEMBER I.D. G 2
SPAN 1 SPAN 1 SPAN 1
CRITTCAL C.P. DIST. 17.2 FEET CRITICAL C.P. DIST. 17.2 FEET CRITICAL C.P. DIST. 17.2 FEET
MOMENT MOMENT MOMENT
(FOOT-KIPS) (FOOT-KIPS) (FOOT-KIPS1
MEMBER CAPACITY 605.2 MEMBER CAPACITY 605.2 MEMBER CAPACITY 605.2
DL EFFECT 206.3 DL EFFECT 206.3 DL EFFECT 206.3
CAPACITY FOR (LL+I) 398.9 CAPACITY FOR (LL+2) 398.9 CAPACITY FOR (LL+I) 398.9
ACTUAL (LL+I) 143.4 ACTUAL (LL+I) 288.6 ACTUAL (LLtI) 222.4
Page 10 of 11
K:\Structures\Bridge_Inspection\DIST4\930227\Tequesta New Span 3
POSTING GROSS TONNAGE 47.3 POSTING GROSS TONNAGE 48.4 POSTING GROSS TONNAGE 65.7
Page 11 of 11
- roPic E �
BRIDGE H(STORY �
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Bridge No: 930227 Date: 3/8/2006
E. B R I D G E H I S T O R Y
Bridge No. 930227 was originally built in 1962 (plans are available). In 2006, Span 3
roadway section was replaced due to deterioration of the original prestressed slab
units. Span 3 replacement was designed by Bridge Design Associates, Inc. from West
Palm Beach, Florida (BDA, Inc. Project Number 06-517). As-Built plans can be requested
through FDOT District 4 Structures and Facilities office in Ft. Lauderdale, Florida.
Prime contractor for Span 3 replacement was Cone & Graham, Inc. (Mr. Randy Cropp).
Subcontractor for the asphalt paving was Wynn & Sons Environmental Construction, Inc.
E1
- roP�c F
FIELD PRE.PARATION
FLORIDA DEPARTMENT OF TRANSPORTATION
BRIDGE MANAGEMENT SYSTEM
Bridge No: 930227 Date: 3/8/2006
F. FIELD PREPARATION
A. Tools and Equipment
Full Size Cargo Van: Yes: �_ No: Pick-up Truck: Yes: No: �
Camera: Yes: � No: Video: Yes: No: X
NDT Equipment: Yes: No: X
What Type? N/A
Binoculars: Yes: No: �.
Diving Performed: Yes: X No:
What Routine
Hand Tools: (i.e. Chipping Hammer, 6' Rule, etc.)
1. Scaffolding 2. Chipping hamm
3. 25' box tape 4. 200' cloth tape
5. 6' folding ruler 6.
Other:
B. Services
Flag Crew: N/A Snooper: N/A
Electrician: N/A Other: N/A
C. Scheduling (Brief Explanation)
Normal daytime hours
D. Site Conditions
Boat Needed: Yes Type of Boat: Center Console Location of Boat Ramp: Burt Reynolds Park
Lengthy Travel Required: 7 hours round trip from Tampa
Difficult Access: No
Water Obviously Polluted: No
,ng Water Current: Not during this inspection
Other: N/A
F1
,
TOP{C G
BRIDGE DESCRIP714N
AND
_ DRAWINGS .
BRIDGE DESIGN ASS�JCfATES, INC. . � � � ` ���
DATE 03/03/06 F'ROJEC7 NO. 06-517
C O SJ S U LT l N G E N G 1 N E E R S
2035 Vista Parkway, Suite 200 ATTENTION patrick O` GradV
West T'alm Beach, Florida 33411
RE: Teauesta Drive Bridae
Phone: (561) 686-3660 • Fax: (561) 686-3664
TO Kisinger Campo & Associates, Inc.
9270 Bay Plaza Blvd., Suite 605
Tampa, Florida 3361�
WE ARE SENDINGYOU �I Attached �] Prints 0 Samples �
❑ Shop drawings ❑ Specifications ❑ Regular Mail ❑ Courier � Overnight Delivery
❑ Copy of letter C] Change order ❑ Hold for pickup
COPIES DATE NO. DESCRIPTION
_ 1 0�/03/06 1-6 17�17 P.s�built plans
THESE ARE TRANSMITTED as checked below:
❑�or approval ❑ Approved as submitted ❑ Resubmit copies for approval
�I For your use 0 Approved as noted ❑ Submit copies for distribution
-�] As requested ❑ Returnecl for corrections 0 Return corrected prints
O For review and comment (� Signed & Sealed �
❑ FOR BIDS DUE 20 ❑ PRINTS RETURNED AFTER LOANTO US
REMARKS
- 2006
.
COPY TO SIGNED �� �
�
BENT NO_�1 BENT N0. 4 '
STA. 77 + 46.00 STA. 16 + 54.00
. END BENT N0. 1 BENT N0. 2 BENT NO. 3 END BENT NU. 7
STA. 17 + 70.00 � � P ��£ �� STA. 77 + 82.00 ��' P/Lf GP
¢ PILE CAP I --- �' p2£ GW �' PICf CAP STA. 18 + 18.00 I �' P2£ GW STA. 18 + 90.00
� � � I 1
70'-0" I J6'-0' l 36'-0" I J6"-0' 36'-0_L J6'-0' __I ?0'-0�
I APPRCI4CH S[AB� SPqN 7
.. � SPqN 1 �` SPAN 3 � SPAN � 1 SPM/ 5 T APPHOACN 5
' _ " = I � � I 1 I _ _ "
���9'; . '__ � '_
�..... � ��— _ � ��� ......
� �
- ,' ____'_ '—'_' ' ,__ � 1
-- - —T - - � +------ ------- ---
� � I
, ..
' � /
� /' ,il�� ` '----- C -'--- :�'�'
f -"- l �— M£A 70 BE REPAIR£D __
......:.._.., .
R£AfOVE £X/SDNC 4�-0" SL1B UNITS
ANO CUR6 ArYD REPUCE W17N NfW
i . J5" OEfP SUB UfJ/75
k
� BRIDGE PLAN
.
� �R'� �� 8rid�ga R paLr� For: Y, or g �� "�
; Te uesta Drive Brid e d< 1
°i 6"" over tha North Pron of the Loxahctchea RWer 0° °
� Palm HmncZ�i Co.ant Fl iao A9 °"°'� 1O � e-oiv
�,.. ,., .:-..�_:�.",.,:;.., , .
�� PRESTRESSED tilE7v/SE� "� RUC7l NO �� �
� GENEFK SPfCII/Gi/ONS� F7NlSM ' F.QUIPMEAf� ON UNITS:
pur7do Mpert t o/ TronspeRafion Sfandard Spec;/irotien /or Read�on0 BMpe The top� o( ➢/�stnsssd units snon ae t�n;snee smoorn: aen�. s r(o�a viM o sbel froNel, Be/ofe Aeevy anstrvclwn epvipmen! ls Qe�miff�J on fAe sNUClwe Ounnq conslrucfion, I
Cans�Nelien (T00�). Nm c vrsely Oma�meC or �o aro.;ee o s�rloce s�rfable lar nonCing fa osp�alt, rkelclre� showing Me oxle spocinq anO nlicipotetl IonOings :non ee submifte0 tu o
�� OESIGM SPECIf)C�7)OM Ill olher sur/xer / fne nrt s�aN nceiw o'Class J" suAOCe /inisn. TAe vEqe oI fne approveC Dy f�e Englnee�. �
y., T001 Em'tton a/ fha MSI{Tp (RFO BnOqe Oesi9n Speci/icofions wif� curnnf intanms, �op o/ tne a�ilocr o/ tha unifa aAOtl be /in�'sneC by use ol a smoll raEius rool. '
2001 EO�Tion c� tnv F,0.0.). S�uctvre Desiyn C�iOalinna nit� curren( �n(anmx CONCR£iE 51RE/�CM: /'05t-�ENSIONINC 560UENCE:
�4'� OESICN L6101NC: Af frcnsf�r ol f�e prnM�a�in loa0, fM1e �� o sut(-; ension�ng sholl De Oone ottord'nq fo t�e nvrn6er sepuance a�ewn on f e pe<asf
aAall ds 5500 9 � Y��n )r s en�tn ol ine c c.efe ,n n 6e aoao loe ayou� sheef.
H�_g1 pr;. lt psi of twen -eignt 29 tiv e i e�oE un�n.
' flctl/+C CONCREIE JaMS BE/w[FM uN�TS
�'' ANIERML 3)R£3SFS: . N.WO4NG ANO STOAAC£�:^ lyy n 'lx.aGal/ ba " o( s ar Aov¢
:.. AU Nefaml P�op��fies are ;n ca.donce wifn cunenf MSNIO spec%ration� le� v!! !A. �nihQto vndling d slero9e. �na Orerfnasea nifs e qck up ou M/ enaa of t�ne 33X / the Je�l9 sf eny(�h 6 o nosl-t ns;o^ n9 op�ra(io e<g;n.
}'.. ^�QIClIOIt i�QW/I �� �he Clo�x�� ,4 I;mOfP�w�t �maqt. IAe prealrcssed unifs usf Ea sforetl� n p- iqM1f s� io ( Co�v sho 11 Da (�kan Io a f ml � / m�r � lo Cucft.
1. L'onc�efe: Minimum TB tlaY 5henqM: /'c fORMS PRLLFiS: ,..._ '.VC'.^C5: lCNiION :If�,1.YJ:.
A1 ertresseE units snall pv cosl on concrete Dotatl �Tne pw1-tensione0 x4onas sAOI1 oe �gioufeo in cro�tivnce Niln sacliM 9J� ol Me
"-. SuyenlrueWn � Pr parcefs onn �n metal lorms. NeYnuy sPeci/ica(ianz. 1�< 9�uraC rfronES no�i �ot ee�ar,��row. �o. a�aN
T Clvxa N: 5500 ysi (dos✓ro Povn, Pour $Mpy ���m Tay De bootl. ' plocetl on fAa tpan /oi o penu0 0/ sevcn(y-Iwo (7I) �ows /opaning qW�fnOlo /ovOS Dc
9 Perotiona.
Cbsi V 5 f �� Bor�isrzJ STRAND EXlE�ro J: A(Ll/�C ANCNORFCf 9[OCKOUIS�
.� P^�b 6500 pri (PrestrcaaeO $loOaJ NI �all exlena p-!�1 (����s �O Me enOS ol t�e Arcslrcxaed un�fs. N( c erogv 0 ou(s cnall be NieO ni�h <onciete vn0 /�nlsAep /lus� .�(�
2. Rain/wein9 StNC SNOP ORAWINGS: suAace eeek�loca.
� CioCe 6P. 60,000 0�% . fis eanfracto� aAoll ivJmif n()) seh ol Mie➢ Oia.�nqs. sha.ing c mple:e deloils o
� !M1S preOOS�d pna4sssN unih� T�e Eivinnqa aM1ol/ inelu✓e n�nlorcing a<ee% yesfnasiny
ro��R�' xfea4 p�esfrasainq 6e0 byov4 tmsioninq onQ detensioninq schetlufvs, antl oll computaUona
�. Pnvide J// :ncA cham�m an all ertpos�e etl9ea one romen ercapt aa ofne�wise nofe0. 'NVYed W confro! fM work.
" 1. CansWefion joinfa w'U 6s p.rmitfad onry of Ms bcefiena indicv(ep en Ihe plvns, BEARING P.105' �
eAtlifional eonaMvc4on je;n�y w aMe•alioni b l�aae ahewn wJl rcv� epyreva/ by Us H^^Oro^� Mo�+9 0�� �ll Oe I/Y irrc� X 6�incn slnps orGOnce mY� secfion 9J2-2
9�^ � ! Nv rp�cifcntiona. fie poGS moy Oe cronfinvovs sViyr �a �ulGple (enq(AS o(
FEMFDRCEMEN�: ��Qat �E 0 inMm mm.mvm isngfn, flra pvOS moy De cu� eommercialy ewAaerv sneeN.
�. R�in/orwmenf sl+o/l be AS/N A-615, GrvEe 60. PAYMEM:
Spirvl li�s !or pnafnu<0 c �s p�lw ahoH Oa monu/ocfured from [0l0 Orv.n iM! ��rc ll�s cmfract un�T prvces /or Me pecnsl-preifrcwed un:fr rhell :nclvda Ma unita,
' mwtin9 M� n9uk�manh o! A$/M AB1. prsiLO�sd afnM; rtinlxch9 alesl MOOed wifh f�a un t-fension cabls+ and
�� �// ✓imsv%wr+ PMCnMg W bcefien ol ra�nlarc� oro te eenfeHine o/ Oen eacepf Mren �ehw vx mGirt ond lempero � �
, Me clear Oimsntion m aMwn N/vice e! conc <e. Cro oQ ry� <°�610���9 �oGlsi r onC hoNwora, neeprene
nnq p a. yremoul0otl oxpansion malenol, epcxy grou! onE non-aMMx grovt.
3. RaNxsmant dsbd d'mmalona are ovf-fo-oW el Oan. Po5f TfNS10N CABL£S '
Poaf tanim eaDlvr tlroll b< Nree (JJ .6 inch tliomafe� f1YC slrcnGr (LO-LU' T]0 9�o
MINIMUM �ONCRETE COVER: !ew-rcb.wfion` w spuiwlent Cadlss rhoul0 Da in o caroance nifA ASTM spscilication '
Cav r (w mn/orc,ng rfeel Hro in fM OrtCq ybn Wtaila will proJUro Me Ioilowing A-�1). ��e aD/ea sne�l pa zfrcsa.d an0 onc�wed af t31,000 po�nde, pe poxt-lens;on
mmimum C/aam�Ce EOSeQ 0� Dbeemen! 0�1 (aDliM(iM folenncas sMnn Gelow: ce0/s. Th� frvns.en� Peif-fanrien coMai ahall nof Oa fanrfonel f�Y Me c n!M1e
sroe: z;ncn m,�,mum qmm�c. (bomonb!) feP. �ffom. e'mN o�W k�ys ��n �t.e�g�n.� � e'",",m�m ei ,,..�y'r� (n) no�rs o� no.,
w
ocn;.ma �s.r � e.:r
F � pa�..�.�e mi.,o��.: :.. sa.,eero sy.�;rma�:��., GBCE o1NCHORICES
F r i em.wnon rai.�oott: .„ cnv ,vo�,,,� ,i sra..eoro v.�utt. m. Ioeneater snan s�ema e.toBr o� �h. coeie onchorc9e o�e oncnomqe .emie.c.ma�r
OESICN ME1M00: Oetoih /or opprorol vif� �Ae snop Omwinqs,
Ap Nemmh weYe EesigneJ �nny Ma lRFD (LOaO enG Rensfonee fe<br De�iqn)
FUNRE WfM/NG SURfACE.� .
�s vou�a, a � :aw�e iooe.
ENNRONMENl�
SupentrucNn: Eshsme/y Agyrrashe �
SubatrvcNn: F+tram�ly Ayqren:w �
PAYNEM.
Poymen! lor inclWntM ilema which arc ref cowre! in fM :nd'ntlual A�0 itams sM1aq be �
nc/�de0 in f�e cnnhoet �nif DMS /w Me �iG T<ma. � �
�
C
a
� .
�
Bridge R pair For:
;� ���� � s��� Tequesta Drive Bridge ���
r the North Prong of the Loxahatchee R"ver �oe e
Palm Boacla County, Florida RD �«�'�� 06
o= m � M f�
04��i h 2gm l J "
a �'o
w �i V�H
2 � �
�ea� 0 ��_ ��
W k y V� p A
`, Ox� � �S 4�= � ��
~ � W ` � J � � � �
� 2I I h W �
� � 0 Q �n 1n (�
�' � N h O �' 4 0 2 loy "vl
I � � p } � V � o
w h � g�� � 2 C�iW (1� i
'� � h 3 it ,.4 � j m
Q Oi N�4K 4i W�Q O SI °1
�� t� � (r, N o d
" '� � �a ro
�:-rF �' '� I.
u �
' __ � `n � 0 ,� .,y u
' �~ ` � �� ~ �" °+ �4
� � , .,
" o '
q ��
� ' ' _� ' ."c
. ��
� . � �
. o � � .'^.� ; ; ti `� N � :::;( ...,...' _ . � � J
,
�.� �
� ��° �� �/2 ,� � i � � �'•�i7
"aam .., � � � �Q o p
U � V � [
� W � � a U
� H,� � � �t,� Q' m
C "1 v w
��� �� �s �S � �� �� � � ��
w • � m�
���W �� S� ' � �� b �
��m� �Q a� .r.� \p �� F. � u A
2 � 0.1�'oi4
I i 1 -►��-_.
� �
0
� ��
� a �
0 3 2 r1_. =
_ n oi .9 . � .9 2y ���g �
I+ a/r s .z/r s:s � .r/r s;s .z/i a 4 ' W V y� �
� y� ` (1 0`
�i�' .r/P9 .di,s:s .�/rv ���.w ry � Q i
Im'N .__�_ !l_ �0.� \ � � .
� _ _- :"'' ""''' '"'""' "'"'. """'' """ """' � v � :
J , � s� r ��
a �
� � , O � � 1�I��ie
, m I � w :
�
o? O �
�� � �' N '
� a �� �] Q � Q Q� � �
�° � � � � O ^
, � .
� I � � � q
� ' � ti
� :::- ------ ------- ---�--� - - �
— : ,._: .:... .
-- --- ------ ----- W
------- : ....
o -----------------�--�--•-----------------
0
��� I - -- � �
,
,+ � ZI� .z/� rr-,oz ,z/1 ri-,oa �
�
� ( �
m� �
i rr .o-.�t ,o ;�r �/t rt
�
�
�
� .
�
'
� i
.�..r,. .� .�,�-,e..- :..,«-,�„w,�
-----------20 �!/2 ----__.__..._..._—__----�------------------- -
'10'-�l l/2' —
t
6'-I1 1/2" i ,�, �.
� �0 1/2' � --'__.__--._ ----- --...___.'�__...._ , ___�a_ '___,__.. ._ 6�-17 I/1 . . . _
_.___
_ i _ _
f , 5 �-"-- 4- � . t ..--- � !- � --�--i—....".—v._ J , U . �, p . 4 . Q . , C, !0 I/.'"
7'-0"
�__'_'.___' .
!7 ! � � � I . .'f`_ ...,� . .. _ ,y :. _ 5' 7' . !' 0"
I � �` - I � I' I I ; , r,�r I I
� I I I
i � � ;
I � i
�
� i I � I I I
..
,;;,,,;,,;;,,;:::,:,:.:,,_,::,�,:,,,.,,,�, ::,,�,,,:,_�:::..:,:,:::,,,:,:,,::,.
....• .,;.., - - - - -
.... ..;..::.
...:::f:::_:: : :::�::'�:�;' �... " --
'. '.`'``.''„ 1
:...... ........... .
......_.... ... .. ..........
�:::-:._.:.: .:.:::�:::`.::_...:>_`: :.:':' ... ; ; . : .:: .: .:: .:.::.:::.,: _:::x.:,::�:_:::::.::,.:�::
. ....
.. : ... ,. :.,.. , ,,:
':.':::._.:..:�:.�:._::.:: :: ; ,.... ::::::.:....._ ,
� .. : �..,...''t;�...:.�'�.., '' , ' ,...._......_....._........ ..._......... - TO REMAIN
..... . . ,. .., . ,. ,,... :�..:::;• .
£X/STING SlDfWALK S(AB UNITS
AND 5/OFWACKS
RfMOVf EXISTWC CONCR£I£ S(A9 ON!/S
�P � VROPE"R y�E CtIRB.
EXISTING BRIDGE CROSS SECTION
� ZO 11 1/2 --
�'__' ?0'-ll 7/2'
'� 6'-if 1/2" .. � '
70 I/2" "_-.__'___�.�__' .'_..._ __' �_�._—_—._ 74'-0" 6'-17 1/1"
1011
' �. �,. �� 5 ,_ . f � •
� 5�_�� �,_�.
!! 1�?"
i ��_��
5'-8 I/1" 5^ 5'-5 7/2" 5 ' - S I II�� 5'-5 7/2" 6^ 5'_g 1/7'
SlAB UNIT I1PE B SG1B UNII TYP£ d�� 6 5(A9 UNII IYPE A SL48 uNl/ RP£ A SL9B UN/7 7YPf B
� ��
`---------�-- «� ----'------ ""� ----"---- :;�: .
t r ....________' _"__'______�.. _____"__ .__________ �
-- � _'_'_^____�
y __'_'_-___. -' ._'_"'_^_"�
j \ — fAST-IN-PWCf
CONCR£/f CURB
a ,�-- CAST-lrl-PUCE
CONCREl£ CLOSURE POUR
� BRIDGE REPAIR CROSS SECTION
� ,��, �.� „� , ..
��jZd�� Hridgc Rcpair• For; c.tia.
� ~'-� _ _:� � Tequesta Drive Bridge "�p" Q..
Y
µ �� M � w n .. . oaoeoe
,� '� _ .. . .. � over the North Prong ol the Loxahatchee Rfver � � � ,��«� p
"�""°""' "'° '��� � �� � Palm 8eac2i County, F'lori$a � �orco
08-5f7
� .. . . ._ _.��_______ _ . ___. __ .� .�.___.
___ _.__.__.._._______ __ __ .
� � J ^-- ESTIMATED QUANTITIES
, 5 '� �� e-o• e _� a �� �_ . s v r/T 1 ��
I 1� °• � r/l• n''°' _I_ __ � ��/z' c• r:�Y e�er s a c � ITEM UNIT QUANTITY
�+ � JI SPA25 af !"-0� I `i����— {ypE A� SU2 UNIfS ] flE0URE0 L�. 105'-9'
I c -. l ... ... .. . ..._l.._..-1_.I._.1_.._.. . ... ... ' _.._1._.. ' ` .L. .I.
... ... ... .. ... .. �..
`e � � � � � � � � ��� � � � � � � � � � � � � � � � � � � �� � � � j { { { I � � j � ��� � � � � � �` � ttPE B SUB UNRS (2 flE4UWED) l.i. )C'-6'
,: ,�� I � �I � � � 1 � �.!II.�_.�...�.� �..�..�..�II�... � � � � L..� �II� � III�TII �
C _;o i � I I I I 1 I I I��I I I I I I I I� I I I 1 I I I I I I i i
7 �..__._..._..._..�.._.. _. - � �..._...-... .. ...----
h: _...�-�...�...�..�.AL�..._�.__I.._�.._I.-.�.-..I-..�11_L._L.I i i 1 i �.�L�..._!.._!__i.l� ! t OF REINFORCING STEEL
� � � �� iu� �....i _���
; � 9 I � 1 ; ! I i I I; : . . . � .__... I � . ; L.1-_.L.,{ I I i I - T� I �� � i R RE
�� �
� illl I i I I i II I I I ! i I I I II�I I 1 I I f i i ji I_ i 11 ��I' I jj I I I II I I IIII � BE _
. ..— ... ... ... ... ..._.._..—._.._. .. ... ... ... ...._,. —
i � ^
� • � . NtIM IREO t.FNGTH BFNDWG
i I �
.. �..__._.�. .T_.. _.. ... . ... ... �.� _ "" R 8
' L � < < < �Z �2 ��'� �/Z� SEE DMC.
PRESTflES5E0 SIAB UNITS �� 7YPE A � G ♦ 41. �2 5'-5 1/2" STRAiCM
PLAN 1/2" � 7'-0 ** 5 42 IB'-10' SEE DUC.
{-- — _.____. ��'� „_ ** 51 :. t2 f9'-a' SEE DIAC.
I S'a .+�� p,rf - fIFKX T ZI 2� 1'-9' SEE DIAC,
� � V 5 1 { 34'-9' STRAICHi
b ��_�
� � '—_ ..^. � , 0 S 55 2'-�0' SIRUCHT
�• � &t?S L !' M'
. . ... /f p K � X 4 fiB 1'-�' STRAICHi
PRESiRE55ED SLqB UNITS
IYPE A
ELEVATION ,�z- e ,•_o�
---- '�''''
7 s'a t/r' a'°' e'-o' e'-o' n'-� i/�' � it � �
YR3ti�d� I r.�„ I 6 , .
`� �� 3t SFACES M)'-0 � � I� � �
t .. �L.. ... . . .._.. . ._. — .. .. .. .. ... ... ._1... ... .. .. _i ._.l._. ..t_.. .
.. ..— .. I . .. ... ._ .. ' _ !
e ���� � � � � � �� � � � � � � � � �� � � � � � � � � �� � � � � � � � � �� � � � � � ���� Bl°S1
,: _ T � � � � I I � � � � � � � � I I � � � I � I � � I I i � � � I ( � � I I � � � � I � �
, . . .. . ..._...�.._... �
C„� rt � � �. I i.r..._I"_� � � � � � �._ I ... .. .._...�'.� _� ._ � � fi -
.n ;� __._I- I I ... I... I I I I I I i I I I II I I I I I I„ I I II I I I I I. _I_.I ..I�iT i I_ I L__ °
�� I I I I ii i--�--� -�� -..-...-.. -. i ..._... i ... I __._ i.;... I i1 j .._ i .._. I ._ .-..I i I I li �... ... I I I
^ IIII I I I I I;£I i I I I i I I�£I I I I I I i I?£I I I I i I I I�EI I I I I III �„
q n ..�.. T ...T...�...� _�_._�.._�._.�._. _�_.�... ... �...�...�., �..-j°-T-j-;-..�_..�..:�.�...�...T....T.171.R
1'-I r/]' ..._ ___'_` �BRSV I 1
.V-0 �. I'-i I/1� l l
1 RONS 84PS X at 1'-0" ac
PflE5TFE5SED SLAB UNITS TypE e
� PIAN ,��• � ,•-o- �
o -- _._`._— '—'-'----
� � - SY PUSIL WC1 - fMUL � 8aR5 f .
� � — � --- � - G r,wu eo4 - nflcv
o �;
e J �"' �e'.rr'��•e�c�xcvr �� ��'m
rmiuc � r
� PRESTRESSED SIAB UNITS ttPE B
f ELEVATION ,�z' _ ,•_
� �°""" �i,}�� Hridg� R pair For: <.ie. �`
; �`��� � Tequesta Drive Bridge a�:A: 5
� � over the North Prong ot the Loxahaichee River oa oe oe ,e,�..�..o
Palm H��cti Count '�s"°'E° �"'Gx�w-b�s�
y, Florida � ae-nlr
__ • _.. . _
5 ,i,�1° �-�--
—__._--' .___ ...._______
3' _ ' S 5 I/'I" I _.. ��2"d ?lOX c! 7a.U ... —.. m\ i` - 6 FlfCO BfNO \ Y-e' A
. . .__ _ LO-UX STR�NOS � � � �
1'-J" 3'-S !�" � PUL!EO i0 JI.000"fACH � � J
, r�_� I I k� - ` 6� �C
�_"_`_'�� i .._._.____.....'__ "_'" j4—J�'~i'..I; 7/7' 3._�.
q' �'-� �/z' ��'-e r/Y r'-� i/2�• „ 3hxs ✓ { BARS 5 BARS T BARS C
t - — _-
'_"__ — •� 1NMdfA F.`IN/Wf0 LAWk
I NfRRE56NJ5 .24fR6 pf g!p$
_ " " � � `s � I � 3AHS S .. .. . _.. .
...., .. ,,.' ��,� • ..�� ,.
� � � . . � -_� � � _ .. _ .._"_' '
F•
ry . . ..,� ,,_, .. r^ r .
e � �" �6'� f3TACKW£10
\ J" MlM . �--- —.....__ _ ° s s n, 5� lecx wft0 t aucts
� — o �
� (5 PIECfSf
� .� __ '_ _' _ __ __ � ' I J_{ 5'-21/7' �-�� I
� — t -- ' ----- * BARS D
� BARS S7
�S C p " NUM&`R R(0!1/RCQ SNOISN
4" �� l 1�1� ! f�7� r� �� REPRES£NfS P/4R5 E.1� dW5
ry r— Z4 - I�i b 27OK Of 5.0� ' MFASUREUEN75 FR£ .'ROM OUT r0 OUT OF RfWFORpNG SiEfL. '
� LO S(RANDS
�� (�-4' 4�4� 9 �� 4�4� l�-4" I� PULLfO 70 31,CJ0( fACN FABR1�qf0.4 MAY SUBST�TVn EOU�fN7 AREA WELDEO WIRE FABRIC
8 SP, z, 7, B SP. RE�NFORCINC EN LIeV OF HOR/IONTAL AND SHEAR REINFORCING SMOWN ON PlANS.
ttPEA af2'o.c d1'o.c d1'ac. ot1'o.c.
� IYPICAL SECTION — u,arav cx�snNC 3ID HoGE BEYOND �
5�-11 lI {— l' TOOLEO RAO/US
I 3 7/16'P HOLE � �
5'-8 J 1' ? - /4 CONIINUOUS .
� 3 � z-�/z'a vax ar �s.o�
�o-ux sraaNfls u4rcH Exisnnc •
l'-7' J'-9 7/7` 10' PUCCEO TO JI.000/ EACH 1° 7MCK PLAi£ � �
7" 7'-8 1'-5 1/2' . 1'-8' .4'I < Baas v J�/ � J t/1
_ (A36)
L4NG (/441J �.
2 1�2" 6^ ANCHOR lSSEM8IY
ewsx�r,'=o•aG aaesa CURB DETAIL TYPICAL ANCHOR PLATE DETAIL
s'x 1r'x s' BcocKOUr , aaes s� �,
(ANCNOR P1A/E 7" x y' x i ) � z � • " � '� .
��
'C 3'M!R - ---- ------ •
'? -- ----- J o HOLE BEYOND �
.
� 1
• � _—_ � �
a . ....................
� Z &4RS G ;,� _' _
d f � ry S ` „� � '/Z �• 14 - 1�1 B 270K of 3.D' VERTIGIL ecocKOUr � �
�� co-ux sr�r✓os ti
AGllMNN PROPER SDRRUP � t'f� 4y <� 9 �� 4 � 4� 1'-4" 7' PULCfO TO 31,000/ FACH t' � 1' OECK UNfT
' PUCFMEM 7N fN0 UNITS. 8 SP. 1. 8 SP.
? of 7� o.c. o�1'ac d 1'o.n ot 1" o.c, 8'
� IYPE B
« TYPICAL SECTION PLA7E BLOCKOUI" DETAIL
n � ��.��11 B idga R pair For: cwa. � .
� Tequesta Drive Bridge °a:�R: 6
a r the North Prong of thc Lozahatchee River ox oe os
Palrn BeacY Cou.nty, Florida "oEO � oe��s��
l
SECTION t�l �
COMMUNICA�TI�NS
III. COMMUNICATIONS
BRIDGE NUMBER: 930227
BRIDGE NAME: Teauesta Drive over North Fork of Loxahatchee River
DOCUMENT LOG
SUBJECT OF MEMORANDUM, REPORT, LETTER, ETC. Date
FDOT notice to proceed with Post Rehabilitation inspection (e-mail) 2/28/06
From: carlo.ferrera@dot.state.fl.us [mailto:carlo.ferrera@dot.state.fl.us]
Sent: Tuesday, February 28, 2006 4:47 PM
To: Patrick OGrady
Cc: Robert Garlo; Tom LoCicero; Ken Reinhold; debbie.meyer�dot.state.fl.us;
Brian.ODonoghue�dot.state.fl.us; jose.quintana@dot.state.fl.us;
hector.kinda@dot,state.fl.us
Subject: Post Rehab inspection authorization 930227
Patrick,
Please be advised that I have received a request from Mr. Bob Garlo, Assistant village
Manager of the Village of Tequesta., concerning the post rehab inspection and load
analysis of one (1) bridge structure located in the in Palm Beach Co.
930227 - Tequesta Drive over North Fork of Loxahatchee River.
Please consider this E-mail as an authorization to conduct a post rehab inspection and
load rating analysis on the above mentioned bridge structure.
Plans for the above mentioned bridge are available from Mr. Garlo. He can be reached @
5b1.575.6240.
Please let me know by E-mail when the inspections will be conducted.
If you have any questions please give me a call.
Thank You,
Carlo "Skip" Ferrera
District 4 Structures & Facilities Office Consultant Inspection Contracts Coordinator
954.777.4536 (Suncom) 436.4536
E-Mail: carlo.ferrera@dot.state.fl.us